Block 0287, lot 010
250 Sutter St
- City’s use
- Commercial Office
- Built
- 1909
- Stories
- 6
- Building
- 54,292 sq ft
- Lot
- 8,940 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
95 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2026 | In progress filed Oct 2026, not yet issued | 250 Sutter St | Peacock Construction | suite 550: office t.i. including selective demo and replacement of walls, doors and a dishwasher. upgrade common restrooms.Details
suite 550: office t.i. including selective demo and replacement of walls, doors and a dishwasher. upgrade common restrooms. | $90,000 |
| Apr 16, 2026 | Completed final sign-off May 2026 | 250 Sutter St | Gci, Inc | 2/f: air distribution for new floor layout. mech only . ref 202512121666.Details
2/f: air distribution for new floor layout. mech only . ref 202512121666. | $125,000 |
| Jan 16, 2026 | Completed final sign-off Feb 2026 | 250 Sutter St | Pioneer Fire Inc. | 2/f: relocate (1) pendent. convert (4) uprights to pendents. ref t.i permit 202512121666Details
2/f: relocate (1) pendent. convert (4) uprights to pendents. ref t.i permit 202512121666 | $1,250 |
| Jan 9, 2026 | Expired or cancelled withdrawn Mar 2026 | 250 Sutter St | Rrs Fire Alarm Inc Dba California Fire D | install 1 ceiling mount strobe in the conference room. relocate 1 ceiling mount strobeDetails
install 1 ceiling mount strobe in the conference room. relocate 1 ceiling mount strobe | $100 |
| Dec 12, 2025 | Completed final sign-off May 2026 | 250 Sutter St | Gci, Inc | 2/fl- commerical interior ti for soft demo and build out of non structrual work.Details
2/fl- commerical interior ti for soft demo and build out of non structrual work. | $140,000 |
| Apr 29, 2024 | Completed final sign-off Sep 2024 | 250 Sutter St | Bilcor Inc | 4/f: install (2) duct detectors. install (2) sampling tubes. mech ref # 202103166654Details
4/f: install (2) duct detectors. install (2) sampling tubes. mech ref # 202103166654 | $2,664 |
| Jul 3, 2023 | Expired or cancelled cancelled Jan 2026 | 248 Sutter St | revision for pa 2023-0606-9319 provide smoke/fire pamaperDetails
revision for pa 2023-0606-9319 provide smoke/fire pamaper | $500 | |
| Jun 15, 2023 | Completed final sign-off Jun 2023 | 248 Sutter St | Incom Mechanical Inc | install pendent protection. as built to permit 202212229006; swap out pendents in yoga hot room to higher temperatureDetails
install pendent protection. as built to permit 202212229006; swap out pendents in yoga hot room to higher temperature | |
| Jun 6, 2023 | Completed final sign-off Jul 2023 | 248 Sutter St | Bilcor Inc | install 5 ceiling strobes, 3 wall mount horn strobes, 10 ceiling mount horn strobes, 7 duct detectors, 6 control relays arch andn mech 202207088071Details
install 5 ceiling strobes, 3 wall mount horn strobes, 10 ceiling mount horn strobes, 7 duct detectors, 6 control relays arch andn mech 202207088071 | $20,460 |
| Apr 11, 2023 | Never finaled issued Apr 2023, no final | 248 Sutter St | J & K Project Mgmt Consultants Llc | revision to 202207088071 relocate laundry machine and relocate hvac unitsDetails
revision to 202207088071 relocate laundry machine and relocate hvac units | $300 |
| Dec 22, 2022 | Completed final sign-off Jun 2023 | 248 Sutter St | Incom Mechanical Inc | install 62 new pendent protection tiDetails
install 62 new pendent protection ti | $20,000 |
| Sep 19, 2022 | Never finaled issued Sep 2022, no final | 250 Sutter St | Intelligent Technologies & Services Inc | supply and install a voluntary clean agent fire suppresson system with 6th fl. it/server roomDetails
supply and install a voluntary clean agent fire suppresson system with 6th fl. it/server room | $31,528 |
| Aug 22, 2022 | Completed final sign-off Sep 2023 | 248 Sutter St | Maguire Inc Dba Lahue And Associates | set of illuminated channel letters attached to e canopy hot yogaDetails
set of illuminated channel letters attached to e canopy hot yoga | $10,000 |
| Jul 15, 2022 | Completed final sign-off Jul 2022 | 250 Sutter St | Bilcor Inc | 5/flr install (2) duct detectors install (2) install (2) sampling tubes. mechanical 202103166654Details
5/flr install (2) duct detectors install (2) install (2) sampling tubes. mechanical 202103166654 | $2,640 |
| Jul 8, 2022 | Completed final sign-off Sep 2023 | 248 Sutter St | J & K Project Mgmt Consultants Llc | ti work for hot 8 yoga with non structural walls, new restrooms, locker rooms, yoga studios, laundry room with associated plumbing, mechanical and electricalDetails
ti work for hot 8 yoga with non structural walls, new restrooms, locker rooms, yoga studios, laundry room with associated plumbing, mechanical and electrical | $350,000 |
| Apr 27, 2021 | Never finaled issued May 2021, no final | 250 Sutter St | Bilcor Inc | fire life safety: install (4) duct detectors reference permit # 2021-0316-6654Details
fire life safety: install (4) duct detectors reference permit # 2021-0316-6654 | $2,640 |
| Mar 16, 2021 | Never finaled issued Apr 2021, no final | 250 Sutter St | Field Construction Inc. | fire smoke damper replacement.Details
fire smoke damper replacement. | $65,000 |
| Dec 16, 2020 | Completed final sign-off Feb 2021 | 250 Sutter St | Bilcor Inc | 1st fl, mezz & roof. fire life safety: install (1) control display module, (4) control relay modules, (4) monitor modules.Details
1st fl, mezz & roof. fire life safety: install (1) control display module, (4) control relay modules, (4) monitor modules. | $3,300 |
| Aug 27, 2020 | Completed final sign-off Jun 2021 | 246 Sutter St | Arrow Sign Company | comply w/ planning enforcement case # 2017-007713enf. install 1 set vinyl fco letters + logo on glass window above entryway - "paper source"Details
comply w/ planning enforcement case # 2017-007713enf. install 1 set vinyl fco letters + logo on glass window above entryway - "paper source" | $1,100 |
| Feb 28, 2020 | Completed final sign-off Feb 2021 | 250 Sutter St | Skyline Construction | comply with planning enf case #2017-007713enf. removal of signage, banners, and projecting banner moiunting brackets from facade. repair to match existing.Details
comply with planning enf case #2017-007713enf. removal of signage, banners, and projecting banner moiunting brackets from facade. repair to match existing. | $12,000 |
| Dec 6, 2019 | Expired or cancelled withdrawn Jul 2022 | 248 Sutter St | ti of (e) space on basement level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing in a mixed-use building. scope includes new studios, offices, restrooms with showers and reception area. maher naDetails
ti of (e) space on basement level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing in a mixed-use building. scope includes new studios, offices, restrooms with showers and reception area. maher na | $380,000 | |
| Aug 27, 2018 | Never finaled issued Feb 2019, no final | 250 Sutter St | Skyline Construction | 5th fl - revision to pa 2018-0724-5305 to revise structural details and calculationsDetails
5th fl - revision to pa 2018-0724-5305 to revise structural details and calculations | |
| Aug 10, 2018 | Completed final sign-off Aug 2018 | 250 Sutter St | Bilcor Inc | 6th: fire alarm ti: install (7) wall mount strobes; (4) ceiling mount horn-strobes; (2) wall mount strobes; (1) smoke detectors w/base; (3) duct detector w/sampling tube; (3) control relays; (1) booster panel/power supply reference ti #201805148978.Details
6th: fire alarm ti: install (7) wall mount strobes; (4) ceiling mount horn-strobes; (2) wall mount strobes; (1) smoke detectors w/base; (3) duct detector w/sampling tube; (3) control relays; (1) booster panel/power supply reference ti #201805148978. | $10,500 |
| Jul 24, 2018 | Completed final sign-off Apr 2019 | 250 Sutter St | Skyline Construction | mep for tenant improvement on the 6th fl. ref pa #201805148978.Details
mep for tenant improvement on the 6th fl. ref pa #201805148978. | $150,000 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 250 Sutter St | Skyline Construction | structural work for operable partition on 6th floor. ref #201805148978.Details
structural work for operable partition on 6th floor. ref #201805148978. | $15,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2021 | 246 Sutter St | Hathaway Dinwiddie Co. | underpinning of (e) 6-story brick building. maher naDetails
underpinning of (e) 6-story brick building. maher na | $18,000 |
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 250 Sutter St | Pioneer Fire Inc. | ste. 600: ref pa# 201805148978; relocate (14) pendentsDetails
ste. 600: ref pa# 201805148978; relocate (14) pendents | $14,690 |
| May 14, 2018 | Completed final sign-off Apr 2019 | 250 Sutter St | Skyline Construction | 6th fl - ti to include demo of non-structural partitions. new partitions, mep, life safety under separate permitDetails
6th fl - ti to include demo of non-structural partitions. new partitions, mep, life safety under separate permit | $150,000 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 250 Sutter St | Walschon Fire Protection Inc | installation of new jockey pump in basement maher naDetails
installation of new jockey pump in basement maher na | $10,000 |
| May 24, 2017 | Completed final sign-off Jul 2017 | 250 Sutter St | Bilcor Inc | fire alarm t.i. replace extg facu (est-2) with new facu(est-3) n/a for maherDetails
fire alarm t.i. replace extg facu (est-2) with new facu(est-3) n/a for maher | $2,000 |
| Aug 23, 2016 | Completed final sign-off Oct 2016 | 246 Sutter St | Tom Hammer Construction Llc | revision to pa 2016-0419-5176 and 2016-0809-4579 - update/revise title 24Details
revision to pa 2016-0419-5176 and 2016-0809-4579 - update/revise title 24 | |
| Aug 10, 2016 | Completed final sign-off Sep 2016 | 246 Sutter St | Bilcor Inc | fire alarm ti - install (2) ceiling mount horn strobe; install (1) control relay module for small store. ref pa 2016-0419-5176. maher naDetails
fire alarm ti - install (2) ceiling mount horn strobe; install (1) control relay module for small store. ref pa 2016-0419-5176. maher na | $1,200 |
| Aug 9, 2016 | Completed final sign-off Oct 2016 | 246 Sutter St | Tom Hammer Construction Llc | revision to pa 2016-0419-5176, to provide new air distribution, ductwork, duct smoke detector, thermostat, and revised electrical work that is existing conditionsDetails
revision to pa 2016-0419-5176, to provide new air distribution, ductwork, duct smoke detector, thermostat, and revised electrical work that is existing conditions | |
| Jul 6, 2016 | Expired or cancelled cancelled Sep 2024 | 250 Sutter St | Thomas Swan Sign Co Inc | to erect single faced electric sign | $5,000 |
| Jul 6, 2016 | Expired or cancelled cancelled Sep 2024 | 250 Sutter St | Thomas Swan Sign Co Inc | erect double faced non electric sign | $2,000 |
| Jun 7, 2016 | Never finaled issued Jun 2016, no final | 250 Sutter St | Centimark Corporation | reroofing. remove bur cap (roof) and install new one.Details
reroofing. remove bur cap (roof) and install new one. | $23,500 |
| Apr 19, 2016 | Completed final sign-off Oct 2016 | 246 Sutter St | Tom Hammer Construction Llc | ground floor new tenant - inteiror remodeling of approximately 3418 sq ft in a multi-story, multi-tenant existing bldg. n/a maher ordinanceDetails
ground floor new tenant - inteiror remodeling of approximately 3418 sq ft in a multi-story, multi-tenant existing bldg. n/a maher ordinance | $190,000 |
| Mar 25, 2016 | Never finaled issued Mar 2016, no final | 246 Sutter St | Skyline Construction | demo of non structural partitions and mezzanine floor. vacant space. ab017 maher naDetails
demo of non structural partitions and mezzanine floor. vacant space. ab017 maher na | $20,000 |
| Feb 8, 2016 | Expired or cancelled cancelled Aug 2023 | 250 Sutter St | Bilcor Inc | fire alarm ti, install 2 dual monitor modules. maher naDetails
fire alarm ti, install 2 dual monitor modules. maher na | $800 |
| Oct 9, 2015 | Completed final sign-off Oct 2015 | 250 Sutter St | Pioneer Fire Inc. | 6th flr: relocate 20 and add 1 pendants; maher n/aDetails
6th flr: relocate 20 and add 1 pendants; maher n/a | $500 |
| Oct 6, 2015 | Completed final sign-off Apr 2016 | 250 Sutter St | Skyline Construction | mechanical & electrical work for ti on the 6th floor. ref pa 2015-08275415 maher naDetails
mechanical & electrical work for ti on the 6th floor. ref pa 2015-08275415 maher na | |
| Oct 5, 2015 | Completed final sign-off Oct 2015 | 250 Sutter St | Bilcor Inc | 6th floor, suite 650: fire alarm ti - install 3 wall mount horn strobes. maher na. permit ref 201508275415Details
6th floor, suite 650: fire alarm ti - install 3 wall mount horn strobes. maher na. permit ref 201508275415 | $1,200 |
| Aug 27, 2015 | Completed final sign-off Apr 2016 | 250 Sutter St | Skyline Construction | 6th floor: ti - includes demo of non structural partitions and bldg back new non structural partition. all new or revised meps & life saftey & sprinkler work will be submitted under under sep permit. bld is fully sprinklered. maher naDetails
6th floor: ti - includes demo of non structural partitions and bldg back new non structural partition. all new or revised meps & life saftey & sprinkler work will be submitted under under sep permit. bld is fully sprinklered. maher na | $137,070 |
| Apr 29, 2015 | Never finaled issued Apr 2015, no final | 250 Sutter St | Skyline Construction | 2nd flr: mechanical & elect work for ti - new heat pumos and transfer fans and lighting. ref pa 2014 1218 4012Details
2nd flr: mechanical & elect work for ti - new heat pumos and transfer fans and lighting. ref pa 2014 1218 4012 | $25,000 |
| Jan 28, 2015 | Completed final sign-off May 2015 | 250 Sutter St | Bilcor Inc | 14th floor: install 2 wall mount strobes. install 2 ceiling mount speaker strobes. t.i. app#201112070276. n/a for the maher.Details
14th floor: install 2 wall mount strobes. install 2 ceiling mount speaker strobes. t.i. app#201112070276. n/a for the maher. | $7,200 |
| Jan 27, 2015 | Completed final sign-off May 2015 | 250 Sutter St | Pioneer Fire Inc. | 2nd flr: add, relocate and remove fire sprinkler heads per tenant improvements, 201412184012, 3 add, 10 relocate, 3 remove; maher n/aDetails
2nd flr: add, relocate and remove fire sprinkler heads per tenant improvements, 201412184012, 3 add, 10 relocate, 3 remove; maher n/a | $11,495 |
| Dec 18, 2014 | Completed final sign-off Jan 2016 | 250 Sutter St | Skyline Construction | 2nd floor t.i. includes (demo of non-structural partitions under pa #201412022793.) building new non-structural partitions. all new or revised hvac, electrical, plumbing & ls, sprinkler will be design build & submitted separately. (bldg is fully sprinklered). maher n/aDetails
2nd floor t.i. includes (demo of non-structural partitions under pa #201412022793.) building new non-structural partitions. all new or revised hvac, electrical, plumbing & ls, sprinkler will be design build & submitted separately. (bldg is fully sprinklered). maher n/a | $642,335 |
| Dec 2, 2014 | Completed final sign-off Jan 2016 | 250 Sutter St | Skyline Construction | demolition on non structural partitions ab 017Details
demolition on non structural partitions ab 017 | $20,000 |
| Jul 31, 2013 | Expired or cancelled cancelled Jan 2026 | 250 Sutter St | 5th fl: t.i includes the demo of corridor and restroom finishes, plumbing fixutres, lighting and life safety and installing new finishes, plumbing fixtures lighting and life safety. all new or revised hvac, electrical and life safety work will be design build and submitted separately. bldg fullyDetails
5th fl: t.i includes the demo of corridor and restroom finishes, plumbing fixutres, lighting and life safety and installing new finishes, plumbing fixtures lighting and life safety. all new or revised hvac, electrical and life safety work will be design build and submitted separately. bldg fully | $200,000 | |
| Nov 19, 2012 | Completed final sign-off Dec 2012 | 250 Sutter St | Siemens Industry, Inc. | addition of 3 horn/strobes and 6 strobes for the asd remodel on floor 6. all devices connect onto the fire alarm systemDetails
addition of 3 horn/strobes and 6 strobes for the asd remodel on floor 6. all devices connect onto the fire alarm system | $4,200 |
| Aug 28, 2012 | Completed final sign-off Dec 2012 | 250 Sutter St | Gci, Inc | 6th floor t.i. includes the demolishing of non-structural partitions and building new non structural partitions. all new or revised hvac, electrical and life safety work will be design build and submitted for permit separately. (bldg is fully sprinklered)Details
6th floor t.i. includes the demolishing of non-structural partitions and building new non structural partitions. all new or revised hvac, electrical and life safety work will be design build and submitted for permit separately. (bldg is fully sprinklered) | $75,000 |
| Aug 2, 2011 | Completed final sign-off Aug 2011 | 250 Sutter St | Red Hawk Fire & Security Ca Llc | fire alarm ti 3rd fl: 2 synch module, 12 horn/strobe, 1 strobe. bldg app 201107220829Details
fire alarm ti 3rd fl: 2 synch module, 12 horn/strobe, 1 strobe. bldg app 201107220829 | $4,827 |
| Jul 22, 2011 | Completed final sign-off Aug 2011 | 250 Sutter St | Skyline Construction | revision to 201006164599 to reconfigure previously approved office suiteDetails
revision to 201006164599 to reconfigure previously approved office suite | |
| Jul 20, 2011 | Completed final sign-off Sep 2011 | 250 Sutter St | Pioneer Fire Inc. | 3rd floor - relocate 5 fire sprinklers.Details
3rd floor - relocate 5 fire sprinklers. | $3,000 |
| Sep 21, 2010 | Never finaled issued Sep 2010, no final | 250 Sutter St | 3rd floor suite #350 - ti upgrade on e fire sprinkler system for the corridor. relocate 12 headsDetails
3rd floor suite #350 - ti upgrade on e fire sprinkler system for the corridor. relocate 12 heads | $3,600 | |
| Jun 16, 2010 | Completed final sign-off Aug 2011 | 250 Sutter St | Skyline Construction | 3rd floor-t.i. includes demo of non-structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperatly. building fully sprinklered. work included common corridor. upgrade restroomsDetails
3rd floor-t.i. includes demo of non-structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperatly. building fully sprinklered. work included common corridor. upgrade restrooms | $95,000 |
| Apr 6, 2010 | Completed final sign-off Oct 2010 | 250 Sutter St | Diversified Fire Products | 4th floor fire alarm t.i. spec sui, addition of 1 power supply, 15 horn/strobes, 3 strobes, 1 smoke dedector , 1 sync module.Details
4th floor fire alarm t.i. spec sui, addition of 1 power supply, 15 horn/strobes, 3 strobes, 1 smoke dedector , 1 sync module. | $11,100 |
| Mar 23, 2010 | Completed final sign-off Oct 2010 | 250 Sutter St | 4th floor. t.i. upgrade on (e) fire sprinkler system. spec suites & corrido. relocate 3 heads, add 5 heads & remove 11 heads.Details
4th floor. t.i. upgrade on (e) fire sprinkler system. spec suites & corrido. relocate 3 heads, add 5 heads & remove 11 heads. | $1,600 | |
| Mar 17, 2010 | Completed final sign-off Oct 2010 | 250 Sutter St | Skyline Construction | spec suits 400 & 450-4th.flr. t.i.demo of non-structural partitions:build (n)non-structural partitions.all (n)or revised hvac, elec.,plumb.& life safety work which will be design build; permit submitted separately. building fully sprinkeled. rest work under this permit.Details
spec suits 400 & 450-4th.flr. t.i.demo of non-structural partitions:build (n)non-structural partitions.all (n)or revised hvac, elec.,plumb.& life safety work which will be design build; permit submitted separately. building fully sprinkeled. rest work under this permit. | $192,675 |
| Feb 8, 2006 | Never finaled issued Feb 2006, no final | 248 Sutter St | interior tenant improvement. mechanical - electrical only.Details
interior tenant improvement. mechanical - electrical only. | $30,000 | |
| Feb 8, 2006 | Never finaled issued Feb 2006, no final | 248 Sutter St | interior tenant improvement. mech. under separate permit.Details
interior tenant improvement. mech. under separate permit. | $200,000 | |
| Jul 21, 2005 | Never finaled issued Jul 2005, no final | 250 Sutter St | street space | ||
| Oct 7, 2004 | Never finaled issued Oct 2004, no final | 246 Sutter St | Siemens Industry, Inc. | addition of one relay module for electric door lock release at the "orvis" retail space in basement.Details
addition of one relay module for electric door lock release at the "orvis" retail space in basement. | $1,200 |
| Sep 14, 2004 | Never finaled issued Sep 2004, no final | 250 Sutter St | streetspace | ||
| Jan 26, 2004 | Never finaled issued Jan 2004, no final | 250 Sutter St | correct pa#2003//01/17/5392 to show change of occupancy from a-3 restaurant to m mercantileDetails
correct pa#2003//01/17/5392 to show change of occupancy from a-3 restaurant to m mercantile | ||
| May 9, 2003 | Never finaled issued May 2003, no final | 250 Sutter St | street space | ||
| Apr 23, 2003 | Expired or cancelled expired Dec 2003 | 248 Sutter St | A Better Image/G.W. Laine | install 2 new faces (copy change only) in 2 existing cabinets, 1 new 6x2 banner on existing bannerDetails
install 2 new faces (copy change only) in 2 existing cabinets, 1 new 6x2 banner on existing banner | |
| Mar 21, 2003 | Completed final sign-off Apr 2003 | 250 Sutter St | Siemens Industry, Inc. | addition of horn/strobes,strobes & duct defector (for heat pump);in the "orvis" -basementDetails
addition of horn/strobes,strobes & duct defector (for heat pump);in the "orvis" -basement | $14,700 |
| Mar 11, 2003 | Completed final sign-off Apr 2003 | 248 Sutter St | Ayoob & Peery Plumbing Co Inc | modify existing fire sprinkler system to accomodate tenant improvement, in basement (8 adds, 56 reloDetails
modify existing fire sprinkler system to accomodate tenant improvement, in basement (8 adds, 56 relo | $6,750 |
| Mar 6, 2003 | Never finaled issued Mar 2003, no final | 250 Sutter St | Siemens Industry, Inc. | replacement of (e) fire alarm sym all initiating devices also had to be replaced to work with theDetails
replacement of (e) fire alarm sym all initiating devices also had to be replaced to work with the | $45,000 |
| Feb 18, 2003 | Completed final sign-off Mar 2003 | 250 Sutter St | Bevilacqua & Sons | demo of (e) internal stair between 5th & 6th floor oficesDetails
demo of (e) internal stair between 5th & 6th floor ofices | $15,000 |
| Jan 17, 2003 | Completed final sign-off Jun 2004 | 250 Sutter St | Roberts And Sons Builders | interior remodel of (e) retail store, no storefront or entry work, minor m,e,p work, ceiling, partitDetails
interior remodel of (e) retail store, no storefront or entry work, minor m,e,p work, ceiling, partit | $400,000 |
| Dec 13, 2002 | Completed final sign-off Dec 2002 | 250 Sutter St | City Building Inc. | barrier remove wood to men & women restrooms on 5th floor. no increase in office space.Details
barrier remove wood to men & women restrooms on 5th floor. no increase in office space. | |
| Jul 19, 2001 | Expired or cancelled expired Dec 2001 | 246 Sutter St | Cps Signs | erect sign for non electric, single facedDetails
erect sign for non electric, single faced | $200 |
| Jun 18, 2001 | Expired or cancelled expired Dec 2001 | 250 Sutter St | Siemens Industry, Inc. | additions to the (e)fire alarm system for the ann taylor; remodels one part of flrs 1 & 2Details
additions to the (e)fire alarm system for the ann taylor; remodels one part of flrs 1 & 2 | $11,200 |
| May 24, 2001 | Completed final sign-off Aug 2001 | 246 Sutter St | one-stop:m.tjoe:revision to pa 200102232823, bubbled as 2,4 & 5.retain portion of exisitingDetails
one-stop:m.tjoe:revision to pa 200102232823, bubbled as 2,4 & 5.retain portion of exisiting | $12,500 | |
| May 22, 2001 | Completed final sign-off Aug 2001 | 246 Sutter St | Aquamatic Fire Protection | add or relocate 120 heads for t.i. on both floorsDetails
add or relocate 120 heads for t.i. on both floors | $17,500 |
| May 14, 2001 | Expired or cancelled expired May 2002 | 250 Sutter St | demo of existing partitions & finishes in former restaurant, demo of kitchen & restrooms associatedDetails
demo of existing partitions & finishes in former restaurant, demo of kitchen & restrooms associated | $83,580 | |
| May 9, 2001 | Expired or cancelled expired May 2002 | 250 Sutter St | City Building Inc. | barrier removal work at men & women restrms on 6th floorDetails
barrier removal work at men & women restrms on 6th floor | $27,348 |
| May 9, 2001 | Completed final sign-off Jan 2002 | 250 Sutter St | City Building Inc. | barrier removal work to men &women restrms on the 5th floorDetails
barrier removal work to men &women restrms on the 5th floor | $27,348 |
| May 9, 2001 | Completed final sign-off Jan 2002 | 250 Sutter St | City Building Inc. | remove barrier work to men & women restroom on the 4/floorDetails
remove barrier work to men & women restroom on the 4/floor | $27,348 |
| Feb 23, 2001 | Completed final sign-off Aug 2001 | 246 Sutter St | E & H Construction Co Inc | one stop:m.tjoe:tenant improvement new mezzanine,ceiling, new lithgnindg, refer to pa 200102142099Details
one stop:m.tjoe:tenant improvement new mezzanine,ceiling, new lithgnindg, refer to pa 200102142099 | $250,000 |
| Feb 22, 2001 | Completed final sign-off Sep 2001 | 246 Sutter St | rev. to appl#200102042099 scope of work to demolish & remove (e) mezzanine & modify wood floorDetails
rev. to appl#200102042099 scope of work to demolish & remove (e) mezzanine & modify wood floor | $15,000 | |
| Feb 14, 2001 | Completed final sign-off Sep 2001 | 246 Sutter St | interior soft demo previous tenant improvement in advance of a new tenant improvement under sep permDetails
interior soft demo previous tenant improvement in advance of a new tenant improvement under sep perm | $20,000 | |
| Oct 27, 2000 | Never finaled filed Oct 2000, never issued | 250 Sutter St | error in file form type: disregard | $100 | |
| Oct 27, 2000 | Expired or cancelled expired Feb 2001 | 250 Sutter St | Siemens Industry, Inc. | revision to 200010042282: reflect manual control of dampers and fansDetails
revision to 200010042282: reflect manual control of dampers and fans | $100 |
| Oct 18, 2000 | Completed final sign-off May 2001 | 250 Sutter St | G P Fire Protection | relocate heads on 6th fl & 5th fl on fire sprinkler systemDetails
relocate heads on 6th fl & 5th fl on fire sprinkler system | $4,800 |
| Oct 4, 2000 | Expired or cancelled expired Feb 2001 | 250 Sutter St | Siemens Industry, Inc. | addtn of fire alrm strobes/horn strb for part softbank tenant rmdl on 5/6 fl horn strbe upgrade forDetails
addtn of fire alrm strobes/horn strb for part softbank tenant rmdl on 5/6 fl horn strbe upgrade for | $3,100 |
| Oct 4, 2000 | Expired or cancelled expired Feb 2001 | 250 Sutter St | Siemens Industry, Inc. | addtn of 2 f/s damper defectors/ceiling strobe fr 4th fl partl rmdl at h/f tenant new equip to ex fcDetails
addtn of 2 f/s damper defectors/ceiling strobe fr 4th fl partl rmdl at h/f tenant new equip to ex fc | $2,750 |
| Aug 28, 2000 | Expired or cancelled expired Sep 2001 | 250 Sutter St | City Building Inc. | oti-2 el,me (6th flr) | $80,000 |
| Aug 28, 2000 | Completed final sign-off May 2001 | 250 Sutter St | City Building Inc. | oti-2 5th floor el meDetails
oti-2 5th floor el me | $80,000 |
| Aug 17, 2000 | Expired or cancelled expired Aug 2001 | 250 Sutter St | City Building Inc. | oti-1 6/f el me ls & sp | $100,000 |
| Aug 17, 2000 | Completed final sign-off May 2001 | 250 Sutter St | City Building Inc. | oti-1 5/f el me ls spDetails
oti-1 5/f el me ls sp | $80,000 |
| May 17, 2000 | Completed final sign-off Jun 2001 | 250 Sutter St | interior improvements: partitions, electrical, mech. new office, stockrm, new staffrmDetails
interior improvements: partitions, electrical, mech. new office, stockrm, new staffrm | $72,000 | |
| Jan 10, 2000 | Expired or cancelled expired Jul 2000 | 250 Sutter St | remove existing panels & replace with new panel.Details
remove existing panels & replace with new panel. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Construction (14), Bilcor Inc (11), City Building Inc. (8), Siemens Industry, Inc. (8), Pioneer Fire Inc. (5), Gci, Inc (3), Tom Hammer Construction Llc (3), Incom Mechanical Inc (2), J & K Project Mgmt Consultants Llc (2), Thomas Swan Sign Co Inc (2), A Better Image/G.W. Laine, Aquamatic Fire Protection, Arrow Sign Company, Ayoob & Peery Plumbing Co Inc, Bevilacqua & Sons, Centimark Corporation, Cps Signs, Diversified Fire Products, E & H Construction Co Inc, Field Construction Inc., G P Fire Protection, Hathaway Dinwiddie Co., Intelligent Technologies & Services Inc, Maguire Inc Dba Lahue And Associates, Peacock Construction, Red Hawk Fire & Security Ca Llc, Roberts And Sons Builders, Rrs Fire Alarm Inc Dba California Fire D, Walschon Fire Protection Inc
- Architects
- Stephen Hambrecht (2), Ahmad Mohazab, Austen Dilberto, Dennis Heath, Guion Chilldress, Jimmy Powers, Joseph A. Remling, Melissa Pesci, Pamela Harris, Timothy W. Mcpartland
- Engineers
- Majid Amiri-Razavian (2), Timothy W. Mcpartland (2), Ahmad Mohazab, Andria Odrowski, Brandon Elliott, Habtom Nugusse Tewelde, Natasha Mogley, Quang Nguyen, Tim Mathinson
- Designers
- James Gallagher, Pioneer Fire Inc.
Find contractors for work like this