From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
146 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress issued Sep 2026 | 801 Market St | Gray West Construction Inc | revision to pa#202512010670 & 202512020738. 1/f & 2/f. remove all central fixture & associated structural anchorage details. fixtures intended to be supported solely on casters. no vertical supporting legs extending to floor below.Details
revision to pa#202512010670 & 202512020738. 1/f & 2/f. remove all central fixture & associated structural anchorage details. fixtures intended to be supported solely on casters. no vertical supporting legs extending to floor below. | |
| Jun 17, 2026 | In progress issued Jul 2026 | 801 Market St | Gray West Construction Inc | revision to bpa#202512010670. relocate sales area, mw fixtures and cove per site conditionDetails
revision to bpa#202512010670. relocate sales area, mw fixtures and cove per site condition | |
| Jun 17, 2026 | In progress issued Jul 2026 | 801 Market St | Gray West Construction Inc | level 2: revision to bpa#202512020738. add one additional male & one female restroom due to plumbing calc requirments. modification of layouts at boh.Details
level 2: revision to bpa#202512020738. add one additional male & one female restroom due to plumbing calc requirments. modification of layouts at boh. | $10,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 801 Market St | Gray West Construction Inc | revision to bpa#202512040974. revise lighting layout per reflected ceiling plan, update lighting scheduleDetails
revision to bpa#202512040974. revise lighting layout per reflected ceiling plan, update lighting schedule | |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 22 04th St | C C I Commercial Construction & Improv | 13/f: installation of 2 - 32sq.ft. phone booths.Details
13/f: installation of 2 - 32sq.ft. phone booths. | $23,000 |
| Dec 19, 2025 | In progress issued Feb 2026 | 801 Market St | Gray West Construction Inc | uniqlo: l1-l2 ellectrical upgrades including new lighting, distribution panel, power and signal devices throughout.Details
uniqlo: l1-l2 ellectrical upgrades including new lighting, distribution panel, power and signal devices throughout. | $10,000 |
| Sep 30, 2025 | Completed final sign-off Oct 2025 | 22 04th St | Golden Gate Fire Protection Inc | fire spinkler, relocate 3 concealed pendents in phone booths on the 13/f. t.i. 202509054715.Details
fire spinkler, relocate 3 concealed pendents in phone booths on the 13/f. t.i. 202509054715. | $750 |
| Sep 5, 2025 | Completed final sign-off Nov 2025 | 22 04th St | C C I Commercial Construction & Improv | 13th/f: installation of phone booth (total 3 - 48 sf) architectural & structural scope. mep deferred.Details
13th/f: installation of phone booth (total 3 - 48 sf) architectural & structural scope. mep deferred. | $23,000 |
| Apr 14, 2025 | Completed final sign-off Sep 2025 | 22 04th St | Skyline Construction | add a vent enclosure to existing elevatorDetails
add a vent enclosure to existing elevator | $10,000 |
| Aug 13, 2024 | Completed final sign-off Nov 2025 | 22 04th St | Skyline Construction | basement l2: diesel fire pump replacement. 1000 gpm x 165 psiDetails
basement l2: diesel fire pump replacement. 1000 gpm x 165 psi | $150,000 |
| Jul 3, 2024 | Completed final sign-off Mar 2025 | 22 04th St | installation of new security gate in existing garage at vehicle ramp at level b2.Details
installation of new security gate in existing garage at vehicle ramp at level b2. | $10,000 | |
| Jun 9, 2023 | Completed final sign-off Nov 2023 | 22 04th St | Johnson Controls Fire | 13th fl fa modification - add 5 control relays (1 for audio shunt; 4 for individual fsd shut down) & 3 speaker/strobes (for phone booths) & replace 1 speaker/stobe from wall to ceiling mount. ref pa 2022-0831-1622Details
13th fl fa modification - add 5 control relays (1 for audio shunt; 4 for individual fsd shut down) & 3 speaker/strobes (for phone booths) & replace 1 speaker/stobe from wall to ceiling mount. ref pa 2022-0831-1622 | $6,000 |
| Mar 17, 2023 | In progress issued Dec 2023 | 22 04th St | Johnson Controls Fire | fire alarm control panel replacement per approved pre-application meeting. replace fire alarm control panel and fire alarm transounders as indicated on plans. provide new fire alarm riser for new panels.Details
fire alarm control panel replacement per approved pre-application meeting. replace fire alarm control panel and fire alarm transounders as indicated on plans. provide new fire alarm riser for new panels. | $500 |
| Feb 14, 2023 | Completed final sign-off Feb 2023 | 22 04th St | C C I Commercial Construction & Improv | 13/f: new power and signal devices through the space. new 2019 title 24 compliant lighting and controls. ref permit 202208311622Details
13/f: new power and signal devices through the space. new 2019 title 24 compliant lighting and controls. ref permit 202208311622 | |
| Jan 23, 2023 | Completed final sign-off Apr 2023 | 22 04th St | True North Signs & Graphic Services | (4) evacuation signs. 13th floor.Details
(4) evacuation signs. 13th floor. | $1,600 |
| Jan 6, 2023 | Completed final sign-off Feb 2023 | 10 04th St | Shield Fire Protection, Inc. | add fire sprinkler under hvac pan, for adequate coverage per inspectors requestDetails
add fire sprinkler under hvac pan, for adequate coverage per inspectors request | $4,616 |
| Dec 20, 2022 | Completed final sign-off Feb 2023 | 22 04th St | Johnson Controls Fire | modify extg fire alarm system, provide, and install 4 speaker strobe, relocate one extg speaker strobe to new location devices as shown on drawings. all work to be done on 13th floor.Details
modify extg fire alarm system, provide, and install 4 speaker strobe, relocate one extg speaker strobe to new location devices as shown on drawings. all work to be done on 13th floor. | $100 |
| Dec 12, 2022 | Completed final sign-off Dec 2022 | 22 04th St | Golden Gate Fire Protection Inc | 13/f: fire sprinklers: relocate 55 uprights and 13 pendents. ref permit 202208311622Details
13/f: fire sprinklers: relocate 55 uprights and 13 pendents. ref permit 202208311622 | $37,400 |
| Sep 8, 2022 | Never finaled issued Sep 2022, no final | 22 04th St | Johnson Controls Fire | 11/f: modify (e) fire alarm. provide new devices, relocate and demo (e) devices as shown on drawings. adding 5 new speaker strobes ceiling mount and 1 speaker strobe wall mount. ref to pa202110251118.Details
11/f: modify (e) fire alarm. provide new devices, relocate and demo (e) devices as shown on drawings. adding 5 new speaker strobes ceiling mount and 1 speaker strobe wall mount. ref to pa202110251118. | $500 |
| Aug 31, 2022 | Completed final sign-off Feb 2023 | 22 04th St | C C I Commercial Construction & Improv | demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office.Details
demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office. | $100,000 |
| Jul 29, 2022 | Never finaled issued Jul 2022, no final | 22 04th St | Ingram Fire Protection Inc | fire sprinkler t.i. 2 sprinkler heads tied to building permit 2022 0504 3523Details
fire sprinkler t.i. 2 sprinkler heads tied to building permit 2022 0504 3523 | $8,500 |
| Jul 11, 2022 | Never finaled issued Jul 2022, no final | 22 04th St | Johnson Controls Fire | 11th fl: voluntary modification of (e) fire alarm system. building sprinklered. 1 strobe for gender neutral restrooms.Details
11th fl: voluntary modification of (e) fire alarm system. building sprinklered. 1 strobe for gender neutral restrooms. | $1,900 |
| May 4, 2022 | Completed final sign-off Oct 2022 | 22 04th St | Dpr Construction | 11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work.Details
11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work. | $80,000 |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 22 04th St | Metropolitan Electrical Construction | retrofit from flourescent to led. provide lighting t.i. to 7800sq ft of open office and enclosed office in new scope area. ref# pa#201805088466.Details
retrofit from flourescent to led. provide lighting t.i. to 7800sq ft of open office and enclosed office in new scope area. ref# pa#201805088466. | $65,000 |
| Nov 5, 2021 | Expired or cancelled cancelled Jan 2026 | 22 04th St | revision to bpa#2021/0824/7006(11th floor). add low height partition only.Details
revision to bpa#2021/0824/7006(11th floor). add low height partition only. | ||
| Oct 25, 2021 | Completed final sign-off Dec 2021 | 22 04th St | Johnson Controls Fire | mod (e) fire alarm system on 11th floor. add 4 new speaker/strobe ceiling mounts, add 1 speaker strobe wall mount. ref t.i. pa 202108247006.Details
mod (e) fire alarm system on 11th floor. add 4 new speaker/strobe ceiling mounts, add 1 speaker strobe wall mount. ref t.i. pa 202108247006. | $6,500 |
| Oct 21, 2021 | Completed final sign-off Dec 2021 | 12 04th St | Ingram Fire Protection Inc | 11/f: fire sprinkler tenant improvement. relocate 6 sprinklers. ref. pa 202108247006.Details
11/f: fire sprinkler tenant improvement. relocate 6 sprinklers. ref. pa 202108247006. | $7,480 |
| Oct 8, 2021 | Completed final sign-off Nov 2021 | 10 04th St | Shield Fire Protection, Inc. | add fire sprikler under hvac panDetails
add fire sprikler under hvac pan | $4,000 |
| Aug 24, 2021 | Never finaled issued Sep 2021, no final | 22 04th St | Dpr Construction | 11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler.Details
11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler. | $160,000 |
| Dec 10, 2020 | Never finaled issued Mar 2021, no final | 22 04th St | Dpr Construction | overall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905Details
overall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905 | |
| Oct 22, 2020 | Completed final sign-off Nov 2020 | 22 04th St | Johnson Controls Fire | 11th floor: modify existing fire alarm system, provide and install (26) speaker strobes, (1) strobe and (1) duct detector. refer ti #2020-0212-4230.Details
11th floor: modify existing fire alarm system, provide and install (26) speaker strobes, (1) strobe and (1) duct detector. refer ti #2020-0212-4230. | $6,500 |
| Sep 26, 2020 | Completed final sign-off Nov 2020 | 22 04th St | Ingram Fire Protection Inc | 37/f: fire sprinkler t.i., sprinkler heads. ref bpa#202002124230Details
37/f: fire sprinkler t.i., sprinkler heads. ref bpa#202002124230 | $21,320 |
| Jul 23, 2020 | Never finaled filed Jul 2020, never issued | 801 Market St | street spaceDetails
street space | ||
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 801 Market St | street spaceDetails
street space | ||
| Mar 2, 2020 | Completed final sign-off Apr 2021 | 22 04th St | Dpr Construction | 11th floor: new electrical. ref app#202002124230Details
11th floor: new electrical. ref app#202002124230 | $100,000 |
| Mar 2, 2020 | Completed final sign-off Apr 2021 | 22 04th St | Dpr Construction | 11th floor: new plumbing t.i. including extg restroom new fixtures. all gender neutral restrooms, and micro kitchen . ref app#202002124230Details
11th floor: new plumbing t.i. including extg restroom new fixtures. all gender neutral restrooms, and micro kitchen . ref app#202002124230 | $30,000 |
| Mar 2, 2020 | Never finaled issued Oct 2020, no final | 22 04th St | Dpr Construction | 11th floor: new mechanical throughout t.i. ref #202002124230Details
11th floor: new mechanical throughout t.i. ref #202002124230 | $100,000 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 22 04th St | Dpr Construction | 11/f ti to upgrade office space, work to incl refurbursement of open office space, conference rooms, pantry, and renovation of existing restrooms, new restroom, no work to existing stairs, elev lobby rated wall repl by glass with deluge sprinklers on both sides, no structural work, no exterior work.Details
11/f ti to upgrade office space, work to incl refurbursement of open office space, conference rooms, pantry, and renovation of existing restrooms, new restroom, no work to existing stairs, elev lobby rated wall repl by glass with deluge sprinklers on both sides, no structural work, no exterior work. | $2,128,000 |
| Jan 28, 2020 | Never finaled issued Jan 2020, no final | 22 04th St | Ingram Fire Protection Inc | demo 40 pendent sprinklres and replace with uprights for temporary protection ref 202001212357Details
demo 40 pendent sprinklres and replace with uprights for temporary protection ref 202001212357 | $6,530 |
| Jan 21, 2020 | Never finaled issued Feb 2020, no final | 22 04th St | Dpr Construction | demo of non structural walls and mech, elec & plumbing systems, interior partitions, finishes, core elements including shafts, risers, stairs and elev to remainDetails
demo of non structural walls and mech, elec & plumbing systems, interior partitions, finishes, core elements including shafts, risers, stairs and elev to remain | $145,000 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 22 04th St | Clune Construction Company L P | 7th fl: minor demo to non-bearing wall per ab-017.Details
7th fl: minor demo to non-bearing wall per ab-017. | $10,000 |
| Dec 12, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Johnson Controls Fire | 5/f & 7/f: revision to 201909202197. replace original speaker strobe with new low freq horn strobe maher not reqDetails
5/f & 7/f: revision to 201909202197. replace original speaker strobe with new low freq horn strobe maher not req | |
| Sep 20, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Johnson Controls Fire | 5&7/f: fa- add 2 relay to the fire alram system. revision to 201905080063Details
5&7/f: fa- add 2 relay to the fire alram system. revision to 201905080063 | $1,100 |
| May 8, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Johnson Controls Fire | fire alarm t.i. to 5th fl. guest room 502 & 7th fl. guest room 705. the t.i. added 4 smokes, 2 strobes and 4 speaker strobes n/a maherDetails
fire alarm t.i. to 5th fl. guest room 502 & 7th fl. guest room 705. the t.i. added 4 smokes, 2 strobes and 4 speaker strobes n/a maher | $6,126 |
| Mar 28, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Centric Construction Inc | interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixtureDetails
interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixture | $65,000 |
| Mar 26, 2019 | Completed final sign-off Dec 2020 | 801 Market St | Battalion One Fire Protection | ground fl - convert (e) dact to a new rf communicator. all existing alarm system components & sequence of operation shall remain unchangedDetails
ground fl - convert (e) dact to a new rf communicator. all existing alarm system components & sequence of operation shall remain unchanged | $1,000 |
| Mar 26, 2019 | Completed final sign-off Dec 2020 | 22 04th St | Battalion One Fire Protection | ground fl - convert (e) dact to a new rf communicator. all existing alarm system components & sequence of operation shall remain unchangedDetails
ground fl - convert (e) dact to a new rf communicator. all existing alarm system components & sequence of operation shall remain unchanged | $1,000 |
| Feb 22, 2019 | Never finaled issued Apr 2019, no final | 22 04th St | Trainor Commercial Construction Inc. | 4th fl - minor office remodel. entry door to suite replacement with storefront.Details
4th fl - minor office remodel. entry door to suite replacement with storefront. | $35,000 |
| Feb 19, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Centric Construction Inc | electrical and plumbing reconfiguration to seven hotel guest rooms. electr and mech for pa 201901150362Details
electrical and plumbing reconfiguration to seven hotel guest rooms. electr and mech for pa 201901150362 | $120,000 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 22 04th St | Metropolitan Electrical Construction | change out lights, flourescent to led. install enlighded controls alsoDetails
change out lights, flourescent to led. install enlighded controls also | $48,774 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 22 04th St | Metropolitan Electrical Construction | change out lights, flourescent to led install controlsDetails
change out lights, flourescent to led install controls | $44,850 |
| Jan 15, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Centric Construction Inc | interior renovation (ti) to existing hotel guest room. demo, new non bearing walls, gyp board. minor exectrical and plumbing work. work on 5th, 6th, 7th, 8th,and 9th floor. rooms: 502/605/705/802/805/902/905. maher n/a.Details
interior renovation (ti) to existing hotel guest room. demo, new non bearing walls, gyp board. minor exectrical and plumbing work. work on 5th, 6th, 7th, 8th,and 9th floor. rooms: 502/605/705/802/805/902/905. maher n/a. | $197,952 |
| Oct 22, 2018 | Completed final sign-off Oct 2018 | 22 04th St | R L H Fire Protection Inc | fire sprinkler: relocate 15, add 1, and delete 1 sprinkler on the 12th & 13th fl. ref ti #201805088466. maher n/a.Details
fire sprinkler: relocate 15, add 1, and delete 1 sprinkler on the 12th & 13th fl. ref ti #201805088466. maher n/a. | $4,425 |
| Oct 18, 2018 | Expired or cancelled cancelled Jan 2024 | 22 04th St | remove & replace (e) (2) pairs of frameless glass swing doors. install (n) pair of sliding alum glass doors w/ full breakaway panels & features @ ground levelDetails
remove & replace (e) (2) pairs of frameless glass swing doors. install (n) pair of sliding alum glass doors w/ full breakaway panels & features @ ground level | $84,000 | |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 22 04th St | Johnson Controls Fire | 12th & 13tth fl - fire alarm ti, install (6) new speaker/strobes. relocate (e) notification appliances as needed. ref pa 2018-0508-8466. maher n/aDetails
12th & 13tth fl - fire alarm ti, install (6) new speaker/strobes. relocate (e) notification appliances as needed. ref pa 2018-0508-8466. maher n/a | $3,200 |
| Sep 21, 2018 | Completed final sign-off Mar 2019 | 22 04th St | Acco Engineered Systems Inc. Dba Acco En, Swinerton Builders | 12 & 13 floors: upgrading existing controls systems to mechanical equipment. also providing new fan coils to serve conversion from open office space to conference rooms. a heat pump will also be added to serve new idf load. maher n/a.Details
12 & 13 floors: upgrading existing controls systems to mechanical equipment. also providing new fan coils to serve conversion from open office space to conference rooms. a heat pump will also be added to serve new idf load. maher n/a. | $315,000 |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 22 04th St | Potter Fire Protection | 4th floor - relocate (74) and plug (31) fire sprinklersDetails
4th floor - relocate (74) and plug (31) fire sprinklers | $32,000 |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 22 04th St | Metropolitan Electrical Construction | outlets - new lights- new flooring poer in conference rooms maher na , reference p.a. 2018 0508 8466, electrical onlyDetails
outlets - new lights- new flooring poer in conference rooms maher na , reference p.a. 2018 0508 8466, electrical only | $46,000 |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 22 04th St | Metropolitan Electrical Construction | outlets - new lights- new flooring poer in conference rooms maher na, reference 2018 0508 8466, electrical onlyDetails
outlets - new lights- new flooring poer in conference rooms maher na, reference 2018 0508 8466, electrical only | $49,000 |
| Jun 6, 2018 | Completed final sign-off Aug 2018 | 22 04th St | Bcci Construction Company | 8th fl - remove pantry millwork island. remove glazed partition & doorsDetails
8th fl - remove pantry millwork island. remove glazed partition & doors | $53,535 |
| May 8, 2018 | Completed final sign-off Mar 2019 | 22 04th St | Swinerton Builders | upgrading existing office space on 12th & 13th floors.: includes replacing office front, building new offices/conference rooms and adding/relocating idf room, mech,elec, sprinklers& plumbing under seperate permitDetails
upgrading existing office space on 12th & 13th floors.: includes replacing office front, building new offices/conference rooms and adding/relocating idf room, mech,elec, sprinklers& plumbing under seperate permit | $315,000 |
| Oct 24, 2017 | Never finaled issued Oct 2017, no final | 12 04th St | Alpha Architectural Signs & Lighting | re-face (2) existing projecting signs and retrofit lighting to led. maher naDetails
re-face (2) existing projecting signs and retrofit lighting to led. maher na | $4,000 |
| Aug 17, 2017 | Completed final sign-off Sep 2017 | 22 04th St | Sc Builders, Inc | 6/f- demo ceiling and audio visual electrical, other demo pa#201708104425 for walls only.Details
6/f- demo ceiling and audio visual electrical, other demo pa#201708104425 for walls only. | $3,000 |
| Aug 15, 2017 | Completed final sign-off Sep 2017 | 22 04th St | Golden Gate Fire Protection Inc | 6th fl: fire sprinkler only. relocate 3 pendents; add 1. (4 total) for clover health. ref #201708104425. n/a maherDetails
6th fl: fire sprinkler only. relocate 3 pendents; add 1. (4 total) for clover health. ref #201708104425. n/a maher | $1,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2017 | 22 04th St | Sc Builders, Inc | 6th fl: demo of 2 existing conference rooms, including non-structural partitions, associated power/telecom outlets, doors, sightlight, etc. fire/life satey systems to remain intact and operational. ab-017. maher naDetails
6th fl: demo of 2 existing conference rooms, including non-structural partitions, associated power/telecom outlets, doors, sightlight, etc. fire/life satey systems to remain intact and operational. ab-017. maher na | |
| Aug 7, 2017 | Never finaled issued Aug 2017, no final | 801 Market St | street spaceDetails
street space | ||
| Jan 31, 2017 | Expired or cancelled withdrawn Jun 2017 | 10 04th St | Pacific Wide Builders Inc. | rev to pa#201607182588. change to mechanical outside air.Details
rev to pa#201607182588. change to mechanical outside air. | |
| Jan 23, 2017 | Expired or cancelled withdrawn Feb 2017 | 10 04th St | Zebra Awning Co Inc | fabricate and install canopy over storage area outside service elevator. canopy will be stand alone not attached to building maher not reqDetails
fabricate and install canopy over storage area outside service elevator. canopy will be stand alone not attached to building maher not req | $10,000 |
| Dec 30, 2016 | Completed final sign-off Jun 2017 | 10 04th St | P S R West Coast Builders Inc | acoustic wall enclosure around existing refrigeration equipment per sfdph. ** maher: n/a **Details
acoustic wall enclosure around existing refrigeration equipment per sfdph. ** maher: n/a ** | $65,000 |
| Nov 21, 2016 | Completed final sign-off Jan 2017 | 22 04th St | Johnson Controls Fire | 15th floor fire alarm tenant improvement - 1 booster panel, 10 duct smoke sensors w/relay, 3 area smoke sensors, 1 relay, 17 speaker/strobes, 12 strobes. ref pa #201607132246. n/a maher ordinanceDetails
15th floor fire alarm tenant improvement - 1 booster panel, 10 duct smoke sensors w/relay, 3 area smoke sensors, 1 relay, 17 speaker/strobes, 12 strobes. ref pa #201607132246. n/a maher ordinance | $23,000 |
| Nov 21, 2016 | Completed final sign-off Jan 2017 | 22 04th St | Johnson Controls Fire | 16th floor fire alarm tenant improvement - 11 duct smoke sensors, 3 area smoke sensors, 1 relay, 15 speaker/strobes, 6 strobes. ref pa #201607132250. n/a maher ordinanceDetails
16th floor fire alarm tenant improvement - 11 duct smoke sensors, 3 area smoke sensors, 1 relay, 15 speaker/strobes, 6 strobes. ref pa #201607132250. n/a maher ordinance | $23,000 |
| Oct 20, 2016 | Completed final sign-off Feb 2017 | 22 04th St | Metropolitan Electrical Construction | 6th floor - furniture power - title 24. n/a maher ordinanceDetails
6th floor - furniture power - title 24. n/a maher ordinance | $32,000 |
| Oct 20, 2016 | Completed final sign-off Jan 2017 | 10 04th St | Johnson Controls Fire | fire alarm ti to bsmnt & 1st fl: 2(n), 1 relo manual pull box; 2 relo duct det; 4 (n) duct smoke with relay, 2 input/output module, 10 speaker/strobe, 6 strobes. ref pa 2016-0718-2588. n/a maher ord. 155-13Details
fire alarm ti to bsmnt & 1st fl: 2(n), 1 relo manual pull box; 2 relo duct det; 4 (n) duct smoke with relay, 2 input/output module, 10 speaker/strobe, 6 strobes. ref pa 2016-0718-2588. n/a maher ord. 155-13 | $16,000 |
| Oct 20, 2016 | Completed final sign-off Feb 2017 | 22 04th St | Metropolitan Electrical Construction | 5th floor - furniture power - title 24. n/a maher ordinanceDetails
5th floor - furniture power - title 24. n/a maher ordinance | $30,000 |
| Oct 17, 2016 | Never finaled issued Oct 2016, no final | 22 04th St | Johnson Controls Fire | fire alarm ti - addition of smoke detector, relay & door hold, level g1Details
fire alarm ti - addition of smoke detector, relay & door hold, level g1 | $3,500 |
| Oct 13, 2016 | Completed final sign-off Nov 2016 | 22 04th St | Golden Gate Fire Protection Inc | 15th & 16th floors: fire sprinklers only 15th - relocate 24 pendents, add 14 heads, relocate 11 uprights add 3 uprights 201607132246 16th: relocate 27 pendents, add4, relocate 13 uprights add 4 201608094527 maher naDetails
15th & 16th floors: fire sprinklers only 15th - relocate 24 pendents, add 14 heads, relocate 11 uprights add 3 uprights 201607132246 16th: relocate 27 pendents, add4, relocate 13 uprights add 4 201608094527 maher na | $13,252 |
| Sep 27, 2016 | Completed final sign-off Oct 2016 | 10 04th St | G P Fire Protection | install 21 new heads for new trader joes. ref# 201607182588 n/a for maherDetails
install 21 new heads for new trader joes. ref# 201607182588 n/a for maher | $15,800 |
| Aug 18, 2016 | Completed final sign-off Mar 2017 | 10 04th St | Golden Gate Sign Company Inc. | trader joes sign - electric, wall, single face sign. maher naDetails
trader joes sign - electric, wall, single face sign. maher na | $4,300 |
| Aug 18, 2016 | Completed final sign-off Mar 2017 | 10 04th St | Golden Gate Sign Company Inc. | trader joes sign - non electric, wall, blade, profecting, double faced. maher naDetails
trader joes sign - non electric, wall, blade, profecting, double faced. maher na | $1,300 |
| Aug 9, 2016 | Completed final sign-off Mar 2017 | 22 04th St | Sc Builders, Inc | 16th flr: mech, plumb, elec for ref pa 201607132250 maher naDetails
16th flr: mech, plumb, elec for ref pa 201607132250 maher na | |
| Aug 9, 2016 | Completed final sign-off Mar 2017 | 22 04th St | Sc Builders, Inc | 15th flr: mech, plumb, elec for ref pa 201607132246 maher naDetails
15th flr: mech, plumb, elec for ref pa 201607132246 maher na | |
| Jul 18, 2016 | Completed final sign-off Jun 2017 | 10 04th St | P S R West Coast Builders Inc | new equipment platform for future refrigeration compressor and condenser. n/a maher ordinanceDetails
new equipment platform for future refrigeration compressor and condenser. n/a maher ordinance | $120,000 |
| Jul 18, 2016 | Completed final sign-off Jun 2017 | 10 04th St | Pacific Wide Builders Inc. | basement- new fixtures, new restrooms, new lights, new hvac distribution, new offices required for grocery store. new frigerated case, new dairy box, new reserve freezer, new fixtures as required for a grocery store. n/a ordinance #155-13. life safety deferred.Details
basement- new fixtures, new restrooms, new lights, new hvac distribution, new offices required for grocery store. new frigerated case, new dairy box, new reserve freezer, new fixtures as required for a grocery store. n/a ordinance #155-13. life safety deferred. | $800,000 |
| Jul 15, 2016 | Completed final sign-off Jan 2017 | 10 04th St | P S R West Coast Builders Inc | lower level- demo extg toilet rooms with all fixtures and lights in basement. remove unused electrical panels and ducting. n/a for maher. ab-017.Details
lower level- demo extg toilet rooms with all fixtures and lights in basement. remove unused electrical panels and ducting. n/a for maher. ab-017. | $75,000 |
| Jul 14, 2016 | Completed final sign-off Jul 2016 | 22 04th St | Golden Gate Fire Protection Inc | 4th floor: fire sprinkler only. relocate 2 pendents for slack. maher not reqDetails
4th floor: fire sprinkler only. relocate 2 pendents for slack. maher not req | $1,000 |
| Jul 13, 2016 | Completed final sign-off Mar 2017 | 22 04th St | 15/f- t.i. new non structural partitions. all new or revised meps. life safety and sprinklers under seperate permit. demo done under pa#201607061671. n/a ordinance #155-13Details
15/f- t.i. new non structural partitions. all new or revised meps. life safety and sprinklers under seperate permit. demo done under pa#201607061671. n/a ordinance #155-13 | $755,000 | |
| Jul 13, 2016 | Completed final sign-off Mar 2017 | 22 04th St | Sc Builders, Inc | 16/f- t.i. new non structural partitions. all new or revised meps. life safety and sprinklers under separate permit. demo done under pa#201607061670. n/a ordinance #155-13Details
16/f- t.i. new non structural partitions. all new or revised meps. life safety and sprinklers under separate permit. demo done under pa#201607061670. n/a ordinance #155-13 | $755,000 |
| Jul 6, 2016 | Completed final sign-off Sep 2016 | 22 04th St | Sc Builders, Inc | 15th flr: interior demo; non structural partitions. ti to follow under sep permit. ab-017. maher naDetails
15th flr: interior demo; non structural partitions. ti to follow under sep permit. ab-017. maher na | |
| Jul 6, 2016 | Completed final sign-off Sep 2016 | 22 04th St | Sc Builders, Inc | 16th flr: interior demo; non structural partitions. ti to follow under sep permit. maher na per ab-017Details
16th flr: interior demo; non structural partitions. ti to follow under sep permit. maher na per ab-017 | |
| Jun 16, 2016 | Completed final sign-off Jul 2016 | 22 04th St | Sc Builders, Inc | 11th floor - furniture electrical distribution and audio-visual electrical distribution. n/a ordinance #155-13Details
11th floor - furniture electrical distribution and audio-visual electrical distribution. n/a ordinance #155-13 | $60,000 |
| Jun 15, 2016 | Completed final sign-off Jul 2016 | 22 04th St | Johnson Controls Fire | 11th floor ti consist of adding (19) speaker/strobes. remove & replace (e) (11) speaker/strobes with new for synchronization. ref ti 2016-0601-8894 n/a for maher.Details
11th floor ti consist of adding (19) speaker/strobes. remove & replace (e) (11) speaker/strobes with new for synchronization. ref ti 2016-0601-8894 n/a for maher. | $20,000 |
| Jun 1, 2016 | Completed final sign-off Jun 2016 | 22 04th St | Sc Builders, Inc | 11th fl: interior demo of non structural partitions only. ti under sep permitDetails
11th fl: interior demo of non structural partitions only. ti under sep permit | $7,500 |
| May 23, 2016 | Completed final sign-off Nov 2016 | 22 04th St | Johnson Controls Fire | as built fire alarm record drawing per inspection to final 201507060695Details
as built fire alarm record drawing per inspection to final 201507060695 | |
| Apr 21, 2016 | Never finaled issued May 2016, no final | 12 04th St | Centric Construction Inc | revision to app#201501125527. work includes the conversion of a storage room to an office on level 8. fire protection shall be part of seperate permit. n/a for maherDetails
revision to app#201501125527. work includes the conversion of a storage room to an office on level 8. fire protection shall be part of seperate permit. n/a for maher | |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 22 04th St | Sc Builders, Inc | electrical furniture feeds & av power. n/a ordinance #155-13Details
electrical furniture feeds & av power. n/a ordinance #155-13 | $20,000 |
| Mar 3, 2016 | Completed final sign-off Apr 2016 | 22 04th St | Clune Construction Company L P | installation of new it equip within e idf room, reconfig of ele pwr dist. to support new it and hvac equiip. new 10kva ups system, new 3/4 ton water source heat pump in storage room. card readers,cameras, door contacts at entrances to space and it rooms.new tech cabling,revision 201502110861Details
installation of new it equip within e idf room, reconfig of ele pwr dist. to support new it and hvac equiip. new 10kva ups system, new 3/4 ton water source heat pump in storage room. card readers,cameras, door contacts at entrances to space and it rooms.new tech cabling,revision 201502110861 | $90,000 |
| Feb 4, 2016 | Never finaled issued Jun 2016, no final | 22 04th St | E & F Demolition | this is a commercial t.i. on a single floor. work to include new partition doors and frames, add power and data outlets, patch and repair finishes, no ceiling/lighting changes. no structural work and plumbing work included. n/a ordinance #155-13Details
this is a commercial t.i. on a single floor. work to include new partition doors and frames, add power and data outlets, patch and repair finishes, no ceiling/lighting changes. no structural work and plumbing work included. n/a ordinance #155-13 | $22,500 |
| Feb 2, 2016 | Completed final sign-off Feb 2016 | 12 04th St | Potter Fire Protection | add (4) fire sprinklers in new restroom ceiling, 1 each on floors 6, 7, 8 and 9. n/a ordinance #155-13Details
add (4) fire sprinklers in new restroom ceiling, 1 each on floors 6, 7, 8 and 9. n/a ordinance #155-13 | $2,200 |
| Dec 29, 2015 | Completed final sign-off Apr 2016 | 22 04th St | Sc Builders, Inc | 4th flr: addition of electrical furniture feeds. maher not req. ref. to app#2015-0903-6112Details
4th flr: addition of electrical furniture feeds. maher not req. ref. to app#2015-0903-6112 | $20,000 |
| Nov 24, 2015 | Completed final sign-off Mar 2016 | 12 04th St | Johnson Controls Fire | fire alarm tenant to 7th and 9th fl. 2 new strobes for new restrooms. t.i. app#201501125527Details
fire alarm tenant to 7th and 9th fl. 2 new strobes for new restrooms. t.i. app#201501125527 | $2,500 |
| Nov 24, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Johnson Controls Fire | fire alarm ti to 12th fl. 1 booster panel, 22 notification appliance speaker/strobes, 2 smoke detectors, 1 strobe applianceDetails
fire alarm ti to 12th fl. 1 booster panel, 22 notification appliance speaker/strobes, 2 smoke detectors, 1 strobe appliance | $16,500 |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | 12th flr: revision to 201509177337; added two new room, changed some lighting fixtures etc. meps under separate permit; maher n/aDetails
12th flr: revision to 201509177337; added two new room, changed some lighting fixtures etc. meps under separate permit; maher n/a | $25,000 |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | 12th flr: meps for pa 201509177337 and revision pa 201511122448; maher n/aDetails
12th flr: meps for pa 201509177337 and revision pa 201511122448; maher n/a | $150,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | 4th and 5th floor: meps for 201509036112 and revision to app#201510099295. 2 new fsd's, n/a for maher. 2 new fsds.n/a for maherDetails
4th and 5th floor: meps for 201509036112 and revision to app#201510099295. 2 new fsd's, n/a for maher. 2 new fsds.n/a for maher | $200,000 |
| Nov 6, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Johnson Controls Fire | fire alarm ti to 4th & 5th floor, 2 booster panels, 4 smoke detectors, 1 heat detectors, 42 speaker/strobes. ref pa 2015-0903-6112. maher naDetails
fire alarm ti to 4th & 5th floor, 2 booster panels, 4 smoke detectors, 1 heat detectors, 42 speaker/strobes. ref pa 2015-0903-6112. maher na | $16,000 |
| Nov 2, 2015 | Completed final sign-off Nov 2015 | 22 04th St | Golden Gate Fire Protection Inc | fire sprinkler only - 4th floor relocate 14, add 3 heads, 5th floor, replace 8 pendents to upright heads, 12th floor, relocate 16 and add 6 heads 33 heads total, ref pa 2015.0903.6112 (4th & 5th floor) 2015-0917-7337 (12th fl). n/a for maher.Details
fire sprinkler only - 4th floor relocate 14, add 3 heads, 5th floor, replace 8 pendents to upright heads, 12th floor, relocate 16 and add 6 heads 33 heads total, ref pa 2015.0903.6112 (4th & 5th floor) 2015-0917-7337 (12th fl). n/a for maher. | $16,500 |
| Oct 9, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | 4th floor revision 201510139457. add additional rooms maher naDetails
4th floor revision 201510139457. add additional rooms maher na | $42,000 |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 22 04th St | Metropolitan Electrical Construction | 6th floor: furniture power - title 24 n/a for maher.Details
6th floor: furniture power - title 24 n/a for maher. | $20,000 |
| Oct 6, 2015 | Completed final sign-off Nov 2015 | 22 04th St | Johnson Controls Fire | fire alarm evacuation message modification, no new devices, programming only and re-accpetance test; maher n/aDetails
fire alarm evacuation message modification, no new devices, programming only and re-accpetance test; maher n/a | $5,000 |
| Sep 29, 2015 | Expired or cancelled cancelled Dec 2015 | 22 04th St | Metropolitan Electrical Construction | furniture power. title 24. n/a for maherDetails
furniture power. title 24. n/a for maher | $30,000 |
| Sep 22, 2015 | Expired or cancelled cancelled Jan 2026 | 22 04th St | floor 3, 6, 10 tenant improvement - upgrade lobbies access control door devices only, and toilet patition door at womens ada restroom door n/a maher ordinanceDetails
floor 3, 6, 10 tenant improvement - upgrade lobbies access control door devices only, and toilet patition door at womens ada restroom door n/a maher ordinance | $10,000 | |
| Sep 17, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | upgrade elevator lobby area, reception area, conference rooms & upgrade existing door access control, scope of work to include demolition of partitions at open office area, elevator lobby. n/a ordinance #155-13Details
upgrade elevator lobby area, reception area, conference rooms & upgrade existing door access control, scope of work to include demolition of partitions at open office area, elevator lobby. n/a ordinance #155-13 | $200,000 |
| Sep 3, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | minor demo, t.i. construction, upgrade/replace extg card reader, new ada pantry millwork on 4th and 5th floor. n/a for maher.Details
minor demo, t.i. construction, upgrade/replace extg card reader, new ada pantry millwork on 4th and 5th floor. n/a for maher. | $40,000 |
| Sep 2, 2015 | Completed final sign-off Mar 2016 | 22 04th St | Plant Construction Co, Lp | revision to 2014-0403-2341. new topping slab and loading area hardscape improvements. compliance with maher ordinance no 155-13 not reuqired.Details
revision to 2014-0403-2341. new topping slab and loading area hardscape improvements. compliance with maher ordinance no 155-13 not reuqired. | $450,000 |
| Aug 10, 2015 | Expired or cancelled withdrawn Nov 2017 | 12 04th St | install an illuminated channel letters onto (2) existing marquee signs (double faced electric). n/a for maher ordinance.Details
install an illuminated channel letters onto (2) existing marquee signs (double faced electric). n/a for maher ordinance. | $6,000 | |
| Jul 24, 2015 | Never finaled issued Jul 2015, no final | 12 04th St | Johnson Controls Fire | level g1 - application to address field inspection comments. reference pa #2015.0508.5790 (provide and install 1 door holder and 1 relay at garage level. n/a maher ordinanceDetails
level g1 - application to address field inspection comments. reference pa #2015.0508.5790 (provide and install 1 door holder and 1 relay at garage level. n/a maher ordinance | |
| Jul 6, 2015 | Completed final sign-off Nov 2016 | 22 04th St | Johnson Controls Fire | fire alarm tenant improvement to 9th, 11th & 13th floors. provide & install 3 new relays for door releaseDetails
fire alarm tenant improvement to 9th, 11th & 13th floors. provide & install 3 new relays for door release | $4,500 |
| Jul 2, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Metropolitan Electrical Construction | 6th floor: tenant improvement for lighting upgrade. n/a for maher ordinance. ref #201504224272Details
6th floor: tenant improvement for lighting upgrade. n/a for maher ordinance. ref #201504224272 | $30,000 |
| Jun 24, 2015 | Completed final sign-off Aug 2015 | 22 04th St | Johnson Controls Fire | 6th floor: fire alarm tenant improvement - remove one txisting notification appliance. relcoate two existing notificaiton appliance. ref #201504224272. n/a maher ordinanceDetails
6th floor: fire alarm tenant improvement - remove one txisting notification appliance. relcoate two existing notificaiton appliance. ref #201504224272. n/a maher ordinance | $4,000 |
| May 29, 2015 | Never finaled issued May 2015, no final | 22 04th St | Metropolitan Electrical Construction | 14th flr: title 24 additional power outlets. ref pa# 201505115918. maher naDetails
14th flr: title 24 additional power outlets. ref pa# 201505115918. maher na | $20,000 |
| May 27, 2015 | Completed final sign-off Sep 2015 | 22 04th St | Alliance Roofing Co Inc | re-roofingDetails
re-roofing | $250,000 |
| May 11, 2015 | Never finaled issued May 2015, no final | 22 04th St | Herrero Builders Incorporated | ste 1400, 14th flr: ti - demo of partitions, new finishes and minor elect. no sturctural. fire/life/safety under sep permit. maher naDetails
ste 1400, 14th flr: ti - demo of partitions, new finishes and minor elect. no sturctural. fire/life/safety under sep permit. maher na | $170,000 |
| May 11, 2015 | Completed final sign-off Nov 2016 | 22 04th St | Sc Builders, Inc | floors 8,9,11 & 13: replace extg and add new card reader devices at stairwells elevator doors and misc, and closets those floors. also replace new lobby doors at floor 8,9 & 13. minor partition demo on floor 8. n/a for maher.Details
floors 8,9,11 & 13: replace extg and add new card reader devices at stairwells elevator doors and misc, and closets those floors. also replace new lobby doors at floor 8,9 & 13. minor partition demo on floor 8. n/a for maher. | $20,000 |
| May 8, 2015 | Never finaled issued May 2015, no final | 22 04th St | Johnson Controls Fire | provide and install 1 door holder and 1 relay at garage level. maher n/a.Details
provide and install 1 door holder and 1 relay at garage level. maher n/a. | $2,000 |
| Apr 23, 2015 | Completed final sign-off Jun 2015 | 22 04th St | Johnson Controls Fire | 3rd and 10th floor: fire alarm t.i. 2 smoke detectors and 8 in duct detectors with relay, 3 synch modules, 44 speaker/strobes. ref app#201502118063 and 201502118061. n/a for maherDetails
3rd and 10th floor: fire alarm t.i. 2 smoke detectors and 8 in duct detectors with relay, 3 synch modules, 44 speaker/strobes. ref app#201502118063 and 201502118061. n/a for maher | $30,000 |
| Apr 22, 2015 | Completed final sign-off Aug 2015 | 22 04th St | Dpr Construction | 6th floor: t.i. to upgrade office space. work includes refurbishing open office, private offices, breakfast, and training room. n/a for the maher.Details
6th floor: t.i. to upgrade office space. work includes refurbishing open office, private offices, breakfast, and training room. n/a for the maher. | $200,000 |
| Mar 13, 2015 | Completed final sign-off Jun 2015 | 22 04th St | R L H Fire Protection Inc | 3rd floor fire sprinkler t.i.: install 62 pendents, 61 uprights, plus 6 window sprinklers to protect the elevator lobby.n/a for the maherDetails
3rd floor fire sprinkler t.i.: install 62 pendents, 61 uprights, plus 6 window sprinklers to protect the elevator lobby.n/a for the maher | $66,306 |
| Mar 13, 2015 | Completed final sign-off May 2015 | 22 04th St | R L H Fire Protection Inc | fire sprinkler. install 50 pendents, 39 uprights, 6 window sprinklers on the 10th floorDetails
fire sprinkler. install 50 pendents, 39 uprights, 6 window sprinklers on the 10th floor | $48,830 |
| Mar 5, 2015 | Expired or cancelled cancelled Jan 2026 | 22 04th St | Ad Art Inc. | erect a wall projecting electric double faced sign; maher n/aDetails
erect a wall projecting electric double faced sign; maher n/a | $10,000 |
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 22 04th St | Metropolitan Electrical Construction | title 24, electrical improvements to upgrade office space on 3/f and 10/f. n/a ordinance #155-13Details
title 24, electrical improvements to upgrade office space on 3/f and 10/f. n/a ordinance #155-13 | $500,000 |
| Feb 27, 2015 | Never finaled issued Mar 2015, no final | 22 04th St | Allied Heating & Air Conditioning | 10th flr: mech permit for arch 201502118063; furnish & install 3 fsds, (2) new 4 pipe hydronic fan coil systems, furnish & install 12 new vav boxes to serve space,furnish & install 2 new wshp 1 for server rm with cooling only,revitalize fancoils,relocate as necessary,install new piping asDetails
10th flr: mech permit for arch 201502118063; furnish & install 3 fsds, (2) new 4 pipe hydronic fan coil systems, furnish & install 12 new vav boxes to serve space,furnish & install 2 new wshp 1 for server rm with cooling only,revitalize fancoils,relocate as necessary,install new piping as | $165,000 |
| Feb 27, 2015 | Never finaled issued Mar 2015, no final | 22 04th St | Allied Heating & Air Conditioning | 3rd: mech permit for arch. 201502118061. install 3 fsds, furnish & install 3 new 4 pipe hydronic fan coils,12 new vav boxes, 3 with reheat coil,2 new wshp, 1 for server room-cooling only, re-use 8 (e) fan coils units & relocate as necessary; maher n/aDetails
3rd: mech permit for arch. 201502118061. install 3 fsds, furnish & install 3 new 4 pipe hydronic fan coils,12 new vav boxes, 3 with reheat coil,2 new wshp, 1 for server room-cooling only, re-use 8 (e) fan coils units & relocate as necessary; maher n/a | $149,000 |
| Feb 11, 2015 | Completed final sign-off Jul 2015 | 22 04th St | Dpr Construction | t.i. to upgrade office space on 10/f. work includes breakroom, restroom expansion, refurbishing, open and private offices. no increase in square footage, no change in use. n/a ordinance #155-13Details
t.i. to upgrade office space on 10/f. work includes breakroom, restroom expansion, refurbishing, open and private offices. no increase in square footage, no change in use. n/a ordinance #155-13 | $822,000 |
| Feb 11, 2015 | Completed final sign-off Oct 2015 | 22 04th St | Dpr Construction | t.i. to upgrade office space on 3/f. work includes breakroom, restroom expansion, refurbishing, open and private offices, scope of work also includes training room. no increase in square footage, no change in use. n/a ordinance #155-13Details
t.i. to upgrade office space on 3/f. work includes breakroom, restroom expansion, refurbishing, open and private offices, scope of work also includes training room. no increase in square footage, no change in use. n/a ordinance #155-13 | $822,000 |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 22 04th St | Dpr Construction | soft demolition of 3/f & 10/f, ab-17 compliant. n/a ordinance #155-13Details
soft demolition of 3/f & 10/f, ab-17 compliant. n/a ordinance #155-13 | $80,000 |
| Jan 12, 2015 | Never finaled issued Jul 2015, no final | 12 04th St | Centric Construction Inc | revision to bpa#2013-1108-1545, remove proposed guestrooms and new lightcourt from scope of work.Details
revision to bpa#2013-1108-1545, remove proposed guestrooms and new lightcourt from scope of work. | |
| Jan 12, 2015 | Never finaled issued Apr 2015, no final | 12 04th St | Double E D Construction Inc | conversion of a storage room to ada compliant unisex restroom on levels 6-9. n/a maher ordinance # 155-13Details
conversion of a storage room to ada compliant unisex restroom on levels 6-9. n/a maher ordinance # 155-13 | $54,000 |
| Nov 20, 2014 | Completed final sign-off Feb 2015 | 12 04th St | Johnson Controls Fire | guest room #730a renovation- 1 smoke alarm, 1 monitor module, 1 speaker/strobe, 1 strobe, t.i. pa#201311081545. n/a ordinance -13Details
guest room #730a renovation- 1 smoke alarm, 1 monitor module, 1 speaker/strobe, 1 strobe, t.i. pa#201311081545. n/a ordinance -13 | $3,500 |
| Sep 30, 2014 | Completed final sign-off Dec 2014 | 22 04th St | Johnson Controls Fire | 14,15,16 floors roof deck. voluntary addition of 3 new exterior speaker/strobes. n/a for the maher ordinance #155-13Details
14,15,16 floors roof deck. voluntary addition of 3 new exterior speaker/strobes. n/a for the maher ordinance #155-13 | $3,800 |
| Aug 21, 2014 | Never finaled issued Aug 2014, no final | 12 04th St | Johnson Controls Fire | 6-9 floors:voluntary synchronization of strobe circuits. provide and install 8 new syc control modules. no t.i. n/a for the maher ordinance #155-13Details
6-9 floors:voluntary synchronization of strobe circuits. provide and install 8 new syc control modules. no t.i. n/a for the maher ordinance #155-13 | $5,600 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 22 04th St | Johnson Controls Fire | addition of 1 speaker/strobe to 9th fl exterior balcony. n/a ordinance #155-13.Details
addition of 1 speaker/strobe to 9th fl exterior balcony. n/a ordinance #155-13. | $2,500 |
| Jun 13, 2014 | Expired or cancelled cancelled Jan 2026 | 22 04th St | Plant Construction Company Lp | rev. to pa#201404032342 power assist doors in lieu of raising deck level on 14, 15, 16 floors. n/a ordinance #155-13Details
rev. to pa#201404032342 power assist doors in lieu of raising deck level on 14, 15, 16 floors. n/a ordinance #155-13 | $10,000 |
| May 22, 2014 | Never finaled issued May 2014, no final | 12 04th St | Aaa Restaurant Fire Control/Dba Aaa Fire | to furnish and install (1) one ansul r-102 fire suppression system in the main kitchen area on the 5/f. n/a ordinance #155-13Details
to furnish and install (1) one ansul r-102 fire suppression system in the main kitchen area on the 5/f. n/a ordinance #155-13 | $2,000 |
| May 13, 2014 | Completed final sign-off Oct 2015 | 22 04th St | Gci, Inc | upgrade to buildings mep central system, replace existing cooling towers and chillers. add new exhaust fan to chiller rooms.Details
upgrade to buildings mep central system, replace existing cooling towers and chillers. add new exhaust fan to chiller rooms. | $2,350,000 |
| May 2, 2014 | Never finaled issued May 2014, no final | 22 04th St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 22 04th St | evacuation map for lobby, g1, and g2; compliance with ord 155-13 not requiredDetails
evacuation map for lobby, g1, and g2; compliance with ord 155-13 not required | $5,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.