Block 3716, lot 021
121 Spear St
- City’s use
- Commercial Retail
- Built
- 1925
- Stories
- 6
- Building
- 236,161 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Sep 2026 | 121 Spear St | Swinerton Builders | 3/fl- mechanical modifications to improve cooling capabilitiesDetails
3/fl- mechanical modifications to improve cooling capabilities | $50,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 121 Spear St | Sc Builders, Inc | 4/fl-deferred seismic anchoring for workout equipment for 202512192304Details
4/fl-deferred seismic anchoring for workout equipment for 202512192304 | |
| Jun 22, 2026 | In progress issued Jul 2026 | 121 Spear St | Sc Builders, Inc | 4th flr mep deferred pa#: 202512192304.Details
4th flr mep deferred pa#: 202512192304. | $266,400 |
| May 22, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | Peacock Construction | ref#: 202602186115; ste14b: t.i. installation of an exhaust fan serviing the single user restroom, elect and idf room. outside air fan serving air to hp1-1 thru 2-3. heat pumps to serve the new zones.air and water balancing of all modified systems. insulation of duck work and piping where req.(e)Details
ref#: 202602186115; ste14b: t.i. installation of an exhaust fan serviing the single user restroom, elect and idf room. outside air fan serving air to hp1-1 thru 2-3. heat pumps to serve the new zones.air and water balancing of all modified systems. insulation of duck work and piping where req.(e) | $245,000 |
| May 22, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | Peacock Construction | b14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24. compliant lighting and controls.Details
b14: ref: 202602186115; new power and signal devices throughout the space new 2025 title 24. compliant lighting and controls. | $239,000 |
| Feb 18, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | Peacock Construction | ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm systems devices to remain. electrical, plumbing, lighting, mechanical and life safety work performed onDetails
ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm systems devices to remain. electrical, plumbing, lighting, mechanical and life safety work performed on | $800,000 |
| Feb 2, 2026 | Completed final sign-off May 2026 | 121 Spear St | Peacock Construction | b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices toDetails
b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices to | |
| Dec 30, 2025 | Completed final sign-off Jan 2026 | 121 Spear St | Pioneer Fire Inc. | 2nd floor. relocate (3) pendents, add (4) pendents. gcti # 202512041028Details
2nd floor. relocate (3) pendents, add (4) pendents. gcti # 202512041028 | $1,000 |
| Dec 19, 2025 | In progress issued May 2026 | 121 Spear St | Sc Builders, Inc | 4/f: interior tenant improvement includes demo and build back of a massage suite with (3) massage rooms with an expanded fitness area. deferred submittals: mep, fire sprinklers, fire alarm, security systems, and seismic anchorage of fitness equipment work will be submitted separately.Details
4/f: interior tenant improvement includes demo and build back of a massage suite with (3) massage rooms with an expanded fitness area. deferred submittals: mep, fire sprinklers, fire alarm, security systems, and seismic anchorage of fitness equipment work will be submitted separately. | $450,000 |
| Dec 18, 2025 | Completed final sign-off Feb 2026 | 121 Spear St | Sabah International Incorporated | 2nd fl ref pa #2025-1204-1028: addition to (e) edwards fire emergency voice/alarm communication system to accomodate new phone booths.Details
2nd fl ref pa #2025-1204-1028: addition to (e) edwards fire emergency voice/alarm communication system to accomodate new phone booths. | $17,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 121 Spear St | Source Planning And Construction Inc | 2nd floor: addition of 7 phone booths in office space.Details
2nd floor: addition of 7 phone booths in office space. | $20,000 |
| Nov 14, 2025 | Completed final sign-off Mar 2026 | 121 Spear St | O C Mc Donald Co Inc | 6/f: installation of 36k btu cooling system in a/v equipment room.Details
6/f: installation of 36k btu cooling system in a/v equipment room. | $62,480 |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 121 Spear St | Cobe Construction Inc | floors 2, 5, 6 offices: install new bevi water dispensing unit at existing breakroom, including minor plumbing and case work modification.Details
floors 2, 5, 6 offices: install new bevi water dispensing unit at existing breakroom, including minor plumbing and case work modification. | $28,526 |
| May 23, 2023 | Completed final sign-off May 2023 | 121 Spear St | J & N Quality Enterprises | ste b12: (e) turbo chef microwave oven all (e) electrical, 2 waffle irons, all (e) electrical. no construction work doneDetails
ste b12: (e) turbo chef microwave oven all (e) electrical, 2 waffle irons, all (e) electrical. no construction work done | $1,500 |
| May 18, 2023 | Completed final sign-off Sep 2023 | 121 Spear St | Bcci Construction Company | 2nd fl: new non-structural glazing, door & security cameras. ref pa# 202202188359.Details
2nd fl: new non-structural glazing, door & security cameras. ref pa# 202202188359. | $50,000 |
| Apr 24, 2023 | Completed final sign-off Jun 2023 | 121 Spear St | Ad Image Advertising | install 1 electric double faced wall sign "penelope's coffee & tea"Details
install 1 electric double faced wall sign "penelope's coffee & tea" | $4,000 |
| Apr 24, 2023 | Completed final sign-off Jun 2023 | 121 Spear St | Ad Image Advertising | install 1 electric single faced wall sign "penelope's coffee & tea"Details
install 1 electric single faced wall sign "penelope's coffee & tea" | $7,500 |
| Mar 21, 2023 | Completed final sign-off Mar 2023 | 121 Spear St | Sabah International Incorporated | 4/f: as-built f/a permit for 202208251216. change smoke detector to duct detector. add 2 relays, 1 add'l duct detector, 5 ceiling strobes, 1 two-way call box and 1 pull station.Details
4/f: as-built f/a permit for 202208251216. change smoke detector to duct detector. add 2 relays, 1 add'l duct detector, 5 ceiling strobes, 1 two-way call box and 1 pull station. | |
| Dec 29, 2022 | Completed final sign-off Jun 2025 | 121 Spear St | Mastec Network Solutions Inc | decommission & removal of sprint site, returning to original condition.Details
decommission & removal of sprint site, returning to original condition. | $20,000 |
| Dec 8, 2022 | Never finaled issued Dec 2022, no final | 121 Spear St | Golden Gate Fire Protection Inc | 2/f fire sprinklers: relocate (2) pendents, (1) upright and add (1) upright. ref t.i. pa# 202210043727.Details
2/f fire sprinklers: relocate (2) pendents, (1) upright and add (1) upright. ref t.i. pa# 202210043727. | $2,200 |
| Dec 7, 2022 | Completed final sign-off Dec 2023 | 121 Spear St | Marchetti Group | ste 220: provide & install 1 water source heat pump., 2 new ceiling mounted supply diffusers & new ductwork connecting to new heat pump. provide & install 2 new ceiling mounted return grills & sound socks. install 2 side wall return grills & soundsocks. air balance, ref pa# 202210043727.Details
ste 220: provide & install 1 water source heat pump., 2 new ceiling mounted supply diffusers & new ductwork connecting to new heat pump. provide & install 2 new ceiling mounted return grills & sound socks. install 2 side wall return grills & soundsocks. air balance, ref pa# 202210043727. | $30,000 |
| Nov 30, 2022 | Completed final sign-off Jun 2023 | 121 Spear St | Bcci Construction Company | 4th floor: mechanical only permit to demo & install new duct and hvac equipment. ref #202210194733. google phase 2.Details
4th floor: mechanical only permit to demo & install new duct and hvac equipment. ref #202210194733. google phase 2. | |
| Nov 16, 2022 | Completed final sign-off Dec 2023 | 121 Spear St | Marchetti Group | new power and data for offices. new lighting and controls. ref app# 202210043727.Details
new power and data for offices. new lighting and controls. ref app# 202210043727. | $2,000 |
| Oct 19, 2022 | Completed final sign-off Jun 2023 | 121 Spear St | Bcci Construction Company | 4/f: mech only permit revision to remove (e) duct & hvac scope from areas in proposed not occupied areas on page m. 2.1. ref bpa#202206146333Details
4/f: mech only permit revision to remove (e) duct & hvac scope from areas in proposed not occupied areas on page m. 2.1. ref bpa#202206146333 | |
| Oct 4, 2022 | Completed final sign-off Dec 2023 | 121 Spear St | Marchetti Group | suite 220: ti project : creating two (n) offices. this involves removal of existing lights, new partitions, doors, glazing, power and data, ceiling grid and tile, mechanical, lighting & controls and finishes. deferred submittal for fire sprinklers.Details
suite 220: ti project : creating two (n) offices. this involves removal of existing lights, new partitions, doors, glazing, power and data, ceiling grid and tile, mechanical, lighting & controls and finishes. deferred submittal for fire sprinklers. | $140,000 |
| Sep 30, 2022 | Completed final sign-off Dec 2022 | 121 Spear St | Ad Image Advertising | replace existing wall sign lettering with new illuminated led channel letters (x2).Details
replace existing wall sign lettering with new illuminated led channel letters (x2). | $6,000 |
| Sep 30, 2022 | Completed final sign-off Dec 2022 | 121 Spear St | Ad Image Advertising | reface 1 blade sign with (e) electrical (nick the greek souvlaki & gyro house)Details
reface 1 blade sign with (e) electrical (nick the greek souvlaki & gyro house) | $600 |
| Sep 1, 2022 | Completed final sign-off Sep 2022 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | modification to (e) fire sprinkler system 1/f: add 2; 2/f add 4, change out/ relocate 4 sprinkler heads per t.i.202202188359Details
modification to (e) fire sprinkler system 1/f: add 2; 2/f add 4, change out/ relocate 4 sprinkler heads per t.i.202202188359 | $4,050 |
| Aug 25, 2022 | Completed final sign-off Mar 2023 | 121 Spear St | Sabah International Incorporated | 4/f: f/a t.i. add (48) control relay module, (48) duct detectors, (66) speaker strobes, (29) strobes, (1) control relay, (5) smoke detectors, (1) synchronization output moduleDetails
4/f: f/a t.i. add (48) control relay module, (48) duct detectors, (66) speaker strobes, (29) strobes, (1) control relay, (5) smoke detectors, (1) synchronization output module | $25,100 |
| Jul 25, 2022 | Completed final sign-off Nov 2022 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 4/f: add, relocate and change out fire sprinlers per t.i.. (e) seismic to remain. ref t.i. pa #202112023525.Details
4/f: add, relocate and change out fire sprinlers per t.i.. (e) seismic to remain. ref t.i. pa #202112023525. | $41,460 |
| Jun 28, 2022 | Completed final sign-off Sep 2023 | 121 Spear St | Bcci Construction Company | 1/f lobby; rev to glass door. new hss steel beam and posts aded to support glass door. rev to pa 202202188359.Details
1/f lobby; rev to glass door. new hss steel beam and posts aded to support glass door. rev to pa 202202188359. | |
| Jun 21, 2022 | Never finaled filed Jun 2022, never issued | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 4th floor: relocate (133) add (98) sprinkler heads per ti. reference #2021-1202-3525. job 21-679Details
4th floor: relocate (133) add (98) sprinkler heads per ti. reference #2021-1202-3525. job 21-679 | $81,375 |
| Jun 14, 2022 | Completed final sign-off Jun 2023 | 121 Spear St | Bcci Construction Company | 4th fl - mep deferred submittal to support approved architectural permit. 2022-0218-8358, new ductwork and various mechanical equipment installed for new ti layoutDetails
4th fl - mep deferred submittal to support approved architectural permit. 2022-0218-8358, new ductwork and various mechanical equipment installed for new ti layout | $400,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2023 | 121 Spear St | Bcci Construction Company | 1st fl: revision to pa# 202203180339. changes to handrail at staircaseDetails
1st fl: revision to pa# 202203180339. changes to handrail at staircase | |
| Apr 25, 2022 | Completed final sign-off Sep 2022 | 121 Spear St | Marchetti Group | new convenience receptacle for future tenant space. new lighting & controls. reference #202203180339Details
new convenience receptacle for future tenant space. new lighting & controls. reference #202203180339 | |
| Apr 8, 2022 | Never finaled issued Apr 2022, no final | 121 Spear St | R L H Fire Protection Inc | 1st fl: fire sprinkler permit (space b14). relocate 2 and delete 3 sprinklers. ti pa# 202010086136Details
1st fl: fire sprinkler permit (space b14). relocate 2 and delete 3 sprinklers. ti pa# 202010086136 | $2,000 |
| Apr 8, 2022 | Completed final sign-off Jun 2022 | 121 Spear St | R L H Fire Protection Inc | 1st fl: fire sprinkler permit (space b3 & b4). delete 6 pendent sprinklers and add 5 new upright sprinklers.Details
1st fl: fire sprinkler permit (space b3 & b4). delete 6 pendent sprinklers and add 5 new upright sprinklers. | $2,500 |
| Mar 18, 2022 | Completed final sign-off Sep 2023 | 121 Spear St | Bcci Construction Company | 1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered.Details
1st floor: new lobby communicating stair, related handrail and guardrail. non structural partitions. doors/frames/hardware, ceiling, millwork, finishes included stuctural calcs included. mep deffered. | $450,000 |
| Mar 9, 2022 | Expired or cancelled cancelled Apr 2022 | 121 Spear St | Anderson, Rowe & Buckley, Inc. | fire only correction permit only to change floor number from 5th fl to 4th floor on 202109218844. to allow for permit to then be cancelledDetails
fire only correction permit only to change floor number from 5th fl to 4th floor on 202109218844. to allow for permit to then be cancelled | |
| Feb 18, 2022 | Completed final sign-off Jun 2023 | 121 Spear St | Bcci Construction Company | 4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included.Details
4/f: construction of new non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. structural drawings and calcs included. | $6,241,495 |
| Feb 18, 2022 | Completed final sign-off Jan 2024 | 121 Spear St | Bcci Construction Company | flrs 1,2: partial demo of non structural interior furring, ceilings and finishes. construction of non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred.Details
flrs 1,2: partial demo of non structural interior furring, ceilings and finishes. construction of non-structural partitions, doors, frames, hardware, ceilings, millwork and finishes. mep deferred. | $650,000 |
| Jan 11, 2022 | Completed final sign-off Feb 2022 | 121 Spear St | Sabah International Incorporated | p1 parking level - modify existing fire alarm system - add 1 heat detector inside trash room as per field inspector directions; bldg pa n/aDetails
p1 parking level - modify existing fire alarm system - add 1 heat detector inside trash room as per field inspector directions; bldg pa n/a | $2,826 |
| Dec 14, 2021 | Completed final sign-off Feb 2023 | 121 Spear St | Source Planning And Construction Inc | mechanical only: install new type ii hood over existing dishwasher, replace existing fc-3-13 (1 ton) with new 3-ton wshp. install new air distribution in existing dishroom.Details
mechanical only: install new type ii hood over existing dishwasher, replace existing fc-3-13 (1 ton) with new 3-ton wshp. install new air distribution in existing dishroom. | $40,000 |
| Dec 2, 2021 | Completed final sign-off Jun 2023 | 121 Spear St | Bcci Construction Company | 4/f: demo only permit of non-structural partitions, doors/frames/hardware, millwork, ceilings and finishes per ab-017. add temp barricade to maintain egress from occupied spaceDetails
4/f: demo only permit of non-structural partitions, doors/frames/hardware, millwork, ceilings and finishes per ab-017. add temp barricade to maintain egress from occupied space | $80,000 |
| Dec 1, 2021 | Completed final sign-off Jan 2022 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 4/f: changeout 199 sprinklers to core and shell conditions per t.i. ref permit 202105140410Details
4/f: changeout 199 sprinklers to core and shell conditions per t.i. ref permit 202105140410 | $44,775 |
| Nov 29, 2021 | Expired or cancelled cancelled Jan 2026 | 121 Spear St | suite b-07: interior remodel (non-structural). reducing size of current countertop. replacing wood tile with updated wood. adding shelves and menu screens. repainting, adding vinyl laminate flooring. adding wood frames for refrigerator.Details
suite b-07: interior remodel (non-structural). reducing size of current countertop. replacing wood tile with updated wood. adding shelves and menu screens. repainting, adding vinyl laminate flooring. adding wood frames for refrigerator. | $30,000 | |
| Oct 22, 2021 | Completed final sign-off May 2022 | 121 Spear St | Skyline Construction | revision to permit #202102054120. furring out walls in ada stalls, because a riser is in the way to mount toilets.Details
revision to permit #202102054120. furring out walls in ada stalls, because a riser is in the way to mount toilets. | $28,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2021 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 2/f: add 4, relocate 9, change out 1 sprinker heads per t.i. ref pa 202103166616.Details
2/f: add 4, relocate 9, change out 1 sprinker heads per t.i. ref pa 202103166616. | $4,350 |
| Sep 21, 2021 | Expired or cancelled cancelled Apr 2022 | 121 Spear St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - demo permit - upright protection upright (65) existing pendents & change out to upright sprks.Details
existing fire sprinkler system - demo permit - upright protection upright (65) existing pendents & change out to upright sprks. | $13,000 |
| Jun 17, 2021 | Completed final sign-off Aug 2021 | 121 Spear St | Sabah International Incorporated | as-built for permit 2020-0928-5347 revise fire alarm sequence of operations to match existing field conditions. sequence of operations now indicates global shutdown of fans/heat pumps and global closure of fire smoke dampers on floors 6 & below. sequence of operations no longer indicates duct detectDetails
as-built for permit 2020-0928-5347 revise fire alarm sequence of operations to match existing field conditions. sequence of operations now indicates global shutdown of fans/heat pumps and global closure of fire smoke dampers on floors 6 & below. sequence of operations no longer indicates duct detect | |
| Jun 16, 2021 | Completed final sign-off Jan 2022 | 121 Spear St | Bcci Construction Company | 2nd floor: mep deferred submittal to support architectural permit. relocate wshp and redistribute ductwork. ref. bldg pa 202103166616.Details
2nd floor: mep deferred submittal to support architectural permit. relocate wshp and redistribute ductwork. ref. bldg pa 202103166616. | $50,000 |
| May 25, 2021 | Completed final sign-off May 2024 | 121 Spear St | Corporate Sign Systems | sign a: install 1 illuminated single-faced canopy sign. for (future tenant)Details
sign a: install 1 illuminated single-faced canopy sign. for (future tenant) | $2,000 |
| May 25, 2021 | Completed final sign-off May 2024 | 121 Spear St | Corporate Sign Systems | sign c: install 2 non-illuminated single-faced wall sign. (sign for future tenant)Details
sign c: install 2 non-illuminated single-faced wall sign. (sign for future tenant) | $8,000 |
| May 25, 2021 | Completed final sign-off May 2024 | 121 Spear St | Corporate Sign Systems | sign b: install 1 non-illuminated double-faced projecting blade sign. for "rincon center" (include future tenant name)Details
sign b: install 1 non-illuminated double-faced projecting blade sign. for "rincon center" (include future tenant name) | $1,000 |
| May 20, 2021 | Completed final sign-off Apr 2022 | 121 Spear St | Sabah International Incorporated | 3rd, 5th, & 6th floor: ti #2021-0205-4120 modify existing fire alarm system. add (2) booster power supplies, (2) synchronization modules, (24) ceiling speaker/strobes, (30) ceiling strobesDetails
3rd, 5th, & 6th floor: ti #2021-0205-4120 modify existing fire alarm system. add (2) booster power supplies, (2) synchronization modules, (24) ceiling speaker/strobes, (30) ceiling strobes | $28,467 |
| May 20, 2021 | Completed final sign-off Apr 2024 | 121 Spear St | Corporate Sign Systems | sign type a- retail blade id qty 6. fabricate and install primary id blade, internally non-illuminated; wall mounting. signage is within "transit center special sign district"Details
sign type a- retail blade id qty 6. fabricate and install primary id blade, internally non-illuminated; wall mounting. signage is within "transit center special sign district" | $8,000 |
| May 20, 2021 | Completed final sign-off Apr 2024 | 121 Spear St | Corporate Sign Systems | replacement of tenant i.d. sign (electrical)"rincon center"Details
replacement of tenant i.d. sign (electrical)"rincon center" | $3,000 |
| May 20, 2021 | Completed final sign-off Apr 2024 | 121 Spear St | Corporate Sign Systems | replace extg non illuminated wall signs: "two rincon center" "121 spear".Details
replace extg non illuminated wall signs: "two rincon center" "121 spear". | $3,000 |
| May 20, 2021 | Completed final sign-off Apr 2024 | 121 Spear St | Corporate Sign Systems | replacement of tenant i.d. sign (electrical) "rincon parking"Details
replacement of tenant i.d. sign (electrical) "rincon parking" | $3,000 |
| May 3, 2021 | Never finaled issued Jun 2021, no final | 121 Spear St | Marchetti Group | removal & replacement of sections of 1st floor slab. interior location.Details
removal & replacement of sections of 1st floor slab. interior location. | $15,000 |
| Mar 16, 2021 | Completed final sign-off Feb 2022 | 121 Spear St | Bcci Construction Company | 2nd fl: selective demolition of non-structural partitions, ceilings, lights & finishes. construction of (n) partitions, ceilings, millwork, lights & finishes. no change in use or area. mep under separate deferred submittal/permit.Details
2nd fl: selective demolition of non-structural partitions, ceilings, lights & finishes. construction of (n) partitions, ceilings, millwork, lights & finishes. no change in use or area. mep under separate deferred submittal/permit. | $737,500 |
| Feb 25, 2021 | Completed final sign-off Oct 2021 | 121 Spear St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 18 pendent sprinklers in the restrooms on the 3rd, 5th & 6th floors. t.i. ref# 2021-02-05-4120Details
fire sprinklers; relocate 18 pendent sprinklers in the restrooms on the 3rd, 5th & 6th floors. t.i. ref# 2021-02-05-4120 | $27,000 |
| Feb 5, 2021 | Completed final sign-off May 2022 | 121 Spear St | Skyline Construction | levels 3,5, & 6: the renovation of 12 exiting men's and women's restrooms with multi-stalls.Details
levels 3,5, & 6: the renovation of 12 exiting men's and women's restrooms with multi-stalls. | $700,000 |
| Dec 14, 2020 | Completed final sign-off Sep 2021 | 121 Spear St | City Mechanical Inc | ste# 250: mechanical improvements. ref pa# 201912200101Details
ste# 250: mechanical improvements. ref pa# 201912200101 | $90,000 |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 121 Spear St | R L H Fire Protection Inc | fire sprinkler permit. relocate 2 sprinklers on the 2nd floor.Details
fire sprinkler permit. relocate 2 sprinklers on the 2nd floor. | $1,000 |
| Nov 5, 2020 | Never finaled issued Dec 2020, no final | 121 Spear St | Sotello Graphic Associates | make & install 10 evacuation mapsDetails
make & install 10 evacuation maps | $9,400 |
| Oct 8, 2020 | Completed final sign-off Sep 2022 | 121 Spear St | Marchetti Group | removal of (e) retail, plumb, electr & lighting fixtures, removal of (e) walls, doors & finishes. patching & preparation for future tenant improvement build-out. space to remain vacant per sf ab-017. mep under separate permit.Details
removal of (e) retail, plumb, electr & lighting fixtures, removal of (e) walls, doors & finishes. patching & preparation for future tenant improvement build-out. space to remain vacant per sf ab-017. mep under separate permit. | $65,000 |
| Sep 28, 2020 | Completed final sign-off Oct 2020 | 121 Spear St | Sabah International Incorporated | suite b10, modify existing fa system, add (2)duct detectors, (1)single input module, (2)control relays, (3)smoke detectors, (3)speaker/strobes. ti pa 201911056534Details
suite b10, modify existing fa system, add (2)duct detectors, (1)single input module, (2)control relays, (3)smoke detectors, (3)speaker/strobes. ti pa 201911056534 | $17,700 |
| Sep 28, 2020 | Completed final sign-off May 2021 | 121 Spear St | Sabah International Incorporated | f/a ti on 2nd fl, suite 250: add 1 booster power supply, 1 syncrhonization output module, 1 speaker/strovbe, 5 duct smoke detector & 5 control relays, relocate 1 existing speaker/strobe. ref pa# 201912200101Details
f/a ti on 2nd fl, suite 250: add 1 booster power supply, 1 syncrhonization output module, 1 speaker/strovbe, 5 duct smoke detector & 5 control relays, relocate 1 existing speaker/strobe. ref pa# 201912200101 | $17,374 |
| Sep 26, 2020 | Completed final sign-off Oct 2020 | 121 Spear St | Sabah International Incorporated | suite b11: modify (e) fire alarm system, add (1) duct detector, (1) control relay, (1) single input module, (8) speaker/strobesDetails
suite b11: modify (e) fire alarm system, add (1) duct detector, (1) control relay, (1) single input module, (8) speaker/strobes | $18,033 |
| Sep 21, 2020 | Completed final sign-off Nov 2020 | 121 Spear St | Sabah International Incorporated | level 2: voluntary modify (e) fire alarm system. add 1 control relay to deactivate newly install delayed egress crash bar.Details
level 2: voluntary modify (e) fire alarm system. add 1 control relay to deactivate newly install delayed egress crash bar. | $18,315 |
| Sep 3, 2020 | Completed final sign-off Oct 2020 | 121 Spear St | Potter Fire Protection | 2nd fl: remove and reconfigure fire sprinkler piping to (14) fire sprinklers. install new branch line restraints where indicated. ref pa# 201912200101Details
2nd fl: remove and reconfigure fire sprinkler piping to (14) fire sprinklers. install new branch line restraints where indicated. ref pa# 201912200101 | $8,000 |
| Mar 16, 2020 | Completed final sign-off Aug 2020 | 121 Spear St | Pioneer Fire Inc. | ground floor: fire sprinklers relocate 8 pendants. ref t.i. pa201911056533. maher n/a.Details
ground floor: fire sprinklers relocate 8 pendants. ref t.i. pa201911056533. maher n/a. | $3,000 |
| Mar 16, 2020 | Completed final sign-off Aug 2020 | 121 Spear St | Pioneer Fire Inc. | ground floor: fire sprinklers relocate 13 pendants & remove 2 pendants. ref t.i. pa201911056533. maher n/a.Details
ground floor: fire sprinklers relocate 13 pendants & remove 2 pendants. ref t.i. pa201911056533. maher n/a. | $4,000 |
| Mar 9, 2020 | Expired or cancelled cancelled Sep 2021 | 121 Spear St | new wall opening thru extg concrete shear walls.Details
new wall opening thru extg concrete shear walls. | $20,000 | |
| Mar 9, 2020 | Completed final sign-off Mar 2021 | 121 Spear St | installation of roof top mechanical concrete platform for mechanical equipment support.Details
installation of roof top mechanical concrete platform for mechanical equipment support. | $15,000 | |
| Mar 9, 2020 | Never finaled issued Jun 2020, no final | 121 Spear St | scope includes concrete slab infill of extg openings on ground level. this is an interior location where extg slab is being replaced.Details
scope includes concrete slab infill of extg openings on ground level. this is an interior location where extg slab is being replaced. | $10,000 | |
| Dec 20, 2019 | Completed final sign-off Sep 2021 | 121 Spear St | Bevilacqua & Sons | suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permitDetails
suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permit | $2,343,634 |
| Dec 11, 2019 | Never finaled issued Aug 2020, no final | 121 Spear St | Durkin Signs & Graphics Inc | electric wall sign. **maher n/a**Details
electric wall sign. **maher n/a** | $12,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2020 | 121 Spear St | Marchetti Group | ground fl suite b8: demolition of non-structural walls & finishes.Details
ground fl suite b8: demolition of non-structural walls & finishes. | $20,000 |
| Nov 5, 2019 | Completed final sign-off Nov 2019 | 121 Spear St | Sabah International Incorporated | 2nd floor: add 2 speker/strobe, 1 relay, 1 input/output module, 1 duct smoke det. ref app#201903225982Details
2nd floor: add 2 speker/strobe, 1 relay, 1 input/output module, 1 duct smoke det. ref app#201903225982 | $14,880 |
| Nov 5, 2019 | Completed final sign-off Dec 2020 | 121 Spear St | Marchetti Group | ground fl. suite b-10 (hair salon) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work, building is fully sprinkledDetails
ground fl. suite b-10 (hair salon) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work, building is fully sprinkled | $200,000 |
| Nov 5, 2019 | Completed final sign-off Dec 2020 | 121 Spear St | Marchetti Group | ground fl.suite b-11; (optician) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work, building is fully sprinkledDetails
ground fl.suite b-11; (optician) t.i. improvement for 1 retail space, improvements include new partitions, ceiling, casework and finishes, mechanical, elec, plumbing alterations, no exterior work, building is fully sprinkled | $200,000 |
| Oct 31, 2019 | Completed final sign-off Dec 2019 | 121 Spear St | Bcci Construction Company | 2nd floor: mechanical drawings to support approved arch set. demo extg duct & equipment. install new heat pumps piping and duct workDetails
2nd floor: mechanical drawings to support approved arch set. demo extg duct & equipment. install new heat pumps piping and duct work | $50,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 121 Spear St | street space w/mtaDetails
street space w/mta | ||
| Oct 9, 2019 | Completed final sign-off Nov 2019 | 121 Spear St | Anderson, Rowe & Buckley, Inc. | 2/f: fire sprinklers, 1 add, 1 relocated. ref 201908219421Details
2/f: fire sprinklers, 1 add, 1 relocated. ref 201908219421 | $1,500 |
| Sep 20, 2019 | Completed final sign-off Oct 2019 | 121 Spear St | R L H Fire Protection Inc | fire sprinlker permit. remove 27 pendent sprinlkers and install 32 upright sprinklers on 1st fl ref 201907196392 maher not reqDetails
fire sprinlker permit. remove 27 pendent sprinlkers and install 32 upright sprinklers on 1st fl ref 201907196392 maher not req | $7,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 121 Spear St | Peacock Construction | ground floor: t-24 mechanical for work under app#201905301962. n/a for maherDetails
ground floor: t-24 mechanical for work under app#201905301962. n/a for maher | |
| Aug 21, 2019 | Completed final sign-off Dec 2019 | 121 Spear St | Bcci Construction Company | 2nd flr - new vetsible, demising a large conference room into 2 meeting rooms & add a phone room and upgrade pantry area. maher n/a.Details
2nd flr - new vetsible, demising a large conference room into 2 meeting rooms & add a phone room and upgrade pantry area. maher n/a. | $485,000 |
| Aug 12, 2019 | Never finaled issued Aug 2019, no final | 121 Spear St | street space w/mtaDetails
street space w/mta | ||
| Jul 29, 2019 | Completed final sign-off Feb 2020 | 121 Spear St | Peacock Construction | g/f: title 24 electrical compliance for pa 201905301962. maher n/a.Details
g/f: title 24 electrical compliance for pa 201905301962. maher n/a. | |
| Jul 19, 2019 | Completed final sign-off Feb 2020 | 121 Spear St | Marchetti Group | removal of interior non-structural partitions, doors, finishes, hvac & electrical distribution @ ground floor tenant space. no exterior work. tenant space to remain unoccupied until future tenant improvement permit and tenant improvement construction are finalized. existing ceilings to remaDetails
removal of interior non-structural partitions, doors, finishes, hvac & electrical distribution @ ground floor tenant space. no exterior work. tenant space to remain unoccupied until future tenant improvement permit and tenant improvement construction are finalized. existing ceilings to rema | $9,500 |
| Jun 14, 2019 | Completed final sign-off Jul 2019 | 121 Spear St | Sabah International Incorporated | suite 220: modifiy existing fire alarm system. add 2 ceiling speaker/strobes, add 2 ceiling strobes. ref ti #201903225982.Details
suite 220: modifiy existing fire alarm system. add 2 ceiling speaker/strobes, add 2 ceiling strobes. ref ti #201903225982. | $13,196 |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 121 Spear St | street spaceDetails
street space | ||
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 121 Spear St | Bcci Construction Company | per fred stumpp 2nd - 6th floors revised smoke control narrative and smoke control special inspection report to document the changes. ref pa 2017-1212-6276 and 2017-1212-6270Details
per fred stumpp 2nd - 6th floors revised smoke control narrative and smoke control special inspection report to document the changes. ref pa 2017-1212-6276 and 2017-1212-6270 | |
| May 30, 2019 | Completed final sign-off Feb 2020 | 121 Spear St | renovations of (e) at rincon ii courtyard restrooms. demo & construction of non structural partitions and doors. new: plm, light fix, accessories and toilet partitions to match current bld standards. new wall and floor finishes. mep deferredDetails
renovations of (e) at rincon ii courtyard restrooms. demo & construction of non structural partitions and doors. new: plm, light fix, accessories and toilet partitions to match current bld standards. new wall and floor finishes. mep deferred | $233,354 | |
| May 23, 2019 | Completed final sign-off Jun 2019 | 121 Spear St | R L H Fire Protection Inc | 2nd flr, fire sprinkler: relocate 6, add 4, and delete 1 sprinkler on the 2nd fl, suite 220. ti #201903225982.Details
2nd flr, fire sprinkler: relocate 6, add 4, and delete 1 sprinkler on the 2nd fl, suite 220. ti #201903225982. | $3,500 |
| Apr 8, 2019 | Never finaled issued Apr 2019, no final | 121 Spear St | street space w/mtaDetails
street space w/mta | ||
| Mar 22, 2019 | Completed final sign-off Oct 2019 | 121 Spear St | Marchetti Group | suite 220: t.i. expansion of conference room, office modification. maher n/a.Details
suite 220: t.i. expansion of conference room, office modification. maher n/a. | $75,000 |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 121 Spear St | Sabah International Incorporated | 4th fl - ti add 4 duct detectors, add 4 multi-voltage relays. ref pa 2018-1113-5643 and 2018-1204-7435Details
4th fl - ti add 4 duct detectors, add 4 multi-voltage relays. ref pa 2018-1113-5643 and 2018-1204-7435 | $12,230 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 121 Spear St | Golden Gate Fire Protection Inc | 4ht flr - fire sprinkler, relocate 29 upright and 10 pendent ref 201807164635Details
4ht flr - fire sprinkler, relocate 29 upright and 10 pendent ref 201807164635 | $20,475 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 121 Spear St | Bcci Construction Company | roo: replace the existing roof gate with a new gate at east tower of building. maher n/a.Details
roo: replace the existing roof gate with a new gate at east tower of building. maher n/a. | $15,000 |
| Dec 4, 2018 | Completed final sign-off Apr 2019 | 121 Spear St | Red Hawk Fire & Security Ca Llc | re pa# 201807164635; fire alarm t.i. on 4th fl. add 11 ceiling speaker strobes (4th fl>)Details
re pa# 201807164635; fire alarm t.i. on 4th fl. add 11 ceiling speaker strobes (4th fl>) | $6,000 |
| Nov 13, 2018 | Completed final sign-off Apr 2019 | 121 Spear St | Richlen Construction | 4th floor: revision to permit # 2018-0716-4635. remove door in corridor.Details
4th floor: revision to permit # 2018-0716-4635. remove door in corridor. | |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 121 Spear St | Bcci Construction Company | 6th floor- fire only permit for a3 occupancy assembly. ref: 2017-1212-6270 ol concentrated 276. ol unconcentrated 14 lb.Details
6th floor- fire only permit for a3 occupancy assembly. ref: 2017-1212-6270 ol concentrated 276. ol unconcentrated 14 lb. | |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 121 Spear St | Bcci Construction Company | 5th fl - fire only. permit for a-2 assembly. ref pa #201711164136. barisita and deck occupant load 149Details
5th fl - fire only. permit for a-2 assembly. ref pa #201711164136. barisita and deck occupant load 149 | |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 121 Spear St | Bcci Construction Company | 2nd fl - fire only. permit for a-3 occupancy assembly. ref pa #201711093681. occupant load 91 and 94Details
2nd fl - fire only. permit for a-3 occupancy assembly. ref pa #201711093681. occupant load 91 and 94 | |
| Oct 26, 2018 | Completed final sign-off Apr 2019 | 121 Spear St | Famand Inc Dba Indoor Environmental Serv | install 1 new wshp with ductsox. retrofit existing wshp ductwork to serve back of building. maher na. new duct smoke detection for equipment shut down. fire alarm sep permitDetails
install 1 new wshp with ductsox. retrofit existing wshp ductwork to serve back of building. maher na. new duct smoke detection for equipment shut down. fire alarm sep permit | $66,461 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 121 Spear St | Bcci Construction Company | 2/f: approval of assembly use per sffd hq ref 201711164136Details
2/f: approval of assembly use per sffd hq ref 201711164136 | |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 121 Spear St | Bcci Construction Company | 6/f: approval of assembly use per sffd hq ref 201712126270Details
6/f: approval of assembly use per sffd hq ref 201712126270 | |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 121 Spear St | Bcci Construction Company | 5/f: approval of assembly use per sffd hq ref 201711164136Details
5/f: approval of assembly use per sffd hq ref 201711164136 | |
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 121 Spear St | street space with mtaDetails
street space with mta | ||
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 121 Spear St | Durkin Signs & Graphics Inc | install electric wall mounted projecting double faced sign "soma eats" maher naDetails
install electric wall mounted projecting double faced sign "soma eats" maher na | $10,000 |
| Aug 3, 2018 | Completed final sign-off Oct 2018 | 121 Spear St | Sabah International Incorporated | ti 201803234417 modify e fire alarm system add 1 booster panel, 16 ceiling speaker strobes, 1 wall speaker/strobe, 3 ceiling strobes, 1 synch module 5 control relays, 1 monitor module for ansul monitoring, 3 duct smoke detectorsDetails
ti 201803234417 modify e fire alarm system add 1 booster panel, 16 ceiling speaker strobes, 1 wall speaker/strobe, 3 ceiling strobes, 1 synch module 5 control relays, 1 monitor module for ansul monitoring, 3 duct smoke detectors | $16,415 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 121 Spear St | Certified Fire And Safety | suite b7: install ul300 ansul fire system to protect kitchenhood, cooking equipment and airmaid pollution control unit. ref app#201803234417. n/a for maher.Details
suite b7: install ul300 ansul fire system to protect kitchenhood, cooking equipment and airmaid pollution control unit. ref app#201803234417. n/a for maher. | $6,000 |
| Jul 25, 2018 | Expired or cancelled cancelled Aug 2023 | 121 Spear St | Bcci Construction Company | fire only approval of assembly spaces. ti permits already approved but fire did not use assembly stamp. 201712126227, 201712126276, 201803163850, 201711164136, 201712126270, 201711214496.Details
fire only approval of assembly spaces. ti permits already approved but fire did not use assembly stamp. 201712126227, 201712126276, 201803163850, 201711164136, 201712126270, 201711214496. | |
| Jul 18, 2018 | Never finaled issued Jul 2018, no final | 121 Spear St | Vkk Signmakers Inc. | design & manucture of evacuation maps for google permit areas floor 2, 3, 5, & 6. 17 total.Details
design & manucture of evacuation maps for google permit areas floor 2, 3, 5, & 6. 17 total. | $5,000 |
| Jul 16, 2018 | Never finaled issued Jul 2018, no final | 121 Spear St | street space w/mtaDetails
street space w/mta | ||
| Jul 16, 2018 | Completed final sign-off Apr 2019 | 121 Spear St | Richlen Construction | t.i on 3,500 sq ft, new wall power lighting and finishesDetails
t.i on 3,500 sq ft, new wall power lighting and finishes | $175,000 |
| Jul 12, 2018 | Completed final sign-off Aug 2018 | 121 Spear St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish & install 1 ansul r-102 fire suppression system, in the pollution control unit on the roof. ref pa 2018-0507-8370 interconnecting fire suppression operation with hood and duct system. fire alarm separate permit. maher naDetails
furnish & install 1 ansul r-102 fire suppression system, in the pollution control unit on the roof. ref pa 2018-0507-8370 interconnecting fire suppression operation with hood and duct system. fire alarm separate permit. maher na | $9,000 |
| Jul 3, 2018 | Completed final sign-off Apr 2019 | 121 Spear St | Sabah International Incorporated, Bcci Construction Company | fire alrm scope of work is to modify the fire alarm field devices layout at proposed tenant improvement projects consist of the interior renovation at floors 2 thru 6 only for use by google. **maher n/a**Details
fire alrm scope of work is to modify the fire alarm field devices layout at proposed tenant improvement projects consist of the interior renovation at floors 2 thru 6 only for use by google. **maher n/a** | $194,400 |
| Jun 26, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 6th fl revision to approved ti. relocate hand sink inpantry. clarify to utilize floor mop sink. update cove base finish in restroom. ref #201803163850. maher naDetails
6th fl revision to approved ti. relocate hand sink inpantry. clarify to utilize floor mop sink. update cove base finish in restroom. ref #201803163850. maher na | |
| Jun 18, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | floors 2, 3, 5, 6 - revised smoke control matrix. ref #201801047815, #201711214496, #201712126270, #201711093681. maher naDetails
floors 2, 3, 5, 6 - revised smoke control matrix. ref #201801047815, #201711214496, #201712126270, #201711093681. maher na | |
| Jun 4, 2018 | Completed final sign-off Jun 2018 | 121 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 23 pendents & 4 uprights for soma eats (ground floor). ref pa 2017-1024-2085Details
fire sprinkler only - relocate 23 pendents & 4 uprights for soma eats (ground floor). ref pa 2017-1024-2085 | $6,885 |
| May 22, 2018 | Completed final sign-off Aug 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 6/f - add 25 , relocate 14, and plug 7 sprinklers in order to conform with the new ti maher na ref 201803163850Details
6/f - add 25 , relocate 14, and plug 7 sprinklers in order to conform with the new ti maher na ref 201803163850 | $20,475 |
| May 9, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 3rd flr - revision to deli stations. ref 201711093681 maher naDetails
3rd flr - revision to deli stations. ref 201711093681 maher na | |
| May 8, 2018 | Never finaled issued May 2018, no final | 121 Spear St | street space w/mtaDetails
street space w/mta | ||
| May 7, 2018 | Completed final sign-off Aug 2018 | 121 Spear St | Aaa Restaurant Fire Control/Dba Aaa Fire | 2nd flr furnish and install 1 ansul pyrana system in the cafeteriaDetails
2nd flr furnish and install 1 ansul pyrana system in the cafeteria | $8,000 |
| Apr 27, 2018 | Completed final sign-off Mar 2019 | 121 Spear St | Novo Construction Inc | suite b7: revision to 201803234417 mechanical - includes hood supply air plenum maher n/aDetails
suite b7: revision to 201803234417 mechanical - includes hood supply air plenum maher n/a | |
| Apr 20, 2018 | Never finaled issued May 2018, no final | 121 Spear St | Discount Signs & Neon Inc | install 1 illuyminated projecting electric double faced "parking" signDetails
install 1 illuyminated projecting electric double faced "parking" sign | $5,000 |
| Apr 18, 2018 | Never finaled issued Apr 2018, no final | 121 Spear St | Bcci Construction Company | 3rd flr - health department food service drawings assoicated with approved arch and mep. ref 201711093681Details
3rd flr - health department food service drawings assoicated with approved arch and mep. ref 201711093681 | |
| Mar 26, 2018 | Completed final sign-off Aug 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | f/s on 2nd-6th fl: 2/f: add 12, relocate 5, and plug 2 sprinklers. 3/f: add 3. 4/f: add 3. 5/f: add 3. 6/f: add 3 sprinklers in order to conform with the new wall/ceiling layout of the ti. ref #201711204399. maher naDetails
f/s on 2nd-6th fl: 2/f: add 12, relocate 5, and plug 2 sprinklers. 3/f: add 3. 4/f: add 3. 5/f: add 3. 6/f: add 3 sprinklers in order to conform with the new wall/ceiling layout of the ti. ref #201711204399. maher na | $14,500 |
| Mar 26, 2018 | Completed final sign-off Jul 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 6/f: add 46, relocate 173, and plug 45 sprinklers in order to conform with new wall and ceiling layout of the ti. ref #201712126270. maher naDetails
6/f: add 46, relocate 173, and plug 45 sprinklers in order to conform with new wall and ceiling layout of the ti. ref #201712126270. maher na | $50,370 |
| Mar 23, 2018 | Completed final sign-off Jun 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 2nd fl - relocate 1 sprinkler. 3rd fl - add 77, relocate 45, & plug 1 sprinkler. rleocate main piping on 3rd fl to conform to new walls and ceilings of tenant improvement.s ref #201711093681. maher naDetails
2nd fl - relocate 1 sprinkler. 3rd fl - add 77, relocate 45, & plug 1 sprinkler. rleocate main piping on 3rd fl to conform to new walls and ceilings of tenant improvement.s ref #201711093681. maher na | $28,000 |
| Mar 23, 2018 | Completed final sign-off Mar 2019 | 121 Spear St | Novo Construction Inc | suite b7: design of a new service/fast casual restaurant with new open food prep service area, coffee/wine bar, closed back of house prep area, full cook line storage, dining, new equipment. modify entry and exit doors and storage front. n/a for maherDetails
suite b7: design of a new service/fast casual restaurant with new open food prep service area, coffee/wine bar, closed back of house prep area, full cook line storage, dining, new equipment. modify entry and exit doors and storage front. n/a for maher | $411,400 |
| Mar 16, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 6th flr - a-3 event space with associated pantry. new equipment on roof. maher naDetails
6th flr - a-3 event space with associated pantry. new equipment on roof. maher na | $1,147,000 |
| Mar 6, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 6th flr - removal of office area maher naDetails
6th flr - removal of office area maher na | $50,000 |
| Mar 2, 2018 | Completed final sign-off Aug 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 4th floor: add 20, relocate 72, plug 21 sprinklers, and relocate main piping around stairs in order to conform with the new wall and ceiling layout of the t.i. ref app#201711154071. n/a for maherDetails
4th floor: add 20, relocate 72, plug 21 sprinklers, and relocate main piping around stairs in order to conform with the new wall and ceiling layout of the t.i. ref app#201711154071. n/a for maher | $19,412 |
| Mar 2, 2018 | Completed final sign-off Aug 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 2nd floor: relocate 2 sprinklers. 5th floor: add 15, relocate 19, plug 1 sprinkler and relocate main piping around stairs in order to conform with the new wall and ceiling layout of the t.i. ref app#201711164136. n/a for maher.Details
2nd floor: relocate 2 sprinklers. 5th floor: add 15, relocate 19, plug 1 sprinkler and relocate main piping around stairs in order to conform with the new wall and ceiling layout of the t.i. ref app#201711164136. n/a for maher. | $7,596 |
| Mar 2, 2018 | Completed final sign-off Jun 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 3rd floor: add 106 & relocate 156 and plug 22 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201711093681. n/a for maher.Details
3rd floor: add 106 & relocate 156 and plug 22 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201711093681. n/a for maher. | $55,282 |
| Mar 2, 2018 | Completed final sign-off Aug 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 2nd floor: add 53, relocate 88 and plug 17 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201712126227. n/a for maher.Details
2nd floor: add 53, relocate 88 and plug 17 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201712126227. n/a for maher. | $29,751 |
| Mar 2, 2018 | Completed final sign-off Jun 2018 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 3rd floor: add one & relocate 2 sprinklers. 5th floor: add 104, relocate 178, plug 30, & change out 7 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201711214496. n/a for maher.Details
3rd floor: add one & relocate 2 sprinklers. 5th floor: add 104, relocate 178, plug 30, & change out 7 sprinklers in order to conform with the new wall and ceiling layout of the t.i. ref app#201711214496. n/a for maher. | $61,612 |
| Feb 20, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 2nd floor: revision to app201712126227 to adjust location of wall. n/a for maherDetails
2nd floor: revision to app201712126227 to adjust location of wall. n/a for maher | |
| Jan 4, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 2nd flr: mep to support approved arch. new lighting, controls, duct work & fsd. ref 201712126227 maher naDetails
2nd flr: mep to support approved arch. new lighting, controls, duct work & fsd. ref 201712126227 maher na | $850,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 2nd flr: office space including partition, event rooms & horizontal exit. maher n/aDetails
2nd flr: office space including partition, event rooms & horizontal exit. maher n/a | $2,000,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 6th flr office ti with mep. new partitions, horizontal exit & finishes. this permit is to be completed together with permit #9.Details
6th flr office ti with mep. new partitions, horizontal exit & finishes. this permit is to be completed together with permit #9. | $5,000,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 3rd flr office ti with mep. new partitions, horizontal exit & finishes.Details
3rd flr office ti with mep. new partitions, horizontal exit & finishes. | $4,500,000 |
| Nov 21, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 5th fl - tenant improvement including build out of workstations, partitions a/meps. also work on 3rd floor mdf room. fire under separate permits. maher naDetails
5th fl - tenant improvement including build out of workstations, partitions a/meps. also work on 3rd floor mdf room. fire under separate permits. maher na | $6,000,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a **Details
on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a ** | $1,100,000 |
| Nov 16, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 5th floor: level 5: coffee barista, counter, general seating . level 2 catering pantry. mep included. n/a for maher.Details
5th floor: level 5: coffee barista, counter, general seating . level 2 catering pantry. mep included. n/a for maher. | $950,000 |
| Nov 15, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13Details
4/f- partial floor t.i. includes wellness center & 2 hr. rated enclosure of stairs that will be under seperate permit. mep. included. n/a ordinance #155-13 | $1,700,000 |
| Nov 9, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. (n) 2 hrs shaft, fire assembly area- two way communication, ul 300, sprinklers and fire alarm separate permit.Details
amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. (n) 2 hrs shaft, fire assembly area- two way communication, ul 300, sprinklers and fire alarm separate permit. | $6,000,000 |
| Oct 24, 2017 | Completed final sign-off Jan 2018 | 121 Spear St | Marchetti Group | g/f- demolition of non structural partitions, ceiling, lighting, finishes and any associated mechanical, plumbing and electrical, new paint and concrete finishing. demo per ab-17, t.i. to follow. no exterior work.Details
g/f- demolition of non structural partitions, ceiling, lighting, finishes and any associated mechanical, plumbing and electrical, new paint and concrete finishing. demo per ab-17, t.i. to follow. no exterior work. | $6,340 |
| Oct 16, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | Pioneer Fire Inc. | g/f- demo pendent drops & bring back to shell coverage. n/a ordinance #155-13Details
g/f- demo pendent drops & bring back to shell coverage. n/a ordinance #155-13 | $6,340 |
| Sep 29, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | R L H Fire Protection Inc | f/s: selective demo of pendent heads on fl 2,3,4,5,6. 1208 pendent removed and 1179 uprights installed, ref ti #201707242790. maher naDetails
f/s: selective demo of pendent heads on fl 2,3,4,5,6. 1208 pendent removed and 1179 uprights installed, ref ti #201707242790. maher na | $121,943 |
| Sep 28, 2017 | Never finaled issued Sep 2017, no final | 121 Spear St | Richlen Construction | lobby: title 24: new wall sconces, ceiling and feature light fixtures. ref t.i. pa#201701260820.Details
lobby: title 24: new wall sconces, ceiling and feature light fixtures. ref t.i. pa#201701260820. | $50,000 |
| Aug 14, 2017 | Completed final sign-off Aug 2017 | 121 Spear St | Red Hawk Fire & Security Ca Llc | 3/f- as built fire alarm for pa#201707273135. n/a ordinance #155-13Details
3/f- as built fire alarm for pa#201707273135. n/a ordinance #155-13 | |
| Jul 27, 2017 | Completed final sign-off Aug 2017 | 121 Spear St | Red Hawk Fire & Security Ca Llc | 3rd fl: fire alarm ti: add (1) smoke detector in i.t. room, reuse all existing devices as shown. remove 2 smoke detectors from pre-action system. ref. pa #2017-0713-1785. maher naDetails
3rd fl: fire alarm ti: add (1) smoke detector in i.t. room, reuse all existing devices as shown. remove 2 smoke detectors from pre-action system. ref. pa #2017-0713-1785. maher na | $1,000 |
| Jul 24, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | demolition of floors 2,3,4,5 & 6 interior only selective areas on each floor to be demolished. n/a maherDetails
demolition of floors 2,3,4,5 & 6 interior only selective areas on each floor to be demolished. n/a maher | $100,000 |
| Jul 13, 2017 | Completed final sign-off Jul 2017 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 3rd fl: remove existing pre-action valve and reconnect pipe to wet system. n/a maherDetails
3rd fl: remove existing pre-action valve and reconnect pipe to wet system. n/a maher | $3,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | Peacock Construction | revision to app#201612024097. removal of 4 additional planters, expanded demolition area at south end, and change infill material from tile to concrete. n/a for maherDetails
revision to app#201612024097. removal of 4 additional planters, expanded demolition area at south end, and change infill material from tile to concrete. n/a for maher | $50,000 |
| Jun 5, 2017 | Completed final sign-off Sep 2017 | 121 Spear St | Peacock Construction | demo of toilet stall prtitions, plumbing fixtures and finiahes. construction of new partitoins, plumb fixtures, light fixtures, finishes for barrier removeal, mep/life safety, sprinkler system modfiications sep permitDetails
demo of toilet stall prtitions, plumbing fixtures and finiahes. construction of new partitoins, plumb fixtures, light fixtures, finishes for barrier removeal, mep/life safety, sprinkler system modfiications sep permit | $104,400 |
| May 18, 2017 | Completed final sign-off Jul 2017 | 121 Spear St | Red Hawk Fire & Security Ca Llc | 1st floor lobby fire alarm t.i. - add 1 speaker strobe & 1 control relay for gas fireplace shutoff. ref pa #201701268020. n/a maher ordinanceDetails
1st floor lobby fire alarm t.i. - add 1 speaker strobe & 1 control relay for gas fireplace shutoff. ref pa #201701268020. n/a maher ordinance | $1,000 |
| May 12, 2017 | Completed final sign-off Jun 2017 | 121 Spear St | J & C Safety 1st Fire Protection Inc | fire sprinkler for new restaurant. add 5 automatic fire sprinkler. ref app#201611173012. n/a for maherDetails
fire sprinkler for new restaurant. add 5 automatic fire sprinkler. ref app#201611173012. n/a for maher | $1,300 |
| Mar 28, 2017 | Completed final sign-off Apr 2017 | 121 Spear St | Ayoob & Peery Plumbing Co Inc | 1st & 1st floor (2nd) floor - add & relocate fire sprinklers per tenant improvements. (1st floor - 2 add, mezz (2nd) floor 7 add, 8 relcoate). ref pa #201701268020. n/a maher ordinanceDetails
1st & 1st floor (2nd) floor - add & relocate fire sprinklers per tenant improvements. (1st floor - 2 add, mezz (2nd) floor 7 add, 8 relcoate). ref pa #201701268020. n/a maher ordinance | $8,840 |
| Mar 16, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | Richlen Construction | revision to pa 2017-0126-8020 - revise drawings to reflect demolition of (e) plaster ceiling to be replaced by gyp ceiling. move location of (n) fire place in wall (tower 2) maher naDetails
revision to pa 2017-0126-8020 - revise drawings to reflect demolition of (e) plaster ceiling to be replaced by gyp ceiling. move location of (n) fire place in wall (tower 2) maher na | $100,000 |
| Feb 8, 2017 | Completed final sign-off May 2017 | 121 Spear St | Red Hawk Fire & Security Ca Llc | add 2 speaker/strobes, add 1 duct detector, add 3 control relays, add 1 pull station, add 1 smoke, add 1 monitor module, relocate 2 devices. ref pa 2016-1117-3012Details
add 2 speaker/strobes, add 1 duct detector, add 3 control relays, add 1 pull station, add 1 smoke, add 1 monitor module, relocate 2 devices. ref pa 2016-1117-3012 | $10,000 |
| Jan 26, 2017 | Completed final sign-off Nov 2017 | 121 Spear St | Richlen Construction | renovation of existing interior lobby. new lighting, finishes, entry doors, gas fireplace, new glass guardrail at mezzanineDetails
renovation of existing interior lobby. new lighting, finishes, entry doors, gas fireplace, new glass guardrail at mezzanine | $200,000 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 121 Spear St | Principal Builders Inc. | 2nd flr: revision to 201606281050 to include occupancy approval for assembly permit at "lab" areaDetails
2nd flr: revision to 201606281050 to include occupancy approval for assembly permit at "lab" area | |
| Dec 2, 2016 | Completed final sign-off Nov 2017 | 121 Spear St | Peacock Construction | removal of built-in planters, concrete pedestral and floor mounted light poles. areas to be filled in with new paving to match extg. n/a for maherDetails
removal of built-in planters, concrete pedestral and floor mounted light poles. areas to be filled in with new paving to match extg. n/a for maher | $90,000 |
| Nov 17, 2016 | Never finaled issued Jan 2017, no final | 121 Spear St | Dorin Buzatu Construction | b-9. install an electric single face (letter) wall sign inside the courtyard. n/a maher ordinanceDetails
b-9. install an electric single face (letter) wall sign inside the courtyard. n/a maher ordinance | $2,800 |
| Nov 17, 2016 | Never finaled issued Jan 2017, no final | 121 Spear St | Mani Builders | install an electric double face projecting sign inside the courtyard. n/a maher ordinanceDetails
install an electric double face projecting sign inside the courtyard. n/a maher ordinance | $1,700 |
| Nov 17, 2016 | Never finaled issued Jan 2017, no final | 121 Spear St | Mani Builders | b-09 change of use from vacant retail to restaurant. glass partitions, stainless steel partitions, elect & plumbing, low voltage work, exterior glass doors, duct work (all exposed ceiling) kitchen equipment/counter/led lighting, concrete flr sealer/base cave 3/8" ridious throughout dining & kitchen.Details
b-09 change of use from vacant retail to restaurant. glass partitions, stainless steel partitions, elect & plumbing, low voltage work, exterior glass doors, duct work (all exposed ceiling) kitchen equipment/counter/led lighting, concrete flr sealer/base cave 3/8" ridious throughout dining & kitchen. | $100,000 |
| Sep 22, 2016 | Never finaled issued Sep 2016, no final | 121 Spear St | Red Hawk Fire & Security Ca Llc | 2nd flr, suite 201: fire alarm; add 10 speaker/strobes, 1 strobe, 1 speaker 6 duct detectors with relays and monitoring modules for heat pump and 1 relay for music shutdown ref 2016-0628-1050Details
2nd flr, suite 201: fire alarm; add 10 speaker/strobes, 1 strobe, 1 speaker 6 duct detectors with relays and monitoring modules for heat pump and 1 relay for music shutdown ref 2016-0628-1050 | $9,000 |
| Aug 23, 2016 | Completed final sign-off Oct 2016 | 121 Spear St | R L H Fire Protection Inc | fire sprinkler install 14 new pendents, 51 new uprights, delete 48 pendents on 2nd fl t.i. 201606281050; maher n/aDetails
fire sprinkler install 14 new pendents, 51 new uprights, delete 48 pendents on 2nd fl t.i. 201606281050; maher n/a | $34,000 |
| Jul 14, 2016 | Completed final sign-off Sep 2016 | 121 Spear St | Peacock Construction | t-24 electrical for work done under pa 2016-0513-7352Details
t-24 electrical for work done under pa 2016-0513-7352 | $10,000 |
| Jun 28, 2016 | Completed final sign-off Nov 2017 | 121 Spear St | Principal Builders Inc. | tenant improvement to include new partitions with glazing configuration, ceiling and power data work and finishes. minimal structural work for new moveable partition and guardrail at e balcony. suite is currently unoccupied. life safety and sprinkler system modificiation to be under separate permit.Details
tenant improvement to include new partitions with glazing configuration, ceiling and power data work and finishes. minimal structural work for new moveable partition and guardrail at e balcony. suite is currently unoccupied. life safety and sprinkler system modificiation to be under separate permit. | $650,000 |
| Jun 16, 2016 | Completed final sign-off Jul 2016 | 121 Spear St | Red Hawk Fire & Security Ca Llc | 1st floor: fire alarm t.i. : peet's coffee. add 4 ceilling speaker strobes, 2 new duct detectors with relays for heat pump. relocate 1 pull and 1 heat detector. ref app#2016-0225-0558Details
1st floor: fire alarm t.i. : peet's coffee. add 4 ceilling speaker strobes, 2 new duct detectors with relays for heat pump. relocate 1 pull and 1 heat detector. ref app#2016-0225-0558 | $5,000 |
| Jun 10, 2016 | Completed final sign-off Jul 2016 | 121 Spear St | Pribuss Engineering Inc | ground floor fire sprinkelr t.i. under pa #201602250558 - relocate 13 & add 8, total 21. n/a maher ordinanceDetails
ground floor fire sprinkelr t.i. under pa #201602250558 - relocate 13 & add 8, total 21. n/a maher ordinance | $10,807 |
| May 18, 2016 | Never finaled issued Jun 2016, no final | 121 Spear St | Sign Of Light | peets coffee: erect single faced wall illum sign maher naDetails
peets coffee: erect single faced wall illum sign maher na | $4,000 |
| May 18, 2016 | Never finaled issued Jun 2016, no final | 121 Spear St | Sign Of Light | peets coffee: erect double faced projecting illum sign maher naDetails
peets coffee: erect double faced projecting illum sign maher na | $2,500 |
| May 13, 2016 | Completed final sign-off Sep 2016 | 121 Spear St | Peacock Construction | 2nd floor - restroom barrier removal, replace plumbing fixtures & configure to meet current accessibility requirements. mep, fire sprinkler and life safety to be design-build and under separate submittals.Details
2nd floor - restroom barrier removal, replace plumbing fixtures & configure to meet current accessibility requirements. mep, fire sprinkler and life safety to be design-build and under separate submittals. | $55,000 |
| Feb 25, 2016 | Completed final sign-off Aug 2016 | 121 Spear St | C B 2 Builders Incorporated | interior tenant improvement only. new restrooms, floor, wall, ceiling finishes to meet peets coffee brandingDetails
interior tenant improvement only. new restrooms, floor, wall, ceiling finishes to meet peets coffee branding | $185,000 |
| Jan 29, 2016 | Completed final sign-off May 2016 | 121 Spear St | Marchetti Group | replace 1 set of (e) exterior doors & install 1 set of (n) exterior doors. all to match existing. no change in occupancy, use, or area. mep, life safety & sprinklers under separate permit. maher na. future interior ti by others. ab-017applies.Details
replace 1 set of (e) exterior doors & install 1 set of (n) exterior doors. all to match existing. no change in occupancy, use, or area. mep, life safety & sprinklers under separate permit. maher na. future interior ti by others. ab-017applies. | $5,316 |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 121 Spear St | Marchetti Group | (n) non structrual demising wall & exit doors in (e)vacant space. mep, life safety & sprinklers under sep permit. no chane in area, use or occupancy. maher naDetails
(n) non structrual demising wall & exit doors in (e)vacant space. mep, life safety & sprinklers under sep permit. no chane in area, use or occupancy. maher na | $23,989 |
| Dec 3, 2015 | Completed final sign-off Dec 2015 | 121 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 3 sprinkler pendents for bentham imf on the 4th floor. pa 2015-1027-0943Details
fire sprinkler only - relocate 3 sprinkler pendents for bentham imf on the 4th floor. pa 2015-1027-0943 | $1,500 |
| Dec 1, 2015 | Completed final sign-off Dec 2016 | 121 Spear St | Bcci Construction Company | 3rd floor: revision to app#201509308432 to add a sump pump and hvac revisionsDetails
3rd floor: revision to app#201509308432 to add a sump pump and hvac revisions | $7,500 |
| Nov 20, 2015 | Completed final sign-off Feb 2016 | 121 Spear St | Red Hawk Fire & Security Ca Llc | 3rd fl: add 7 speaker/strobes, 2 speakers. ref ti 2015-0930-8432Details
3rd fl: add 7 speaker/strobes, 2 speakers. ref ti 2015-0930-8432 | $7,000 |
| Nov 19, 2015 | Completed final sign-off Apr 2016 | 121 Spear St | Ron Thorn Construction Inc | add 2, 2.5 antenns, add 2 , 2.5 rrh , new coax jumper lines from rrhs to new antennas, install new hydbrid lines to new sector locations, add n 2.5 equipment inside e mmbs cabinet, new 2.5 batteries inside e bbu cab,replace damaged cable trays,remove old mounts, walls patched,painted. sprintDetails
add 2, 2.5 antenns, add 2 , 2.5 rrh , new coax jumper lines from rrhs to new antennas, install new hydbrid lines to new sector locations, add n 2.5 equipment inside e mmbs cabinet, new 2.5 batteries inside e bbu cab,replace damaged cable trays,remove old mounts, walls patched,painted. sprint | $20,000 |
| Nov 4, 2015 | Completed final sign-off Dec 2015 | 121 Spear St | Eco Fire Sprinklers Inc | install 10 new pendent sprinklers in area of work for t.i. pa# 201509308432. n/a ordinance #155-13Details
install 10 new pendent sprinklers in area of work for t.i. pa# 201509308432. n/a ordinance #155-13 | $4,500 |
| Oct 27, 2015 | Completed final sign-off Feb 2016 | 121 Spear St | Peacock Construction | 4th floor t.i.: new interior non-structural partitions, fineshes, mill work, ceiling repair, lighting replacement, electrical, minor mechanical. electrical mechanical, sprinkler, life safety under separate permit if requiredDetails
4th floor t.i.: new interior non-structural partitions, fineshes, mill work, ceiling repair, lighting replacement, electrical, minor mechanical. electrical mechanical, sprinkler, life safety under separate permit if required | $72,000 |
| Oct 26, 2015 | Completed final sign-off Dec 2016 | 121 Spear St | Bcci Construction Company | structural work associated with approved permit 201509308432 for demountable wall system. n/a for maher.Details
structural work associated with approved permit 201509308432 for demountable wall system. n/a for maher. | $48,000 |
| Oct 21, 2015 | Completed final sign-off Oct 2015 | 121 Spear St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 2 pendent sprinklers on the 6th floor ti 2015-0515-6419Details
fire sprinklers; relocate 2 pendent sprinklers on the 6th floor ti 2015-0515-6419 | $1,030 |
| Oct 9, 2015 | Completed final sign-off Oct 2015 | 121 Spear St | Pioneer Fire Inc. | 2nd flr: added one pendantDetails
2nd flr: added one pendant | $4,238 |
| Sep 30, 2015 | Completed final sign-off Dec 2016 | 121 Spear St | Bcci Construction Company | 3rd flr: partial floor t.i. in office portion of the building incl demo,drywall ceilings,doors,finishes,mechanical & electric, fire alarm life safety and sprinklers on seperate permits. maher n/aDetails
3rd flr: partial floor t.i. in office portion of the building incl demo,drywall ceilings,doors,finishes,mechanical & electric, fire alarm life safety and sprinklers on seperate permits. maher n/a | $511,560 |
| Sep 10, 2015 | Completed final sign-off Dec 2015 | 121 Spear St | Bcci Construction Company | partial ti on the 6th floor including selective demo, new partition, ceiling, finishes & associated mechanical. fire life safety under separate permitDetails
partial ti on the 6th floor including selective demo, new partition, ceiling, finishes & associated mechanical. fire life safety under separate permit | $68,000 |
| Aug 25, 2015 | Completed final sign-off Oct 2015 | 121 Spear St | Marchetti Group | remove non-structural partitions. removal of interior glass and full height. installation of new interior glass and full height non-rated partitions. compliance with maher ordinance no 155-13.Details
remove non-structural partitions. removal of interior glass and full height. installation of new interior glass and full height non-rated partitions. compliance with maher ordinance no 155-13. | $35,959 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 121 Spear St | Certified Fire & Safety Co | install ul 300 core fire system to protect pollution control unit in kitchen duct exhaust. n/a for maher.Details
install ul 300 core fire system to protect pollution control unit in kitchen duct exhaust. n/a for maher. | $5,000 |
| Jul 10, 2015 | Completed final sign-off Jul 2015 | 121 Spear St | Red Hawk Fire & Security Ca Llc | build out of existing ti space to include 5 notification appliances, 1 power suply, 4 monitor points.Details
build out of existing ti space to include 5 notification appliances, 1 power suply, 4 monitor points. | $8,500 |
| Jun 30, 2015 | Completed final sign-off Sep 2015 | 121 Spear St | Thomas Swan Sign Co Inc | erect an electric single faced wall sign. n/a maher ordinanceDetails
erect an electric single faced wall sign. n/a maher ordinance | $10,000 |