Steven Rossi
- License
- C18176
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Steven Rossi Architecture
- Based in
- San Diego
- On San Francisco permits
- May 2018 to Mar 2025
10 permits since 2000 (architect on 10 permits): 10 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Construction Inc (5), Trainor Commercial Construction Inc. (2), R S M 2 Contractors Inc
- Engineers
- Mark D. Robison (2), Mark Robison (2), Sean Galbreath
- Authorized agents
- Vince Wright
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2025 | Completed final sign-off Apr 2025 | 8 Mission St | Trainor Commercial Construction Inc. | revision 202408148686- admin permit to remove 6th floor from scope of work and add 7th floor. new scope of work should be add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 7,8.Details
revision 202408148686- admin permit to remove 6th floor from scope of work and add 7th floor. new scope of work should be add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 7,8. | |
| Aug 14, 2024 | Completed final sign-off Apr 2025 | 8 Mission St | Trainor Commercial Construction Inc. | add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 6,8.Details
add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 6,8. | $40,000 |
| Aug 14, 2024 | Completed final sign-off Jun 2025 | 495 Jefferson St | R S M 2 Contractors Inc | int. ti of hotel guestrooms - remove (e) light fixture above vanity and reuse j box to install new lit mirror (approx. 252); remove (1) non-accessible tub/shower, replace with accessible tub/shower; remove and replace in 12 non access. showers wall tiles, valve, shower head, and shower enclosure.Details
int. ti of hotel guestrooms - remove (e) light fixture above vanity and reuse j box to install new lit mirror (approx. 252); remove (1) non-accessible tub/shower, replace with accessible tub/shower; remove and replace in 12 non access. showers wall tiles, valve, shower head, and shower enclosure. | $70,500 |
| Jun 17, 2021 | Completed final sign-off May 2022 | 8 Mission St | Centric Construction Inc | interior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes.Details
interior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes. | $380,000 |
| Mar 24, 2021 | Completed final sign-off May 2022 | 8 Mission St | ti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes.Details
ti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes. | $475,000 | |
| Mar 28, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Centric Construction Inc | interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixtureDetails
interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixture | $65,000 |
| Feb 19, 2019 | Completed final sign-off Jan 2021 | 450 Powell St | Centric Construction Inc | 21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes.Details
21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes. | $950,000 |
| Feb 19, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Centric Construction Inc | electrical and plumbing reconfiguration to seven hotel guest rooms. electr and mech for pa 201901150362Details
electrical and plumbing reconfiguration to seven hotel guest rooms. electr and mech for pa 201901150362 | $120,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2020 | 12 04th St | Centric Construction Inc | interior renovation (ti) to existing hotel guest room. demo, new non bearing walls, gyp board. minor exectrical and plumbing work. work on 5th, 6th, 7th, 8th,and 9th floor. rooms: 502/605/705/802/805/902/905. maher n/a.Details
interior renovation (ti) to existing hotel guest room. demo, new non bearing walls, gyp board. minor exectrical and plumbing work. work on 5th, 6th, 7th, 8th,and 9th floor. rooms: 502/605/705/802/805/902/905. maher n/a. | $197,952 |
| May 8, 2018 | Completed final sign-off Jul 2022 | 8 Mission St | floors 2-8: ti of 200 guestrooms. work includes new finishes, 6 (e) ada rooms to be brought up to code, 2 typical guestrooms to become ada rooms, 14 (e) rooms to be altered to meet communication complaince. tubs to be converted to showers, new wall sconces, switches become vacancy sensors. maher naDetails
floors 2-8: ti of 200 guestrooms. work includes new finishes, 6 (e) ada rooms to be brought up to code, 2 typical guestrooms to become ada rooms, 14 (e) rooms to be altered to meet communication complaince. tubs to be converted to showers, new wall sconces, switches become vacancy sensors. maher na | $850,000 |