Block 3794, lot 010
123 Townsend St
- City’s use
- Commercial Office
- Built
- 1903
- Stories
- 6
- Rooms
- 8 bathrooms
- Building
- 137,625 sq ft
- Lot
- 22,825 sq ft
- Zoning
- MUO
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
150 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 4, 2025 | In progress issued Jun 2026 | 123 Townsend St | C C I Commercial Construction & Improv | 5th floor tenant improvement demo of (e) non bearing walls, adding (n) interior non bearing walls and cleanup finishes. reduced scope from 12/4/2025 review.Details
5th floor tenant improvement demo of (e) non bearing walls, adding (n) interior non bearing walls and cleanup finishes. reduced scope from 12/4/2025 review. | $145,500 |
| Sep 10, 2025 | Completed final sign-off Nov 2025 | 123 Townsend St | Pyro-Comm Systems, Inc. | as built to show updated sequence of operation per sffd inspector comments 202209132310Details
as built to show updated sequence of operation per sffd inspector comments 202209132310 | |
| Sep 13, 2022 | Completed final sign-off Nov 2025 | 123 Townsend St | Pyro-Comm Systems, Inc. | voluntary elevator upgrade. adding 1 relay module for elevator #1 machine room smoke detector.Details
voluntary elevator upgrade. adding 1 relay module for elevator #1 machine room smoke detector. | $500 |
| Apr 27, 2022 | Never finaled issued Apr 2022, no final | 123 Townsend St | Elson Electric Holdings Inc | install restroom lights and power install breakroom lights and powerDetails
install restroom lights and power install breakroom lights and power | $120,000 |
| Mar 28, 2022 | Completed final sign-off Jun 2022 | 123 Townsend St | Rrs Fire Alarm Inc Dba California Fire D | modification of an existing fire alarm system. 1st floor.Details
modification of an existing fire alarm system. 1st floor. | $10,000 |
| Feb 14, 2022 | Completed final sign-off Oct 2022 | 123 Townsend St | Peacock Construction | 1st floor t.i. of an extg partial floor unoccuppied suite. scope includes non-structural demo, new non struc. glass partitions, accent lighting, millwork, & floor & wall finishes. restroom accessibility upgrades new plmg fixtures and floor & wall finishes. no change in occupancy,use or areasDetails
1st floor t.i. of an extg partial floor unoccuppied suite. scope includes non-structural demo, new non struc. glass partitions, accent lighting, millwork, & floor & wall finishes. restroom accessibility upgrades new plmg fixtures and floor & wall finishes. no change in occupancy,use or areas | $528,580 |
| Jul 8, 2021 | Completed final sign-off Oct 2021 | 123 Townsend St | Matrix Hg Inc | roof top: replace (1) heating hot water boiler w/ (2) (n) higher officiency boilers of identical capacity, miscellaneous piping, and miscellaneous hydronic accessories.Details
roof top: replace (1) heating hot water boiler w/ (2) (n) higher officiency boilers of identical capacity, miscellaneous piping, and miscellaneous hydronic accessories. | $134,078 |
| Feb 4, 2021 | Completed final sign-off Aug 2021 | 123 Townsend St | Pyro-Comm Systems, Inc. | fire alarm; voluntary panel replacement with a new cellular communicator. all devices will now have textual display on the facp describing device and location.Details
fire alarm; voluntary panel replacement with a new cellular communicator. all devices will now have textual display on the facp describing device and location. | $6,000 |
| Oct 27, 2020 | Completed final sign-off Mar 2021 | 123 Townsend St | Pyro-Comm Systems, Inc. | fire alarm as built. as-built to show av shutdown is not in this scope per matrix. cloud smoke detector on 1st floor as new and not existing. cloud sublease space that was not used that was in original scope. permit reference 2020-0313-6980.Details
fire alarm as built. as-built to show av shutdown is not in this scope per matrix. cloud smoke detector on 1st floor as new and not existing. cloud sublease space that was not used that was in original scope. permit reference 2020-0313-6980. | |
| Oct 6, 2020 | Completed final sign-off Mar 2021 | 123 Townsend St | Bigham Taylor Roofing Co | reroofingDetails
reroofing | $277,607 |
| Mar 13, 2020 | Completed final sign-off Mar 2021 | 123 Townsend St | Pyro-Comm Systems, Inc. | fire alarm 6 ceiling horn strobes, 5 ceiling strobes, 1 smoke detector, 1 wall horn strobe to be added to (e) facuDetails
fire alarm 6 ceiling horn strobes, 5 ceiling strobes, 1 smoke detector, 1 wall horn strobe to be added to (e) facu | $7,500 |
| Feb 21, 2020 | Never finaled issued Aug 2020, no final | 118 King St | M C S Construction Services | ref# 2019-1206-8883: deferred hvac and electrical select upgrades to lights, power and duct work.Details
ref# 2019-1206-8883: deferred hvac and electrical select upgrades to lights, power and duct work. | $25,000 |
| Jan 23, 2020 | Completed final sign-off Apr 2020 | 118 King St | Pioneer Fire Inc. | ref pa# 201912068883; relocate 1 sprinkler add 1 upright, remove 4 pendents, remove pre action and tie into (e) wet systemDetails
ref pa# 201912068883; relocate 1 sprinkler add 1 upright, remove 4 pendents, remove pre action and tie into (e) wet system | $2,000 |
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 123 Townsend St | Pyro-Comm Systems, Inc. | ref pa# 201912119189; fire alarm as built to show 2 75 candela ceiling speaker strobes, and 3 relays per inspector commentsDetails
ref pa# 201912119189; fire alarm as built to show 2 75 candela ceiling speaker strobes, and 3 relays per inspector comments | |
| Dec 26, 2019 | Never finaled issued Dec 2019, no final | 118 King St | street spaceDetails
street space | ||
| Dec 12, 2019 | Completed final sign-off Feb 2020 | 123 Townsend St | Ayoob & Peery Plumbing Co Inc | relocate (4) and (9) sprinklers in order to conform with new layoutDetails
relocate (4) and (9) sprinklers in order to conform with new layout | $5,625 |
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 123 Townsend St | Pyro-Comm Systems, Inc. | 15 ceiling horn strobes and 4 ceiling strobes to be added to (e) faco 1 manual pull station to be relocated n/a maherDetails
15 ceiling horn strobes and 4 ceiling strobes to be added to (e) faco 1 manual pull station to be relocated n/a maher | $9,500 |
| Dec 6, 2019 | Completed final sign-off Nov 2020 | 118 King St | M C S Construction Services | tenant improvement work-interior only. 1st & 2nd floors demo existing non-bearing walls, add interior non-bearing walls, w/ cleaned up finishesDetails
tenant improvement work-interior only. 1st & 2nd floors demo existing non-bearing walls, add interior non-bearing walls, w/ cleaned up finishes | $65,700 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 118 King St | street spaceDetails
street space | ||
| Oct 15, 2019 | Completed final sign-off Mar 2020 | 123 Townsend St | Swinerton Builders | partial 4th floor interior t.i. to include: non-structural demo; construction of non-structural partition, doors, millwork, finishes, lighting, mep n/a maherDetails
partial 4th floor interior t.i. to include: non-structural demo; construction of non-structural partition, doors, millwork, finishes, lighting, mep n/a maher | $1,000,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 123 Townsend St | Pyro-Comm Systems, Inc. | 4th floor: as builts for app#201905100295 (phase 1)Details
4th floor: as builts for app#201905100295 (phase 1) | |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 123 Townsend St | Pyro-Comm Systems, Inc. | 4th floor: as builts for app#201905100301 (phase 2)Details
4th floor: as builts for app#201905100301 (phase 2) | |
| Jun 27, 2019 | Completed final sign-off Aug 2019 | 123 Townsend St | Golden Gate Fire Protection Inc | fire sprinkler only: ref 201905100295; relocate 1 upright; add 4 uprightfor paypal 4th floor:Details
fire sprinkler only: ref 201905100295; relocate 1 upright; add 4 uprightfor paypal 4th floor: | $2,500 |
| May 22, 2019 | Never finaled issued May 2019, no final | 123 Townsend St | street space/mta metersDetails
street space/mta meters | ||
| May 10, 2019 | Never finaled issued May 2019, no final | 123 Townsend St | Pyro-Comm Systems, Inc. | 4th floor: 1 in-duct smoke detector, 1 l series ceiling mount horn strobe. t.i. to extg system. fire alarm t.i. fire alarm to be added to extg facu. ref app#201904127809 and ref t.i. #201903114865. n/a for maherDetails
4th floor: 1 in-duct smoke detector, 1 l series ceiling mount horn strobe. t.i. to extg system. fire alarm t.i. fire alarm to be added to extg facu. ref app#201904127809 and ref t.i. #201903114865. n/a for maher | $9,000 |
| May 10, 2019 | Never finaled issued May 2019, no final | 123 Townsend St | Pyro-Comm Systems, Inc. | 4th floor: 2 audio/visual power supply, 2 area smoke detector, 1 fire alarm control module, 3 l series wall mount horn strobe. t.i. to extg system. fire alarm t.i. to be added to extg facu. ref app#201904127809 and ref t.i. #201903114865. n/a for maherDetails
4th floor: 2 audio/visual power supply, 2 area smoke detector, 1 fire alarm control module, 3 l series wall mount horn strobe. t.i. to extg system. fire alarm t.i. to be added to extg facu. ref app#201904127809 and ref t.i. #201903114865. n/a for maher | $9,500 |
| Apr 12, 2019 | Completed final sign-off Apr 2019 | 123 Townsend St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 5 uprights, add 4 plug off 3 outlets for paypal 4th flDetails
fire sprinkler only. relocate 5 uprights, add 4 plug off 3 outlets for paypal 4th fl | $4,500 |
| Mar 11, 2019 | Completed final sign-off Aug 2019 | 123 Townsend St | Swinerton Builders | interior ti improvement to include: selective non structural demo of partitions, doors, lighting & finishes. construction of non structual partitions , doors, millwork, finishes, lighting electrical, mechanical, & plumbingDetails
interior ti improvement to include: selective non structural demo of partitions, doors, lighting & finishes. construction of non structual partitions , doors, millwork, finishes, lighting electrical, mechanical, & plumbing | $700,000 |
| Mar 6, 2017 | Completed final sign-off Dec 2017 | 123 Townsend St | Novo Construction Inc | mechanical & electrical work for tenant improvement on the 3rd floor. ref pa 2016-1230-6268Details
mechanical & electrical work for tenant improvement on the 3rd floor. ref pa 2016-1230-6268 | $75,000 |
| Mar 3, 2017 | Completed final sign-off May 2017 | 123 Townsend St | Pyro-Comm Systems, Inc. | fire alrm ti to suite 300 add new remote power supply. add 6 horn/strobe and 17 strobes. ref pa 2016-1230-6268. n/a maherDetails
fire alrm ti to suite 300 add new remote power supply. add 6 horn/strobe and 17 strobes. ref pa 2016-1230-6268. n/a maher | $14,000 |
| Feb 23, 2017 | Completed final sign-off Mar 2017 | 123 Townsend St | R L H Fire Protection Inc | 3rd floor fire sprinkler permit - relocate 3, add 4, delete 9 upright sprinklers and add 5 pendent sprinklers on the 3rd floor. ref pa 2016-1230-6268. maher naDetails
3rd floor fire sprinkler permit - relocate 3, add 4, delete 9 upright sprinklers and add 5 pendent sprinklers on the 3rd floor. ref pa 2016-1230-6268. maher na | $4,000 |
| Dec 30, 2016 | Completed final sign-off Dec 2017 | 123 Townsend St | Novo Construction Inc | 3rd flr: ti - of an (e) full floor suite. non structural demo of interior partitions & door/frame/hardware. lighting & finishes. new non structural interior partitions & doors/frame/hardware. new ele/plumb/mech & lighting & life safety to tie into (e) bld. new millwork & finishes maher naDetails
3rd flr: ti - of an (e) full floor suite. non structural demo of interior partitions & door/frame/hardware. lighting & finishes. new non structural interior partitions & doors/frame/hardware. new ele/plumb/mech & lighting & life safety to tie into (e) bld. new millwork & finishes maher na | $1,489,411 |
| Apr 1, 2016 | Completed final sign-off Jul 2016 | 123 Townsend St | Swinerton Builders | 5th floor: revision to app#201511172788 per bldg inspectors comments. add card readers to partition plan. adjust extg plan to show only 49 occupants of fire escape. n/a for maher.Details
5th floor: revision to app#201511172788 per bldg inspectors comments. add card readers to partition plan. adjust extg plan to show only 49 occupants of fire escape. n/a for maher. | |
| Jan 6, 2016 | Completed final sign-off Mar 2016 | 123 Townsend St | Pyro-Comm Systems, Inc. | new fire alarm devices added to ti in an (e) building to include (1) power supply, (31) horn/strobes, (13) strobes. ref pa 2015-1117-2788. maher naDetails
new fire alarm devices added to ti in an (e) building to include (1) power supply, (31) horn/strobes, (13) strobes. ref pa 2015-1117-2788. maher na | $10,700 |
| Nov 24, 2015 | Completed final sign-off Feb 2016 | 123 Townsend St | Novo Construction Inc | 3rd floor: new break area casework, finishes, sink at e plumbing. barrier removal at mens and womens restrooms, drinking fountainDetails
3rd floor: new break area casework, finishes, sink at e plumbing. barrier removal at mens and womens restrooms, drinking fountain | $20,713 |
| Nov 17, 2015 | Completed final sign-off Jul 2016 | 123 Townsend St | Swinerton Builders | 5th floor - non-structural construction of partitions, door, ceilings, electrical, mechanical, plumbing, lighting, millwork & finishes. fre life safety & electrical deferred. maher naDetails
5th floor - non-structural construction of partitions, door, ceilings, electrical, mechanical, plumbing, lighting, millwork & finishes. fre life safety & electrical deferred. maher na | $2,100,000 |
| Nov 12, 2015 | Never finaled issued Nov 2015, no final | 123 Townsend St | Novo Construction Inc | 3rd floor - demolition only of non-structural walls, glazing, doors, casework, ceilings & lighting per ab-017. n/a maher ordinanceDetails
3rd floor - demolition only of non-structural walls, glazing, doors, casework, ceilings & lighting per ab-017. n/a maher ordinance | $13,465 |
| Oct 29, 2015 | Completed final sign-off Feb 2016 | 123 Townsend St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti: relocate 4 heads, add 9, total 13. also, plug 9. ref pa 2015-0511-5989.Details
fire sprinkler ti: relocate 4 heads, add 9, total 13. also, plug 9. ref pa 2015-0511-5989. | $7,000 |
| Oct 22, 2015 | Completed final sign-off May 2016 | 118 King St | barrier removal and finishes upgrades to (e) ti voluntary upgrade of finishes and millwork in breakroom on 2nd floor, restrooms on 2nd floor. voluntary upgrade of finishes in restrooms on ground floor. maher naDetails
barrier removal and finishes upgrades to (e) ti voluntary upgrade of finishes and millwork in breakroom on 2nd floor, restrooms on 2nd floor. voluntary upgrade of finishes in restrooms on ground floor. maher na | $115,000 | |
| May 11, 2015 | Never finaled issued May 2015, no final | 123 Townsend St | Swinerton Builders | demo of partition walls (interior)Details
demo of partition walls (interior) | $26,891 |
| Jan 26, 2015 | Completed final sign-off Jan 2015 | 123 Townsend St | Golden Gate Fire Protection Inc | lower level 2- relocate 2 pendent sprinklers, relocate 10 upright sprinklers. t.i. pa#201410280062. n/a ordinance #155-13Details
lower level 2- relocate 2 pendent sprinklers, relocate 10 upright sprinklers. t.i. pa#201410280062. n/a ordinance #155-13 | $6,180 |
| Jan 15, 2015 | Expired or cancelled cancelled Jan 2026 | 123 Townsend St | Novo Construction Inc | install new vav boxes, relocate existing vav boxes and removal of vav boxes and ductworkDetails
install new vav boxes, relocate existing vav boxes and removal of vav boxes and ductwork | $25,000 |
| Jan 6, 2015 | Completed final sign-off Mar 2015 | 123 Townsend St | Pyro-Comm Systems, Inc. | lower level 2 - new fire alarm devices for tenant improvement to existing building to include: (4) horn/strobes (3) strobes. ref pa# 2014-1028-0062.Details
lower level 2 - new fire alarm devices for tenant improvement to existing building to include: (4) horn/strobes (3) strobes. ref pa# 2014-1028-0062. | $2,300 |
| Nov 25, 2014 | Completed final sign-off Aug 2015 | 123 Townsend St | Novo Construction Inc | this is a revision to current building permit #2014-1028-0062. scope includes replacement of men & womens restroom, upgrade to coffee area, installation of (n) conference rooms & phone booths. mep to be submitted under seperate permit.Details
this is a revision to current building permit #2014-1028-0062. scope includes replacement of men & womens restroom, upgrade to coffee area, installation of (n) conference rooms & phone booths. mep to be submitted under seperate permit. | $419,175 |
| Oct 30, 2014 | Completed final sign-off Nov 2014 | 123 Townsend St | R L H Fire Protection Inc | relocate fire sprkinkler. relocate 3 , add 7, delete 3 pendent sprinkler. add 2 and delete 12 upright sprinklers on level 1. n/a ordinance #155-13.Details
relocate fire sprkinkler. relocate 3 , add 7, delete 3 pendent sprinkler. add 2 and delete 12 upright sprinklers on level 1. n/a ordinance #155-13. | $6,168 |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 123 Townsend St | Novo Construction Inc | lower level 2- replacement of existing mens & womens restrooms, upgrade coffee area, new conference rooms. mep. under seperate permit. n/a ordinance #155-13.Details
lower level 2- replacement of existing mens & womens restrooms, upgrade coffee area, new conference rooms. mep. under seperate permit. n/a ordinance #155-13. | $49,000 |
| Oct 22, 2014 | Never finaled issued Oct 2014, no final | 123 Townsend St | Novo Construction Inc | lower level 1- mechanical work for tenent improvement on lewer level 1. ref. to arch pa#201406300114. n/a ordinance #155-13Details
lower level 1- mechanical work for tenent improvement on lewer level 1. ref. to arch pa#201406300114. n/a ordinance #155-13 | $15,000 |
| Oct 15, 2014 | Completed final sign-off Jan 2015 | 123 Townsend St | Pyro-Comm Systems, Inc. | lower level #1: new fire alarm devices for t.i. to include: 2 strobes, 6 horn/strobes. ref app#201406300114. n/a for the maher ordinanceDetails
lower level #1: new fire alarm devices for t.i. to include: 2 strobes, 6 horn/strobes. ref app#201406300114. n/a for the maher ordinance | $2,000 |
| Sep 30, 2014 | Never finaled issued Sep 2014, no final | 123 Townsend St | street spaceDetails
street space | ||
| Sep 17, 2014 | Completed final sign-off Dec 2014 | 123 Townsend St | Swinerton Builders | 6th floor:revision to app#201406168466. addition of magnetic locking door hardware to extg door.n/a for the maher ordinance #155-13Details
6th floor:revision to app#201406168466. addition of magnetic locking door hardware to extg door.n/a for the maher ordinance #155-13 | $6,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 123 Townsend St | Anderson, Rowe & Buckley, Inc. | 6th floor fire sprinkler system. t.i. improvement. add 29 sprinklers. refl appl. 2014.0616.8466. maher n/a.Details
6th floor fire sprinkler system. t.i. improvement. add 29 sprinklers. refl appl. 2014.0616.8466. maher n/a. | $14,500 |
| Jul 1, 2014 | Completed final sign-off Oct 2014 | 123 Townsend St | Pyro-Comm Systems, Inc. | 6th floor - new fire alarm devices for a tenant improvement to an existing bldg to include (1) power supply, (1) relay module, (1) voltage relay, (21) horn/strobes, (22) strobes. ref # 2014.0616.8466. n/a maher ordinanceDetails
6th floor - new fire alarm devices for a tenant improvement to an existing bldg to include (1) power supply, (1) relay module, (1) voltage relay, (21) horn/strobes, (22) strobes. ref # 2014.0616.8466. n/a maher ordinance | $11,200 |
| Jun 30, 2014 | Completed final sign-off May 2015 | 123 Townsend St | Novo Construction Inc | lower level - install shower, locker rooms, exercise areas & bicycle storage for tenant use. electrical/lighting work included. mechanical, sprinklers, fire alarm under separate permit. change from storage to partial storage & exercise room. n/a maher orinanceDetails
lower level - install shower, locker rooms, exercise areas & bicycle storage for tenant use. electrical/lighting work included. mechanical, sprinklers, fire alarm under separate permit. change from storage to partial storage & exercise room. n/a maher orinance | $832,653 |
| Jun 16, 2014 | Completed final sign-off Dec 2014 | 123 Townsend St | Swinerton Builders | tenant improvement of new office space including new partitions, ceilings, lighting, finishes, electrical hvac & plumbing minor structural work to be performed. sprinklers under separate permit ** maher: compliance with ordinance no# 155-13 not required **Details
tenant improvement of new office space including new partitions, ceilings, lighting, finishes, electrical hvac & plumbing minor structural work to be performed. sprinklers under separate permit ** maher: compliance with ordinance no# 155-13 not required ** | $2,162,475 |
| May 8, 2014 | Never finaled issued Dec 2014, no final | 123 Townsend St | Jfc Construction Inc. | install unmanned t-mobile telecommunication facility consisting of 4 bts cabinets, stepdown transformer, bbu, pbc-02 cabinet, esc-02 utility box, 7 rru's, 4 tma's & 6 antenns enclosed within radomes.Details
install unmanned t-mobile telecommunication facility consisting of 4 bts cabinets, stepdown transformer, bbu, pbc-02 cabinet, esc-02 utility box, 7 rru's, 4 tma's & 6 antenns enclosed within radomes. | $110,000 |
| Nov 1, 2013 | Expired or cancelled cancelled Jan 2026 | 123 Townsend St | demolition of non load bearing/non rated partitions. construction of non load bearing partitions. installation of storefront, addition of accessible shower, relocation of light fixture.Details
demolition of non load bearing/non rated partitions. construction of non load bearing partitions. installation of storefront, addition of accessible shower, relocation of light fixture. | $152,470 | |
| Nov 16, 2011 | Never finaled issued Dec 2011, no final | 123 Townsend St | Novo Construction Inc | demolition of non-load bearing/non rated partitions. remove of mill-work and sink.Details
demolition of non-load bearing/non rated partitions. remove of mill-work and sink. | $9,500 |
| Oct 12, 2010 | Completed final sign-off Feb 2011 | 123 Townsend St | Pacific Coast Fire | 3rd floor - relocate fire sprinkler for new office.Details
3rd floor - relocate fire sprinkler for new office. | $4,100 |
| Oct 6, 2010 | Completed final sign-off Feb 2011 | 123 Townsend St | Red Hawk Fire & Security Ca Llc | 3rd floor - add new horn/strobes to conf. rooms, open office areas. 4-strobes, 1-horn/strobeDetails
3rd floor - add new horn/strobes to conf. rooms, open office areas. 4-strobes, 1-horn/strobe | $6,000 |
| Aug 24, 2010 | Completed final sign-off Jan 2011 | 123 Townsend St | Skyline Construction | 3rd floor-demo of non lead bearing partitions & associated electrical. construction of non load bearing partitions. installation of aluminum framed doors & sidelights. new work stations & finishes. all m.e.p work is design buldDetails
3rd floor-demo of non lead bearing partitions & associated electrical. construction of non load bearing partitions. installation of aluminum framed doors & sidelights. new work stations & finishes. all m.e.p work is design buld | $560,000 |
| Sep 2, 2009 | Never finaled issued Sep 2009, no final | 123 Townsend St | Red Hawk Fire & Security Ca Llc | 3rd floor -add 4 strobes to sound booths on 3rd floor. sustituded for horns, because of sound booths-Details
3rd floor -add 4 strobes to sound booths on 3rd floor. sustituded for horns, because of sound booths- | $5,000 |
| Aug 28, 2009 | Completed final sign-off Sep 2009 | 123 Townsend St | Warren Tarbell | modify existing supply ducting to four new custom sound proof rooms approved under 200908044105.Details
modify existing supply ducting to four new custom sound proof rooms approved under 200908044105. | $5,000 |
| Aug 26, 2009 | Completed final sign-off Sep 2009 | 123 Townsend St | R L H Fire Protection Inc | 3rd fl - t.i. upgrades on an (e) fire sprinkler system; for sega; on the 3rd. floor. relocate 4 heads to (n) sound booths.Details
3rd fl - t.i. upgrades on an (e) fire sprinkler system; for sega; on the 3rd. floor. relocate 4 heads to (n) sound booths. | $800 |
| Aug 7, 2009 | Completed final sign-off Sep 2009 | 123 Townsend St | Warren Tarbell | revision to original plans; application #2009/0804/4105. modify attachment from typical wall to ceiling.Details
revision to original plans; application #2009/0804/4105. modify attachment from typical wall to ceiling. | |
| Aug 4, 2009 | Completed final sign-off Sep 2009 | 123 Townsend St | Warren Tarbell | installation of prefab sound rooms in office buildng on 3rd floor. electrical, hvac, sprinklers & life safety under separate permit. scope includes installation of handicap access landing to rooms.Details
installation of prefab sound rooms in office buildng on 3rd floor. electrical, hvac, sprinklers & life safety under separate permit. scope includes installation of handicap access landing to rooms. | $20,000 |
| Jul 20, 2009 | Never finaled issued Jul 2009, no final | 123 Townsend St | R L H Fire Protection Inc | remove (e) underground connection and 2 backflow preventers. run new underground and add 1 double check detectorDetails
remove (e) underground connection and 2 backflow preventers. run new underground and add 1 double check detector | $27,600 |
| Jul 6, 2009 | Never finaled issued Jul 2009, no final | 123 Townsend St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Apr 22, 2009 | Never finaled issued Apr 2009, no final | 123 Townsend St | Red Hawk Fire & Security Ca Llc | existing fire alarm control panel relocated to 1st floor main telco room. 1 new smoke added above panelDetails
existing fire alarm control panel relocated to 1st floor main telco room. 1 new smoke added above panel | $5,000 |
| Jan 5, 2009 | Completed final sign-off Nov 2009 | 123 Townsend St | Rusciano Construction Inc. | install new microturbine (new capstone c65) on roof. connect to extg boiler system and (hhws) system. install new pump and radiator to serve microturbine. electrical/plumbing on separate permit.Details
install new microturbine (new capstone c65) on roof. connect to extg boiler system and (hhws) system. install new pump and radiator to serve microturbine. electrical/plumbing on separate permit. | $100,000 |
| Apr 21, 2008 | Completed final sign-off May 2008 | 123 Townsend St | new 1 hour rated gyp board ceiling in the mpoe room. this room does not meet criteria for ab-060 server room requirement & is being upgraded voluntarily. no epo switch or fire dampers required. fire sprinklers under separate permit.Details
new 1 hour rated gyp board ceiling in the mpoe room. this room does not meet criteria for ab-060 server room requirement & is being upgraded voluntarily. no epo switch or fire dampers required. fire sprinklers under separate permit. | $4,850 | |
| Oct 9, 2007 | Never finaled issued Oct 2007, no final | 123 Townsend St | street space for scaffoldDetails
street space for scaffold | ||
| Jul 6, 2006 | Expired or cancelled expired May 2008 | 123 Townsend St | Dpw Inc. | renew of pa#200504190366.Details
renew of pa#200504190366. | |
| Jan 27, 2006 | Completed final sign-off Mar 2006 | 123 Townsend St | install accessible break area sink, millwork, non load bearing partitionDetails
install accessible break area sink, millwork, non load bearing partition | $22,000 | |
| Dec 13, 2005 | Expired or cancelled expired May 2008 | 123 Townsend St | oti-1 1st floor, el, me, ls, spDetails
oti-1 1st floor, el, me, ls, sp | $10,000 | |
| Aug 2, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Intelligent Technologies & Services Inc | modify the existing fire alarm audible visuals devices on the 4th floor & 3rd flr new restroomsDetails
modify the existing fire alarm audible visuals devices on the 4th floor & 3rd flr new restrooms | $3,600 |
| Jul 15, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Critchfield Mechanical Inc | adding in air in two new erstrooms, revision to pa #200506276120.Details
adding in air in two new erstrooms, revision to pa #200506276120. | $1,000 |
| Jul 15, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Critchfield Mechanical Inc | adding in air in two new restrooms. reference pa#200506276118. 03rd/flDetails
adding in air in two new restrooms. reference pa#200506276118. 03rd/fl | $1,000 |
| Jul 15, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Critchfield Mechanical Inc | remodel 3 (e) vav zones and adding 2 new vav zones. reference pa#200506276116.Details
remodel 3 (e) vav zones and adding 2 new vav zones. reference pa#200506276116. | $15,000 |
| Jul 13, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Dpw Inc. | modify existing sinkler system for (n) hard lid eililngs in restroom on 3rd & 4th floorsDetails
modify existing sinkler system for (n) hard lid eililngs in restroom on 3rd & 4th floors | $3,500 |
| Jul 12, 2005 | Never finaled issued Jul 2005, no final | 123 Townsend St | streetspaceDetails
streetspace | ||
| Jul 12, 2005 | Never finaled issued Jul 2005, no final | 123 Townsend St | Emt Electric | add 2 new devices in new restrooms.Details
add 2 new devices in new restrooms. | $500 |
| Jun 27, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Novo Construction Inc | oti-1 3/f el,me,spDetails
oti-1 3/f el,me,sp | $62,000 |
| Jun 27, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Novo Construction Inc | oti-1 4th floor el, me, spDetails
oti-1 4th floor el, me, sp | $62,000 |
| Jun 27, 2005 | Completed final sign-off Sep 2005 | 123 Townsend St | Novo Construction Inc | oti-1 4/fl el, me, ls, spDetails
oti-1 4/fl el, me, ls, sp | $180,000 |
| Jun 22, 2005 | Expired or cancelled expired May 2008 | 123 Townsend St | Novo Construction Inc | redesign building lobby, new ceiling system, lighting. re-work of (e) mechanical & fire sprinkler heads.Details
redesign building lobby, new ceiling system, lighting. re-work of (e) mechanical & fire sprinkler heads. | $225,000 |
| Jun 2, 2005 | Expired or cancelled expired Jan 2008 | 118 King St | Dpw Inc. | modify (e) sprinkler system on 1st & 2nd fls only. remove and run new piping for new preaction sytemDetails
modify (e) sprinkler system on 1st & 2nd fls only. remove and run new piping for new preaction sytem | $28,000 |
| May 12, 2005 | Expired or cancelled expired May 2008 | 123 Townsend St | Critchfield Mechanical Inc | oti-2 2nd floor meDetails
oti-2 2nd floor me | $5,000 |
| May 10, 2005 | Completed final sign-off Jan 2006 | 118 King St | Intelligent Technologies & Services Inc | modify the (e) fire alarm system. (1st floor). no office increase.Details
modify the (e) fire alarm system. (1st floor). no office increase. | $7,000 |
| May 10, 2005 | Completed final sign-off Jan 2006 | 118 King St | Intelligent Technologies & Services Inc | modify the (e) pre-action system. (1st floor) no office increase.Details
modify the (e) pre-action system. (1st floor) no office increase. | $12,000 |
| May 2, 2005 | Expired or cancelled expired Jan 2008 | 118 King St | Novo Construction Inc | new steel posts & columns. 1st fl. 16 ceiling joists/studs.Details
new steel posts & columns. 1st fl. 16 ceiling joists/studs. | $45,000 |
| Apr 27, 2005 | Expired or cancelled expired Jan 2008 | 118 King St | Critchfield Mechanical Inc | remove and replace 5 extg vav zones & add 9 new vav zones on the 1st floorDetails
remove and replace 5 extg vav zones & add 9 new vav zones on the 1st floor | $85,000 |
| Apr 19, 2005 | Never finaled issued Apr 2005, no final | 123 Townsend St | Dpw Inc. | modify (e) branch lines for new bathrooms on 5th fl.Details
modify (e) branch lines for new bathrooms on 5th fl. | $3,000 |
| Apr 19, 2005 | Completed final sign-off May 2005 | 123 Townsend St | Dpw Inc. | reinstall new piping for floor . infill on ground flDetails
reinstall new piping for floor . infill on ground fl | $4,000 |
| Apr 19, 2005 | Never finaled issued Apr 2005, no final | 123 Townsend St | Dpw Inc. | install (4) new sprinkler heads for new handlin ceiling and relocate (1) branch lineDetails
install (4) new sprinkler heads for new handlin ceiling and relocate (1) branch line | $2,500 |
| Apr 8, 2005 | Never finaled issued Apr 2005, no final | 118 King St | streetspaceDetails
streetspace | ||
| Apr 5, 2005 | Completed final sign-off Jan 2006 | 123 Townsend St | Novo Construction Inc | oti-1 2/f el me ls spDetails
oti-1 2/f el me ls sp | $224,000 |
| Apr 4, 2005 | Expired or cancelled expired Jan 2008 | 118 King St | Novo Construction Inc | interior demo of (e) office space, t/i under separate permitDetails
interior demo of (e) office space, t/i under separate permit | $10,000 |
| Mar 31, 2005 | Completed final sign-off Jan 2006 | 118 King St | construction of a master control, ingest, audio control, video control rooms with associated spacesDetails
construction of a master control, ingest, audio control, video control rooms with associated spaces | $1,000,000 | |
| Mar 25, 2005 | Expired or cancelled expired May 2008 | 123 Townsend St | Novo Construction Inc | oti-1, 5th floor, el, me, ls, sp. complaint # 200001904 and 200558850.Details
oti-1, 5th floor, el, me, ls, sp. complaint # 200001904 and 200558850. | $60,000 |
| Dec 6, 2004 | Completed final sign-off Jul 2005 | 123 Townsend St | Emt Electric | oti-2, 6th fl only - l/s onlyDetails
oti-2, 6th fl only - l/s only | $15,000 |
| Nov 22, 2004 | Completed final sign-off May 2005 | 123 Townsend St | fill in 2 fls opening w/const to match (e) toincrease floor area total of 450 sf, footprint of bldgDetails
fill in 2 fls opening w/const to match (e) toincrease floor area total of 450 sf, footprint of bldg | $40,000 | |
| Nov 9, 2004 | Completed final sign-off Jul 2005 | 123 Townsend St | Novo Construction Inc | revision to approved permit application #200409285346:structural wall supportDetails
revision to approved permit application #200409285346:structural wall support | $1,500 |
| Nov 5, 2004 | Completed final sign-off Jul 2005 | 123 Townsend St | Dpw Inc. | 6/f- modify (e) sprinkler system for new walls & ceilings.Details
6/f- modify (e) sprinkler system for new walls & ceilings. | $9,000 |
| Nov 3, 2004 | Expired or cancelled expired May 2008 | 123 Townsend St | removal of (e) guardrail -relocate (e) stair. construct non rated interior glazing curtain wall +Details
removal of (e) guardrail -relocate (e) stair. construct non rated interior glazing curtain wall + | $40,000 | |
| Oct 29, 2004 | Completed final sign-off Jul 2005 | 123 Townsend St | Critchfield Mechanical Inc | install 26 new vav zones and 1 new heat pump on the 6th floor.Details
install 26 new vav zones and 1 new heat pump on the 6th floor. | $90,000 |
| Oct 29, 2004 | Completed final sign-off May 2005 | 123 Townsend St | Critchfield Mechanical Inc | install one heat pump on 1st floorDetails
install one heat pump on 1st floor | $1,500 |
| Oct 18, 2004 | Completed final sign-off May 2005 | 123 Townsend St | Jm Electric Dba Jensco Inc. | upgrade fire alarm system because the oti-workDetails
upgrade fire alarm system because the oti-work | $2,000 |
| Oct 15, 2004 | Never finaled issued Oct 2004, no final | 123 Townsend St | street spaceDetails
street space | ||
| Oct 8, 2004 | Completed final sign-off Nov 2004 | 123 Townsend St | Dpw Inc. | remove and replace existing piping for new stairs from 1st to 6th flr. upgrade 3/4" lines with 1" liDetails
remove and replace existing piping for new stairs from 1st to 6th flr. upgrade 3/4" lines with 1" li | $13,000 |
| Oct 5, 2004 | Completed final sign-off Dec 2004 | 118 King St | Cal-Air Inc | hvac remodel/use extg hvac on 2nd floor new supply grilles/relocate thermostat test & start upDetails
hvac remodel/use extg hvac on 2nd floor new supply grilles/relocate thermostat test & start up | $8,570 |
| Sep 28, 2004 | Completed final sign-off Jul 2005 | 123 Townsend St | Novo Construction Inc | oti-1, 6th fl, - el, me, ls, sp.Details
oti-1, 6th fl, - el, me, ls, sp. | $550,000 |
| Sep 24, 2004 | Completed final sign-off Dec 2004 | 123 Townsend St | Dpw Inc. | minor modifications on 1, 2, 3, & 5 floorDetails
minor modifications on 1, 2, 3, & 5 floor | $9,000 |
| Sep 14, 2004 | Completed final sign-off Dec 2004 | 123 Townsend St | Critchfield Mechanical Inc | 56th floor - remodel 4 exist vav zones & add 1 new vav zones on the 5th floor.Details
56th floor - remodel 4 exist vav zones & add 1 new vav zones on the 5th floor. | $4,500 |
| Aug 31, 2004 | Completed final sign-off Dec 2004 | 118 King St | Novo Construction Inc | oti-1, 2nd floor, el me ls spDetails
oti-1, 2nd floor, el me ls sp | $224,815 |
| Aug 26, 2004 | Completed final sign-off Dec 2004 | 123 Townsend St | Critchfield Mechanical Inc | remodeling of two (20 variable air volume zones on 3rd flfoor onlyDetails
remodeling of two (20 variable air volume zones on 3rd flfoor only | $2,000 |
| Aug 25, 2004 | Completed final sign-off Jan 2005 | 123 Townsend St | rev. to pa#2004/06/07/5726 - delete stair from 5th to 6th floorDetails
rev. to pa#2004/06/07/5726 - delete stair from 5th to 6th floor | $5,000 | |
| Aug 17, 2004 | Completed final sign-off May 2005 | 123 Townsend St | Critchfield Mechanical Inc | remodel 2 existing vav zones and add 1 new zonesDetails
remodel 2 existing vav zones and add 1 new zones | $8,000 |
| Aug 16, 2004 | Completed final sign-off May 2005 | 123 Townsend St | Novo Construction Inc | extension of exit corridor, upgrade walls at server room to 1-hour, provide epo switch & dampers perDetails
extension of exit corridor, upgrade walls at server room to 1-hour, provide epo switch & dampers per | $23,000 |
| Aug 10, 2004 | Completed final sign-off Dec 2004 | 123 Townsend St | Novo Construction Inc | oti-1 5th floor el, l/s, sp, meDetails
oti-1 5th floor el, l/s, sp, me | $246,000 |
| Aug 4, 2004 | Completed final sign-off May 2005 | 123 Townsend St | framing for catwalk where section of (e) catwalk removedDetails
framing for catwalk where section of (e) catwalk removed | $5,000 | |
| Aug 2, 2004 | Expired or cancelled expired May 2008 | 123 Townsend St | Novo Construction Inc | build 4 offices,convert janitor closet to shower.elec/plum/mech/fire sprinkler under seperate permitDetails
build 4 offices,convert janitor closet to shower.elec/plum/mech/fire sprinkler under seperate permit | $100,000 |
| Jul 6, 2004 | Completed final sign-off May 2005 | 123 Townsend St | Novo Construction Inc | oti-1 1st/fl-el,me, sp, lsDetails
oti-1 1st/fl-el,me, sp, ls | $80,000 |
| Jun 7, 2004 | Completed final sign-off Jan 2005 | 123 Townsend St | rev. to pa#2004/03/03/7637 - delete stair #2, reconfigure stair #1Details
rev. to pa#2004/03/03/7637 - delete stair #2, reconfigure stair #1 | ||
| Mar 3, 2004 | Completed final sign-off Jan 2005 | 123 Townsend St | revision to pa#200401123785. change location of stairs at ground floor and second level.Details
revision to pa#200401123785. change location of stairs at ground floor and second level. | $1,000 | |
| Jan 12, 2004 | Completed final sign-off Jan 2005 | 123 Townsend St | structural frame-out for 2 new exit stairs from g/f thru 6/f includes architectural work interiorDetails
structural frame-out for 2 new exit stairs from g/f thru 6/f includes architectural work interior | $80,000 | |
| Dec 19, 2003 | Completed final sign-off Jan 2005 | 123 Townsend St | structural repairs with shotcrete,seismic upgrade under app#9918172Details
structural repairs with shotcrete,seismic upgrade under app#9918172 | $350,000 | |
| Aug 23, 2001 | Expired or cancelled withdrawn Dec 2001 | 118 King St | provide atm machine per plansDetails
provide atm machine per plans | $20,000 | |
| Jun 30, 2001 | Expired or cancelled expired Sep 2003 | 123 Townsend St | install mail room in garage at first floorDetails
install mail room in garage at first floor | $10,000 | |
| May 11, 2001 | Expired or cancelled expired Sep 2001 | 123 Townsend St | remove & reinstall exist parapet bracing building permit on 9918172.Details
remove & reinstall exist parapet bracing building permit on 9918172. | ||
| Apr 26, 2001 | Expired or cancelled expired Sep 2003 | 123 Townsend St | to erect 1 faced single faced electric signDetails
to erect 1 faced single faced electric sign | $1,750 | |
| Apr 12, 2001 | Expired or cancelled expired Apr 2002 | 123 Townsend St | Sasco | upgrade fire alarm system in the tenant improvement space to meet code & city requirementsDetails
upgrade fire alarm system in the tenant improvement space to meet code & city requirements | $50,000 |
| Apr 10, 2001 | Expired or cancelled expired Aug 2001 | 123 Townsend St | retrofit of existing parapet bracing-handicap accessibility addressed in app 9918172 umbDetails
retrofit of existing parapet bracing-handicap accessibility addressed in app 9918172 umb | $2,000 | |
| Mar 15, 2001 | Expired or cancelled expired Jul 2001 | 123 Townsend St | install railing around transformers at inspectors request transfer enclosure ratedDetails
install railing around transformers at inspectors request transfer enclosure rated | $1,500 | |
| Mar 5, 2001 | Expired or cancelled expired Jul 2001 | 123 Townsend St | Golden Bear Fire Protect. | as built fire sprinkler drawings for 200006157806Details
as built fire sprinkler drawings for 200006157806 | |
| Feb 8, 2001 | Expired or cancelled expired Jun 2001 | 123 Townsend St | revise to app #20000129592 no work to be done on 6/fDetails
revise to app #20000129592 no work to be done on 6/f | ||
| Jan 11, 2001 | Expired or cancelled expired Jul 2001 | 123 Townsend St | Sasco | smoke dection/solevoidinterface for pre-action system mdf room on llDetails
smoke dection/solevoidinterface for pre-action system mdf room on ll | $10,000 |
| Nov 8, 2000 | Expired or cancelled expired Mar 2001 | 123 Townsend St | provide new aluminum storefront door atDetails
provide new aluminum storefront door at | ||
| Oct 14, 2000 | Expired or cancelled expired Feb 2001 | 123 Townsend St | revise to app #200001299592 partition layout rm layout build up floor reinstall (e) fire doors in nDetails
revise to app #200001299592 partition layout rm layout build up floor reinstall (e) fire doors in n | ||
| Sep 1, 2000 | Never finaled issued Sep 2000, no final | 123 Townsend St | street spaceDetails
street space | ||
| Jun 15, 2000 | Expired or cancelled expired Jul 2001 | 123 Townsend St | Golden Bear Fire Protect. | installation of fire sprinkler systemDetails
installation of fire sprinkler system | $145,000 |
| Jun 10, 2000 | Expired or cancelled withdrawn Mar 2001 | 123 Townsend St | provide fire alarm upgradeDetails
provide fire alarm upgrade | $80,000 | |
| May 25, 2000 | Expired or cancelled expired Jan 2001 | 123 Townsend St | to construct pg & e vault at gradeDetails
to construct pg & e vault at grade | $25,000 | |
| May 13, 2000 | Never finaled issued Sep 2000, no final | 123 Townsend St | provide mechanical electrical & plumbing per planDetails
provide mechanical electrical & plumbing per plan | $500,000 | |
| May 11, 2000 | Expired or cancelled expired Oct 2001 | 123 Townsend St | Sasco | upgrade fire alarm system in the core space to meet code and city requirementsDetails
upgrade fire alarm system in the core space to meet code and city requirements | $50,000 |
| Apr 11, 2000 | Completed final sign-off Aug 2001 | 123 Townsend St | seismic upgrd of unreinforced masonry buildingDetails
seismic upgrd of unreinforced masonry building | $825,000 | |
| Mar 31, 2000 | Expired or cancelled expired Jun 2001 | 123 Townsend St | to correct and make changes in work approved under pa#9918172Details
to correct and make changes in work approved under pa#9918172 | $30,000 | |
| Mar 8, 2000 | Expired or cancelled expired Sep 2000 | 123 Townsend St | record change in work approved on pa#9918172Details
record change in work approved on pa#9918172 | ||
| Feb 25, 2000 | Completed final sign-off Sep 2001 | 123 Townsend St | one-stop,new stairs, assessibility ramps interior,mech, elec,plbg,arch improvmentsDetails
one-stop,new stairs, assessibility ramps interior,mech, elec,plbg,arch improvments | $1,750,000 | |
| Jan 29, 2000 | Expired or cancelled expired Oct 2002 | 123 Townsend St | tenant improvement on all floors. seismic upgrade under separate permit.Details
tenant improvement on all floors. seismic upgrade under separate permit. | $1,000,000 | |
| Jan 18, 2000 | Expired or cancelled expired Dec 2000 | 123 Townsend St | detail east & west faced of (e) bldg under #9918172Details
detail east & west faced of (e) bldg under #9918172 | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.