Allen Dadafarian
- Listed as
- architect, engineer
- Firm
- Allen Engineering & Const.
- Based in
- Moraga
- On San Francisco permits
- May 2005 to Jul 2026
17 permits since 2000 (engineer on 16 permits, architect on 1 permit): 15 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 6, 2026 | In progress issued Jul 2026 | 1546 26th Av | Isais Bay Area Construction Inc | new bath at 2nd floor. new closet at bathroom #1. enlarge closet at bathroom #2.Details
new bath at 2nd floor. new closet at bathroom #1. enlarge closet at bathroom #2. | $18,000 |
| Dec 29, 2025 | Completed final sign-off Aug 2026 | 1492 Valencia St | Level Land Builders Inc. | to abate nov 202532986- remove and replace vehicular damaged post outside in front of store. not in public right of way.Details
to abate nov 202532986- remove and replace vehicular damaged post outside in front of store. not in public right of way. | $16,200 |
| Feb 27, 2025 | In progress issued Apr 2025 | 601 Laguna Honda Bl | Alive Design & Construction | interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening.Details
interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening. | $108,000 |
| Dec 22, 2022 | Completed final sign-off Jun 2024 | 1506 33rd Av | M A Marini Construction | new bathroom & room addition by installing partition walls at the back of garage areaDetails
new bathroom & room addition by installing partition walls at the back of garage area | $50,000 |
| Oct 14, 2022 | Completed final sign-off Aug 2023 | 458 Colon Av | drainage improvement at existing house, retaining walls at rear and left side.Details
drainage improvement at existing house, retaining walls at rear and left side. | $18,000 | |
| Oct 15, 2021 | Completed final sign-off May 2022 | 2840 Fulton St | Jakcon, Inc | master bathroom enlargement and remodeling of 2nd bath.Details
master bathroom enlargement and remodeling of 2nd bath. | $8,500 |
| Sep 2, 2021 | Completed final sign-off Nov 2021 | 2199 Divisadero St | Kolby Development | remove center wall in office, replace 1 window and remove 1 in office (not visible from street) remove door in master bed for pocket door. move door & build a 3 ft wall in study. relocate wall bew storage and garage. rev.to 202106222971Details
remove center wall in office, replace 1 window and remove 1 in office (not visible from street) remove door in master bed for pocket door. move door & build a 3 ft wall in study. relocate wall bew storage and garage. rev.to 202106222971 | $9,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 2199 Divisadero St | Kolby Development | kitchen & bath remodel. wall between kitchen and dining to be removed. add 1/2 bath at 2nd flr(main floor level). ref to pa# 202106142383.Details
kitchen & bath remodel. wall between kitchen and dining to be removed. add 1/2 bath at 2nd flr(main floor level). ref to pa# 202106142383. | $45,000 |
| Apr 12, 2021 | Completed final sign-off Nov 2021 | 1920 14th Av | Re-Model Design & Build Co | kitchen remodelingDetails
kitchen remodeling | $25,000 |
| Mar 15, 2021 | Completed final sign-off Sep 2022 | 173 Marietta Dr | Jakcon, Inc | new 6x11 2nd story deck over existing 1st fl deckDetails
new 6x11 2nd story deck over existing 1st fl deck | $18,000 |
| Nov 6, 2020 | Completed final sign-off Feb 2022 | 278 Liberty St | A W Construction Company | remove and replace unsafe cracked foundation. remove and replace dry rotted beams and posts at basement.Details
remove and replace unsafe cracked foundation. remove and replace dry rotted beams and posts at basement. | $85,000 |
| Aug 31, 2020 | Completed final sign-off Nov 2021 | 4 Dellbrook Av | Jakcon, Inc | interior remodel. bathroom addition on 1st floor.Details
interior remodel. bathroom addition on 1st floor. | $86,000 |
| Jan 11, 2019 | Completed final sign-off Apr 2019 | 1063 Union St | 21st Century Home Improvt | remove & replace existing damaged post under garage header due to vehicular impactDetails
remove & replace existing damaged post under garage header due to vehicular impact | $8,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1953 Grove St | remove and replace extg beam at playroom at ground level. remove and replace window at play room due to water leak.Details
remove and replace extg beam at playroom at ground level. remove and replace window at play room due to water leak. | $12,500 | |
| Apr 5, 2016 | Completed final sign-off Nov 2017 | 1875 38th Av | Alive Design & Construction | remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/denDetails
remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/den | $205,000 |
| May 7, 2013 | Completed final sign-off Jul 2015 | 981 Mission St | Rinaldi Construction | repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations.Details
repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations. | $200,000 |
| May 27, 2005 | Completed final sign-off Oct 2006 | 412 Hanover St | horizontal addition to rear of home interior remodel.Details
horizontal addition to rear of home interior remodel. | $60,000 |