Rene Garcia Calara
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Huntsman Arch.Group
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Feb 2022
80 permits since 2000 (architect on 76 permits, authorized agent-others on 2 permits, engineer on 2 permits): 61 completed, 17 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2022 | Completed final sign-off Jun 2022 | 1 California St | M C S Construction Services | tenant improvement 19th fl to include construction of non structural partiions to create private officess. elec under sep permitDetails
tenant improvement 19th fl to include construction of non structural partiions to create private officess. elec under sep permit | $75,150 |
| Jan 24, 2022 | Completed final sign-off Aug 2022 | 111 Sutter St | Gci, Inc | 10/f: non structural demo a construction of non structural partitions, doors, sidelights, ceilings, power , finishes a millwork.Details
10/f: non structural demo a construction of non structural partitions, doors, sidelights, ceilings, power , finishes a millwork. | $591,132 |
| Sep 14, 2021 | Never finaled issued Sep 2021, no final | 301 Howard St | roof level: evac sign submittal per request of fire nov 2108-0103.Details
roof level: evac sign submittal per request of fire nov 2108-0103. | ||
| Mar 16, 2021 | Completed final sign-off Feb 2022 | 121 Spear St | Bcci Construction Company | 2nd fl: selective demolition of non-structural partitions, ceilings, lights & finishes. construction of (n) partitions, ceilings, millwork, lights & finishes. no change in use or area. mep under separate deferred submittal/permit.Details
2nd fl: selective demolition of non-structural partitions, ceilings, lights & finishes. construction of (n) partitions, ceilings, millwork, lights & finishes. no change in use or area. mep under separate deferred submittal/permit. | $737,500 |
| Dec 1, 2020 | Completed final sign-off Aug 2021 | 301 Howard St | Novo Construction Inc | 13/f: revision to pa #2020-0914-4100 to remove door at service elevator lobby #1341.Details
13/f: revision to pa #2020-0914-4100 to remove door at service elevator lobby #1341. | |
| Nov 24, 2020 | Completed final sign-off Jul 2021 | 301 Howard St | Skyline Construction | suite 1050: interior remodel of (e) 1-hr rated elevator lobby and corridor on the 10/f. including interior selective non-structural demolition, no change in occupancy, use or area.Details
suite 1050: interior remodel of (e) 1-hr rated elevator lobby and corridor on the 10/f. including interior selective non-structural demolition, no change in occupancy, use or area. | $562,653 |
| Oct 6, 2020 | Completed final sign-off Sep 2022 | 301 Howard St | Peacock Construction | 16th flr. interior tenant improvement of a full floor occupied tenant suite incl selective interior non-structural demo of partitions, ceiling, lights, finishes, millwork. (n) hearing rms, lobby, interior offices, ceilings, lights, millwork, finishes. upgrades to single accommodation toilet room.Details
16th flr. interior tenant improvement of a full floor occupied tenant suite incl selective interior non-structural demo of partitions, ceiling, lights, finishes, millwork. (n) hearing rms, lobby, interior offices, ceilings, lights, millwork, finishes. upgrades to single accommodation toilet room. | $1,082,125 |
| Sep 14, 2020 | Completed final sign-off Sep 2021 | 301 Howard St | Novo Construction Inc | 13th floor: ti of an existing multi-tenant floor. non-structural demolition, new non-structural partitions, lighting, millwork & finishes.toilet room upgrades. no change in occupancy.Details
13th floor: ti of an existing multi-tenant floor. non-structural demolition, new non-structural partitions, lighting, millwork & finishes.toilet room upgrades. no change in occupancy. | $1,061,958 |
| Jul 23, 2020 | Expired or cancelled cancelled Jan 2026 | 50 California St | 25th fl - to document accessible toilet in women's restroom to remain in existing location. all other conditions will be code compliant. addition of 25th fl technical infeasibility request (sheet 25rr-2) 25rr-1;modified demo and construction sheet notes, modified accessory & toilet locations,Details
25th fl - to document accessible toilet in women's restroom to remain in existing location. all other conditions will be code compliant. addition of 25th fl technical infeasibility request (sheet 25rr-2) 25rr-1;modified demo and construction sheet notes, modified accessory & toilet locations, | $32,365 | |
| Jul 14, 2020 | Never finaled issued Aug 2020, no final | 1655 03rd St | Dpr Construction | rev to pa#2018-1127-6767 mb3 north tower in response to sffd inspection comments. as-built oil piping & rated enclosure elements.Details
rev to pa#2018-1127-6767 mb3 north tower in response to sffd inspection comments. as-built oil piping & rated enclosure elements. | |
| Jun 12, 2020 | Never finaled issued Jul 2020, no final | 1725 03rd St | Dpr Construction | rev to pa#201907166064: evacuation plans for level 1 to level 11. maher n/a.Details
rev to pa#201907166064: evacuation plans for level 1 to level 11. maher n/a. | |
| Mar 10, 2020 | Completed final sign-off Feb 2022 | 1655 03rd St | Dpr Construction | 3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.Details
3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope. | $1,475,000 |
| Jan 27, 2020 | Never finaled issued Oct 2020, no final | 300 16th St | Dpr Construction | mb4: admin pa to memorialize installation req per ab-005 for framery phone booths as shown in ti permits for levels 3-11. l3-2019-0716-6063, l4-2019-0522-1411, l5-2019-0522-1416, l6-2018-1001-1925 & rev 2019-0402-6929, l8- 2019-0923-2389, l9-2019-0923-2383, l10-2019-0923-2384;l11-2019-0923-2386Details
mb4: admin pa to memorialize installation req per ab-005 for framery phone booths as shown in ti permits for levels 3-11. l3-2019-0716-6063, l4-2019-0522-1411, l5-2019-0522-1416, l6-2018-1001-1925 & rev 2019-0402-6929, l8- 2019-0923-2389, l9-2019-0923-2383, l10-2019-0923-2384;l11-2019-0923-2386 | |
| Jan 27, 2020 | Never finaled issued Oct 2020, no final | 300 16th St | Dpr Construction | mb3: admin pa to memorialize installation equipment per ab005 for framery phone boots as shown in ti permits for 2nd fl-11th. l2-201907166051, l3-201907166059, l4-201905221410, l5-201905221406, l6-201904026930, l7-201904026931, l8-201909232413, l9-201909232409, l10-201909232391 & l11-201909232408Details
mb3: admin pa to memorialize installation equipment per ab005 for framery phone boots as shown in ti permits for 2nd fl-11th. l2-201907166051, l3-201907166059, l4-201905221410, l5-201905221406, l6-201904026930, l7-201904026931, l8-201909232413, l9-201909232409, l10-201909232391 & l11-201909232408 | |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 75 Hawthorne St | Novo Construction Inc | 8th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permitDetails
8th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permit | $635,855 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 75 Hawthorne St | Novo Construction Inc | 6th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permitDetails
6th flr - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permit | $694,903 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,250,015 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,235,187 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,133,034 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maherDetails
mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher | $2,145,835 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maherDetails
mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher | $2,236,961 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.Details
mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. | $2,116,305 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290Details
mb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290 | $2,250,015 | |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maherDetails
mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher | $2,235,187 |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | Dpr Construction | rev to pa# 201810011925 & 201904026929; revised areas clouded w/ delta 17. revision to memorialize new smoke conrol system (provided in base bldg per mit rev 2019061333375 original pa# 201606149954527 and corresponding smoke conrol nairative updateDetails
rev to pa# 201810011925 & 201904026929; revised areas clouded w/ delta 17. revision to memorialize new smoke conrol system (provided in base bldg per mit rev 2019061333375 original pa# 201606149954527 and corresponding smoke conrol nairative update | |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | Dpr Construction | rev to pa# 201905221411; revised areas clouded w/ delta 17. revision to memorialize new smoke control systemDetails
rev to pa# 201905221411; revised areas clouded w/ delta 17. revision to memorialize new smoke control system | |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | Dpr Construction | mb4-l5: revision to bpa #201905221416. revised areas clouded w/delta 17. revision to memorialize new smoke control system.Details
mb4-l5: revision to bpa #201905221416. revised areas clouded w/delta 17. revision to memorialize new smoke control system. | |
| Aug 15, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | Dpr Construction | mb3-l5: revision to bpa #2019052251406. revised areas clouded w/delta 17. revision to memorialize new smoke control system.Details
mb3-l5: revision to bpa #2019052251406. revised areas clouded w/delta 17. revision to memorialize new smoke control system. | |
| Jul 16, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 north, 1st time ti level 3, work includes new partitons, finishes, mepDetails
mb3 north, 1st time ti level 3, work includes new partitons, finishes, mep | $3,178,766 |
| Jul 3, 2019 | Completed final sign-off Feb 2020 | 50 California St | Swinerton Builders | suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.Details
suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a. | $500,000 |
| Jun 3, 2019 | Completed final sign-off Sep 2019 | 50 California St | Gci, Inc | 13th fl - ti of (e) office - replace all interior finishes & furniture, ceiling & tiles, electricalDetails
13th fl - ti of (e) office - replace all interior finishes & furniture, ceiling & tiles, electrical | $267,000 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.Details
installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch. | $16,000 |
| May 22, 2019 | Completed final sign-off Nov 2020 | 300 16th St | Dpr Construction | mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.Details
mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. | $4,868,336 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $3,979,382 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $4,055,807 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $4,807,428 |
| May 14, 2019 | Completed final sign-off Sep 2019 | 4408 17th St | Miguel A Padilla Construction | new wood pergola @ rear yardDetails
new wood pergola @ rear yard | $1,200 |
| May 3, 2019 | Completed final sign-off Sep 2020 | 75 Hawthorne St | Tcg Builders Inc Dba The Core Group | 4th fl - mep for interior ti on (e) unoccupied space, reflected in pa 2019-0412-7813. maher n/a.Details
4th fl - mep for interior ti on (e) unoccupied space, reflected in pa 2019-0412-7813. maher n/a. | |
| Apr 2, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | revision to 201810011925 work includes revisions to partitions, layout and finishes mb4 southDetails
revision to 201810011925 work includes revisions to partitions, layout and finishes mb4 south | |
| Apr 2, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 north level 6 ti - non structural partitions, doors & frames, millwork and finishesDetails
mb3 north level 6 ti - non structural partitions, doors & frames, millwork and finishes | $5,727,579 |
| Feb 1, 2019 | Completed final sign-off May 2019 | 555 California St | Bcci Construction Company | 33rd fl, ste 3360 - selective demo of (e) non-structural partitions & doors. construction of new non-structural walls, glazing doors, millwork & finishes. n/a for maher.Details
33rd fl, ste 3360 - selective demo of (e) non-structural partitions & doors. construction of new non-structural walls, glazing doors, millwork & finishes. n/a for maher. | $145,644 |
| Jan 16, 2019 | Completed final sign-off Jul 2020 | 300 16th St | Dpr Construction | installation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a**Details
installation of (n) grease exhaust fan on level 12 (roof) for kitchen exhaust on levels 6 & 7 (app #2018-1001-1925). work includes house keeping pads, waterproofing at roof patch.**maher n/a** | $50,000 |
| Nov 27, 2018 | Never finaled issued Aug 2019, no final | 300 16th St | Dpr Construction | south tower-mb4. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **Details
south tower-mb4. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a ** | $125,000 |
| Nov 27, 2018 | Never finaled issued Aug 2019, no final | 300 16th St | Dpr Construction | north tower-mb3. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life-safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a **Details
north tower-mb3. installation of new generator on roof, level 12, for the purpose of providing emergency power to non-life-safety devices. work includes house keeping pad, exterior wall waterproofing @ penetration. ** maher: n/a ** | $125,000 |
| Nov 27, 2018 | Completed final sign-off Jul 2020 | 300 16th St | Dpr Construction | south tower-mb4. provide new grease separator.** maher: n/a **Details
south tower-mb4. provide new grease separator.** maher: n/a ** | $75,000 |
| Oct 26, 2018 | Completed final sign-off Jan 2019 | 1 California St | Gci, Inc | 28/f:interior non-structural demo of (e) unoccupied 28th flr including partitions, ceiling, lighting, finishes, doors, frames, hardware & millwork. desing build sprinkler scope required by removal of ceiling in on unoccupied tenant. ab-017 space will rem,ain unoccupied.Details
28/f:interior non-structural demo of (e) unoccupied 28th flr including partitions, ceiling, lighting, finishes, doors, frames, hardware & millwork. desing build sprinkler scope required by removal of ceiling in on unoccupied tenant. ab-017 space will rem,ain unoccupied. | $60,000 |
| Nov 14, 2017 | Completed final sign-off Apr 2018 | 220 Montgomery St | San Francisco Commercial Builders Inc | 4th floor #460 - non-structural demolition & construction of non-structural partitions, doors & glazing, lighting, electrical, ceiling & finishes. no increase in occupancy, use or area. design/build mech, elec, plbg, fire alarm & fire sprinkelrs under separate permit. n/a maher ordinanceDetails
4th floor #460 - non-structural demolition & construction of non-structural partitions, doors & glazing, lighting, electrical, ceiling & finishes. no increase in occupancy, use or area. design/build mech, elec, plbg, fire alarm & fire sprinkelrs under separate permit. n/a maher ordinance | $137,826 |
| Oct 24, 2017 | Completed final sign-off Jun 2018 | 75 Hawthorne St | C B 2 Builders Incorporated | ti on 5th fl suite (partial floor), includes demolition, construction of non-structural partitions, doors, interior glazing, ceiling lighting, millwork & finishes. no change in occupancy. mep under sep. permit.Details
ti on 5th fl suite (partial floor), includes demolition, construction of non-structural partitions, doors, interior glazing, ceiling lighting, millwork & finishes. no change in occupancy. mep under sep. permit. | $645,645 |
| Sep 26, 2017 | Never finaled issued Oct 2017, no final | 1 Post St | Skyline Construction | 36/f- commercial t.i. including but not limited to new interior non structural partitions, floor, wall, ceiling, finishes & restroom upgrades. new m.e.p. under seperate permit. no change to bldg. exterior or floor plate s.f. no (e) parking in bldg.Details
36/f- commercial t.i. including but not limited to new interior non structural partitions, floor, wall, ceiling, finishes & restroom upgrades. new m.e.p. under seperate permit. no change to bldg. exterior or floor plate s.f. no (e) parking in bldg. | $758,989 |
| Sep 25, 2017 | Never finaled issued Oct 2017, no final | 1 Post St | Skyline Construction | 37th fl: commercial t.i. including but not limited to: new interior non-struct. partitions, floors, walls & ceiling, finishes, & restroom upgrades. new mep/engineered drawings under sep. permit. no changes to bldg exterior or floor plate sf. no (e) parking in bldg. life safety deferred.Details
37th fl: commercial t.i. including but not limited to: new interior non-struct. partitions, floors, walls & ceiling, finishes, & restroom upgrades. new mep/engineered drawings under sep. permit. no changes to bldg exterior or floor plate sf. no (e) parking in bldg. life safety deferred. | $762,608 |
| Jun 15, 2017 | Completed final sign-off Dec 2017 | 220 Montgomery St | San Francisco Commercial Builders Inc | 4th flr- upgrades to (e) men's room; addition of women's restrm from (e) office suite 417. demo & construct non-structural prtitions, doors, ele, plbg, ceiling & finishes. no increase in area or change in occupancy. mep, sprinklers, l/s deferredDetails
4th flr- upgrades to (e) men's room; addition of women's restrm from (e) office suite 417. demo & construct non-structural prtitions, doors, ele, plbg, ceiling & finishes. no increase in area or change in occupancy. mep, sprinklers, l/s deferred | $120,000 |
| May 26, 2017 | Completed final sign-off Oct 2017 | 360 03rd St | Principal Builders Inc. | 3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher naDetails
3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na | $68,000 |
| Mar 21, 2017 | Completed final sign-off Oct 2017 | 1 Market St | Dpr Construction | spear tower-37th floor - revision to pa 2016-0908-7059 and includes the conversion of a break area/hub to a crepe station/serving area. new non-structural partitions. equipment, millwork, lights and mep will be installed. no change in use or areaDetails
spear tower-37th floor - revision to pa 2016-0908-7059 and includes the conversion of a break area/hub to a crepe station/serving area. new non-structural partitions. equipment, millwork, lights and mep will be installed. no change in use or area | $60,000 |
| Mar 17, 2017 | Completed final sign-off Dec 2017 | 220 Montgomery St | San Francisco Commercial Builders Inc | ground floor suite 132 - commercial t.i. including two accessible restrooms with showers & elec. room. (e) space is vancant & will remain vacant until future t.i. under separate permit. no increase in occupancy use or area. design/build mep, life safety, & fire sprinkelrs under separate permit.Details
ground floor suite 132 - commercial t.i. including two accessible restrooms with showers & elec. room. (e) space is vancant & will remain vacant until future t.i. under separate permit. no increase in occupancy use or area. design/build mep, life safety, & fire sprinkelrs under separate permit. | $90,000 |
| Feb 28, 2017 | Completed final sign-off May 2017 | 50 California St | Richlen Construction | 17th flr -selective demolition of finishes & plumbing fixtures. new construction consists of non-structural partitions, restroom fixtures, accessories & finishes. all within common areas only. tenant improvement under separate permit. space is occupied & will remain occupied during project.n/a maherDetails
17th flr -selective demolition of finishes & plumbing fixtures. new construction consists of non-structural partitions, restroom fixtures, accessories & finishes. all within common areas only. tenant improvement under separate permit. space is occupied & will remain occupied during project.n/a maher | $160,000 |
| Feb 24, 2017 | Completed final sign-off Jul 2017 | 50 California St | Principal Builders Inc. | 17th floor: t.i. to demo and construct new partitions, doors, millwork, ceiling and finishes and mechanical and electrical equipment. life safty and fire under seperate permit. n/a for maher.Details
17th floor: t.i. to demo and construct new partitions, doors, millwork, ceiling and finishes and mechanical and electrical equipment. life safty and fire under seperate permit. n/a for maher. | $800,000 |
| Dec 30, 2016 | Completed final sign-off Dec 2017 | 123 Townsend St | Novo Construction Inc | 3rd flr: ti - of an (e) full floor suite. non structural demo of interior partitions & door/frame/hardware. lighting & finishes. new non structural interior partitions & doors/frame/hardware. new ele/plumb/mech & lighting & life safety to tie into (e) bld. new millwork & finishes maher naDetails
3rd flr: ti - of an (e) full floor suite. non structural demo of interior partitions & door/frame/hardware. lighting & finishes. new non structural interior partitions & doors/frame/hardware. new ele/plumb/mech & lighting & life safety to tie into (e) bld. new millwork & finishes maher na | $1,489,411 |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 50 California St | Richlen Construction | 19/f- selective demo of non structural partitions, doors, glazing, hardware, millwork, lighting, ceiling grid & tile, electrical & finishes. new work consists non structural partitions, elevator lobby doors, restroom fixtures/accessories/finishes, space remain unoccupied. ti will follow. n/a maher;Details
19/f- selective demo of non structural partitions, doors, glazing, hardware, millwork, lighting, ceiling grid & tile, electrical & finishes. new work consists non structural partitions, elevator lobby doors, restroom fixtures/accessories/finishes, space remain unoccupied. ti will follow. n/a maher; | $155,000 |
| Sep 6, 2016 | Expired or cancelled cancelled Jan 2026 | 1 Market St | 7th flr (spear tower)this submittal is a permit revision to approved 201511031519; card readers @ passenger elev lobby are not installed; filed inspector removal of documentation on permit set to reflect as such; maher n/aDetails
7th flr (spear tower)this submittal is a permit revision to approved 201511031519; card readers @ passenger elev lobby are not installed; filed inspector removal of documentation on permit set to reflect as such; maher n/a | ||
| Aug 11, 2016 | Completed final sign-off Oct 2017 | 1 Market St | Dpr Construction | 37/f spear tower- project consists of addition of a few painted metal louver @ (e) window at north builing 37/f, louver is to vent (n) restroom exhaust, associated interior t.i. included arch. & mep will be submitted under seperate permit. n/a ordinance #155-13Details
37/f spear tower- project consists of addition of a few painted metal louver @ (e) window at north builing 37/f, louver is to vent (n) restroom exhaust, associated interior t.i. included arch. & mep will be submitted under seperate permit. n/a ordinance #155-13 | $20,000 |
| Jun 2, 2016 | Completed final sign-off Aug 2016 | 1 Market St | Dpr Construction | revision to pa 2015-0805-3357, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher naDetails
revision to pa 2015-0805-3357, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher na | $3,500 |
| Jun 2, 2016 | Completed final sign-off Aug 2016 | 330 Townsend St | Peacock Construction | #136- scope of work for this project is to demolish all existing non-structural partitions, doors, glazing, millwork and flooring, remove all electrical from delmoished wall. demo only per ab-017. n/a ordinance #155-13Details
#136- scope of work for this project is to demolish all existing non-structural partitions, doors, glazing, millwork and flooring, remove all electrical from delmoished wall. demo only per ab-017. n/a ordinance #155-13 | $6,492 |
| Jun 2, 2016 | Completed final sign-off Aug 2016 | 1 Market St | Dpr Construction | revision to pa 2015-0804-3216, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher naDetails
revision to pa 2015-0804-3216, addition of powered door operators @ (e) restrooms in lieu of interior door side clearances as requested by field inspector. maher na | $3,500 |
| May 19, 2016 | Completed final sign-off Dec 2016 | 1 Market St | Dpr Construction | spear tower: selective interior non-structural demolition, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical and hvac. no change in occupancy, use or floor area. n/a ordinance #155-13Details
spear tower: selective interior non-structural demolition, (n) non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical and hvac. no change in occupancy, use or floor area. n/a ordinance #155-13 | $131,040 |
| Apr 19, 2016 | Completed final sign-off Aug 2016 | 1 Market St | Dpr Construction | 7th flr: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish use of flame retardant product to be used on art piece installation.no change in occupant load,occupancy & no change in floor area; maher n/aDetails
7th flr: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish use of flame retardant product to be used on art piece installation.no change in occupant load,occupancy & no change in floor area; maher n/a | |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 1 Market St | Dpr Construction | #7055: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish occupant load @tech talk rm 7055 for purposes of assembly permit application.no change in occupant load,occupancy or floor area.; maher n/aDetails
#7055: this submittal is a permit revision to issued permit 201511031519, this permit submittal is to establish occupant load @tech talk rm 7055 for purposes of assembly permit application.no change in occupant load,occupancy or floor area.; maher n/a | |
| Dec 23, 2015 | Completed final sign-off Aug 2016 | 1 Market St | Dpr Construction | work on 07th flr.this project is a permit revision to p/a #201511031519 includes the installation of a food staging area. no change in area, occupancy or occupancy load. mep under separate permit. n/a for maher ordinance no. 155-13Details
work on 07th flr.this project is a permit revision to p/a #201511031519 includes the installation of a food staging area. no change in area, occupancy or occupancy load. mep under separate permit. n/a for maher ordinance no. 155-13 | $40,000 |
| Aug 6, 2015 | Completed final sign-off May 2016 | 1 Market St | Dpr Construction | 13th floor - selective interior non-structural demo; (n) non-structural partitions, doors, ceiling, lights, millwork, finishes. no change in occupancy and no change in floor area. providing horizontial exits. mep. seperate permit.Details
13th floor - selective interior non-structural demo; (n) non-structural partitions, doors, ceiling, lights, millwork, finishes. no change in occupancy and no change in floor area. providing horizontial exits. mep. seperate permit. | $1,300,000 |
| Aug 5, 2015 | Never finaled issued Aug 2015, no final | 1 Market St | Dpr Construction | selective interior non-structural demo, (n) non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy and no change in floor area. providing horizontal exits. n/a ordinance #155-13Details
selective interior non-structural demo, (n) non structural partitions, doors, ceilings, lights, millwork, finishes, electrical, plumbing & hvac. no change in occupancy and no change in floor area. providing horizontal exits. n/a ordinance #155-13 | $1,300,000 |
| Jan 16, 2015 | Completed final sign-off Aug 2015 | 50 California St | Richlen Construction | 32nd floor - remove hazardous material from current unoccupied space full floor and includes demo of non-sturctural partitions, power/data, millwork, plumbing and ceiling. new work consists of restroom build back and elevator enclosure. space remain unoccupied. t.i.under sep. permit.maher n/a.Details
32nd floor - remove hazardous material from current unoccupied space full floor and includes demo of non-sturctural partitions, power/data, millwork, plumbing and ceiling. new work consists of restroom build back and elevator enclosure. space remain unoccupied. t.i.under sep. permit.maher n/a. | $1,100,000 |
| Dec 18, 2014 | Completed final sign-off Aug 2015 | 50 California St | Skyline Construction | 26th flr: new non-structural partitions, doors ceiling, lights, millwork & finishes, mep, life safety & fire sprinkler under sep permit; maher n/aDetails
26th flr: new non-structural partitions, doors ceiling, lights, millwork & finishes, mep, life safety & fire sprinkler under sep permit; maher n/a | $744,102 |
| May 28, 2014 | Completed final sign-off Nov 2015 | 1 South Park | Bcci Construction Company | ground floor commercial t.i. of office space including demo/construction of non structural partitions, new millwork, lighting & finishes. this project does not change use or occupancy. mep under separate permit. n/a maher ordinanceDetails
ground floor commercial t.i. of office space including demo/construction of non structural partitions, new millwork, lighting & finishes. this project does not change use or occupancy. mep under separate permit. n/a maher ordinance | $350,000 |
| Feb 13, 2014 | Completed final sign-off May 2014 | 50 California St | Skyline Construction | #2500- tenant improvement including construction of new non-structural partitions, new doors, frames, side lights, power/data electrical, lighting and finishes. compliance with ordinance #155-13 not required.Details
#2500- tenant improvement including construction of new non-structural partitions, new doors, frames, side lights, power/data electrical, lighting and finishes. compliance with ordinance #155-13 not required. | $455,620 |
| Sep 27, 2013 | Completed final sign-off Apr 2014 | 50 California St | Richlen Construction | tenant improvement including new demising wall, partial demolition of existing non-structural partitions, construct new non-structural partitions, new doors, frames, power/data electrical, mill work and finishes. m.e.p. under seperate permit. work for suite 2540 only under this permitDetails
tenant improvement including new demising wall, partial demolition of existing non-structural partitions, construct new non-structural partitions, new doors, frames, power/data electrical, mill work and finishes. m.e.p. under seperate permit. work for suite 2540 only under this permit | $120,500 |
| Apr 15, 2013 | Completed final sign-off Dec 2013 | 615 Battery St | Hathaway Dinwiddie Co. | 5th floor:provide/install an intercommunicating stair between the fourth and fifth floor of 615 battery st.Details
5th floor:provide/install an intercommunicating stair between the fourth and fifth floor of 615 battery st. | $45,000 |
| Apr 24, 2012 | Never finaled issued Apr 2012, no final | 615 Battery St | Hathaway Dinwiddie Co. | 4th fl-demo of (e) non-struct inter. partitions, doors, millwork, flring, electrical, ceiling & lighting. space shall remain vacant. future occupancy under seperate permit, per ab-017. no req to provide disable accesss for vacant space disabled access will be addressed @time of const. for future t.iDetails
4th fl-demo of (e) non-struct inter. partitions, doors, millwork, flring, electrical, ceiling & lighting. space shall remain vacant. future occupancy under seperate permit, per ab-017. no req to provide disable accesss for vacant space disabled access will be addressed @time of const. for future t.i | $15,000 |
| Dec 28, 2011 | Completed final sign-off Apr 2012 | 50 California St | Skyline Construction | 4th floor-(e) space recently abated under pa# 2011-0916-4854- included build out of new accessicle restrooms. new construction consists of common corridor, elevator lobby finishes, tenant demising walls. spaces will remain unoccupied after this project, future occupancy/build outs under seperate peDetails
4th floor-(e) space recently abated under pa# 2011-0916-4854- included build out of new accessicle restrooms. new construction consists of common corridor, elevator lobby finishes, tenant demising walls. spaces will remain unoccupied after this project, future occupancy/build outs under seperate pe | $150,000 |
| Jan 13, 2009 | Completed final sign-off Jan 2010 | 275 Battery St | Turner Construction Co | 14th floor full floor tenant improvement including new finishes, light fixtures & hvac, rooms include server room, offices, conf rooms & relocation of high density shelving.Details
14th floor full floor tenant improvement including new finishes, light fixtures & hvac, rooms include server room, offices, conf rooms & relocation of high density shelving. | $350,000 |
| May 1, 2007 | Completed final sign-off Apr 2008 | 3921 Geary Bl | Zion Construction Company | interior renovation, change in use from b to m, ada upgrades, reconfigureation & new finishes throughout. minor exterior grading & glazing replacement. mechanicalwork under seperate permit.Details
interior renovation, change in use from b to m, ada upgrades, reconfigureation & new finishes throughout. minor exterior grading & glazing replacement. mechanicalwork under seperate permit. | $300,000 |
| Apr 6, 2005 | Completed final sign-off Nov 2007 | 1500 Valencia St | Associated Builders | revision to permitted & approved seismic grade beams.Details
revision to permitted & approved seismic grade beams. |