Sebastian Fahim
- License
- M38047
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M38047 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Hunstman
- Based in
- San Francisco
- On San Francisco permits
- May 2019 to Oct 2020
16 permits since 2000 (engineer on 16 permits): 15 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dpr Construction (14), Sc Builders, Inc
- Architects
- Rene Calara (14), Brain Corbett, Scott Clement
- Engineers
- Robert Nixdorf (15)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 16
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 9, 2020 | Completed final sign-off Jul 2021 | 185 Berry St | Sc Builders, Inc | 6th flr. t.i., demo (non-structural), (n) construction of conference rooms and lobby. mep included (work in (n) conference & lobby area only.Details
6th flr. t.i., demo (non-structural), (n) construction of conference rooms and lobby. mep included (work in (n) conference & lobby area only. | $550,000 |
| Jul 14, 2020 | Never finaled issued Jul 2020, no final | 1725 03rd St | Dpr Construction | 12/f: mb4 :rev to pa201811276770 in response to sffd inspection as documented in bulletin 32. rev to include 2016 version of sffd ab2.07 & as-bulits of fuel piping.Details
12/f: mb4 :rev to pa201811276770 in response to sffd inspection as documented in bulletin 32. rev to include 2016 version of sffd ab2.07 & as-bulits of fuel piping. | |
| Mar 10, 2020 | Completed final sign-off Feb 2022 | 1655 03rd St | Dpr Construction | 3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.Details
3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope. | $1,475,000 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maherDetails
mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher | $2,236,961 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | mb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290Details
mb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290 | $2,250,015 | |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,133,034 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maherDetails
mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher | $2,235,187 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,250,015 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep workDetails
mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work | $2,235,187 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maherDetails
mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher | $2,145,835 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.Details
mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. | $2,116,305 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $3,979,382 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $4,807,428 |
| May 22, 2019 | Completed final sign-off Nov 2020 | 300 16th St | Dpr Construction | mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.Details
mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. | $4,868,336 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.Details
installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch. | $16,000 |
| May 22, 2019 | Completed final sign-off Sep 2020 | 300 16th St | Dpr Construction | mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher naDetails
mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na | $4,055,807 |