Block 3775, lot 073
501 03rd St
- City’s use
- Industrial
- Built
- 1920
- Stories
- 3
- Rooms
- 6 bathrooms
- Building
- 18,300 sq ft
- Lot
- 6,100 sq ft
- Zoning
- SLI
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 24, 2019 | Completed final sign-off May 2026 | 501 03rd St | Kell Mechanical Heating And Air Condi | 3/f-ref pa# 2019-0906-0892: installation of new vrf mechanical system.Details
3/f-ref pa# 2019-0906-0892: installation of new vrf mechanical system. | $65,000 |
| Dec 20, 2019 | Never finaled issued Dec 2019, no final | 501 03rd St | Elson Electric Holdings Inc | commercial ti. installation of new lights and plugs deferred 201909060892Details
commercial ti. installation of new lights and plugs deferred 201909060892 | $200,000 |
| Nov 15, 2019 | Completed final sign-off Jul 2020 | 501 03rd St | Aegis Enterprises Inc | 3rd flr: to add 13 pendent & relocate 6/add 36 upright fire sprinklers to accommodate new tenant improvement. ref. pa #2019-0906-0892Details
3rd flr: to add 13 pendent & relocate 6/add 36 upright fire sprinklers to accommodate new tenant improvement. ref. pa #2019-0906-0892 | $7,650 |
| Oct 4, 2019 | Completed final sign-off Mar 2020 | 501 03rd St | Aegis Enterprises Inc | 2/f: fire sprinklers: add 10 ssu & relocation 15 ssu to accomodate new ti changes. ref t.i. 201908068027. maher n/a.Details
2/f: fire sprinklers: add 10 ssu & relocation 15 ssu to accomodate new ti changes. ref t.i. 201908068027. maher n/a. | $5,000 |
| Oct 1, 2019 | Completed final sign-off Jul 2020 | 501 03rd St | Rrs Fire Alarm Inc Dba California Fire D | 3rd flr. install 15 ceiling strobes and 3 ceiling horn strobes in 3rd fl tenant space. existing sprinkler monitoring to activate notificationDetails
3rd flr. install 15 ceiling strobes and 3 ceiling horn strobes in 3rd fl tenant space. existing sprinkler monitoring to activate notification | $12,000 |
| Sep 20, 2019 | Completed final sign-off Dec 2019 | 501 03rd St | D A Pope Inc | revision to 201908068027 to (e) ti. installation of interior sound proof glass windowsDetails
revision to 201908068027 to (e) ti. installation of interior sound proof glass windows | $8,000 |
| Sep 17, 2019 | Completed final sign-off Mar 2020 | 501 03rd St | Rrs Fire Alarm Inc Dba California Fire D | modification of e fire alarm system. install 5 ceiling strobes and 4 ceiling horn strobes. 1 sync module in common areas of tenant spaceDetails
modification of e fire alarm system. install 5 ceiling strobes and 4 ceiling horn strobes. 1 sync module in common areas of tenant space | $10,000 |
| Sep 6, 2019 | Completed final sign-off May 2020 | 501 03rd St | D A Pope Inc | suite 300: interior remodel (ti) to 3rd fl - light demolition, new drywall, offices, mep reconfiguration & interior finishes.Details
suite 300: interior remodel (ti) to 3rd fl - light demolition, new drywall, offices, mep reconfiguration & interior finishes. | $450,000 |
| Aug 6, 2019 | Completed final sign-off Dec 2019 | 501 03rd St | D A Pope Inc | suite 200: demolition of e non bearing partion. new non bearing partitions to create new offices, phone rm, copy rm, open officeDetails
suite 200: demolition of e non bearing partion. new non bearing partitions to create new offices, phone rm, copy rm, open office | $400,000 |
| Jul 20, 2018 | Completed final sign-off Nov 2018 | 501 03rd St | D A Pope Inc | further voluntary seismic strengthening and ada upgradesDetails
further voluntary seismic strengthening and ada upgrades | $80,000 |
| Mar 28, 2011 | Completed final sign-off Apr 2011 | 501 03rd St | Perfect Connection Inc. | install 48 new sprinkler heads to an existing sprinkler system on the 3rd floorDetails
install 48 new sprinkler heads to an existing sprinkler system on the 3rd floor | $5,000 |
| Mar 9, 2011 | Completed final sign-off Nov 2011 | 501 03rd St | Nabi Construction & Engineering Inc | alteration of (e) elevator shaft to mechanical room & exterior re-surfing of stair shaft & elevator shaftDetails
alteration of (e) elevator shaft to mechanical room & exterior re-surfing of stair shaft & elevator shaft | $8,000 |
| Feb 22, 2011 | Never finaled issued Feb 2011, no final | 501 03rd St | Ting Kun Chow | 3rd floor-install condensing furnace, flu pipe & ductingDetails
3rd floor-install condensing furnace, flu pipe & ducting | $14,000 |
| Oct 12, 2010 | Expired or cancelled cancelled Jan 2026 | 501 03rd St | Nabi Construction & Engineering Inc | build new accessories room and new storage room over extg roof.Details
build new accessories room and new storage room over extg roof. | $15,000 |
| Feb 3, 2010 | Completed final sign-off Nov 2011 | 501 03rd St | Nabi Construction & Engineering Inc | (n) partition walls for office @ 3rd. flr. (n) gypsum board ceiling. (n) h/c men's & women's bathrooms.Details
(n) partition walls for office @ 3rd. flr. (n) gypsum board ceiling. (n) h/c men's & women's bathrooms. | $80,000 |
| Dec 6, 2006 | Completed final sign-off Jan 2007 | 501 03rd St | Nabi Construction & Engineering Inc | show deck framing on sheets sr1.1, revision on dwg a2.1 shows low height wall as cabinet wall. rev 200607146644Details
show deck framing on sheets sr1.1, revision on dwg a2.1 shows low height wall as cabinet wall. rev 200607146644 | |
| Nov 28, 2006 | Never finaled issued Nov 2006, no final | 501 03rd St | street space permitDetails
street space permit | ||
| Jul 14, 2006 | Completed final sign-off Jan 2007 | 501 03rd St | Nabi Construction & Engineering Inc | roof strenthening. new guardrail at roof deck. low height and full height walls at 2nd floor & new ada bathroom at 2nd floor.revision to 200507228409 for roof strengthening & 200312122257 for 2nd floor work.Details
roof strenthening. new guardrail at roof deck. low height and full height walls at 2nd floor & new ada bathroom at 2nd floor.revision to 200507228409 for roof strengthening & 200312122257 for 2nd floor work. | $21,000 |
| May 16, 2006 | Expired or cancelled expired Oct 2007 | 501 03rd St | Nabi Construction & Engineering Inc | extension to pa 200507228409, reduce scope of work.Details
extension to pa 200507228409, reduce scope of work. | |
| Apr 5, 2006 | Never finaled issued Apr 2006, no final | 501 03rd St | street space permitDetails
street space permit | ||
| Mar 14, 2006 | Completed final sign-off May 2006 | 501 03rd St | Fire & Security & Alarm Co/ F.S.A.C. | adding smoke & heat detectors for elevator recall & shut trip.Details
adding smoke & heat detectors for elevator recall & shut trip. | $5,000 |
| Mar 8, 2006 | Never finaled issued Mar 2006, no final | 501 03rd St | Nabi Construction & Engineering Inc | street spaceDetails
street space | |
| Jan 6, 2006 | Never finaled issued Jan 2006, no final | 501 03rd St | street spaceDetails
street space | ||
| Jan 3, 2006 | Never finaled issued Jan 2006, no final | 501 03rd St | street spaceDetails
street space | ||
| Jul 22, 2005 | Never finaled issued Jul 2005, no final | 501 03rd St | street spaceDetails
street space | ||
| Jul 22, 2005 | Completed final sign-off Jan 2007 | 501 03rd St | Nabi Construction & Engineering Inc | revision to application #200312122257 roof strengthening alteration no.200403037705 of (e) mezz non bearing 9' and 5' high walls at 1st floorDetails
revision to application #200312122257 roof strengthening alteration no.200403037705 of (e) mezz non bearing 9' and 5' high walls at 1st floor | |
| May 16, 2005 | Never finaled issued May 2005, no final | 501 03rd St | street spaceDetails
street space | ||
| Apr 18, 2005 | Never finaled issued Apr 2005, no final | 501 03rd St | street spaceDetails
street space | ||
| Mar 16, 2005 | Completed final sign-off May 2006 | 501 03rd St | Perfect Connection Inc. | add heds to (e) system.parking mez + elevator.Details
add heds to (e) system.parking mez + elevator. | $9,800 |
| Jan 28, 2005 | Completed final sign-off Jan 2007 | 501 03rd St | Nabi Construction & Engineering Inc | replace (e) stair w/ new stair at taber street. revision to pa# 2003/12/12/2257 & pa#2004/03/03/7705Details
replace (e) stair w/ new stair at taber street. revision to pa# 2003/12/12/2257 & pa#2004/03/03/7705 | $16,000 |
| Mar 3, 2004 | Completed final sign-off Jan 2007 | 501 03rd St | Nabi Construction & Engineering Inc | revision to app 200312122257- space under (n) ramp. rev to seismic foundation. replacing (e) windowsDetails
revision to app 200312122257- space under (n) ramp. rev to seismic foundation. replacing (e) windows | $25,000 |
| Dec 12, 2003 | Completed final sign-off Jan 2007 | 501 03rd St | Nabi Construction & Engineering Inc | revs: to 200202280352: seismic strenghting of (e) umb building as per section 34036 (104f) of sfbcDetails
revs: to 200202280352: seismic strenghting of (e) umb building as per section 34036 (104f) of sfbc | $375,000 |
| Feb 28, 2002 | Completed final sign-off Jan 2007 | 501 03rd St | seismic retrofit of unreinforced masonry building as per 'special procedure"Details
seismic retrofit of unreinforced masonry building as per 'special procedure" | $298,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nabi Construction & Engineering Inc (11), D A Pope Inc (4), Aegis Enterprises Inc (2), Perfect Connection Inc. (2), Rrs Fire Alarm Inc Dba California Fire D (2), Elson Electric Holdings Inc, Fire & Security & Alarm Co/ F.S.A.C., Kell Mechanical Heating And Air Condi, Ting Kun Chow
- Architects
- Philip Dix Nettle (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.