Block 0175, lot 030
731 Sansome St
47 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2025 | In progress filed Jan 2025, not yet issued | 731 Sansome St | Rrs Fire Alarm Inc Dba California Fire D | replace (e) fire alarm system | $2,500 |
| Nov 22, 2024 | In progress issued Nov 2024 | 731 Sansome St | Elson Electric Holdings Inc | 2/fl-electrical work only- new lighting/lighting controls and minor power off (e) panel | $65,000 |
| Nov 14, 2024 | In progress issued Dec 2024 | 731 Sansome St | Rrs Fire Alarm Inc Dba California Fire D | one for one swap of existing fire alarm system with new non proprierty system | $25,000 |
| May 27, 2020 | Completed final sign-off Aug 2020 | 731 Sansome St | State Roofing Systems Inc | reroofing. | $23,488 |
| Apr 2, 2019 | Completed final sign-off May 2019 | 731 Sansome St | Rod Heisler Construction | 3rd fl - deferred electrical plans for pa 2018-1009-2575. 3rd fl ti upgrade lighting, power and controls | $65,000 |
| Mar 8, 2019 | Completed final sign-off May 2019 | 731 Sansome St | Rod Heisler Construction | rev to pa 201810092575; add wc to mens room, add sheet a811 misc. & finish changes. all mep work under sep permit, no change floors or egress path to street. | |
| Feb 20, 2019 | Completed final sign-off Apr 2019 | 731 Sansome St | Johnson Controls Fire | f/a: installing alarm devices on 3rd fl: 1 smoke detector, 7 duct detectors, 2 strobes, 1 auxiliary relay, and 13 horn/strobes. ref ti #201810092575. | $23,129 |
| Jan 24, 2019 | Completed final sign-off May 2019 | 731 Sansome St | Bayside Mechanical Inc | provide and install 7 new air handlers, and one new cooling only split system, provide and install duct work and air diffusers. ref ti #201810092575. 3rd fl. | $90,000 |
| Dec 19, 2018 | Completed final sign-off Apr 2019 | 731 Sansome St | Flow Masters Plumbing Inc | 3rd floor: reconfigure existing fire sprinkler system to suit t.i to 3rd floor only. no work to existing underground, riser, standpipe system, main ,cross main, or spinkler line in existing gridded fs system. no work to existing seismic bracing or sprinkler line hingers. install 80 sprinkler head. | $5,000 |
| Oct 9, 2018 | Completed final sign-off May 2019 | 731 Sansome St | Rod Heisler Construction | 3rd fl. interior t.i. including non-structural remodel of partitions, flooring, ceilings,furnishes and finishes, mep & fire alarm deferred | $547,040 |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 731 Sansome St | Commercial Interior Builders Inc | 3rd floor - demolition of existing interior only ti. no exterior work. ab-017 applies. remain vacant & ti permit is required. | $25,000 |
| Mar 6, 2017 | Never finaled issued Mar 2017, no final | 731 Sansome St | Johnson Controls Fire | as built fire alarm drawings record drawing for pa 2017-0118-7387 maher na. full floor moved sd from closet to idf rom; changed id tags/labels. | |
| Jan 18, 2017 | Never finaled issued Jan 2017, no final | 731 Sansome St | Johnson Controls Fire | fire alarm ti to 5th floor - 1 booster panel, 2 mokes, 1 manual pull box, 15 horn/strobes. 3 strobes. ref pa 2016-1028-1369. maher na | $14,500 |
| Dec 13, 2016 | Never finaled issued Dec 2016, no final | 731 Sansome St | Commercial Interior Builders Inc | 5th floor: revision to 201610281369 - ada restroom change; n/a maher | |
| Nov 7, 2016 | Completed final sign-off Dec 2016 | 731 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 28 pendent, add 1 pendent for trade desk on the 5th fl maher not req. ref #201610281369 | $7,250 |
| Oct 28, 2016 | Completed final sign-off Mar 2017 | 731 Sansome St | Commercial Interior Builders Inc | 5th flr: office ti - framing, mep and new finishes maher na | $375,000 |
| Apr 8, 2016 | Never finaled issued Apr 2016, no final | 731 Sansome St | C C I Commercial Construction & Improv | selective demo of walls, parttions, doors, and work stations. ab-017 applies. compliance with maher ordinance no 155-13 not required. | $25,000 |
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 731 Sansome St | Cci Com'l Constr & Improv**See 985808*** | new non-load bearing walls, doors & glazing. relocated lights & new outlets, new unisex restroom. all mep work to be design/build under separate permit. | $58,000 |
| Dec 9, 2011 | Completed final sign-off Dec 2011 | 731 Sansome St | Simplex Grinnell | fire alarm system tenant improvement. 1 new power supply with batteries, 4 strobes, 2 horn/strobes | $3,000 |
| Nov 4, 2011 | Completed final sign-off Dec 2011 | 731 Sansome St | Cci Com'l Constr & Improv**See 985808*** | demoliton of base cabinets, installation of new equipment in break room, new non load bearing walls, new doors, and power supply. mep under seperate permit. | $33,000 |
| Oct 31, 2011 | Expired or cancelled cancelled Jan 2026 | 731 Sansome St | Incom Mechanical Inc | as-built fire sprinkler plan. previous app# 2011-1013-6707. change/remove 3 heads. 2 new, 1 existing | $7,500 |
| Oct 13, 2011 | Never finaled issued Oct 2011, no final | 731 Sansome St | Incom Mechanical Inc | relocate 41 fire sprinkler heads for tenant improvement | $7,500 |
| Oct 7, 2011 | Completed final sign-off Nov 2011 | 731 Sansome St | revision to appl.#201106289045, provide (n) 1-hr. rated partition. | ||
| Oct 4, 2011 | Completed final sign-off Nov 2011 | 731 Sansome St | Bullard's Heating & Air Inc. | ground floor install (2) fancoils & related ductwork. t.i. #201106289045. | $50,000 |
| Jun 28, 2011 | Completed final sign-off Nov 2011 | 731 Sansome St | Cci Com'l Constr & Improv**See 985808*** | minor non structural demo, non load bearing walls new lighting and outlet. new 1 hour rated corridor. mep under seperate permit. | $65,000 |
| Mar 2, 2011 | Completed final sign-off Mar 2011 | 731 Sansome St | Skyline Construction | revision to pa# 2010-0706-5977-change #5 on d.a. checklist to equivalent facilitation hardship & add hardship | |
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 731 Sansome St | Simplex Grinnell | 4th floor t.i. - add new (6) horn/strobe & (7) strobes. | $8,000 |
| Jan 14, 2011 | Completed final sign-off Apr 2011 | 731 Sansome St | Pacific Coast Fire | relocate 7 fire sprinkler heads to cover new office wall layout | $3,500 |
| Jan 7, 2011 | Never finaled issued Jan 2011, no final | 731 Sansome St | Incom Mechanical Inc | as built fire sprinkler for permit appl. # 2010.10.12.2753 at gound level lobby. | |
| Dec 3, 2010 | Completed final sign-off Dec 2011 | 731 Sansome St | Simplex Grinnell | fire alarm t.i on 2nd. & 3rd. flr. addition of 2-strobes for 2nd. flr. restrooms. addition of 2-strobes 3rd. flr. restrooms. | $4,000 |
| Oct 22, 2010 | Completed final sign-off Dec 2010 | 731 Sansome St | Cci Com'l Constr & Improv**See 985808*** | interior partition for new office and relocate extg light fixture to accomodate new partition walls on 2nd floor | $90,000 |
| Oct 19, 2010 | Completed final sign-off May 2017 | 731 Sansome St | Simplex Grinnell | fire alarm ti on 3rd floor includes 1 new power supply, 1 new smoke detector, 2 new horn/strobes and 2 new strobes | $5,000 |
| Oct 12, 2010 | Never finaled issued Oct 2010, no final | 731 Sansome St | Pacific Coast Fire | 3rd floor - relocate fire sprinkler heads for new walls. | $2,100 |
| Oct 12, 2010 | Completed final sign-off Dec 2010 | 731 Sansome St | Incom Mechanical Inc | modification to fire sprinkler system for lobby | $4,900 |
| Sep 23, 2010 | Completed final sign-off Dec 2010 | 731 Sansome St | Skyline Construction | revision to app#201007065976 to reduce scope of work for tennant improvement on the 3rd floor. | |
| Jul 8, 2010 | Completed final sign-off Dec 2010 | 731 Sansome St | Cci Com'l Constr & Improv**See 985808*** | work on grd fl of the existing building. work incl removal of exist6ing entrance lobby finishes and installation of new finishes. | $160,000 |
| Jul 6, 2010 | Completed final sign-off Mar 2011 | 731 Sansome St | Skyline Construction | new non load bearing partitions ceiling and finshes on the 4th fl. mep, fs, and life safety sep permit as required | $127,000 |
| Jul 6, 2010 | Completed final sign-off Dec 2010 | 731 Sansome St | Skyline Construction | new non load bearing partitions, minor ceiling work and finishes on 3rd fl. mep , fire sp, ls sep permit | $105,000 |
| Jun 14, 2010 | Expired or cancelled cancelled Jan 2026 | 731 Sansome St | tenant improvement on the 3rd. & 4th. flrs. (n) non-load bearing partitions ceiling & finishes. mep, life safety & fire sprinkler under sep. permit. | $250,000 | |
| Jun 3, 2010 | Never finaled issued Jun 2010, no final | 731 Sansome St | Skyline Construction | demo of non load bearing paritions on 3rd and 4th floor. ab017 | $8,135 |
| Apr 21, 2010 | Never finaled issued Apr 2010, no final | 731 Sansome St | Incom Mechanical Inc | raise existing pendant protection to accomodate demo ceiling grid. no change in layout or coverage to be performed. | $5,000 |
| Dec 22, 2009 | Never finaled issued Dec 2009, no final | 731 Sansome St | Cci Com'l Constr & Improv**See 985808*** | ground floor and second floor. removal of tenant improvements. | $30,000 |
| Mar 22, 2005 | Completed final sign-off Apr 2005 | 731 Sansome St | Skyline Construction | oti-3 4th floor | $10,000 |
| Mar 16, 2005 | Completed final sign-off Apr 2005 | 731 Sansome St | Skyline Construction | oti-2, 4th foor, me | $8,000 |
| Mar 10, 2005 | Completed final sign-off Apr 2005 | 731 Sansome St | relocationn o49 sprinller heads, 2 added, 2 removed | $4,000 | |
| Feb 22, 2005 | Completed final sign-off Apr 2005 | 731 Sansome St | Skyline Construction | oti-1, 4th floor, el, me, ls, sp. | $30,000 |
| Dec 22, 2004 | Completed final sign-off Mar 2005 | 731 Sansome St | tenant improvement for offices for use by comcast on 2nd floor | $70,000 |