Permit GraphShortlistSan Francisco building permits since 2000

Brian Featherston

License
M32323
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M32323 at the Board for Professional Engineers
Listed as
engineer
Firm
Indoor Environmental Service
On San Francisco permits
Feb 2016 to Jan 2021

15 permits since 2000 (engineer on 15 permits): 11 completed, 3 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Famand Inc Dba Indoor Environmental Serv (5), Field Construction Inc. (5), Novo Construction Inc (2), Rossi Builders Inc. (2), Richlen Construction
Architects
Charles Bloszies
Engineers
Jesus Cabellon Jr., Robin Paul Roderick
Authorized agents
John Pena

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 13, 2021Completed
final sign-off Apr 2022
135 04th StFamand Inc Dba Indoor Environmental Servreplace rooftop air cooled chiller.
Details
Permit
202101132540
Permit issued
May 28, 2021
Final sign-off
Apr 11, 2022

replace rooftop air cooled chiller.

Open the permit page

$65,935
Aug 7, 2019Completed
final sign-off Dec 2020
360 Spear StRossi Builders Inc.hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils.
Details
Permit
201908078128
Permit issued
Aug 7, 2019
Final sign-off
Dec 7, 2020

hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils.

Open the permit page

$575,000
Jun 12, 2019Never finaled
issued Jun 2019, no final
15 Waverly PlFamand Inc Dba Indoor Environmental Servinstalling 1 rooftop ac unit (replacing like for like) adding 1 condenser on roof. install new ac air handlers on walls of two offices.
Details
Permit
201906123163
Permit issued
Jun 12, 2019

installing 1 rooftop ac unit (replacing like for like) adding 1 condenser on roof. install new ac air handlers on walls of two offices.

Open the permit page

$69,204
Jun 11, 2019Completed
final sign-off Aug 2019
1700 Owens StRossi Builders Inc.ste: 535: ref pa# 2019-0425-8886: hvac- grille, ductwork to be demolished and relocated.
Details
Permit
201906113149
Permit issued
Jun 12, 2019
Final sign-off
Aug 30, 2019

ste: 535: ref pa# 2019-0425-8886: hvac- grille, ductwork to be demolished and relocated.

Open the permit page

$19,000
Oct 26, 2018Completed
final sign-off Apr 2019
121 Spear StFamand Inc Dba Indoor Environmental Servinstall 1 new wshp with ductsox. retrofit existing wshp ductwork to serve back of building. maher na. new duct smoke detection for equipment shut down. fire alarm sep permit
Details
Permit
201810264226
Permit issued
Oct 26, 2018
Final sign-off
Apr 16, 2019

install 1 new wshp with ductsox. retrofit existing wshp ductwork to serve back of building. maher na. new duct smoke detection for equipment shut down. fire alarm sep permit

Open the permit page

$66,461
Sep 29, 2017Completed
final sign-off Feb 2018
101 Mission StField Construction Inc.5th fl - mechanical and electrical for pa 2017-0712-1657. n/a for maher.
Details
Permit
201709299905
Permit issued
Oct 4, 2017
Final sign-off
Feb 26, 2018

5th fl - mechanical and electrical for pa 2017-0712-1657. n/a for maher.

Open the permit page

$149,250
Sep 29, 2017Completed
final sign-off Feb 2018
101 Mission StField Construction Inc.19th fl - mechanical and electrical for pa 2017-0912-7687. n/a for maher.
Details
Permit
201709299906
Permit issued
Oct 4, 2017
Final sign-off
Feb 26, 2018

19th fl - mechanical and electrical for pa 2017-0912-7687. n/a for maher.

Open the permit page

$123,080
Sep 18, 2017Never finaled
issued Oct 2017, no final
111 Sutter StFamand Inc Dba Indoor Environmental Serv17/f- mechanical work for (e) pa#201708104455, supply (2) water source heat pumps with all duct & piping, complete with osa connection & t-24 t-stat, 1 exhaust fan for it room. n/a ordinance #155-13
Details
Permit
201709188834
Permit issued
Oct 2, 2017

17/f- mechanical work for (e) pa#201708104455, supply (2) water source heat pumps with all duct & piping, complete with osa connection & t-24 t-stat, 1 exhaust fan for it room. n/a ordinance #155-13

Open the permit page

$39,728
Aug 23, 2017Completed
final sign-off Dec 2017
250 Montgomery StField Construction Inc.6/f #610- mechanical & electrical work to pa#201707071218, isolate vav to serve new conference room, new lighting & branch circuiting to (e) panel, maintain same (e) power, signal outlets. provide additional new power branch circuiting & raceway systems as required to new power & signal. n/a maher
Details
Permit
201708235643
Permit issued
Aug 23, 2017
Final sign-off
Dec 4, 2017

6/f #610- mechanical & electrical work to pa#201707071218, isolate vav to serve new conference room, new lighting & branch circuiting to (e) panel, maintain same (e) power, signal outlets. provide additional new power branch circuiting & raceway systems as required to new power & signal. n/a maher

Open the permit page

$30,000
Jun 6, 2017Never finaled
issued Jun 2017, no final
525 Market StRichlen Construction15th fl: hvac modifcations. there will be changes to some vav boxes, duct and thermostat locations based on new architectural floor plan. a new transfer fan will be installed per owner request. ref. pa #201702099029
Details
Permit
201706068506
Permit issued
Jun 6, 2017

15th fl: hvac modifcations. there will be changes to some vav boxes, duct and thermostat locations based on new architectural floor plan. a new transfer fan will be installed per owner request. ref. pa #201702099029

Open the permit page

$30,000
May 1, 2017Completed
final sign-off Jan 2018
1415 Howard StFamand Inc Dba Indoor Environmental Servretrofit exisitng bldg, complete urf hvac system which include ceiling mounted fancoils ducted, fancoil units exhaust fans & outdoor heat pumps piped to fan coil units 2 outside air units are supplied for tempered outside air. ref pa #201608114810. n/a maher ordinance
Details
Permit
201705015322
Permit issued
May 10, 2017
Final sign-off
Jan 24, 2018

retrofit exisitng bldg, complete urf hvac system which include ceiling mounted fancoils ducted, fancoil units exhaust fans & outdoor heat pumps piped to fan coil units 2 outside air units are supplied for tempered outside air. ref pa #201608114810. n/a maher ordinance

Open the permit page

$269,037
Sep 8, 2016Completed
final sign-off Mar 2017
1390 Market StNovo Construction Incmechanical work for ti ref pa 2016-0627-0974. n/a maher
Details
Permit
201609087045
Permit issued
Sep 8, 2016
Final sign-off
Mar 1, 2017

mechanical work for ti ref pa 2016-0627-0974. n/a maher

Open the permit page

$10,000
Sep 8, 2016Completed
final sign-off Mar 2017
1390 Market StNovo Construction Inc12th floor: mechanical work for ti ref pa 2016-0721-3010. n/a maher
Details
Permit
201609087043
Permit issued
Sep 8, 2016
Final sign-off
Mar 1, 2017

12th floor: mechanical work for ti ref pa 2016-0721-3010. n/a maher

Open the permit page

$10,000
Apr 28, 2016Completed
final sign-off Aug 2017
943 Howard StField Construction Inc.rework existing registers for new layout. installation of new ac including spiral ductin & exhaust fans. arch set ref pa 2015-0928-8218. sheets a2.1.1 and a2.3.1 maher na
Details
Permit
201604285918
Permit issued
Jul 27, 2017
Final sign-off
Aug 17, 2017

rework existing registers for new layout. installation of new ac including spiral ductin & exhaust fans. arch set ref pa 2015-0928-8218. sheets a2.1.1 and a2.3.1 maher na

Open the permit page

$86,460
Feb 16, 2016Expired or cancelled
expired Apr 2021
1390 Market StField Construction Inc.revision to mep. permit #201508103781 different drawing layout. n/a ordinance #155-13
Details
Permit
201602169612
Permit issued
Feb 17, 2016

revision to mep. permit #201508103781 different drawing layout. n/a ordinance #155-13

Open the permit page