Stanley's Construction
- Based in
- Danville
- On San Francisco permits
- Sep 2022 to Jun 2026
- Last 24 months
- 4 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | Completed final sign-off Aug 2026 | 334 Teddy Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $24,000 |
| Mar 26, 2026 | Completed final sign-off Jun 2026 | 35 Western Shore Ln | unit #3: bathroom remodel like to like. kitchen remodel like to like. carpet replacing.Details
unit #3: bathroom remodel like to like. kitchen remodel like to like. carpet replacing. | $40,000 |
| Mar 5, 2026 | Completed final sign-off Sep 2026 | 1412 Jackson St | a like for like renovation of 2 bathrooms. in one bathroom, plumbing & electrical will need to be moved and thr room will be extended. the closet of the adjoining room will become part of the bathroom. structural engineers have confirmed the wall to be moved is not load bearing.no change in sq ftDetails
a like for like renovation of 2 bathrooms. in one bathroom, plumbing & electrical will need to be moved and thr room will be extended. the closet of the adjoining room will become part of the bathroom. structural engineers have confirmed the wall to be moved is not load bearing.no change in sq ft | $80,000 |
| Feb 6, 2026 | Completed final sign-off May 2026 | 2634 43rd Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment. | $23,700 |
| May 22, 2023 | Completed final sign-off Oct 2023 | 3341 Clement St | (1) 42 sq ft main bath remodel on 2nd floor, in kind no structural, no changes to window or openings. replace (e) with (n) curbed shower, toilet, and vanity.Details
(1) 42 sq ft main bath remodel on 2nd floor, in kind no structural, no changes to window or openings. replace (e) with (n) curbed shower, toilet, and vanity. | $29,000 |
| May 8, 2023 | Completed final sign-off Jan 2024 | 2638 45th Av | (2) bathroom remodels in kind, no changes to walls or openings. bath #a) 38 sq ft guest bath on 1st. (n) curbless shower toilet, and vanity. all (n) fixtures and finishes. bath #b) 60 sq ft main bath on 2nd floor. (n) curbed shower. (n) tub, (n) toilet and (n) vanity. all (n) fixtures and finishes.Details
(2) bathroom remodels in kind, no changes to walls or openings. bath #a) 38 sq ft guest bath on 1st. (n) curbless shower toilet, and vanity. all (n) fixtures and finishes. bath #b) 60 sq ft main bath on 2nd floor. (n) curbed shower. (n) tub, (n) toilet and (n) vanity. all (n) fixtures and finishes. | $45,000 |
| May 8, 2023 | Completed final sign-off Oct 2023 | 720 York St | unit 201: (1) 43 sq ft (main) bathroom remodel on 2nd floor in kind. no changers to walls or openings. (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.Details
unit 201: (1) 43 sq ft (main) bathroom remodel on 2nd floor in kind. no changers to walls or openings. (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. | $29,000 |
| Feb 7, 2023 | Completed final sign-off Sep 2024 | 51 Prospect Av | 2/f: (1) full bathroom remodel (60 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & double vanity, all new fixtures/finishesDetails
2/f: (1) full bathroom remodel (60 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & double vanity, all new fixtures/finishes | $29,000 |
| Oct 11, 2022 | Completed final sign-off Mar 2023 | 2230 Cabrillo St | 64 sf full bath remodel on 2nd fl in-kind. no structural. no changes to walls or openings. replace (e) with (n) tub/shower, toilet & vanity. all (n) fixtures finishesDetails
64 sf full bath remodel on 2nd fl in-kind. no structural. no changes to walls or openings. replace (e) with (n) tub/shower, toilet & vanity. all (n) fixtures finishes | $14,500 |
| Sep 27, 2022 | Completed final sign-off Nov 2024 | 115 Alpine Tr | (4) bathrooms remodel in kind- no structural- no changes to walls or openings. bath a: 64 sqft master bath 3rd floor (n) tub/ shower toilet and double vanity: bath b: 61 sqft 3/4 bath on 3rd floor (n) curbed shower, toilet, double vanity bath c: 42 sqft powder room 2nd floor (n) toilet and vanity:Details
(4) bathrooms remodel in kind- no structural- no changes to walls or openings. bath a: 64 sqft master bath 3rd floor (n) tub/ shower toilet and double vanity: bath b: 61 sqft 3/4 bath on 3rd floor (n) curbed shower, toilet, double vanity bath c: 42 sqft powder room 2nd floor (n) toilet and vanity: | $40,000 |