Gene Pena
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Rapt Studio
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Oct 2017
94 permits since 2000 (architect on 89 permits, designer on 4 permits, authorized agent-others on 2 permits, engineer on 2 permits): 84 completed, 7 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 21st fl - interior ti of new non-structural partitions, existing power/telecom, finishes, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted under separate permitDetails
21st fl - interior ti of new non-structural partitions, existing power/telecom, finishes, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted under separate permit | $14,875 |
| Oct 2, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 17th fl - interior ti of (n) non-structural partitions. existing power/telecom, finises, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted separatelyDetails
17th fl - interior ti of (n) non-structural partitions. existing power/telecom, finises, ceiling tile, grid and lighting to remain. associated electrical and life safety scope to be design build and submitted separately | $19,875 |
| Sep 1, 2017 | Completed final sign-off Dec 2018 | 2 South Park | Principal Builders Inc. | addition of new skylight and gas flue and new mech unit bracing on roof. hvac system connecting to interior system. maher not reqDetails
addition of new skylight and gas flue and new mech unit bracing on roof. hvac system connecting to interior system. maher not req | $33,880 |
| Aug 28, 2017 | Completed final sign-off Nov 2018 | 71 Stevenson St | Source Planning And Construction Inc | 10th fl - interior ti of (e) office space; minimal (n) non structural partitions. mep's, life safety & sprinkler permits under separate permit submittal if needed.Details
10th fl - interior ti of (e) office space; minimal (n) non structural partitions. mep's, life safety & sprinkler permits under separate permit submittal if needed. | |
| Aug 23, 2017 | Completed final sign-off Aug 2018 | 71 Stevenson St | Source Planning And Construction Inc | 10/f- selective demo of wall etc. non-structural partition power/telecom outlets, finishes per ab-017Details
10/f- selective demo of wall etc. non-structural partition power/telecom outlets, finishes per ab-017 | $15,000 |
| Aug 17, 2017 | Completed final sign-off Sep 2017 | 22 04th St | Sc Builders, Inc | 6/f- demo ceiling and audio visual electrical, other demo pa#201708104425 for walls only.Details
6/f- demo ceiling and audio visual electrical, other demo pa#201708104425 for walls only. | $3,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2017 | 22 04th St | Sc Builders, Inc | 6th fl: demo of 2 existing conference rooms, including non-structural partitions, associated power/telecom outlets, doors, sightlight, etc. fire/life satey systems to remain intact and operational. ab-017. maher naDetails
6th fl: demo of 2 existing conference rooms, including non-structural partitions, associated power/telecom outlets, doors, sightlight, etc. fire/life satey systems to remain intact and operational. ab-017. maher na | |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 23/f- interior t.i. of existing office space to include minor construction of only non-structural partitions.Details
23/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. | $51,740 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 22/f- interior t.i. of existing office space to include minor construction of only non-structural partitions.Details
22/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. | $47,400 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 16/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. no mechanical work to be performed.Details
16/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. no mechanical work to be performed. | $50,240 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 15/f- interior t.i. of existing office space to include minor construction of only non-structural partitions.Details
15/f- interior t.i. of existing office space to include minor construction of only non-structural partitions. | $44,560 |
| Apr 19, 2017 | Completed final sign-off Feb 2018 | 535 Mission St | Skyline Construction | interior tenant improvement consistency of constructural interior partitions, ceiling, millwork, and finishes. mep under sep permitDetails
interior tenant improvement consistency of constructural interior partitions, ceiling, millwork, and finishes. mep under sep permit | $500,000 |
| Apr 19, 2017 | Completed final sign-off Feb 2018 | 535 Mission St | Skyline Construction | interior tenant improvement consistency of non structural interior partitions, ceiling, millwork and finishes. mep under sep permitDetails
interior tenant improvement consistency of non structural interior partitions, ceiling, millwork and finishes. mep under sep permit | $500,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 16th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174100Details
16th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174100 | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 22nd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. f/s pa#201704174103.Details
22nd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. f/s pa#201704174103. | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 15th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. ref fire sprinkler permit pa#201704174099.Details
15th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit. ref fire sprinkler permit pa#201704174099. | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 17th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174101Details
17th flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174101 | $24,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2017 | 71 Stevenson St | Source Planning And Construction Inc | 23rd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174104Details
23rd flr: ti of (e) space: demo of non structural partitions only. (e) pwr/data finishes, ceiling tile, grid & light fixtures to remain. ele/life safety to be design build & filed under sep permit.f/s pa#201704174104 | $24,000 |
| Mar 27, 2017 | Completed final sign-off Nov 2017 | 71 Stevenson St | Source Planning And Construction Inc | 18th floor - ti (e) office space including minimal (n) non structural partitions, finishes; meps & life safety under separate permitDetails
18th floor - ti (e) office space including minimal (n) non structural partitions, finishes; meps & life safety under separate permit | $430,161 |
| Jan 31, 2017 | Completed final sign-off May 2017 | 2300 Harrison St | Novo Construction Inc | tenant improvement to consist of demolition of non-structural partitions, new partitions and finishes; mep & fire, life safety under separate permit; maher ord 155-13 naDetails
tenant improvement to consist of demolition of non-structural partitions, new partitions and finishes; mep & fire, life safety under separate permit; maher ord 155-13 na | $215,000 |
| Dec 14, 2016 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | 2/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit.Details
2/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit. | $250,000 |
| Dec 14, 2016 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | 4/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit.Details
4/f: t.i. (n) interior partitions, glazing, doors and millwork. mep, l/s & f/s under sep permit. | $250,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 405 Howard St | Skyline Construction | ref permit # 201507141406, need to change occupancy of lounge from b to a3 on sheet a04cDetails
ref permit # 201507141406, need to change occupancy of lounge from b to a3 on sheet a04c | |
| Oct 20, 2016 | Completed final sign-off May 2017 | 2 South Park | Principal Builders Inc. | 1st floor - revision to app#201609157867 to show change of wall rating to match conditions on site and additional ceiling framing details per inspector request. n/a for maher ordinanceDetails
1st floor - revision to app#201609157867 to show change of wall rating to match conditions on site and additional ceiling framing details per inspector request. n/a for maher ordinance | |
| May 16, 2016 | Completed final sign-off Mar 2018 | 30 03rd St | Skyline Construction | revision to pa 2016-0425-5548, add door at elevator lobbyDetails
revision to pa 2016-0425-5548, add door at elevator lobby | |
| May 2, 2016 | Completed final sign-off Dec 2018 | 30 03rd St | Skyline Construction | structural work for basement/00, new plumbing trench infill. t.i. pa#201604255548Details
structural work for basement/00, new plumbing trench infill. t.i. pa#201604255548 | $2,000 |
| Apr 25, 2016 | Completed final sign-off Dec 2018 | 30 03rd St | Skyline Construction | basement/1st floor: change of use ti consists of new interior partitions,millwork, glazing & doors. mep/fire/life safety under sepDetails
basement/1st floor: change of use ti consists of new interior partitions,millwork, glazing & doors. mep/fire/life safety under sep | $125,000 |
| Apr 5, 2016 | Completed final sign-off May 2017 | 595 Market St | Source Planning And Construction Inc | lower level: interior t.i. of existing office space including mininal (n) non-structural partitions, finishes, electrical and (n) light fixtures. no structural work to be performed. mep to be design build & filed seperately.Details
lower level: interior t.i. of existing office space including mininal (n) non-structural partitions, finishes, electrical and (n) light fixtures. no structural work to be performed. mep to be design build & filed seperately. | $273,000 |
| Apr 5, 2016 | Completed final sign-off Feb 2017 | 595 Market St | Source Planning And Construction Inc | 1/f, 2/f & mezz on 2/f: interior t.i. of existing office space including mininal (n) non-structural partitions, finishes, electrical, (e) ceiling grid, tile & light fixtures to remain. electrical, plumbing to be design build & filed seperately. fire sprinklers & life safety under seperate permit.Details
1/f, 2/f & mezz on 2/f: interior t.i. of existing office space including mininal (n) non-structural partitions, finishes, electrical, (e) ceiling grid, tile & light fixtures to remain. electrical, plumbing to be design build & filed seperately. fire sprinklers & life safety under seperate permit. | $2,493,671 |
| Mar 24, 2016 | Completed final sign-off Nov 2017 | 30 03rd St | Skyline Construction | 2nd flr: ti to consist of new non structural partitions, maher na mep/fire/life safety under sep permitDetails
2nd flr: ti to consist of new non structural partitions, maher na mep/fire/life safety under sep permit | $350,000 |
| Mar 24, 2016 | Completed final sign-off Nov 2017 | 30 03rd St | Skyline Construction | 4th flr: ti - new non structural partitions, glazing, doors & millwork. mep /fire/life safety under sep permit. maher naDetails
4th flr: ti - new non structural partitions, glazing, doors & millwork. mep /fire/life safety under sep permit. maher na | $400,000 |
| Feb 4, 2016 | Completed final sign-off Nov 2016 | 595 Market St | Source Planning And Construction Inc | 15th floor - interior ti: minimal (n) structural partitions. finishes (n) ceiling grid & tiles. mep, ls & sprinkler to be build & submitted separtely if needed. no structural work. building fully sprinkleredDetails
15th floor - interior ti: minimal (n) structural partitions. finishes (n) ceiling grid & tiles. mep, ls & sprinkler to be build & submitted separtely if needed. no structural work. building fully sprinklered | $975,000 |
| Feb 4, 2016 | Completed final sign-off Nov 2016 | 595 Market St | Source Planning And Construction Inc | 16th floor interior ti includes: minimal (n) non-structural partitions, finishes. (n) ceiling grid & tiles. mep, life safety & sprinklers to be design build and filed separately if needed. no structural, building fully sprinklered.Details
16th floor interior ti includes: minimal (n) non-structural partitions, finishes. (n) ceiling grid & tiles. mep, life safety & sprinklers to be design build and filed separately if needed. no structural, building fully sprinklered. | $975,000 |
| Jan 11, 2016 | Completed final sign-off Apr 2017 | 333 Brannan St | Principal Builders Inc. | install t-24 mech equipment on roof to facilitate food service equipment on 3rd fl. & roof, see pa#201510058804 for struc footing and 201510210423 for 3rd fl food service equip and architectural. compliance with maher ordinance no 155-13 not required.Details
install t-24 mech equipment on roof to facilitate food service equipment on 3rd fl. & roof, see pa#201510058804 for struc footing and 201510210423 for 3rd fl food service equip and architectural. compliance with maher ordinance no 155-13 not required. | $935,533 |
| Jan 7, 2016 | Completed final sign-off Apr 2016 | 225 Bush St | Skyline Construction | revision to 201509247934 to keep existing partitions, new sound rated wall. demo existing glazing and provide alternate f glazing & provide alternate f glazing.Details
revision to 201509247934 to keep existing partitions, new sound rated wall. demo existing glazing and provide alternate f glazing & provide alternate f glazing. | |
| Dec 23, 2015 | Completed final sign-off Nov 2016 | 345 Brannan St | Principal Builders Inc. | t.i. on 1/f to build new partitions, doors, ceiling, millwork and finishes. bracing for equipment. mep, life safety and sprinkler on seperate permit. n/a ordinance #155-13Details
t.i. on 1/f to build new partitions, doors, ceiling, millwork and finishes. bracing for equipment. mep, life safety and sprinkler on seperate permit. n/a ordinance #155-13 | $2,238,720 |
| Dec 9, 2015 | Completed final sign-off Nov 2016 | 345 Brannan St | Principal Builders Inc. | tenant improvement on 3/f to construct new partitions, doors, millwork, ceilings and finishes.mep, fire alarm and sprinklers to be submitted seprately. n/a ordinance #155-13Details
tenant improvement on 3/f to construct new partitions, doors, millwork, ceilings and finishes.mep, fire alarm and sprinklers to be submitted seprately. n/a ordinance #155-13 | $2,255,760 |
| Dec 9, 2015 | Completed final sign-off Nov 2016 | 345 Brannan St | Principal Builders Inc. | tenant improvement on 2/f to construct new partitions, doors, millwork, ceilings, finishes. mep, fire alarm and sprinklers to be submitted seperately. n/a ordinance #155-13Details
tenant improvement on 2/f to construct new partitions, doors, millwork, ceilings, finishes. mep, fire alarm and sprinklers to be submitted seperately. n/a ordinance #155-13 | $2,255,760 |
| Dec 3, 2015 | Completed final sign-off Nov 2016 | 345 Brannan St | Principal Builders Inc. | 4th floor - ocnstruction of non-structural partitoins, doors, millwork, finishes, & ceilings & lighting. sprinklers & fire alarms will remain as existing. mechanical and plumbing under separate permitDetails
4th floor - ocnstruction of non-structural partitoins, doors, millwork, finishes, & ceilings & lighting. sprinklers & fire alarms will remain as existing. mechanical and plumbing under separate permit | $1,386,000 |
| Dec 1, 2015 | Completed final sign-off Jul 2016 | 595 Market St | Source Planning And Construction Inc | basement/lower lvel new mdf room. meps to be design build and under separate permit if neededDetails
basement/lower lvel new mdf room. meps to be design build and under separate permit if needed | $30,250 |
| Oct 27, 2015 | Completed final sign-off Nov 2016 | 333 Brannan St | Principal Builders Inc. | 2nd, 4th, 5th floor - construction of new partitions, doors, millwork, ceilings & finishes. life safety, sprinklers & mep under separate permit. n/a maher ordinanceDetails
2nd, 4th, 5th floor - construction of new partitions, doors, millwork, ceilings & finishes. life safety, sprinklers & mep under separate permit. n/a maher ordinance | $6,279,729 |
| Oct 8, 2015 | Completed final sign-off Nov 2016 | 333 Brannan St | Principal Builders Inc. | lower terrace parking level sub ground floor to build new partitions, doors, millwork, ceilings and mep. n/a for maher. mech/plumbing assembly in building on 3/f only; electrical, life safety, sprinklers uder separate permit.Details
lower terrace parking level sub ground floor to build new partitions, doors, millwork, ceilings and mep. n/a for maher. mech/plumbing assembly in building on 3/f only; electrical, life safety, sprinklers uder separate permit. | $2,000,000 |
| Sep 24, 2015 | Completed final sign-off Apr 2016 | 225 Bush St | Skyline Construction | 6th floor: ti- of (e) office, selective demo and new partitions, doors, ceiling - no structural work. mep/fire/life safety under sep permit.Details
6th floor: ti- of (e) office, selective demo and new partitions, doors, ceiling - no structural work. mep/fire/life safety under sep permit. | $600,000 |
| Jul 24, 2015 | Expired or cancelled cancelled Jan 2026 | 275 Brannan St | Truebeck Construction | 3rd floor - demolitoin of (e) stadium seating incl. associated power, demolition of (e) sliding non-struct. partitions. relocate (e) light fixture, install 6 new fixtures, relocate power/data outlets & install new power/data outlets. no structural, no plumbing, no sidewalk use. n/a maher ordinanceDetails
3rd floor - demolitoin of (e) stadium seating incl. associated power, demolition of (e) sliding non-struct. partitions. relocate (e) light fixture, install 6 new fixtures, relocate power/data outlets & install new power/data outlets. no structural, no plumbing, no sidewalk use. n/a maher ordinance | $45,000 |
| Jul 14, 2015 | Completed final sign-off Apr 2017 | 405 Howard St | Skyline Construction | t.i. on 2/f to include modification of existing tenant space selective demolition and new non-load bearing partitions and new finishes. n/a ordinance #155-13Details
t.i. on 2/f to include modification of existing tenant space selective demolition and new non-load bearing partitions and new finishes. n/a ordinance #155-13 | $1,000,000 |
| Jul 6, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 9th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit.Details
9th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit. | $486,000 |
| Jul 6, 2015 | Completed final sign-off Sep 2016 | 71 Stevenson St | Source Planning And Construction Inc | 13th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit.Details
13th fl: interior t.i of (e) office space including (n) non-structural partitions, minimal changes to light fixtures. meps to be design build and filed under sep permit. | $702,000 |
| Jun 1, 2015 | Never finaled issued Jul 2015, no final | 225 Bush St | Skyline Construction | clarification to pa# 2015-0109-5337 and 2015-0128-6935 to remove requirement for full floor smoke detection associated with delayed egress. additional manufacture info & response ot code ref. 2013 cbc 1008.43 & 1008.1.9.8Details
clarification to pa# 2015-0109-5337 and 2015-0128-6935 to remove requirement for full floor smoke detection associated with delayed egress. additional manufacture info & response ot code ref. 2013 cbc 1008.43 & 1008.1.9.8 | |
| May 4, 2015 | Completed final sign-off Apr 2016 | 595 Market St | Source Planning And Construction Inc | t.i. of existing office space, (n) non-structural partition, finishes etc. existing ceiling grid, tile & light fixtures to remain. no structural. meps under seperate permit.Details
t.i. of existing office space, (n) non-structural partition, finishes etc. existing ceiling grid, tile & light fixtures to remain. no structural. meps under seperate permit. | $430,161 |
| Apr 22, 2015 | Completed final sign-off May 2015 | 595 Market St | Source Planning And Construction Inc | demo of only non-structural partitions, associated power & telecom outlets, plumbing power & finishes, ab-017. tenant improvement under separate permit.Details
demo of only non-structural partitions, associated power & telecom outlets, plumbing power & finishes, ab-017. tenant improvement under separate permit. | $44,000 |
| Apr 13, 2015 | Completed final sign-off Jun 2016 | 901 Market St | Novo Construction Inc | alteration to (e) roof deck with addition of fences & ada upgrades in 4 areas. mep & fire protectionunder seperate permits. maher - not req'dDetails
alteration to (e) roof deck with addition of fences & ada upgrades in 4 areas. mep & fire protectionunder seperate permits. maher - not req'd | $30,000 |
| Mar 12, 2015 | Never finaled issued Mar 2015, no final | 214 Grant Av | Rudolph Commercial Interiors Inc, Rci | limited relocation of light fixtures, construction of 4 meeting rooms with minimal electrical work.Details
limited relocation of light fixtures, construction of 4 meeting rooms with minimal electrical work. | $61,000 |
| Feb 25, 2015 | Never finaled issued Mar 2015, no final | 595 Market St | Gci, Inc | 9th floor suite #930 tenant improvement including demo, new glazing, new electrical, new millwork, new ceiling & lighting. no plumbing, no structural. mep under separate permit.Details
9th floor suite #930 tenant improvement including demo, new glazing, new electrical, new millwork, new ceiling & lighting. no plumbing, no structural. mep under separate permit. | $100,000 |
| Feb 20, 2015 | Completed final sign-off Aug 2015 | 1 Bush St | Bcci Construction Company | 12th floor: full floor interior construction of new, non-load bearing partitions, glazing, doors, millwork, lighting and associated electrical and mechanical. life safety under separate permit.Details
12th floor: full floor interior construction of new, non-load bearing partitions, glazing, doors, millwork, lighting and associated electrical and mechanical. life safety under separate permit. | $1,450,000 |
| Jan 30, 2015 | Completed final sign-off Mar 2015 | 595 Market St | Richlen Construction | revision to appl: 2014.0520.6227: additoinal changes to roig permit - door closer, remove data outlets, j box furiture monuments, no pantry or storage.Details
revision to appl: 2014.0520.6227: additoinal changes to roig permit - door closer, remove data outlets, j box furiture monuments, no pantry or storage. | |
| Jan 28, 2015 | Never finaled issued Mar 2015, no final | 225 Bush St | Skyline Construction | 8th floor t.i. for office work includes (n) partitions, glazing, doors ceilings, lighting, fixtures, finishes. no structural work. mep, fire protection under separate permits.Details
8th floor t.i. for office work includes (n) partitions, glazing, doors ceilings, lighting, fixtures, finishes. no structural work. mep, fire protection under separate permits. | $1,000,000 |
| Jan 27, 2015 | Never finaled issued Feb 2015, no final | 185 Berry St | Dpr Construction | 5th flr, ste 5100: reference to permit 201406097837; added gyp soffit and accoustical ceiling tile (05-a2.1); revise lighting layout and power data plan, all revisions are clouded (05-a21 and 05-a3.1). install fcu and piping.Details
5th flr, ste 5100: reference to permit 201406097837; added gyp soffit and accoustical ceiling tile (05-a2.1); revise lighting layout and power data plan, all revisions are clouded (05-a21 and 05-a3.1). install fcu and piping. | $350,000 |
| Oct 27, 2014 | Never finaled issued Nov 2014, no final | 1 Lombard St | Gci, Inc | interior ti of non structural, demo of existing office. new partitions, millwork, lighting electrical fixtures, telecome, plumbing and mechanical. no structural work. compliance with maher ordinance no. 155-13 not required.Details
interior ti of non structural, demo of existing office. new partitions, millwork, lighting electrical fixtures, telecome, plumbing and mechanical. no structural work. compliance with maher ordinance no. 155-13 not required. | $500,000 |
| Jun 19, 2014 | Completed final sign-off Sep 2014 | 595 Market St | Gci, Inc | 11/f: interior tenant improvement including demolition, new partition, new electrical and related finishes,no structural or plumbing work to be performedDetails
11/f: interior tenant improvement including demolition, new partition, new electrical and related finishes,no structural or plumbing work to be performed | $33,000 |
| Jun 16, 2014 | Completed final sign-off Dec 2014 | 123 Townsend St | Swinerton Builders | tenant improvement of new office space including new partitions, ceilings, lighting, finishes, electrical hvac & plumbing minor structural work to be performed. sprinklers under separate permit ** maher: compliance with ordinance no# 155-13 not required **Details
tenant improvement of new office space including new partitions, ceilings, lighting, finishes, electrical hvac & plumbing minor structural work to be performed. sprinklers under separate permit ** maher: compliance with ordinance no# 155-13 not required ** | $2,162,475 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 535 Mission St | Swinerton Builders | 6th floor :t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishesDetails
6th floor :t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes | $1,000,000 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 535 Mission St | Swinerton Builders | 7th floor :t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. f/a and sprinklers under sepatare permit.Details
7th floor :t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. f/a and sprinklers under sepatare permit. | $1,000,000 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 535 Mission St | Swinerton Builders | 8/f: t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. access control egress door at stair #2 and elev lobby.Details
8/f: t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. access control egress door at stair #2 and elev lobby. | $1,000,000 |
| May 20, 2014 | Expired or cancelled cancelled Jan 2026 | 595 Market St | 14th floor:demolition only of extg non structural partitions, associated power and telecomm outlets, plmg and finishes.Details
14th floor:demolition only of extg non structural partitions, associated power and telecomm outlets, plmg and finishes. | $72,000 | |
| May 20, 2014 | Completed final sign-off Dec 2014 | 535 Mission St | Swinerton Builders | tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes. include me- - sprinklers and fire alarm separate permit.Details
tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes. include me- - sprinklers and fire alarm separate permit. | $1,000,000 |
| May 20, 2014 | Completed final sign-off Mar 2015 | 595 Market St | Richlen Construction | 27th floor: interior t.i. including demolition, new partitions, new electrical and plmg, new ceiling and lighting and related finishes. no structural work to be performed. sprinklers and ls on sep permits.Details
27th floor: interior t.i. including demolition, new partitions, new electrical and plmg, new ceiling and lighting and related finishes. no structural work to be performed. sprinklers and ls on sep permits. | $60,000 |
| May 20, 2014 | Completed final sign-off Dec 2014 | 535 Mission St | Swinerton Builders | tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes - including mep, sprinkler & fire alarm under sep permitDetails
tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes - including mep, sprinkler & fire alarm under sep permit | $1,000,000 |
| May 20, 2014 | Completed final sign-off Dec 2014 | 535 Mission St | Swinerton Builders | tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes - include mep, sprinklers and fire alarm separate permitDetails
tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes - include mep, sprinklers and fire alarm separate permit | $1,000,000 |
| May 6, 2014 | Completed final sign-off Nov 2014 | 595 Market St | Gci, Inc | 13th floor interior tenant improvement including demolition, new partitions, new electrical and plumbing, new ceiling and lighting and related finishes, no structural work to be performed.Details
13th floor interior tenant improvement including demolition, new partitions, new electrical and plumbing, new ceiling and lighting and related finishes, no structural work to be performed. | $50,000 |
| May 6, 2014 | Completed final sign-off Sep 2014 | 650 California St | Principal Builders Inc. | 25/f- interior accessibility upgrade of mens and womens common restrooms including new toilet partitions and accessories. n/a ordinance #155-13.Details
25/f- interior accessibility upgrade of mens and womens common restrooms including new toilet partitions and accessories. n/a ordinance #155-13. | $30,000 |
| May 6, 2014 | Completed final sign-off Sep 2014 | 650 California St | Principal Builders Inc. | 24/f - interior accessibility upgrade of mens and womens common retrooms including new toilet partitions and accessories. n/a maher ordinance # 155-13Details
24/f - interior accessibility upgrade of mens and womens common retrooms including new toilet partitions and accessories. n/a maher ordinance # 155-13 | $30,000 |
| May 6, 2014 | Completed final sign-off Jul 2014 | 595 Market St | Gci, Inc | 12th floor: creating market ready space, demolition of existing non-structural partitions, associated power and telecom outlets, plumbing and finishes, construction of new partition, new door and small portion of new ceiling. life safety sep. permits.Details
12th floor: creating market ready space, demolition of existing non-structural partitions, associated power and telecom outlets, plumbing and finishes, construction of new partition, new door and small portion of new ceiling. life safety sep. permits. | $23,000 |
| May 6, 2014 | Completed final sign-off Aug 2014 | 595 Market St | Gci, Inc | 25th floor interior tenant improvement including demolition, new partitions, new electrical and plumbing, new ceiling and lighting and related finishes. no structural work to be performed. life safety sep permitsDetails
25th floor interior tenant improvement including demolition, new partitions, new electrical and plumbing, new ceiling and lighting and related finishes. no structural work to be performed. life safety sep permits | $100,000 |
| Mar 20, 2014 | Completed final sign-off Mar 2015 | 650 Townsend St | Novo Construction Inc | t.i. consisting of non structural demolition of existing office partitions, new construction to include partitions, glazing, doors, millwork, electrical & mechanical included. na ordinance #155-13Details
t.i. consisting of non structural demolition of existing office partitions, new construction to include partitions, glazing, doors, millwork, electrical & mechanical included. na ordinance #155-13 | $625,000 |
| Feb 13, 2014 | Completed final sign-off Aug 2014 | 1 Front St | Skyline Construction | construction of new non load bearing partitions, glazing, doors, lighting with associated electrical, audio visual. plumbing & fire/life safety, mechanical under seperate permit. comply with ordinance #155-13 not required.Details
construction of new non load bearing partitions, glazing, doors, lighting with associated electrical, audio visual. plumbing & fire/life safety, mechanical under seperate permit. comply with ordinance #155-13 not required. | $1,100,000 |
| Jan 28, 2014 | Completed final sign-off Mar 2015 | 650 Townsend St | Novo Construction Inc | tenant improvement consisting of non-structural demolition of existing offices, new construction to include partitions, glazing, door, millwork, lighting, electrical & mechanical.Details
tenant improvement consisting of non-structural demolition of existing offices, new construction to include partitions, glazing, door, millwork, lighting, electrical & mechanical. | $1,200,000 |
| Jan 22, 2014 | Completed final sign-off Sep 2014 | 153 Kearny St | Dome Construction Corp | tenant improvement of existing office space including limited new partitions, ceilings, lighting, finishes, electrical and hvac, no structural work to be performed. compliance with ordinance #155-13 not required.Details
tenant improvement of existing office space including limited new partitions, ceilings, lighting, finishes, electrical and hvac, no structural work to be performed. compliance with ordinance #155-13 not required. | $370,480 |
| Jan 15, 2014 | Completed final sign-off Apr 2015 | 405 Howard St | Skyline Construction | tenant improvement of existing space including minor demolition, construction of new walls and finishes. mep. under seperate permit. compliance with ordinance #155-13, not required.Details
tenant improvement of existing space including minor demolition, construction of new walls and finishes. mep. under seperate permit. compliance with ordinance #155-13, not required. | $200,000 |
| Nov 19, 2013 | Completed final sign-off Jan 2014 | 3 Embarcadero Center | Bcci Construction Company | #500- t.i. work including demo, drywall, ceilings, finishes, mechanical & electrical.Details
#500- t.i. work including demo, drywall, ceilings, finishes, mechanical & electrical. | $495,000 |
| Oct 29, 2013 | Completed final sign-off Feb 2014 | 77 Geary St | Principal Builders Inc. | full floor t.i. on 5th floor, construct new non load bearing partitions glazing, doors & mill work. mep. on seperate permit.Details
full floor t.i. on 5th floor, construct new non load bearing partitions glazing, doors & mill work. mep. on seperate permit. | $1,700,389 |
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 650 California St | Principal Builders Inc. | interior accessibility upgrade of mens and womens restrooms including new toilet partitions and accessories.Details
interior accessibility upgrade of mens and womens restrooms including new toilet partitions and accessories. | $30,000 |
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 650 California St | Principal Builders Inc. | demolition of only existing non-structural partitions, associated power and telecom outlets, millwork and finishes. existing and occupancy to be addressed under seperate permit per ab-017Details
demolition of only existing non-structural partitions, associated power and telecom outlets, millwork and finishes. existing and occupancy to be addressed under seperate permit per ab-017 | $25,000 |
| Aug 28, 2013 | Completed final sign-off Feb 2015 | 123 Mission St | Skyline Construction | 9/f- demolition of existing non-structural partitions associated power & telecom outlets, plumbing and finishes, existing ceiling lighting, soffits and associated ceiling items.Details
9/f- demolition of existing non-structural partitions associated power & telecom outlets, plumbing and finishes, existing ceiling lighting, soffits and associated ceiling items. | $10,000 |
| Aug 13, 2013 | Completed final sign-off Dec 2013 | 595 Market St | Cannon Constructors North Inc | 21/f- interior t.i. including demolition, new partitions. new electrical and plumbing, new ceiling and lighting and related finishes. no structural work to be performed. fire & sprinkler under separate permit.Details
21/f- interior t.i. including demolition, new partitions. new electrical and plumbing, new ceiling and lighting and related finishes. no structural work to be performed. fire & sprinkler under separate permit. | $440,000 |
| Aug 13, 2013 | Completed final sign-off Jun 2014 | 595 Market St | Richlen Construction | 24/f- interior t.i. including demolition, new partitions. new electrical, new ceiling and lighting and related finishes.Details
24/f- interior t.i. including demolition, new partitions. new electrical, new ceiling and lighting and related finishes. | $205,000 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 595 Market St | Cannon Constructors North Inc | interior t.i. including demolition, new partitions, plumbing and related finishes. no structural work to be performed. restroom remodel only.Details
interior t.i. including demolition, new partitions, plumbing and related finishes. no structural work to be performed. restroom remodel only. | $80,000 |
| Aug 1, 2013 | Completed final sign-off Apr 2014 | 595 Market St | Cannon Constructors North Inc | interior t.i. including demolition, new partitions, new electrical, new plumbing, new ceiling, lighting and related finishes. no structural work to be performed.Details
interior t.i. including demolition, new partitions, new electrical, new plumbing, new ceiling, lighting and related finishes. no structural work to be performed. | $350,000 |
| Jul 29, 2013 | Completed final sign-off Dec 2013 | 595 Market St | Cannon Constructors North Inc | 12th floor-interior tenant improvement including demolition & new partitions, new electrical & plumbing. new ceiling & lighting. related finishes.Details
12th floor-interior tenant improvement including demolition & new partitions, new electrical & plumbing. new ceiling & lighting. related finishes. | $290,000 |
| Jul 11, 2013 | Completed final sign-off Jan 2014 | 650 California St | Dome Construction Corp | office tenant improvement including minor upgrade to existing walls and new floor finishes. electrical, mechanical and fire life safety under a seperate permit, no structural work to be performed.Details
office tenant improvement including minor upgrade to existing walls and new floor finishes. electrical, mechanical and fire life safety under a seperate permit, no structural work to be performed. | $240,000 |
| May 9, 2013 | Completed final sign-off Dec 2013 | 595 Market St | Cannon Constructors North Inc | 27th floor-interior t.i including demoltion, new partitions, new electrical & plumbing. new ceiling, lighting, related finishes. no structural work to be performed. m e p to be submitted under seperate permitDetails
27th floor-interior t.i including demoltion, new partitions, new electrical & plumbing. new ceiling, lighting, related finishes. no structural work to be performed. m e p to be submitted under seperate permit | $150,000 |
| Dec 5, 2012 | Expired or cancelled cancelled Jan 2026 | 595 Market St | 4th floor-barrier removal providing accessible ramps at exterior decks as required by building inspectorDetails
4th floor-barrier removal providing accessible ramps at exterior decks as required by building inspector | $40,000 | |
| Nov 9, 2012 | Completed final sign-off Jan 2013 | 595 Market St | Dome Construction Corp | 14th floor:interior t.i. including demolition, new partitions, new electrical and plmg, new ceiling and lighting and related finishes. no structural work to be performed.Details
14th floor:interior t.i. including demolition, new partitions, new electrical and plmg, new ceiling and lighting and related finishes. no structural work to be performed. | $50,000 |
| Jun 29, 2012 | Completed final sign-off Mar 2013 | 350 Masonic Av | Moroso Construction Inc | install (n) wall mounted exhaust fan to exterior wall facing east property line at parking area. install (n) louver in same wall. install (n) cement plaster wall infill to match existing in same wall.Details
install (n) wall mounted exhaust fan to exterior wall facing east property line at parking area. install (n) louver in same wall. install (n) cement plaster wall infill to match existing in same wall. | $5,200 |
| May 17, 2011 | Completed final sign-off Apr 2012 | 579 Market St | Shames Construction Company Ltd | ti-incl demolition of existing stair and restrooms, new partitions, restrooms, and entry at rear of building ( on stevenson street).Details
ti-incl demolition of existing stair and restrooms, new partitions, restrooms, and entry at rear of building ( on stevenson street). | $700,000 |