Permit GraphShortlistSan Francisco building permits since 2000

Steven Rossi

License
C18176
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Steven Rossi Architecture
Based in
San Diego
On San Francisco permits
May 2018 to Mar 2025

10 permits since 2000 (architect on 10 permits): 10 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Centric Construction Inc (5), Trainor Commercial Construction Inc. (2), R S M 2 Contractors Inc
Engineers
Mark D. Robison (2), Mark Robison (2), Sean Galbreath
Authorized agents
Vince Wright

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 20, 2025Completed
final sign-off Apr 2025
8 Mission StTrainor Commercial Construction Inc.revision 202408148686- admin permit to remove 6th floor from scope of work and add 7th floor. new scope of work should be add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 7,8.
Details
Permit
202503202673
Permit issued
Mar 20, 2025
Final sign-off
Apr 18, 2025

revision 202408148686- admin permit to remove 6th floor from scope of work and add 7th floor. new scope of work should be add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 7,8.

Open the permit page

Aug 14, 2024Completed
final sign-off Apr 2025
8 Mission StTrainor Commercial Construction Inc.add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 6,8.
Details
Permit
202408148686
Permit issued
Feb 20, 2025
Final sign-off
Apr 18, 2025

add 4 new connecting doors to 8 existing hotel guest rooms. metal framing, drywall, door install. 2 rooms on each floor: 3,4, 6,8.

Open the permit page

$40,000
Aug 14, 2024Completed
final sign-off Jun 2025
495 Jefferson StR S M 2 Contractors Incint. ti of hotel guestrooms - remove (e) light fixture above vanity and reuse j box to install new lit mirror (approx. 252); remove (1) non-accessible tub/shower, replace with accessible tub/shower; remove and replace in 12 non access. showers wall tiles, valve, shower head, and shower enclosure.
Details
Permit
202408148619
Permit issued
Oct 23, 2024
Final sign-off
Jun 6, 2025

int. ti of hotel guestrooms - remove (e) light fixture above vanity and reuse j box to install new lit mirror (approx. 252); remove (1) non-accessible tub/shower, replace with accessible tub/shower; remove and replace in 12 non access. showers wall tiles, valve, shower head, and shower enclosure.

Open the permit page

$70,500
Jun 17, 2021Completed
final sign-off May 2022
8 Mission StCentric Construction Incinterior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes.
Details
Permit
202106172664
Permit issued
Jun 25, 2021
Final sign-off
May 27, 2022

interior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes.

Open the permit page

$380,000
Mar 24, 2021Completed
final sign-off May 2022
8 Mission Stti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes.
Details
Permit
202103247172
Permit issued
Jun 14, 2021
Final sign-off
May 27, 2022

ti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes.

Open the permit page

$475,000
Mar 28, 2019Completed
final sign-off Nov 2020
12 04th StCentric Construction Incinterior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixture
Details
Permit
201903286542
Permit issued
Apr 4, 2019
Final sign-off
Nov 12, 2020

interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixture

Open the permit page

$65,000
Feb 19, 2019Completed
final sign-off Jan 2021
450 Powell StCentric Construction Inc21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes.
Details
Permit
201902193179
Permit issued
May 13, 2019
Final sign-off
Jan 21, 2021

21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes.

Open the permit page

$950,000
Feb 19, 2019Completed
final sign-off Nov 2020
12 04th StCentric Construction Incelectrical and plumbing reconfiguration to seven hotel guest rooms. electr and mech for pa 201901150362
Details
Permit
201902193178
Permit issued
Mar 18, 2019
Final sign-off
Nov 12, 2020

electrical and plumbing reconfiguration to seven hotel guest rooms. electr and mech for pa 201901150362

Open the permit page

$120,000
Jan 15, 2019Completed
final sign-off Nov 2020
12 04th StCentric Construction Incinterior renovation (ti) to existing hotel guest room. demo, new non bearing walls, gyp board. minor exectrical and plumbing work. work on 5th, 6th, 7th, 8th,and 9th floor. rooms: 502/605/705/802/805/902/905. maher n/a.
Details
Permit
201901150362
Permit issued
Mar 18, 2019
Final sign-off
Nov 12, 2020

interior renovation (ti) to existing hotel guest room. demo, new non bearing walls, gyp board. minor exectrical and plumbing work. work on 5th, 6th, 7th, 8th,and 9th floor. rooms: 502/605/705/802/805/902/905. maher n/a.

Open the permit page

$197,952
May 8, 2018Completed
final sign-off Jul 2022
8 Mission Stfloors 2-8: ti of 200 guestrooms. work includes new finishes, 6 (e) ada rooms to be brought up to code, 2 typical guestrooms to become ada rooms, 14 (e) rooms to be altered to meet communication complaince. tubs to be converted to showers, new wall sconces, switches become vacancy sensors. maher na
Details
Permit
201805088493
Permit issued
Jul 14, 2021
Final sign-off
Jul 5, 2022

floors 2-8: ti of 200 guestrooms. work includes new finishes, 6 (e) ada rooms to be brought up to code, 2 typical guestrooms to become ada rooms, 14 (e) rooms to be altered to meet communication complaince. tubs to be converted to showers, new wall sconces, switches become vacancy sensors. maher na

Open the permit page

$850,000