Block 0013, lot 016
145 Jefferson St
- City’s use
- Commercial Retail
- Lot
- 27,656 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
95 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2025 | Completed final sign-off Oct 2025 | 145 Jefferson St | Mjm Construction(Michael Mendoza Const I | interior remodel to include new finishes & furniture in front of house, including dining area, lighting to remain. limited demolition, limited plumbing & electrical work. limited (n)equipment in kitchen & back of house. boh wall, floor and ceiling finishes to remain. boh lighting remain.Details
interior remodel to include new finishes & furniture in front of house, including dining area, lighting to remain. limited demolition, limited plumbing & electrical work. limited (n)equipment in kitchen & back of house. boh wall, floor and ceiling finishes to remain. boh lighting remain. | $150,000 |
| Apr 16, 2025 | In progress issued Apr 2025 | 145 Jefferson St | revision to pa# 202504083967, revised ocupancy load calculations.Details
revision to pa# 202504083967, revised ocupancy load calculations. | ||
| Apr 8, 2025 | In progress issued Apr 2025 | 145 Jefferson St | 2nd/f t.i. cosmetic work only. no construction. patch & paint as neccessary. install casework & display case for museum of failures. new bathroom signage & ada compliant soap dispenser to satisfy ada upgrade. e) light, mrch & sprinkler remain as-is. no change in use, no structural, & exterior workDetails
2nd/f t.i. cosmetic work only. no construction. patch & paint as neccessary. install casework & display case for museum of failures. new bathroom signage & ada compliant soap dispenser to satisfy ada upgrade. e) light, mrch & sprinkler remain as-is. no change in use, no structural, & exterior work | $7,500 | |
| Apr 3, 2025 | In progress issued Apr 2025 | 145 Jefferson St | ti: patch and paint as necessary. installation of slat walls, casework, and display cases for merchandise display. no structural, (e) lighting, mech, and sprinklers to remain as-is. no change of use. new entry doors to satisfy the new ada requirements.Details
ti: patch and paint as necessary. installation of slat walls, casework, and display cases for merchandise display. no structural, (e) lighting, mech, and sprinklers to remain as-is. no change of use. new entry doors to satisfy the new ada requirements. | $20,000 | |
| Sep 27, 2024 | Completed final sign-off Dec 2024 | 145 Jefferson St | Fox Security And Communications, Inc. | all floors: ref ti 202405081650 - fire only to move and remove equipment only. no new equipment being added.Details
all floors: ref ti 202405081650 - fire only to move and remove equipment only. no new equipment being added. | $2,000 |
| May 8, 2024 | Completed final sign-off Dec 2024 | 145 Jefferson St | Diamond One Construction Inc | removal of non strucutral partitions & finishes, millwork and exhbits on 1st,2nd and 3rd fls. all existing lighting, hvac, low voltage & electrical (not in walls being demolished). existing sprinklers to remain in place. only suspended ceiling systems to be removed.Details
removal of non strucutral partitions & finishes, millwork and exhbits on 1st,2nd and 3rd fls. all existing lighting, hvac, low voltage & electrical (not in walls being demolished). existing sprinklers to remain in place. only suspended ceiling systems to be removed. | $50,000 |
| Aug 3, 2023 | Completed final sign-off Oct 2023 | 145 Jefferson St | Arrow Sign Company | install 1-led illuminated marquee single face wall sign "world's largest candy department store" revision to pa# 202304044977, ref to pa# 202308033604.Details
install 1-led illuminated marquee single face wall sign "world's largest candy department store" revision to pa# 202304044977, ref to pa# 202308033604. | $3,500 |
| Aug 3, 2023 | Completed final sign-off Jan 2024 | 145 Jefferson St | Arrow Sign Company | revision to pa# 202304044977 to revised from non-illuminated to 1-illuminated marquee single face sign "worlds largest candy department store". ref pa# 202308033597.Details
revision to pa# 202304044977 to revised from non-illuminated to 1-illuminated marquee single face sign "worlds largest candy department store". ref pa# 202308033597. | |
| May 23, 2023 | In progress issued Dec 2023 | 145 Jefferson St | Signs For San Diego | space #500: install 1 illuminated single faced wall sign "the escape game" maher n/a.Details
space #500: install 1 illuminated single faced wall sign "the escape game" maher n/a. | $10,000 |
| May 23, 2023 | Expired or cancelled cancelled Jan 2026 | 145 Jefferson St | Zeus Electric | space #500: install 1 exterior illuminated led readerboard wall sign, maher n/a.Details
space #500: install 1 exterior illuminated led readerboard wall sign, maher n/a. | $15,000 |
| May 23, 2023 | Expired or cancelled cancelled Jan 2026 | 145 Jefferson St | Zeus Electric | space #500: install 1 illuminated double face projecting blade sign "escape", maher n/a.Details
space #500: install 1 illuminated double face projecting blade sign "escape", maher n/a. | $8,000 |
| Apr 4, 2023 | Completed final sign-off May 2023 | 145 Jefferson St | Arrow Sign Company | install (1) electric single face wall sign (it's sugar) (sign 1)Details
install (1) electric single face wall sign (it's sugar) (sign 1) | $5,000 |
| Apr 4, 2023 | Completed final sign-off May 2023 | 145 Jefferson St | Arrow Sign Company | install (2) electric single face wall signs 8'0"x 4'0" (sign 3)Details
install (2) electric single face wall signs 8'0"x 4'0" (sign 3) | $1,200 |
| Apr 4, 2023 | Completed final sign-off Jan 2024 | 145 Jefferson St | Arrow Sign Company | install (1) non electric single face wall sign 7'0"x16'0" (sign 2) (you know you want it)Details
install (1) non electric single face wall sign 7'0"x16'0" (sign 2) (you know you want it) | $2,300 |
| Mar 28, 2023 | Completed final sign-off Apr 2023 | 145 Jefferson St | Rrs Fire Alarm Inc Dba California Fire D | revision to 202302101792 fire alarm, add 10 devicesDetails
revision to 202302101792 fire alarm, add 10 devices | $24,291 |
| Mar 6, 2023 | Completed final sign-off Jun 2023 | 145 Jefferson St | Aaa Restaurant Fire Control/Dba Aaa Fire | basement: add/ relocated 147 sprinkler heads. bpa# 2022-1212-8119Details
basement: add/ relocated 147 sprinkler heads. bpa# 2022-1212-8119 | $64,000 |
| Feb 28, 2023 | Completed final sign-off Jun 2023 | 145 Jefferson St | Fox Security And Communications, Inc. | install new notification appliances in basement & 1st fl for underground ti work. ref pa 2022-1212-8119. 8 strobes, 50 speaker/strobes.Details
install new notification appliances in basement & 1st fl for underground ti work. ref pa 2022-1212-8119. 8 strobes, 50 speaker/strobes. | $5,000 |
| Feb 10, 2023 | Completed final sign-off Apr 2023 | 145 Jefferson St | Rrs Fire Alarm Inc Dba California Fire D | 1st/2nd fl - install notification devices in common areas of tenant space. add duct detector and relay module all other devices extg to remain. ref 202209293428.Details
1st/2nd fl - install notification devices in common areas of tenant space. add duct detector and relay module all other devices extg to remain. ref 202209293428. | $15,000 |
| Feb 8, 2023 | Expired or cancelled cancelled Jan 2026 | 145 Jefferson St | Ocean Park Mechanical, Inc | revision to pa#202209293428. reduce mech scope of work to roof top unit replacement and aur balance.Details
revision to pa#202209293428. reduce mech scope of work to roof top unit replacement and aur balance. | |
| Jan 18, 2023 | Completed final sign-off Mar 2023 | 145 Jefferson St | Pioneer Fire Inc. | 1-2/flr: relocated 8 fire sprinkler pendents. ref pa 2022-0929-3428Details
1-2/flr: relocated 8 fire sprinkler pendents. ref pa 2022-0929-3428 | $1,200 |
| Dec 12, 2022 | Completed final sign-off Jun 2023 | 145 Jefferson St | Gray West Construction Inc | basement: ti build-out of special amusement spaces at basement level. work includes non structural partitions, doors, fixtures, finishes and associated mep.Details
basement: ti build-out of special amusement spaces at basement level. work includes non structural partitions, doors, fixtures, finishes and associated mep. | $1,500,000 |
| Sep 29, 2022 | Completed final sign-off Oct 2023 | 145 Jefferson St | Build Group Inc. | retail store interior t.i., no change of use/structural/exterior. new partitions, triple sink, water heater, hand sink, refurbish e(e toilets, install new fixtures, lighting/diffusers & power, flooring, perimeter shelving, refurbish hvac units/utilize (e) ducting, add new trunks where required,Details
retail store interior t.i., no change of use/structural/exterior. new partitions, triple sink, water heater, hand sink, refurbish e(e toilets, install new fixtures, lighting/diffusers & power, flooring, perimeter shelving, refurbish hvac units/utilize (e) ducting, add new trunks where required, | $85,000 |
| Aug 4, 2022 | Completed final sign-off Jan 2023 | 145 Jefferson St | Bcci Construction Company | interior demolition to remove prevoius tenants improvements in advance of future ti fof its sugar store. no change of occupancy. no structural work ab-017Details
interior demolition to remove prevoius tenants improvements in advance of future ti fof its sugar store. no change of occupancy. no structural work ab-017 | $32,760 |
| Feb 8, 2022 | Completed final sign-off Mar 2022 | 145 Jefferson St | Aaa Restaurant Fire Control/Dba Aaa Fire | add 1 new pendent off (e) outlet. add (1) new pendent w/ mechanical tee of (e) branch lines.Details
add 1 new pendent off (e) outlet. add (1) new pendent w/ mechanical tee of (e) branch lines. | $9,200 |
| Dec 22, 2021 | Completed final sign-off Feb 2022 | 145 Jefferson St | Fox Security And Communications, Inc. | basement - demo fire alarm in basement due to room & closets being removed. relocate 3 notification devices on the 1st fl ref pa 2021-1108-1975Details
basement - demo fire alarm in basement due to room & closets being removed. relocate 3 notification devices on the 1st fl ref pa 2021-1108-1975 | $5,000 |
| Dec 9, 2021 | Completed final sign-off Feb 2022 | 145 Jefferson St | Diamond One Construction Inc | addition of non structural partitions and finishes resulting in new it room, on first fl. no new work in basement, space to remain vacant for future tenant improvement by othersDetails
addition of non structural partitions and finishes resulting in new it room, on first fl. no new work in basement, space to remain vacant for future tenant improvement by others | $350,000 |
| Nov 8, 2021 | Completed final sign-off Feb 2022 | 145 Jefferson St | Diamond One Construction Inc | removal of non structural partition and finishes, lighting, millwork and hvac equipment on basement and 1/f. ab-017 to remain vacant.Details
removal of non structural partition and finishes, lighting, millwork and hvac equipment on basement and 1/f. ab-017 to remain vacant. | $100,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2020 | 145 Jefferson St | S C Anderson Group International Inc. | no structural. demo of gypson and cabinetry thru restaurant due to water damage and mold remedication cover by licensed contractor. ada under ti per ab-017Details
no structural. demo of gypson and cabinetry thru restaurant due to water damage and mold remedication cover by licensed contractor. ada under ti per ab-017 | $300,000 |
| Dec 17, 2019 | Never finaled issued Feb 2020, no final | 145 Jefferson St | to show as built plans of co2 tank conditional permit to operate co2 storage tank, no work performed under this application n/a maherDetails
to show as built plans of co2 tank conditional permit to operate co2 storage tank, no work performed under this application n/a maher | ||
| Dec 12, 2018 | Never finaled issued Dec 2018, no final | 145 Jefferson St | street spaceDetails
street space | ||
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 145 Jefferson St | street spaceDetails
street space | ||
| Aug 24, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | W. Wong Construction Co. Inc. | provide lighting plan with title 24, refer ti permit #201806141864. maher naDetails
provide lighting plan with title 24, refer ti permit #201806141864. maher na | $3,000 |
| Aug 7, 2018 | Never finaled issued Aug 2018, no final | 145 Jefferson St | street spaceDetails
street space | ||
| Jul 20, 2018 | Never finaled issued Jul 2018, no final | 145 Jefferson St | W. Wong Construction Co. Inc. | provide structural detail to exterior signs and facade decoration. ref 201805149067. maher n/aDetails
provide structural detail to exterior signs and facade decoration. ref 201805149067. maher n/a | $5,000 |
| Jul 18, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | W. Wong Construction Co. Inc. | install one illuminated single-faced wall sign for giants dugout store.Details
install one illuminated single-faced wall sign for giants dugout store. | $2,000 |
| Jul 18, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | W. Wong Construction Co. Inc. | install one illuminated single-faced wall sign for lefty ballpark baseball buffet & cafe. maher n/a.Details
install one illuminated single-faced wall sign for lefty ballpark baseball buffet & cafe. maher n/a. | $3,000 |
| Jun 28, 2018 | Never finaled issued Jun 2018, no final | 145 Jefferson St | street spaceDetails
street space | ||
| Jun 14, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | W. Wong Construction Co. Inc. | ti for change ownership of (e) restaurant - mep, fire sprinkler & fire alarm under separate permit. maher naDetails
ti for change ownership of (e) restaurant - mep, fire sprinkler & fire alarm under separate permit. maher na | $180,000 |
| Jun 5, 2018 | Completed final sign-off Aug 2018 | 145 Jefferson St | Crime Watch Security Sys Llc | fire alarm: installation of a new manual and automatic fire alarm system. new fire alarm system to interface with base building fire alarm system. ref arch #201806141864.Details
fire alarm: installation of a new manual and automatic fire alarm system. new fire alarm system to interface with base building fire alarm system. ref arch #201806141864. | $40,000 |
| May 14, 2018 | Never finaled issued Jun 2018, no final | 145 Jefferson St | W. Wong Construction Co. Inc. | facade improvements to include new metal truss, metal faux truss, sconces, led digital panels, signs sep permitDetails
facade improvements to include new metal truss, metal faux truss, sconces, led digital panels, signs sep permit | $8,000 |
| May 1, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | W. Wong Construction Co. Inc. | in existing vacant restaurant space, replace damaged non-structural walls, install non-bearing partition for out walls and infill extg floor opening at 2nd floor in preparation for future t.i. no exterior work. n/a for maherDetails
in existing vacant restaurant space, replace damaged non-structural walls, install non-bearing partition for out walls and infill extg floor opening at 2nd floor in preparation for future t.i. no exterior work. n/a for maher | $30,000 |
| Feb 14, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | W. Wong Construction Co. Inc. | exploratory soft demolition, not structure, remove artificial folies and decorative panels. prepare for future tenant improvement. interior only. maher not reqDetails
exploratory soft demolition, not structure, remove artificial folies and decorative panels. prepare for future tenant improvement. interior only. maher not req | $1,000 |
| Sep 27, 2017 | Never finaled issued Sep 2017, no final | 145 Jefferson St | street spaceDetails
street space | ||
| Jan 13, 2017 | Completed final sign-off Apr 2019 | 145 Jefferson St | Diamond One Construction Inc | erect an illuminate double faced projecting sign 'the san francisco dungeon'. ref pa #201606109623. n/a maher ordinanceDetails
erect an illuminate double faced projecting sign 'the san francisco dungeon'. ref pa #201606109623. n/a maher ordinance | $100 |
| Jan 13, 2017 | Completed final sign-off Apr 2019 | 145 Jefferson St | Diamond One Construction Inc | erect an illuminate single faced painted sign " madame tussauds" @ new marquee. ref pa #201606109623. n/a maher ordinanceDetails
erect an illuminate single faced painted sign " madame tussauds" @ new marquee. ref pa #201606109623. n/a maher ordinance | $100 |
| Jan 13, 2017 | Completed final sign-off Apr 2019 | 145 Jefferson St | Diamond One Construction Inc | erect an illuminate single faced sign 'madame tussauds' @ new marquee. ref pa #201606109623. n/a maher ordinanceDetails
erect an illuminate single faced sign 'madame tussauds' @ new marquee. ref pa #201606109623. n/a maher ordinance | $100 |
| Nov 29, 2016 | Expired or cancelled cancelled Jan 2017 | 145 Jefferson St | Diamond One Construction Inc | single faced painted sign for "the san francisco dungeon"Details
single faced painted sign for "the san francisco dungeon" | $1,000 |
| Nov 29, 2016 | Expired or cancelled cancelled Jan 2017 | 145 Jefferson St | Diamond One Construction Inc | single faced painted sign for "madame tussauds"Details
single faced painted sign for "madame tussauds" | $500 |
| Nov 29, 2016 | Expired or cancelled cancelled Jan 2017 | 145 Jefferson St | Diamond One Construction Inc | single faced painted sign for "madame tussauds"Details
single faced painted sign for "madame tussauds" | $500 |
| Oct 26, 2016 | Completed final sign-off Apr 2019 | 145 Jefferson St | Diamond One Construction Inc | revision to pa 2016-0610-9623 adding structural steel beams to proposed marquee. any proposed exterior work to be repaired in kind. maher naDetails
revision to pa 2016-0610-9623 adding structural steel beams to proposed marquee. any proposed exterior work to be repaired in kind. maher na | $5,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 145 Jefferson St | Gray West Construction Inc | revision to pa #201604265694 - add ada compliant metal grate & t-24 revision.Details
revision to pa #201604265694 - add ada compliant metal grate & t-24 revision. | |
| Sep 21, 2016 | Completed final sign-off Jan 2017 | 145 Jefferson St | Fox Security And Communications, Inc. | basement: install 5 new smoke detectors, 4 sounders and 4 relays for new drop ride and 2 new fsds. n/a maher ord. 155-13Details
basement: install 5 new smoke detectors, 4 sounders and 4 relays for new drop ride and 2 new fsds. n/a maher ord. 155-13 | $19,000 |
| Sep 2, 2016 | Never finaled issued Sep 2016, no final | 145 Jefferson St | Potter Fire Protection | relocate 1, add 2, and plug, 2 fire sprinklers. ref app#201606150006.Details
relocate 1, add 2, and plug, 2 fire sprinklers. ref app#201606150006. | $1,750 |
| Aug 8, 2016 | Never finaled issued Oct 2016, no final | 145 Jefferson St | Gray West Construction Inc | revision to ref pa 201606150006, new display shelving.Details
revision to ref pa 201606150006, new display shelving. | |
| Aug 4, 2016 | Never finaled issued Aug 2016, no final | 145 Jefferson St | Fox Security And Communications, Inc. | relocate 3 notification applicances and delete 1 . reference ti 2016.04.26.5694 maher naDetails
relocate 3 notification applicances and delete 1 . reference ti 2016.04.26.5694 maher na | $10,000 |
| Aug 4, 2016 | Completed final sign-off Oct 2016 | 145 Jefferson St | Fox Security And Communications, Inc. | addition of 1 door holder, 2 smoke detectors, move 1 (e) speaker/strobe to wall.reference ti 2016.04.26.5696 maher naDetails
addition of 1 door holder, 2 smoke detectors, move 1 (e) speaker/strobe to wall.reference ti 2016.04.26.5696 maher na | $10,000 |
| Jun 15, 2016 | Completed final sign-off Dec 2016 | 145 Jefferson St | Gray West Construction Inc | modification of (e) circulation, adding & construction of new ride. holding new amusement drop ride & new photo collection room.Details
modification of (e) circulation, adding & construction of new ride. holding new amusement drop ride & new photo collection room. | $350,000 |
| Jun 10, 2016 | Completed final sign-off Apr 2019 | 145 Jefferson St | Diamond One Construction Inc, Bevilacqua & Sons | modification of the building facade new canopies, tv monitor, blade sign, ada bathroom ,weathered timber shutters not acceptable.Details
modification of the building facade new canopies, tv monitor, blade sign, ada bathroom ,weathered timber shutters not acceptable. | $85,000 |
| Apr 26, 2016 | Completed final sign-off Dec 2016 | 145 Jefferson St | Bevilacqua & Sons | modification to extg admission area at ground floor(museum). scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, communicating door, lighting, and finishes for 's.f. dungeon'.Details
modification to extg admission area at ground floor(museum). scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, communicating door, lighting, and finishes for 's.f. dungeon'. | $60,000 |
| Apr 26, 2016 | Completed final sign-off Dec 2016 | 145 Jefferson St | Bevilacqua & Sons | modification to extg admission area at ground floor. scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, exit door, lighting, and finishes for 'madame tussauds'.Details
modification to extg admission area at ground floor. scope includes removal of non bearing walls, service counter, and finishes, and construction of new service counter, exit door, lighting, and finishes for 'madame tussauds'. | $75,000 |
| Mar 18, 2016 | Completed final sign-off Mar 2016 | 145 Jefferson St | Fox Security And Communications, Inc. | remove (3) horns for painting & reinstall. compliance with maher ordinance no 155-13 not required.Details
remove (3) horns for painting & reinstall. compliance with maher ordinance no 155-13 not required. | $2,000 |
| Feb 25, 2016 | Completed final sign-off Mar 2016 | 145 Jefferson St | Fire Guard Protection Inc. | 1st flr: raise 2 sprinkler heads up, add 2 in dining area. maher naDetails
1st flr: raise 2 sprinkler heads up, add 2 in dining area. maher na | |
| Oct 14, 2015 | Never finaled issued Oct 2015, no final | 145 Jefferson St | Superior Electrical Advertising Inc | reface existing marquee sign for mcdonaldsDetails
reface existing marquee sign for mcdonalds | $2,000 |
| Oct 14, 2015 | Never finaled issued Oct 2015, no final | 145 Jefferson St | Superior Electrical Advertising Inc | reface existing marquee sign for mcdonalds. n/a ordinance #155-13Details
reface existing marquee sign for mcdonalds. n/a ordinance #155-13 | $8,000 |
| Sep 16, 2015 | Completed final sign-off Apr 2016 | 145 Jefferson St | Ybj Construction Services | decore upgrade, ada barrier removal, store front alteration. n/a ordinance #155-13Details
decore upgrade, ada barrier removal, store front alteration. n/a ordinance #155-13 | $190,000 |
| Jul 23, 2015 | Completed final sign-off Feb 2016 | 145 Jefferson St | Fox Security And Communications, Inc. | add 4 door holders with smoke detectors to existing fire alarm. n/a ordinance #155-13.Details
add 4 door holders with smoke detectors to existing fire alarm. n/a ordinance #155-13. | $10,000 |
| Jul 23, 2015 | Completed final sign-off Feb 2016 | 145 Jefferson St | Fox Security And Communications, Inc. | add 1 door holder with smoke detector to existing fire alarm. n/a ordinance #155-13.Details
add 1 door holder with smoke detector to existing fire alarm. n/a ordinance #155-13. | $5,000 |
| Apr 9, 2015 | Completed final sign-off Jun 2015 | 145 Jefferson St | Siemens Industry, Inc. | fire alarm work to provide internal driver cards for the graphic annunciatior, provided by others, under permit pa 201502128240. this portion of the annunciator additions deal with the "rain forest" tenant only. n/a for the maherDetails
fire alarm work to provide internal driver cards for the graphic annunciatior, provided by others, under permit pa 201502128240. this portion of the annunciator additions deal with the "rain forest" tenant only. n/a for the maher | $2,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 145 Jefferson St | Fox Security And Communications, Inc. | revision to permit #201403281944 to install graphic annunciator. (maher ordinance extended ordinance 155-13 not required)Details
revision to permit #201403281944 to install graphic annunciator. (maher ordinance extended ordinance 155-13 not required) | $30,000 |
| Jun 17, 2014 | Never finaled issued Jun 2014, no final | 145 Jefferson St | Fox Security And Communications, Inc. | fire alarm panel replacement. ref app#201403281944. n/a for the maher ordinance #155-13Details
fire alarm panel replacement. ref app#201403281944. n/a for the maher ordinance #155-13 | $9,850 |
| Jun 5, 2014 | Expired or cancelled cancelled Apr 2016 | 145 Jefferson St | Bcci Construction Company | (16) emergency evacuation signs throughout building.Details
(16) emergency evacuation signs throughout building. | $5,000 |
| Jun 3, 2014 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | revision to approved mechanical permit 201405014709 to show as-built condition; compliance with ord 155-13 requiredDetails
revision to approved mechanical permit 201405014709 to show as-built condition; compliance with ord 155-13 required | |
| May 27, 2014 | Expired or cancelled cancelled Jan 2026 | 145 Jefferson St | balcony signs non electricDetails
balcony signs non electric | $1,000 | |
| May 27, 2014 | Completed final sign-off Jul 2014 | 145 Jefferson St | Bcci Construction Company | 1 awning signDetails
1 awning sign | $1,500 |
| May 27, 2014 | Completed final sign-off Jul 2014 | 145 Jefferson St | Bcci Construction Company | 2 awning signsDetails
2 awning signs | $5,000 |
| May 27, 2014 | Completed final sign-off Jul 2014 | 145 Jefferson St | Bcci Construction Company | 3 new awnnigs on facade of building on jefferson- sprinklers required under separate permits.Details
3 new awnnigs on facade of building on jefferson- sprinklers required under separate permits. | $5,000 |
| May 27, 2014 | Completed final sign-off Jul 2014 | 145 Jefferson St | Bcci Construction Company | 4 blade signs double sidedDetails
4 blade signs double sided | $2,000 |
| May 13, 2014 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | installation of gas appliance torch at facade above entrance. maher-compliance with ordinance no. 155-13.not required.Details
installation of gas appliance torch at facade above entrance. maher-compliance with ordinance no. 155-13.not required. | $1,000 |
| May 1, 2014 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | revision to app#201304164667-r2. providing mechanical drawing sheets with revision for fire department approval and mechanical. *** maher: compliance with ordinance no# 155-13 not required ***Details
revision to app#201304164667-r2. providing mechanical drawing sheets with revision for fire department approval and mechanical. *** maher: compliance with ordinance no# 155-13 not required *** | |
| Mar 28, 2014 | Completed final sign-off Jul 2015 | 145 Jefferson St | Fox Security And Communications, Inc. | addition to existing fire alarm system to include smoke & heat detectors, nanual pull stations, hvac duct detectors, speaker/strobes, and aspiration smoke detection system. associated with pa# 201304164667 r2. ** maher: compliance with ordinance no# 155-13 not required **Details
addition to existing fire alarm system to include smoke & heat detectors, nanual pull stations, hvac duct detectors, speaker/strobes, and aspiration smoke detection system. associated with pa# 201304164667 r2. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 |
| Feb 5, 2014 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | revision to pa# 201304164673 change 2 hr exit passage to 1 hr exit access corridor on 1/fDetails
revision to pa# 201304164673 change 2 hr exit passage to 1 hr exit access corridor on 1/f | |
| Jan 31, 2014 | Completed final sign-off Jun 2014 | 145 Jefferson St | Ayoob & Peery Plumbing Co Inc | change fire sprinkler degree on plan due to mistake (all floors); on permit 201311141881 (ref. 201311141881/201304164673; compliance with ord 155-13 not requiredDetails
change fire sprinkler degree on plan due to mistake (all floors); on permit 201311141881 (ref. 201311141881/201304164673; compliance with ord 155-13 not required | |
| Jan 28, 2014 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | work associated with permit app#201304164667 r-2. install raised flooring in parts of the tenant space. structural work only. n/a for maher ordinance #155-13Details
work associated with permit app#201304164667 r-2. install raised flooring in parts of the tenant space. structural work only. n/a for maher ordinance #155-13 | $84,000 |
| Nov 14, 2013 | Completed final sign-off Feb 2015 | 145 Jefferson St | Ayoob & Peery Plumbing Co Inc | fire sprinkler modification per tenant improvement: basement- add 36, relocate 145, remove 12, total 181. 1/f- add 16, relocate 26, total 42. 2/f- add 12, relocate 45, remove 5, total 57. 3/f- add 16, relocate 64, remove 6, total 80. t.i.app# 2013-0416-4673Details
fire sprinkler modification per tenant improvement: basement- add 36, relocate 145, remove 12, total 181. 1/f- add 16, relocate 26, total 42. 2/f- add 12, relocate 45, remove 5, total 57. 3/f- add 16, relocate 64, remove 6, total 80. t.i.app# 2013-0416-4673 | $184,526 |
| Oct 7, 2013 | Never finaled issued Oct 2013, no final | 145 Jefferson St | street spaceDetails
street space | ||
| Aug 7, 2013 | Never finaled issued Aug 2013, no final | 145 Jefferson St | street space w/mtaDetails
street space w/mta | ||
| Apr 16, 2013 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | non structural t.i on portions of basement, 1st,2nd & 3rd flrs. include: amusement attraction with amusement rides in the basement, titleing + retail on 1st and wax museum on the 2nd +3rd flrs w/ ticketing & retail on the 1st. related mech, plumb, elect. sprinkler/fire alarm on separate permits.Details
non structural t.i on portions of basement, 1st,2nd & 3rd flrs. include: amusement attraction with amusement rides in the basement, titleing + retail on 1st and wax museum on the 2nd +3rd flrs w/ ticketing & retail on the 1st. related mech, plumb, elect. sprinkler/fire alarm on separate permits. | $5,500,000 |
| Apr 16, 2013 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | core & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaionDetails
core & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaion | $500,000 |
| Feb 27, 2013 | Never finaled issued Feb 2013, no final | 145 Jefferson St | Zebra Awning Co Inc | painted onto valances "activities & tours" lettering " tall.Details
painted onto valances "activities & tours" lettering " tall. | $494 |
| Feb 27, 2013 | Completed final sign-off Feb 2014 | 145 Jefferson St | Zebra Awning Co Inc | install awning in recess of bldg nook. replacing current awning w/ (n)Details
install awning in recess of bldg nook. replacing current awning w/ (n) | $494 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 145 Jefferson St | Young Electric Sign Co. | to erect illuminated wall signDetails
to erect illuminated wall sign | $15,000 |
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 145 Jefferson St | J K M Fire Protection | as built ref appl #200902202475 ansul fire system.Details
as built ref appl #200902202475 ansul fire system. | |
| Feb 20, 2009 | Completed final sign-off Jul 2009 | 145 Jefferson St | J K M Fire Protection | remove existing wet mechemical non ul300 to new ul300 wet chemical pyro system.Details
remove existing wet mechemical non ul300 to new ul300 wet chemical pyro system. | $6,000 |
| Aug 29, 2008 | Expired or cancelled expired Jul 2014 | 145 Jefferson St | replace existing store front with new sliding store front.Details
replace existing store front with new sliding store front. | $15,000 | |
| Sep 5, 2006 | Expired or cancelled expired Feb 2009 | 145 Jefferson St | modify small portion of existing chocolate store merchandising area to accommodate ice cream equipmentDetails
modify small portion of existing chocolate store merchandising area to accommodate ice cream equipment | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (13), Fox Security And Communications, Inc. (12), Diamond One Construction Inc (11), W. Wong Construction Co. Inc. (8), Arrow Sign Company (5), Gray West Construction Inc (4), Bevilacqua & Sons (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Ayoob & Peery Plumbing Co Inc (2), J K M Fire Protection (2), Rrs Fire Alarm Inc Dba California Fire D (2), Superior Electrical Advertising Inc (2), Zebra Awning Co Inc (2), Zeus Electric (2), Build Group Inc., Crime Watch Security Sys Llc, Fire Guard Protection Inc., Mjm Construction(Michael Mendoza Const I, Ocean Park Mechanical, Inc, Pioneer Fire Inc., Potter Fire Protection, S C Anderson Group International Inc., Siemens Industry, Inc., Signs For San Diego, Ybj Construction Services, Young Electric Sign Co.
- Architects
- Eric Ibsen (7), Andrew Rodgers (3), Edward Gee (2), Gary Semling (2), Matthew Rieskin (2), Michael Castro (2), David Fernando Caneer, David Kozolchyk Plotkin, David Plotkin, Flynn Rosenthal, Gregory Lagrega, Raymond S Situ, Stephen Maher, Teresa Emery
- Engineers
- Raymond Situ (2), Richard Dreyer (2), Tony Jacob (2), Douglas Mass, Harris Liu, Mark Robison, Matthew Nichols, Roy Payne
- Authorized agent-otherss
- Nick Vetzmadian (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.