Js Sullivan Construction Inc

Contractor license
981435
State license record
Based in
San Francisco
On San Francisco permits
Jul 2006 to May 2026
Last 24 months
2 permits filed

84 permits since 2000: 60 completed, 1 in progress, 21 never finaled, 2 expired or cancelled.

Of the 21 never-finaled permits, 8 are 3 to 5 years old, 9 are 5 to 10 years old, 4 are over 10 years old. 4 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 1Deck 1Stairs 5Bathroom remodel 5

5 stairs permits: 5 completed. Typically 166 days from filing to permit and 642 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 10, 2020Completed
final sign-off Sep 2022
100 Duboce Avaltered site permit revision to pa #201408053094s, ncrease unit count fr 28 to 29 unts, eliminate basement, garage parking, relocate to g/f, revise to unit layout, stair, roofdeck & ext facde essign, add addresses 100 duboce(residential lobby), 196 valencia st (comm space).
Details
Permit
202007109964
Status
complete
Filed
Jul 10, 2020
Permit issued
Dec 23, 2020
Final sign-off
Sep 26, 2022
Address
100 Duboce Av

altered site permit revision to pa #201408053094s, ncrease unit count fr 28 to 29 unts, eliminate basement, garage parking, relocate to g/f, revise to unit layout, stair, roofdeck & ext facde essign, add addresses 100 duboce(residential lobby), 196 valencia st (comm space).

Open the permit page

Dec 12, 2019Completed
final sign-off Feb 2025
988 Harrison Stalter site. revision to approved site pa# 201712146448-s. re-arrange of residential units. re-arrange garage parking. relocate elevator & stair cores. modification to exterior facade. revise type i-a to i-b. use from s to s-2. ** maher: yes. route to dph **
Details
Permit
201912129351
Status
complete
Filed
Dec 12, 2019
Permit issued
Aug 11, 2021
Final sign-off
Feb 20, 2025
Address
988 Harrison St

alter site. revision to approved site pa# 201712146448-s. re-arrange of residential units. re-arrange garage parking. relocate elevator & stair cores. modification to exterior facade. revise type i-a to i-b. use from s to s-2. ** maher: yes. route to dph **

Open the permit page

Aug 8, 2019Completed
final sign-off Jun 2020
2444 Lombard Strevision to pa #201712156664-s3. revise townhouse stair 03 per plan. tread rise and run to be 7.75"h and 11"d. stair 03 serves the town home units only (occupancy r3).
Details
Permit
201908088351
Status
complete
Filed
Aug 8, 2019
Permit issued
Aug 9, 2019
Final sign-off
Jun 1, 2020
Address
2444 Lombard St

revision to pa #201712156664-s3. revise townhouse stair 03 per plan. tread rise and run to be 7.75"h and 11"d. stair 03 serves the town home units only (occupancy r3).

Open the permit page

Mar 29, 2019Completed
final sign-off Dec 2021
230 07th Staltered site permit & revision to pa #2018-0626-3029 s. rearrangement of residential unit layouts, removal of ground flr commercial, relocate elevator & stair cores, elimination of interior court, reconfigure light court, revise front & rear facade.
Details
Permit
201903296630
Status
complete
Filed
Mar 29, 2019
Permit issued
Jan 22, 2020
Final sign-off
Dec 21, 2021
Address
230 07th St

altered site permit & revision to pa #2018-0626-3029 s. rearrangement of residential unit layouts, removal of ground flr commercial, relocate elevator & stair cores, elimination of interior court, reconfigure light court, revise front & rear facade.

Open the permit page

Jul 20, 2017Completed
final sign-off Mar 2018
1198 Valencia Strevision to pa #2015-0714-1495. delta 3 architectural revisions per plan. revise layout for units 101,102 &103. (n) stair penthouse for unit 103. revise storefront glazing to operable sliding glass panel along 23rd st. updated door schedule eliminated roof sky lights. relocate bike rack to basement.
Details
Permit
201707202439
Status
complete
Filed
Jul 20, 2017
Permit issued
Sep 22, 2017
Final sign-off
Mar 7, 2018
Declared cost
$5,000
Address
1198 Valencia St

revision to pa #2015-0714-1495. delta 3 architectural revisions per plan. revise layout for units 101,102 &103. (n) stair penthouse for unit 103. revise storefront glazing to operable sliding glass panel along 23rd st. updated door schedule eliminated roof sky lights. relocate bike rack to basement.

Open the permit page

$5,000