Manouchehr Hakhamaneshi
- Listed as
- engineer
- Firm
- Engineerinc
- Based in
- Burbank
- On San Francisco permits
- Nov 2021 to Mar 2026
8 permits since 2000 (engineer on 8 permits): 6 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 5, 2026 | Completed final sign-off Sep 2026 | 1412 Jackson St | Stanley's Construction | a like for like renovation of 2 bathrooms. in one bathroom, plumbing & electrical will need to be moved and thr room will be extended. the closet of the adjoining room will become part of the bathroom. structural engineers have confirmed the wall to be moved is not load bearing.no change in sq ftDetails
a like for like renovation of 2 bathrooms. in one bathroom, plumbing & electrical will need to be moved and thr room will be extended. the closet of the adjoining room will become part of the bathroom. structural engineers have confirmed the wall to be moved is not load bearing.no change in sq ft | $80,000 |
| Jan 18, 2024 | Completed final sign-off May 2026 | 273 Edinburgh St | Kobliska Construction | revise application# 202206216657: (for kitchen, deck, bath remodel) plan revision to incorporate- re-framing of wall along gridline in kitchen. re-construction of roof above rear foyer. rear foyer will be added to the same area as kitchen.Details
revise application# 202206216657: (for kitchen, deck, bath remodel) plan revision to incorporate- re-framing of wall along gridline in kitchen. re-construction of roof above rear foyer. rear foyer will be added to the same area as kitchen. | |
| Aug 10, 2023 | Completed final sign-off Jun 2024 | 154 Beaumont Av | 1st floor - remove sunroom, add 1 full bathroom, office, family room with wet bar; 2nd fl no change. installed new water heater, furnace, washer & dryerDetails
1st floor - remove sunroom, add 1 full bathroom, office, family room with wet bar; 2nd fl no change. installed new water heater, furnace, washer & dryer | $50,000 | |
| May 18, 2023 | Completed final sign-off Oct 2024 | 138 Corwin St | in-kind replacement/renovation of lower unit bathrooms, windows, patio doors, wood floor, kitchen, replace metal deck railings w/glass railings, new garage/entrance doors, install new wet bar on 3/fDetails
in-kind replacement/renovation of lower unit bathrooms, windows, patio doors, wood floor, kitchen, replace metal deck railings w/glass railings, new garage/entrance doors, install new wet bar on 3/f | $325,000 | |
| Apr 28, 2023 | Never finaled filed Apr 2023, never issued | 93 Monterey Bl | Eagle Environmental Construction | new landscape & retaining wall in rear yard, to ref complaint # 202295495Details
new landscape & retaining wall in rear yard, to ref complaint # 202295495 | $5,000 |
| Jan 6, 2023 | Completed final sign-off Jan 2024 | 190 10th St | 1st Light Energy Inc. | provide and install a utility interactive roof mounted photovoltaic system 33.60kw dcDetails
provide and install a utility interactive roof mounted photovoltaic system 33.60kw dc | $36,390 |
| Jun 21, 2022 | Completed final sign-off May 2026 | 273 Edinburgh St | 1st fl remodel. remodel kitchen including new walls, flooring, appliances, electrical, plumbing. add 1 new window and 2 skylights. replace (e) windows in kitchen. add sliding glass door. renovate (e) outside deck. renovate e bath 2nd/fDetails
1st fl remodel. remodel kitchen including new walls, flooring, appliances, electrical, plumbing. add 1 new window and 2 skylights. replace (e) windows in kitchen. add sliding glass door. renovate (e) outside deck. renovate e bath 2nd/f | $50,000 | |
| Nov 29, 2021 | Expired or cancelled cancelled Jan 2026 | 121 Spear St | suite b-07: interior remodel (non-structural). reducing size of current countertop. replacing wood tile with updated wood. adding shelves and menu screens. repainting, adding vinyl laminate flooring. adding wood frames for refrigerator.Details
suite b-07: interior remodel (non-structural). reducing size of current countertop. replacing wood tile with updated wood. adding shelves and menu screens. repainting, adding vinyl laminate flooring. adding wood frames for refrigerator. | $30,000 |