Rrs Fire Alarm Inc Dba California Fire D
- Based in
- Pleasant Hill
- On San Francisco permits
- May 2019 to Apr 2026
- Last 24 months
- 19 permits filed
91 permits since 2000: 66 completed, 10 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 8 are 3 to 5 years old, 2 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2026 | In progress issued May 2026 | 451 Pacific Av | install base station and power supply in storage room 110. install 6 call boxes on basement floor through 3rd floor. riser to be ran up two hour rated enclosure call boxes to be mounted in that enclosure. pots phone line required for communication with ul central station. pots lineto be installedDetails
install base station and power supply in storage room 110. install 6 call boxes on basement floor through 3rd floor. riser to be ran up two hour rated enclosure call boxes to be mounted in that enclosure. pots phone line required for communication with ul central station. pots lineto be installed | $100 |
| Jan 9, 2026 | Expired or cancelled withdrawn Mar 2026 | 250 Sutter St | install 1 ceiling mount strobe in the conference room. relocate 1 ceiling mount strobeDetails
install 1 ceiling mount strobe in the conference room. relocate 1 ceiling mount strobe | $100 |
| Dec 8, 2025 | Completed final sign-off Dec 2025 | 146 Geary St | modification of an existing fire alarm system. install a few notification devices on basement, 1/f and 2/f only. existing notification devices on 3/f and 4/f as well as any on basement, 1/f and 2/f to remain in tenant space.Details
modification of an existing fire alarm system. install a few notification devices on basement, 1/f and 2/f only. existing notification devices on 3/f and 4/f as well as any on basement, 1/f and 2/f to remain in tenant space. | $100 |
| Dec 8, 2025 | In progress issued Dec 2025 | 1815 Market St | install new fire panel, pull station, smoke, sprinkler monitoring & 2 duct detectors. ref pa #2025-0325-3024Details
install new fire panel, pull station, smoke, sprinkler monitoring & 2 duct detectors. ref pa #2025-0325-3024 | $100 |
| Oct 6, 2025 | In progress issued Oct 2025 | 146 Geary St | modification of an existing fire alarm system. install 1 new notification device in common area of 1/f tenant space. existing notificatoin to remain in tenant space. all initiating devices are in affected and to remain, new notification devices to be paired and supervised by existing notifcationDetails
modification of an existing fire alarm system. install 1 new notification device in common area of 1/f tenant space. existing notificatoin to remain in tenant space. all initiating devices are in affected and to remain, new notification devices to be paired and supervised by existing notifcation | |
| Oct 1, 2025 | Completed final sign-off Dec 2025 | 465 California St | 14th flr.tenant improvement to an (e) fire alarm system. relocate (e) speaker strobe to accomodate remodel space in the 14th fl. all other fire alarm devices are to remain and not to be part of the scope.Details
14th flr.tenant improvement to an (e) fire alarm system. relocate (e) speaker strobe to accomodate remodel space in the 14th fl. all other fire alarm devices are to remain and not to be part of the scope. | |
| Sep 9, 2025 | Completed final sign-off Sep 2026 | 311 California St | 2/f: tenant improvement to an (e) alarm system: (e) fire alarm control unit (silent knight 5820xl) install one 1-new audiable and visual occupant notification device in area of work all other (e) fire alarm devices to remain and are unaffected.Details
2/f: tenant improvement to an (e) alarm system: (e) fire alarm control unit (silent knight 5820xl) install one 1-new audiable and visual occupant notification device in area of work all other (e) fire alarm devices to remain and are unaffected. | |
| Aug 21, 2025 | Completed final sign-off Sep 2026 | 1840 Sutter St | 1st/fl: install new horn strobes on the first floorDetails
1st/fl: install new horn strobes on the first floor | |
| Jul 10, 2025 | Completed final sign-off Apr 2026 | 2240 Market St | install 2 new heat detectors in the trash room and in the vestibule.Details
install 2 new heat detectors in the trash room and in the vestibule. | |
| Jul 10, 2025 | In progress issued Jul 2025 | 2801 Jones St | replace the existing fire alarm control unit for dedicated function fire alarm system with a new 10 zone firelite (ms-10ud)install one 1 new smoke detector on top of the facu. install one 1 new pull station next to the facu. install one 1 new document box next to the facu.Details
replace the existing fire alarm control unit for dedicated function fire alarm system with a new 10 zone firelite (ms-10ud)install one 1 new smoke detector on top of the facu. install one 1 new pull station next to the facu. install one 1 new document box next to the facu. | $100 |
| Jun 23, 2025 | Completed final sign-off Jul 2025 | 660 03rd St | install one new ceiling strobes in restroom.2025.0224.0978Details
install one new ceiling strobes in restroom.2025.0224.0978 | $100 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 350 Parnassus Av | 3/f t.i. install and relocate 1 strobe and 1 speaker strobe ref 202505146451Details
3/f t.i. install and relocate 1 strobe and 1 speaker strobe ref 202505146451 | $100 |
| Mar 20, 2025 | In progress issued Mar 2025 | 1241 Stockton St | installation of a new fire alarm systemDetails
installation of a new fire alarm system | |
| Jan 16, 2025 | In progress filed Jan 2025, not yet issued | 731 Sansome St | replace (e) fire alarm systemDetails
replace (e) fire alarm system | $2,500 |
| Jan 16, 2025 | Completed final sign-off Apr 2025 | 260 California St | 6th floor. relocate five existing wall strobes. install one new wall strobe.Details
6th floor. relocate five existing wall strobes. install one new wall strobe. | $1,000 |
| Nov 20, 2024 | In progress issued Nov 2024 | 220 04th St | 1/fl-ti 202312212914- install notification devices in common areas of tenant spaceDetails
1/fl-ti 202312212914- install notification devices in common areas of tenant space | $12,600 |
| Nov 14, 2024 | In progress issued Dec 2024 | 731 Sansome St | one for one swap of existing fire alarm system with new non proprierty systemDetails
one for one swap of existing fire alarm system with new non proprierty system | $25,000 |
| Oct 29, 2024 | Completed final sign-off Aug 2025 | 3040 16th St | ref pa # 2024-0815-8753 install new power supply by (e) facp power supply to be activated by facp on alarm install notification devices throughout the spaceDetails
ref pa # 2024-0815-8753 install new power supply by (e) facp power supply to be activated by facp on alarm install notification devices throughout the space | $10,000 |
| Oct 22, 2024 | Completed final sign-off Jan 2025 | 3055 16th St | install power supply andnotification devices in new common areas of tenant space. all other devices existing to remain. ref pa 202211076021Details
install power supply andnotification devices in new common areas of tenant space. all other devices existing to remain. ref pa 202211076021 | $8,000 |
| Sep 12, 2024 | In progress issued Sep 2024 | 1601 Mariposa St | relocate existing speaker strobe 10ft out of way of pendant light. building app 202307061574Details
relocate existing speaker strobe 10ft out of way of pendant light. building app 202307061574 | $2,000 |
| Sep 6, 2024 | Completed final sign-off Jul 2025 | 488 Folsom St | wall mount speaker to unit 4302 converted bedroomDetails
wall mount speaker to unit 4302 converted bedroom | |
| Aug 29, 2024 | Completed final sign-off Feb 2025 | 175 Frida Kahlo Wy | installation of new fire alarm sprinkler panel on 3rd fl.Details
installation of new fire alarm sprinkler panel on 3rd fl. | $4,530 |
| Aug 23, 2024 | Completed final sign-off Dec 2024 | 2343 Fillmore St | relocation of (e) audible and visual devices.Details
relocation of (e) audible and visual devices. | $16,250 |
| Aug 23, 2024 | In progress issued Aug 2024 | 333 Dolores St | revision to pa# 202209071941, as-built fire alarm.Details
revision to pa# 202209071941, as-built fire alarm. | $55,610 |
| Aug 1, 2024 | Completed final sign-off Feb 2025 | 1100 Sansome St | voluntary installation of a new fire alarm systemDetails
voluntary installation of a new fire alarm system | $49,730 |
| Jul 29, 2024 | Completed final sign-off Feb 2025 | 2177 Jerrold Av | install dedicated functions elevator and hvac system. elevator recall and hvac monitoring and control. sprinler monitoring as well. ref pa #202310209176Details
install dedicated functions elevator and hvac system. elevator recall and hvac monitoring and control. sprinler monitoring as well. ref pa #202310209176 | $20,000 |
| Jun 24, 2024 | Completed final sign-off Aug 2024 | 2001 Van Ness Av | install notification devices in common area of tenant space 402. bpa #202405242935Details
install notification devices in common area of tenant space 402. bpa #202405242935 | $6,000 |
| May 28, 2024 | Completed final sign-off Feb 2025 | 275 South Van Ness Av | fire only: installation of new fire alarm system: ti: 2022-1222-9044Details
fire only: installation of new fire alarm system: ti: 2022-1222-9044 | $27,135 |
| Apr 2, 2024 | Completed final sign-off May 2024 | 220 Jackson St | ref pa #2024-0222-6337 install notification devices in common areas of tenant spaceDetails
ref pa #2024-0222-6337 install notification devices in common areas of tenant space | $10,650 |
| Apr 2, 2024 | Completed final sign-off Apr 2025 | 251 Rhode Island St | relocate existing annunciator, pull station and wall horn strobe to new wallDetails
relocate existing annunciator, pull station and wall horn strobe to new wall | $8,500 |
| Mar 7, 2024 | Completed final sign-off Jun 2024 | 657 Howard St | install notification devices inn common areas, use existing circuit in space to activate notification devices. all other devices existing to remain. build permit 202301120086Details
install notification devices inn common areas, use existing circuit in space to activate notification devices. all other devices existing to remain. build permit 202301120086 | $10,000 |
| Jan 29, 2024 | Completed final sign-off Apr 2024 | 660 03rd St | relocate 2 wall horn strobes and install 1 ceiling horn strobe. all other devices exsiting to remain. ref pa# 202306099692.Details
relocate 2 wall horn strobes and install 1 ceiling horn strobe. all other devices exsiting to remain. ref pa# 202306099692. | $6,000 |
| Jan 18, 2024 | Completed final sign-off Mar 2024 | 1160 Mission St | relocaton of an (e) smoke detector and installation of two new speakers strobesDetails
relocaton of an (e) smoke detector and installation of two new speakers strobes | $8,450 |
| Jan 9, 2024 | Completed final sign-off Feb 2024 | 188 Octavia St | 1/f: installation of 1 wall horn strobe in new common area room. ref pa# 202312212961.Details
1/f: installation of 1 wall horn strobe in new common area room. ref pa# 202312212961. | $10,000 |
| Dec 12, 2023 | Completed final sign-off Feb 2024 | 2001 Van Ness Av | install fire alarm notification devices in common areas of tenant space ref pa# 2023-1120-1091Details
install fire alarm notification devices in common areas of tenant space ref pa# 2023-1120-1091 | $18,000 |
| Nov 21, 2023 | Completed final sign-off Jan 2024 | 1035 Battery St | install strobe in new conference room 207. all other devices existing to remain. this is a market ready space. ref 202308023520Details
install strobe in new conference room 207. all other devices existing to remain. this is a market ready space. ref 202308023520 | |
| Nov 21, 2023 | Completed final sign-off Jan 2024 | 1222 10th Av | install strobe in new conference room 207. all other devices existing to remain. this is a market ready space. ref 202308023520Details
install strobe in new conference room 207. all other devices existing to remain. this is a market ready space. ref 202308023520 | $25,700 |
| Oct 12, 2023 | Completed final sign-off Mar 2024 | 1061 Folsom St | install 2 relays control of elevator smoke curtains. orig fire alarm 202304055093Details
install 2 relays control of elevator smoke curtains. orig fire alarm 202304055093 | $10,743 |
| Aug 25, 2023 | Completed final sign-off Sep 2023 | 1650 Pacific Av | rev to pa# 202306220575 & 202206146297 (ti), removed relay for door release, no door release provided.Details
rev to pa# 202306220575 & 202206146297 (ti), removed relay for door release, no door release provided. | |
| Jul 11, 2023 | Never finaled issued Jul 2023, no final | 190 09th St | install 3 new duct detectors for all units on roof, ref pa# 202111041798.Details
install 3 new duct detectors for all units on roof, ref pa# 202111041798. | $12,630 |
| Jul 10, 2023 | Never finaled filed Jul 2023, never issued | 333 Dolores St | install new elevator two-wayDetails
install new elevator two-way | $20,310 |
| Jul 10, 2023 | Expired or cancelled withdrawn Jan 2024 | 333 Dolores St | install new fire alarmDetails
install new fire alarm | $55,610 |
| Jun 22, 2023 | Completed final sign-off Sep 2023 | 1650 Pacific Av | as-builts for pa 202301120100: install f/a system with spirnklermointoring and elvator control as well as hvac monitoring and notiication throughout.Details
as-builts for pa 202301120100: install f/a system with spirnklermointoring and elvator control as well as hvac monitoring and notiication throughout. | $20,000 |
| May 25, 2023 | Completed final sign-off Oct 2024 | 1800 Montgomery St | replace existing fire alarm systemDetails
replace existing fire alarm system | $21,610 |
| May 23, 2023 | Expired or cancelled withdrawn Apr 2024 | 1061 Folsom St | installation of new fire alarm systemDetails
installation of new fire alarm system | $19,000 |
| May 12, 2023 | Completed final sign-off May 2024 | 1900 Broadway | install wireless low frequency sounders in sleeping areas. install new telguard. install new heat detectors above facu, in garage, in boiler room. install new annunciator.Details
install wireless low frequency sounders in sleeping areas. install new telguard. install new heat detectors above facu, in garage, in boiler room. install new annunciator. | $12,000 |
| Apr 14, 2023 | Completed final sign-off May 2023 | 410 Bartlett St | low frequency horn upgradeDetails
low frequency horn upgrade | $25,000 |
| Apr 5, 2023 | Completed final sign-off Mar 2024 | 1061 Folsom St | install dedicated functions elevator recall panel & 2-way comm monitoring. ref bpa 202205254948Details
install dedicated functions elevator recall panel & 2-way comm monitoring. ref bpa 202205254948 | $15,000 |
| Apr 5, 2023 | Never finaled issued Apr 2023, no final | 2380 Irving St | monitor and control of 2 new conventional duct detectors. ref bpa 202209293431Details
monitor and control of 2 new conventional duct detectors. ref bpa 202209293431 | $6,000 |
| Apr 5, 2023 | Completed final sign-off Mar 2024 | 1061 Folsom St | install elevator two way communication system. ref bpa 202205254948Details
install elevator two way communication system. ref bpa 202205254948 | $10,000 |
| Mar 28, 2023 | Completed final sign-off Apr 2023 | 145 Jefferson St | revision to 202302101792 fire alarm, add 10 devicesDetails
revision to 202302101792 fire alarm, add 10 devices | $24,291 |
| Feb 10, 2023 | Completed final sign-off Apr 2023 | 145 Jefferson St | 1st/2nd fl - install notification devices in common areas of tenant space. add duct detector and relay module all other devices extg to remain. ref 202209293428.Details
1st/2nd fl - install notification devices in common areas of tenant space. add duct detector and relay module all other devices extg to remain. ref 202209293428. | $15,000 |
| Jan 12, 2023 | Completed final sign-off Sep 2023 | 1650 Pacific Av | install elevator 2 way with 1 call box on 2nd fl. ref to t.i. 202206146297Details
install elevator 2 way with 1 call box on 2nd fl. ref to t.i. 202206146297 | $8,000 |
| Jan 12, 2023 | Completed final sign-off Sep 2023 | 1650 Pacific Av | install fire alarm system w/ sprinklwes monitoring and elevator controll as well as hvac monitoring and notification devices thru out. ref to t.i. 202206146297Details
install fire alarm system w/ sprinklwes monitoring and elevator controll as well as hvac monitoring and notification devices thru out. ref to t.i. 202206146297 | $20,000 |
| Nov 14, 2022 | Never finaled issued Nov 2022, no final | 965 Geneva Av | move (e) notification device to another locationDetails
move (e) notification device to another location | $4,100 |
| Nov 2, 2022 | Never finaled issued Nov 2022, no final | 2001 Van Ness Av | as built to pa#202203280984: added relay module for 3rd floor hvac unit.Details
as built to pa#202203280984: added relay module for 3rd floor hvac unit. | |
| Nov 2, 2022 | Never finaled issued Nov 2022, no final | 2001 Van Ness Av | 3/f: t.i., modificaiton of (e) f/a system. ref bpa#202203280984 & #202211025711Details
3/f: t.i., modificaiton of (e) f/a system. ref bpa#202203280984 & #202211025711 | $25,000 |
| Jul 20, 2022 | Completed final sign-off Jul 2022 | 20 Jones St | install 1 new relay module to control elevator smoke curtains. all other devices (e) to remain. ref pa201908209386. maher n/aDetails
install 1 new relay module to control elevator smoke curtains. all other devices (e) to remain. ref pa201908209386. maher n/a | $5,000 |
| Jul 12, 2022 | Completed final sign-off Jul 2022 | 20 Heron St | revision to pa# 202202027152; add strobes, smokes & duct detectors on 1st, 3rd & 4th floors; ti ref pa# 202110281420Details
revision to pa# 202202027152; add strobes, smokes & duct detectors on 1st, 3rd & 4th floors; ti ref pa# 202110281420 | $5,000 |
| Jun 29, 2022 | Never finaled issued Jun 2022, no final | 2001 Van Ness Av | 3/f: fire alarm installation of notification devices througout and install 3 duct detectors to control 3 fsd's.Details
3/f: fire alarm installation of notification devices througout and install 3 duct detectors to control 3 fsd's. | $10,000 |
| May 4, 2022 | Completed final sign-off Jun 2022 | 450 Shotwell St | fire as-built for pa# 202112305184. (e) facp & sprinklers monitoring to remain. new elevator lobby & machine room smokes. new relay modules for elevator recall.Details
fire as-built for pa# 202112305184. (e) facp & sprinklers monitoring to remain. new elevator lobby & machine room smokes. new relay modules for elevator recall. | |
| Mar 28, 2022 | Never finaled issued Apr 2022, no final | 2001 Van Ness Av | new fire alarm system installationDetails
new fire alarm system installation | $65,000 |
| Mar 28, 2022 | Completed final sign-off Jun 2022 | 123 Townsend St | modification of an existing fire alarm system. 1st floor.Details
modification of an existing fire alarm system. 1st floor. | $10,000 |
| Mar 10, 2022 | Completed final sign-off Aug 2022 | 777 Brannan St | fire alarm control: install dedicated function elevator control system. smoke detectors in lobby and elvator machine room and hoistway. ref t.i. pa 2022022288887. maher n/aDetails
fire alarm control: install dedicated function elevator control system. smoke detectors in lobby and elvator machine room and hoistway. ref t.i. pa 2022022288887. maher n/a | $15,000 |
| Feb 2, 2022 | Completed final sign-off Jun 2022 | 2104 Hayes St | t.i. to (e) building. adding notification & addressable decives to daycare.Details
t.i. to (e) building. adding notification & addressable decives to daycare. | $20,000 |
| Feb 2, 2022 | Completed final sign-off Aug 2022 | 20 Heron St | new fire alarm system. add one strobe for 3/f ti.Details
new fire alarm system. add one strobe for 3/f ti. | $5,000 |
| Dec 30, 2021 | Completed final sign-off Jun 2022 | 450 Shotwell St | install new sprinklers monitoring and elevators control dedicated funcions sprinklers monitring panelDetails
install new sprinklers monitoring and elevators control dedicated funcions sprinklers monitring panel | $10,000 |
| Oct 14, 2021 | Completed final sign-off Oct 2021 | 20 Jones St | added 5 notification: ref pa 2021-0128-3565. as built revision.Details
added 5 notification: ref pa 2021-0128-3565. as built revision. | $3,000 |
| Aug 24, 2021 | Expired or cancelled withdrawn Jan 2022 | 450 Shotwell St | install new dedicated function sprinklers mointoring panel and elevator control. no sprinklers in shaft and control room. shunt trip not reqd.smokes in elevator lobby.Details
install new dedicated function sprinklers mointoring panel and elevator control. no sprinklers in shaft and control room. shunt trip not reqd.smokes in elevator lobby. | $10,000 |
| Jun 28, 2021 | Completed final sign-off Nov 2021 | 2055 Sacramento St | one for one replacement of (e) broken fire alarm system cell dialer added for communication. building to be updated to code compliance in separate permitDetails
one for one replacement of (e) broken fire alarm system cell dialer added for communication. building to be updated to code compliance in separate permit | $20,000 |
| Jun 15, 2021 | Completed final sign-off Nov 2021 | 77 Geary St | install notification devices throughout suite 300. existing power supply. initiating devices all existing. facp, pull stations and sprinkler monitoring devices existing. power supplt to trigger new devices is existing. spare circuits available.Details
install notification devices throughout suite 300. existing power supply. initiating devices all existing. facp, pull stations and sprinkler monitoring devices existing. power supplt to trigger new devices is existing. spare circuits available. | $10,000 |
| Jun 15, 2021 | Never finaled filed Jun 2021, never issued | 1128 Market St | replace outdated fa system. keep market ready. full coverage will be added during tenant improvement. elevator recall and sprinkler monitoring. pull stations at all stair exits on floors 2-6. fsds on floor 5 only no other hvac.Details
replace outdated fa system. keep market ready. full coverage will be added during tenant improvement. elevator recall and sprinkler monitoring. pull stations at all stair exits on floors 2-6. fsds on floor 5 only no other hvac. | $20,000 |
| Jan 28, 2021 | Completed final sign-off Nov 2021 | 20 Jones St | installation of a new two way communication systemDetails
installation of a new two way communication system | $15,000 |
| Dec 10, 2020 | Completed final sign-off Feb 2021 | 1275 Folsom St | fire alarm as-builts for fire alarm permit 2020-0923-4787.Details
fire alarm as-builts for fire alarm permit 2020-0923-4787. | $8,000 |
| Dec 9, 2020 | Completed final sign-off Feb 2021 | 333 Broadway | resubmittal: existing elevator only can do primary recall and shunt trip. removed alternate recall and fireman's hat.Details
resubmittal: existing elevator only can do primary recall and shunt trip. removed alternate recall and fireman's hat. | |
| Sep 26, 2020 | Completed final sign-off Jan 2021 | 146 Geary St | 3/f & 4/f: modification of (e) fire alarm system. add notification in common areasDetails
3/f & 4/f: modification of (e) fire alarm system. add notification in common areas | $8,000 |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 1275 Folsom St | installation voluntary new fire alarm system in non-sprinklered building with hvac shutdownDetails
installation voluntary new fire alarm system in non-sprinklered building with hvac shutdown | $8,000 |
| Sep 23, 2020 | Completed final sign-off Jan 2021 | 146 Geary St | modification to extg fire alarm system. add notification in common area.Details
modification to extg fire alarm system. add notification in common area. | $3,000 |
| Sep 23, 2020 | Completed final sign-off Nov 2021 | 20 Heron St | installation of new fire alarm system for core and shellDetails
installation of new fire alarm system for core and shell | $30,000 |
| Sep 21, 2020 | Completed final sign-off Mar 2022 | 3000 26th St | install dedicated function sprinklers monitoring panel.Details
install dedicated function sprinklers monitoring panel. | $10,000 |
| Sep 2, 2020 | Completed final sign-off Mar 2021 | 2112 Hayes St | new fire alarm syetem to replace existing local. new dialer provided for communication to central stateion. ref pa# 202002184642Details
new fire alarm syetem to replace existing local. new dialer provided for communication to central stateion. ref pa# 202002184642 | $30,000 |
| Sep 1, 2020 | Completed final sign-off Oct 2020 | 2108 Hayes St | tie in backflow to existing zone panel. panel is local alarm only but will be replaced in new permit currently in progress.Details
tie in backflow to existing zone panel. panel is local alarm only but will be replaced in new permit currently in progress. | $2,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 209 Post St | 8/f:install 7 new speaker strobes in added common areas. ref-202002063682Details
8/f:install 7 new speaker strobes in added common areas. ref-202002063682 | $6,000 |
| Dec 16, 2019 | Never finaled issued Mar 2020, no final | 333 Broadway | install 1 smoke in elevator lobby and 1 duct detector, install 3 ceiling strobes and 4 ceiling horn sounders in common space n/a maherDetails
install 1 smoke in elevator lobby and 1 duct detector, install 3 ceiling strobes and 4 ceiling horn sounders in common space n/a maher | $6,000 |
| Dec 16, 2019 | Completed final sign-off Feb 2021 | 333 Broadway | installation of new fire alarm system for bsement and 1st fl. for b occupancy, 1 panel, cellular dialer notification throughout, water flow and tampes switch monitoring elevator recall (basement & 1st fl.) n/a maherDetails
installation of new fire alarm system for bsement and 1st fl. for b occupancy, 1 panel, cellular dialer notification throughout, water flow and tampes switch monitoring elevator recall (basement & 1st fl.) n/a maher | $12,000 |
| Oct 1, 2019 | Expired or cancelled cancelled Aug 2023 | 649 Mission St | install new fire alarm panel with cell dialer on 1st fl. monitor e waterflow, install new notification on 2nd through 5th fl. 1 pull station installed by panel rps installed on 4th fl to activate notif. on 4th and 5th smoke detectors installed above both panels. ** maher: n/a **Details
install new fire alarm panel with cell dialer on 1st fl. monitor e waterflow, install new notification on 2nd through 5th fl. 1 pull station installed by panel rps installed on 4th fl to activate notif. on 4th and 5th smoke detectors installed above both panels. ** maher: n/a ** | $16,000 |
| Oct 1, 2019 | Completed final sign-off Jul 2020 | 501 03rd St | 3rd flr. install 15 ceiling strobes and 3 ceiling horn strobes in 3rd fl tenant space. existing sprinkler monitoring to activate notificationDetails
3rd flr. install 15 ceiling strobes and 3 ceiling horn strobes in 3rd fl tenant space. existing sprinkler monitoring to activate notification | $12,000 |
| Sep 17, 2019 | Completed final sign-off Mar 2020 | 501 03rd St | modification of e fire alarm system. install 5 ceiling strobes and 4 ceiling horn strobes. 1 sync module in common areas of tenant spaceDetails
modification of e fire alarm system. install 5 ceiling strobes and 4 ceiling horn strobes. 1 sync module in common areas of tenant space | $10,000 |
| Jun 20, 2019 | Completed final sign-off Jul 2019 | 357 Tehama St | unit#3: interior remodel to extg live work unit. add notification in business area, 1 new duct detector monitor module. new wall strobes and new horn strobes. revision to app#201905231491. t.i ref app#201901281368.Details
unit#3: interior remodel to extg live work unit. add notification in business area, 1 new duct detector monitor module. new wall strobes and new horn strobes. revision to app#201905231491. t.i ref app#201901281368. | $4,541 |
| Jun 17, 2019 | Completed final sign-off Jul 2019 | 400 Sutter St | 4th floor: fire alarm modification. install 1 new wall hornstrobe and remove 3 extg wall strobes. ref app#201905231493. n/a for maherDetails
4th floor: fire alarm modification. install 1 new wall hornstrobe and remove 3 extg wall strobes. ref app#201905231493. n/a for maher | $5,000 |
| May 23, 2019 | Completed final sign-off Jul 2019 | 357 Tehama St | interior remodel to (e) live work add notification in business area suite #3. 1 new smoke detector and control module for furnace shutoff, 3 new wall strobes and 2 new horn strobes, 1 new low frequency horn in bedroom.Details
interior remodel to (e) live work add notification in business area suite #3. 1 new smoke detector and control module for furnace shutoff, 3 new wall strobes and 2 new horn strobes, 1 new low frequency horn in bedroom. | $8,000 |