Block 0861, lot 003
229 Steiner St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2008 | Completed final sign-off Oct 2008 | 229 Steiner St | remove & replace unsafe dry-rotted woodframing members at the shower & tubs, at first floor only.Details
remove & replace unsafe dry-rotted woodframing members at the shower & tubs, at first floor only. | $2,400 | |
| Nov 27, 2006 | Completed final sign-off Apr 2007 | 229 Steiner St | this is to reference 200607277785 as an application to comply with 3r report #3r-4474 for condo conversion. for patrial compliance with report 3r-4474. see 200606204490 and 200607277785 for related work.Details
this is to reference 200607277785 as an application to comply with 3r report #3r-4474 for condo conversion. for patrial compliance with report 3r-4474. see 200606204490 and 200607277785 for related work. | $10,000 | |
| Jul 27, 2006 | Never finaled issued Jul 2006, no final | 229 Steiner St | West Coast Premier Construction Inc | enlarge front guest room window for emergency egress. section 310.4 sfbc existing residential building , ground floor window. not visible from streetDetails
enlarge front guest room window for emergency egress. section 310.4 sfbc existing residential building , ground floor window. not visible from street | $1,200 |
| Jun 20, 2006 | Completed final sign-off Oct 2006 | 225 Steiner St | Houseworks Enterprises Inc. | bring building to code as specified in building report for tic to condo conversion 3r-4474. all items except 11-15, unit 229 will obtain separate building permit. no cfc until all cleared.Details
bring building to code as specified in building report for tic to condo conversion 3r-4474. all items except 11-15, unit 229 will obtain separate building permit. no cfc until all cleared. | $13,500 |
| Aug 26, 2004 | Completed final sign-off Jul 2005 | 225 Steiner St | site permit-infill deck @ floor "z" under (e) deck @ floor "3" . legalize (e) deck. we are simultaneDetails
site permit-infill deck @ floor "z" under (e) deck @ floor "3" . legalize (e) deck. we are simultane | $5,000 | |
| Nov 25, 2002 | Completed final sign-off Mar 2003 | 227 Steiner St | minor repair of backyard stairway repair in kind less than 50%Details
minor repair of backyard stairway repair in kind less than 50% | $500 | |
| Mar 19, 2001 | Completed final sign-off Apr 2001 | 229 Steiner St | construct redwood trellis approx 8'4" x 11'0" at front yard, 9' from sidewalk.Details
construct redwood trellis approx 8'4" x 11'0" at front yard, 9' from sidewalk. | $1,000 | |
| Feb 2, 2001 | Completed final sign-off Feb 2001 | 229 Steiner St | replace walkway @ yard to ground flr. entry, provide area drain @ cong. slabDetails
replace walkway @ yard to ground flr. entry, provide area drain @ cong. slab | $1,500 | |
| Sep 19, 2000 | Completed final sign-off May 2001 | 225 Steiner St | California Design And Construction | replace kitichen cabinets, countertops, replace fixturesDetails
replace kitichen cabinets, countertops, replace fixtures | $21,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- California Design And Construction, Houseworks Enterprises Inc., West Coast Premier Construction Inc
- Engineers
- Allen Dadafarin
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.