Zion Construction Company
- Based in
- San Ramon
- On San Francisco permits
- Feb 2005 to Jul 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2013 | Never finaled issued Jul 2013, no final | 3550 Cesar Chavez St | 2nd and 3rd floor mess residence bathrooms + showers. demo (e) finishes and fixtures and replace with new finishes and fixtures (4) showers, (4) toilets, (6) sinks, (2) urinals each floor. all new fixtures to go back in existing locations.Details
2nd and 3rd floor mess residence bathrooms + showers. demo (e) finishes and fixtures and replace with new finishes and fixtures (4) showers, (4) toilets, (6) sinks, (2) urinals each floor. all new fixtures to go back in existing locations. | $72,480 |
| May 25, 2010 | Never finaled issued May 2010, no final | 1880 Wawona St | install new vinyl dual glazed low 'e" clear tempered replacement window front @ house (7-total).Details
install new vinyl dual glazed low 'e" clear tempered replacement window front @ house (7-total). | $5,300 |
| Nov 29, 2007 | Completed final sign-off Apr 2008 | 3921 Geary Bl | relocation of (e) stair with new configuration & guardrail replacement. shear wall reconfigeration at 2nd floor. m/e/p work under separate permit.Details
relocation of (e) stair with new configuration & guardrail replacement. shear wall reconfigeration at 2nd floor. m/e/p work under separate permit. | $200,000 |
| May 1, 2007 | Completed final sign-off Apr 2008 | 3921 Geary Bl | interior renovation, change in use from b to m, ada upgrades, reconfigureation & new finishes throughout. minor exterior grading & glazing replacement. mechanicalwork under seperate permit.Details
interior renovation, change in use from b to m, ada upgrades, reconfigureation & new finishes throughout. minor exterior grading & glazing replacement. mechanicalwork under seperate permit. | $300,000 |
| Mar 7, 2005 | Never finaled issued Mar 2005, no final | 300 West Portal Av | 2 (e) hvac units are bad. 3 1/2 ton each. we are replacing units with same. 3 1/2 ton in kind. noDetails
2 (e) hvac units are bad. 3 1/2 ton each. we are replacing units with same. 3 1/2 ton in kind. no | $10,000 |
| Feb 22, 2005 | Never finaled issued Feb 2005, no final | 300 West Portal Av | move existing supplies & returns. add 2 new bathroom vents.Details
move existing supplies & returns. add 2 new bathroom vents. | $3,000 |