Block 0350, lot 004
1072 Market St
- City’s use
- Commercial Retail
- Built
- 1911
- Stories
- 3
- Units
- 4
- Rooms
- 12 bathrooms
- Building
- 26,880 sq ft
- Lot
- 11,316 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2024 | Completed final sign-off Jul 2024 | 1072 Market St | Metropolitan Electrical Construction | att modification of unmanned telecom facility consisting of remove and 3 antennas, relocate 1 antenna install y cable and single 40 a breaker on e rru 4449 per sector,total 3. remove 3 e strings of 155 ah batteries install 2 strings,210 210 ah and 1 string 170 ah batteries in existing cabinets, instDetails
att modification of unmanned telecom facility consisting of remove and 3 antennas, relocate 1 antenna install y cable and single 40 a breaker on e rru 4449 per sector,total 3. remove 3 e strings of 155 ah batteries install 2 strings,210 210 ah and 1 string 170 ah batteries in existing cabinets, inst | $35,000 |
| Jul 20, 2022 | Completed final sign-off Jul 2022 | 20 Jones St | Rrs Fire Alarm Inc Dba California Fire D | install 1 new relay module to control elevator smoke curtains. all other devices (e) to remain. ref pa201908209386. maher n/aDetails
install 1 new relay module to control elevator smoke curtains. all other devices (e) to remain. ref pa201908209386. maher n/a | $5,000 |
| May 10, 2022 | Completed final sign-off Feb 2024 | 1072 Market St | Jfc Construction Inc. | at&t: relocate sectors a+c. replace 1 antenna + add 1 new to all sectors with infant frp vents. remove 6 rru's + install 3 new rrus. remove 2 rbs cabinets. install 1 vertivxte dual stack battery cab with 4 new 190ah batteries. swap 12 "e" 155ah batteries with 12 new 190ah. 4 new rectifiers.one 6630.Details
at&t: relocate sectors a+c. replace 1 antenna + add 1 new to all sectors with infant frp vents. remove 6 rru's + install 3 new rrus. remove 2 rbs cabinets. install 1 vertivxte dual stack battery cab with 4 new 190ah batteries. swap 12 "e" 155ah batteries with 12 new 190ah. 4 new rectifiers.one 6630. | $75,000 |
| Feb 23, 2022 | Completed final sign-off Aug 2022 | 20 Jones St | Gulf Construction Construction | build approx 10'-0 wall in ront of the fire sprinkler pipe & fire alarm equipment.Details
build approx 10'-0 wall in ront of the fire sprinkler pipe & fire alarm equipment. | $2,000 |
| Oct 14, 2021 | Completed final sign-off Oct 2021 | 20 Jones St | Rrs Fire Alarm Inc Dba California Fire D | added 5 notification: ref pa 2021-0128-3565. as built revision.Details
added 5 notification: ref pa 2021-0128-3565. as built revision. | $3,000 |
| Jan 28, 2021 | Completed final sign-off Nov 2021 | 20 Jones St | Gulf Construction Construction | replacement of existing fa system with a new farenhyt f/a system.Details
replacement of existing fa system with a new farenhyt f/a system. | $30,000 |
| Jan 28, 2021 | Completed final sign-off Nov 2021 | 20 Jones St | Rrs Fire Alarm Inc Dba California Fire D | installation of a new two way communication systemDetails
installation of a new two way communication system | $15,000 |
| May 22, 2020 | Never finaled filed May 2020, never issued | 20 Jones St | Victory Fire Protection Inc | install new afs system throughout entire building per nfpa 13 2016 and the city of san francisco fire departmentDetails
install new afs system throughout entire building per nfpa 13 2016 and the city of san francisco fire department | $286,178 |
| May 18, 2020 | Completed final sign-off Jan 2022 | 20 Jones St | Victory Fire Protection Inc | new automatic fire sprinkler system asbuilt drawings (added sprinklers covering windows)Details
new automatic fire sprinkler system asbuilt drawings (added sprinklers covering windows) | $286,178 |
| Nov 15, 2019 | Completed final sign-off Jan 2022 | 20 Jones St | Victory Fire Protection Inc | install new fire sprinkler system (1 basement, 3 flrs)Details
install new fire sprinkler system (1 basement, 3 flrs) | $327,000 |
| Nov 15, 2019 | Completed final sign-off Jan 2022 | 20 Jones St | Victory Fire Protection Inc | install new underground fire service line.Details
install new underground fire service line. | $12,000 |
| Aug 20, 2019 | Completed final sign-off Aug 2022 | 20 Jones St | Gulf Construction Construction | revision to app#201608084501. install fire curtain and electrical. build new walls 5x7 in front of the elevator doorDetails
revision to app#201608084501. install fire curtain and electrical. build new walls 5x7 in front of the elevator door | $50,000 |
| Apr 12, 2019 | Completed final sign-off Dec 2019 | 20 Jones St | Gulf Construction Construction | 3rd flr - 2 bathrooms & 1 washing area -replace tiles in bathroom, change faucet & waterproof floor areaDetails
3rd flr - 2 bathrooms & 1 washing area -replace tiles in bathroom, change faucet & waterproof floor area | $25,000 |
| Aug 13, 2018 | Completed final sign-off Aug 2021 | 20 Jones St | Gulf Construction Construction | comply with nov 201859451 repair parapet & cracking/spallingDetails
comply with nov 201859451 repair parapet & cracking/spalling | $20,000 |
| Apr 11, 2018 | Never finaled filed Apr 2018, never issued | 1072 Market St | exterior work only: partial exterior improvements of (e) facades @ market & mcallister & jones street (painting, lighting) and ground floor tenant storefront improvements (entries, storefront glazing, overhead grilles, signage, power door operators). under separate permit: signageDetails
exterior work only: partial exterior improvements of (e) facades @ market & mcallister & jones street (painting, lighting) and ground floor tenant storefront improvements (entries, storefront glazing, overhead grilles, signage, power door operators). under separate permit: signage | $49,000 | |
| Mar 30, 2018 | Completed final sign-off Apr 2020 | 1072 Market St | Electric Tech Construction Inc | at&t wireless remove & replace 6 antennas swap out equipment, install 9 rrus, install 1 gps antenna, install 1 power plant, install 3 dc-12 in equipment area. rmeove 9 pbc-02's.Details
at&t wireless remove & replace 6 antennas swap out equipment, install 9 rrus, install 1 gps antenna, install 1 power plant, install 3 dc-12 in equipment area. rmeove 9 pbc-02's. | $15,000 |
| Dec 13, 2017 | Expired or cancelled withdrawn Feb 2018 | 1072 Market St | Swinerton Builders | tiebacks at 1012 market street for new construction @ 1066 market street. ref pa# 2014/06/12/8212-s.Details
tiebacks at 1012 market street for new construction @ 1066 market street. ref pa# 2014/06/12/8212-s. | $350,000 |
| Dec 6, 2017 | Expired or cancelled cancelled Jun 2018 | 1072 Market St | swap (3) existing antennas for (3) new antennas, install (1) dus-41 & (1) xmu inside exisiting cabinet & add dci fiber jumpers.Details
swap (3) existing antennas for (3) new antennas, install (1) dus-41 & (1) xmu inside exisiting cabinet & add dci fiber jumpers. | $15,000 | |
| Aug 8, 2016 | Completed final sign-off Aug 2022 | 20 Jones St | change of use. remove (e) entry doors, install (n) entry doors. remove portion of (e) wall for (n) opening.Details
change of use. remove (e) entry doors, install (n) entry doors. remove portion of (e) wall for (n) opening. | $1,000 | |
| Oct 30, 2013 | Completed final sign-off May 2014 | 1072 Market St | Triton Tower Inc | modification to an (e) att facility consisting of installtion of 3 new rrus near (e) att antennas on roof.Details
modification to an (e) att facility consisting of installtion of 3 new rrus near (e) att antennas on roof. | $12,000 |
| Oct 2, 2013 | Never finaled issued Oct 2013, no final | 1098 Market St | 225 Shipley Inc | tenant improvement in (e) vacant sheall space, no structural work, no exterior work.Details
tenant improvement in (e) vacant sheall space, no structural work, no exterior work. | $25,000 |
| Jul 24, 2013 | Never finaled issued Jul 2013, no final | 20 Jones St | street space and mta parkingDetails
street space and mta parking | ||
| Apr 30, 2012 | Completed final sign-off May 2012 | 20 Jones St | G C Electric | provide fire alarm evacutation system. 2nd fl officeDetails
provide fire alarm evacutation system. 2nd fl office | $5,500 |
| Aug 15, 2011 | Completed final sign-off May 2012 | 20 Jones St | office ti on the 2nd floor. interior demo, add new offices, finishes, power , data, hvac, lighting, bathrooms, conference room and some accessible upgrades at entry.Details
office ti on the 2nd floor. interior demo, add new offices, finishes, power , data, hvac, lighting, bathrooms, conference room and some accessible upgrades at entry. | $600,000 | |
| Dec 15, 2010 | Completed final sign-off Jun 2013 | 1072 Market St | Triton Tower Inc | installation of a wireless telecommunication facility consisting of (6) antannas and (6) rbs cabinets on roof.Details
installation of a wireless telecommunication facility consisting of (6) antannas and (6) rbs cabinets on roof. | $125,000 |
| Mar 12, 2010 | Completed final sign-off Mar 2010 | 1072 Market St | renew for final 200708089111Details
renew for final 200708089111 | ||
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 1072 Market St | remove atm in response to nov at ground floor. comply w/ nov 200790109 dated 1/31/07. renew appl #200708089111.Details
remove atm in response to nov at ground floor. comply w/ nov 200790109 dated 1/31/07. renew appl #200708089111. | ||
| Aug 8, 2007 | Expired or cancelled expired Feb 2008 | 1072 Market St | remove atm in response to n.o.v. at ground floor comply w/#200790109 dated 1/31/07Details
remove atm in response to n.o.v. at ground floor comply w/#200790109 dated 1/31/07 | $400 | |
| Mar 21, 2007 | Never finaled issued Mar 2007, no final | 1072 Market St | street spaceDetails
street space | ||
| Jul 2, 2004 | Never finaled issued Jan 2005, no final | 20 Jones St | Amana Engineering & Const | revision to app3200406307666. structural drawing of sidewalk replacement.Details
revision to app3200406307666. structural drawing of sidewalk replacement. | |
| Jun 30, 2004 | Never finaled issued Jun 2004, no final | 20 Jones St | Amana Engineering & Const | struct. re-bar in side walk over basement 126' lineal feet of sidewalk buy 15' wide dpw pa#m27457Details
struct. re-bar in side walk over basement 126' lineal feet of sidewalk buy 15' wide dpw pa#m27457 | $2,800 |
| May 12, 2004 | Never finaled issued May 2004, no final | 20 Jones St | street space and sidewalkDetails
street space and sidewalk | ||
| Oct 7, 2002 | Never finaled issued Oct 2002, no final | 1098 Market St | Johnson United Inc Dba United Sign Syste | sign permit-electrical, wal sign.Details
sign permit-electrical, wal sign. | $13,000 |
| May 22, 2002 | Expired or cancelled cancelled Feb 2005 | 1098 Market St | Johnson United Inc Dba United Sign Syste | replace extg signDetails
replace extg sign | $13,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gulf Construction Construction (5), Victory Fire Protection Inc (4), Rrs Fire Alarm Inc Dba California Fire D (3), Amana Engineering & Const (2), Johnson United Inc Dba United Sign Syste (2), Triton Tower Inc (2), 225 Shipley Inc, Electric Tech Construction Inc, G C Electric, Jfc Construction Inc., Metropolitan Electrical Construction, Swinerton Builders
- Architects
- Robert Roth (3), Michael Steiner, Nestor Popowych, Stephen Lau
- Engineers
- James Spore (2), Rodrigo Santos, Wissam Zalzali
- Authorized agent-otherss
- Robinson Nguyen (2)
- Designers
- Ryan Filibert
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.