Permit GraphShortlistSan Francisco building permits since 2000

Sebastian Fahim

License
M38047
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M38047 at the Board for Professional Engineers
Listed as
engineer
Firm
Hunstman
Based in
San Francisco
On San Francisco permits
May 2019 to Oct 2020

16 permits since 2000 (engineer on 16 permits): 15 completed, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Dpr Construction (14), Sc Builders, Inc
Architects
Rene Calara (14), Brain Corbett, Scott Clement
Engineers
Robert Nixdorf (15)

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 9, 2020Completed
final sign-off Jul 2021
185 Berry StSc Builders, Inc6th flr. t.i., demo (non-structural), (n) construction of conference rooms and lobby. mep included (work in (n) conference & lobby area only.
Details
Permit
202010096233
Permit issued
Nov 30, 2020
Final sign-off
Jul 8, 2021

6th flr. t.i., demo (non-structural), (n) construction of conference rooms and lobby. mep included (work in (n) conference & lobby area only.

Open the permit page

$550,000
Jul 14, 2020Never finaled
issued Jul 2020, no final
1725 03rd StDpr Construction12/f: mb4 :rev to pa201811276770 in response to sffd inspection as documented in bulletin 32. rev to include 2016 version of sffd ab2.07 & as-bulits of fuel piping.
Details
Permit
202007140172
Permit issued
Jul 27, 2020

12/f: mb4 :rev to pa201811276770 in response to sffd inspection as documented in bulletin 32. rev to include 2016 version of sffd ab2.07 & as-bulits of fuel piping.

Open the permit page

Mar 10, 2020Completed
final sign-off Feb 2022
1655 03rd StDpr Construction3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.
Details
Permit
202003106696
Permit issued
Jan 12, 2021
Final sign-off
Feb 17, 2022

3rd fl - mb3 l3 - revision to 2019-0716-6059 revised areas clouded w/delta's 15-27. scope of work limited to area of b&a occupancy spce on the south west side of the 3rd fl. no change in occupancy groups or use. da checklist updated to include added scope.

Open the permit page

$1,475,000
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
Details
Permit
201909232389
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 8: t. i. work includes non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher

Open the permit page

$2,236,961
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th Stmb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290
Details
Permit
201909232409
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 9- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work. core restrooms submitted under separate pa 2018-0802-6290

Open the permit page

$2,250,015
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232386
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 11 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,133,034
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher
Details
Permit
201909232384
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 l10: non structural partitions, doors, frames, millwork, finishes light fixtures ceiling and mep work. n/a for maher

Open the permit page

$2,235,187
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232391
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 10 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,250,015
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work
Details
Permit
201909232383
Permit issued
Dec 20, 2019
Final sign-off
Sep 24, 2020

mb4 level 9 - non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work

Open the permit page

$2,235,187
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher
Details
Permit
201909232408
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

mb3 level 11: non structural partitions, doors, frames, millwork, finishes, light fixtures ceilings and mep work. n/a for maher

Open the permit page

$2,145,835
Sep 23, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.
Details
Permit
201909232413
Permit issued
Dec 20, 2019
Final sign-off
Sep 18, 2020

mb3 level 8- non-structural partitions, doors, frames, millwork, finishes, light fixtures ceilings & mep work.

Open the permit page

$2,116,305
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221411
Permit issued
Oct 21, 2019
Final sign-off
Sep 24, 2020

mb4 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$3,979,382
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221406
Permit issued
Oct 22, 2019
Final sign-off
Sep 18, 2020

mb3 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$4,807,428
May 22, 2019Completed
final sign-off Nov 2020
300 16th StDpr Constructionmb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.
Details
Permit
201905221410
Permit issued
Oct 22, 2019
Final sign-off
Nov 4, 2020

mb3 - level 4 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work.

Open the permit page

$4,868,336
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructioninstallation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.
Details
Permit
201905221413
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020

installation of new rooftop equipment on roof. work includes house keeping pads, waterproofing at roof patch.

Open the permit page

$16,000
May 22, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na
Details
Permit
201905221416
Permit issued
Oct 21, 2019
Final sign-off
Sep 24, 2020

mb4 - level 5 - 1st time ti, interior only, work to include non-structural partitions, doors, frames, millwork, finishes, light fixtures, ceiling and mep work. maher na

Open the permit page

$4,055,807