Kevin Russell

License
822465
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Centric Construction Inc
Based in
Brisbane
On San Francisco permits
Mar 2007 to Oct 2026

313 permits since 2000 (contractor on 313 permits, authorized agent-others on 1 permit): 237 completed, 6 in progress, 58 never finaled, 12 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

Showing the 100 most recent of 313.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 1, 2026In progress
filed Oct 2026, not yet issued
600 Stockton StCentric Construction Increvision to bpa#202606183514, minor interior remodel of existing retail shop(562 sf) on 4th floor(entry level). includes new beam supporting nanowall assembly. no exterior work.
Details
Permit
202610018883
Status
filed
Filed
Oct 1, 2026
Declared cost
$5,000
Address
600 Stockton St

revision to bpa#202606183514, minor interior remodel of existing retail shop(562 sf) on 4th floor(entry level). includes new beam supporting nanowall assembly. no exterior work.

Open the permit page

$5,000
Aug 11, 2026Completed
final sign-off Aug 2026
555 Post StCentric Construction Increvision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit.
Details
Permit
202608116392
Status
complete
Filed
Aug 11, 2026
Permit issued
Aug 18, 2026
Final sign-off
Aug 20, 2026
Declared cost
$7,000
Address
555 Post St

revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit.

Open the permit page

$7,000
Jun 18, 2026In progress
issued Jul 2026
600 Stockton StCentric Construction Incminor interior remodel of existing retail shop. inlcudes plumbing, hvac, and electrical. no exterior work.
Details
Permit
202606183514
Status
issued
Filed
Jun 18, 2026
Permit issued
Jul 9, 2026
Declared cost
$145,000
Address
600 Stockton St

minor interior remodel of existing retail shop. inlcudes plumbing, hvac, and electrical. no exterior work.

Open the permit page

$145,000
Jun 17, 2026Completed
final sign-off Sep 2026
181 03rd StCentric Construction Incupgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811.
Details
Permit
202606173399
Status
complete
Filed
Jun 17, 2026
Permit issued
Jul 2, 2026
Final sign-off
Sep 11, 2026
Declared cost
$145,000
Address
181 03rd St

upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811.

Open the permit page

$145,000
Jun 11, 2026In progress
issued Jun 2026
3150 Pacific AvCentric Construction Inc3rd floor: replace existing solarium style shower, in kind. waterproofing, repair to deck and roof areas and 2nd floor ceiling due to leaks.
Details
Permit
202606113060
Status
issued
Filed
Jun 11, 2026
Permit issued
Jun 17, 2026
Declared cost
$30,000
Address
3150 Pacific Av

3rd floor: replace existing solarium style shower, in kind. waterproofing, repair to deck and roof areas and 2nd floor ceiling due to leaks.

Open the permit page

$30,000
May 20, 2026In progress
issued Jul 2026
500 Sansome StCentric Construction Inc6/f suite 600 - t.i buildout of an (e) office space. scope include new open office space, enclosed office space, employeee kitchenette and storage. new office space will utilize (e) men's and women's restrooms on 6/f.
Details
Permit
202605201632
Status
issued
Filed
May 20, 2026
Permit issued
Jul 9, 2026
Declared cost
$1,300,000
Address
500 Sansome St

6/f suite 600 - t.i buildout of an (e) office space. scope include new open office space, enclosed office space, employeee kitchenette and storage. new office space will utilize (e) men's and women's restrooms on 6/f.

Open the permit page

$1,300,000
Apr 2, 2026Completed
final sign-off Sep 2026
600 Stockton StCentric Construction Incminor interior remodel of (e) lobby lounge/bar (1227 sf) on 4th floor (entry level). includes plumbing and electrical. no exterior work.
Details
Permit
202604028752
Status
complete
Filed
Apr 2, 2026
Permit issued
Jul 2, 2026
Final sign-off
Sep 14, 2026
Declared cost
$470,000
Address
600 Stockton St

minor interior remodel of (e) lobby lounge/bar (1227 sf) on 4th floor (entry level). includes plumbing and electrical. no exterior work.

Open the permit page

$470,000
Mar 3, 2026Completed
final sign-off Sep 2026
181 03rd StCentric Construction Inclobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipment
Details
Permit
202603036811
Status
complete
Filed
Mar 3, 2026
Permit issued
Mar 26, 2026
Final sign-off
Sep 11, 2026
Declared cost
$785,000
Address
181 03rd St

lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipment

Open the permit page

$785,000
Oct 6, 2025In progress
issued Dec 2025
335 Powell StCentric Construction Increvision 202301230600- revised electrical alterations
Details
Permit
202509155261
Status
issued
Filed
Oct 6, 2025
Permit issued
Dec 8, 2025
Address
335 Powell St

revision 202301230600- revised electrical alterations

Open the permit page

Sep 19, 2025Completed
final sign-off Mar 2026
550 07th StCentric Construction Inc2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street.
Details
Permit
202509195770
Status
complete
Filed
Sep 19, 2025
Permit issued
Dec 9, 2025
Final sign-off
Mar 26, 2026
Declared cost
$1,744,000
Address
550 07th St

2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street.

Open the permit page

$1,744,000
Aug 27, 2025Completed
final sign-off Nov 2025
550 07th StCentric Construction Inctenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed.
Details
Permit
202508273981
Status
complete
Filed
Aug 27, 2025
Permit issued
Sep 9, 2025
Final sign-off
Nov 17, 2025
Declared cost
$325,000
Address
550 07th St

tenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed.

Open the permit page

$325,000
May 30, 2025Completed
final sign-off Dec 2025
500 Sansome StCentric Construction Inc1st floor: deferred structural for pa #202503263112
Details
Permit
202505307587
Status
complete
Filed
May 30, 2025
Permit issued
Jul 23, 2025
Final sign-off
Dec 10, 2025
Address
500 Sansome St

1st floor: deferred structural for pa #202503263112

Open the permit page

May 8, 2025In progress
issued Aug 2025
335 Powell StCentric Construction Incadminstrative review for assembly and occuapancy permit number 202306150178. restaurant pdr bar
Details
Permit
202505086098
Status
issued
Filed
May 8, 2025
Permit issued
Aug 20, 2025
Address
335 Powell St

adminstrative review for assembly and occuapancy permit number 202306150178. restaurant pdr bar

Open the permit page

Mar 26, 2025Completed
final sign-off Dec 2025
500 Sansome StCentric Construction Inc1/fl and mezzanine- ti including dmeo and construction of non structual partitions ceilings, finishes and ffe. (n) restrooms and breakroom. deferred mep
Details
Permit
202503263112
Status
complete
Filed
Mar 26, 2025
Permit issued
May 27, 2025
Final sign-off
Dec 10, 2025
Declared cost
$4,360,000
Address
500 Sansome St

1/fl and mezzanine- ti including dmeo and construction of non structual partitions ceilings, finishes and ffe. (n) restrooms and breakroom. deferred mep

Open the permit page

$4,360,000
Apr 29, 2024Completed
final sign-off Jun 2024
1 Kearny StCentric Construction Increvision to pa# 202209122232 and 202304055128: changes include - remove scope of work at 1902 building (710 market) and roof. remove chipped paint and repaint at select areas. add crack injection details. update cover sheet notes.
Details
Permit
202404291007
Status
complete
Filed
Apr 29, 2024
Permit issued
Jun 14, 2024
Final sign-off
Jun 20, 2024
Address
1 Kearny St

revision to pa# 202209122232 and 202304055128: changes include - remove scope of work at 1902 building (710 market) and roof. remove chipped paint and repaint at select areas. add crack injection details. update cover sheet notes.

Open the permit page

Mar 15, 2024Completed
final sign-off Apr 2025
335 Powell StCentric Construction Incaddition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387
Details
Permit
202403157987
Status
complete
Filed
Mar 15, 2024
Permit issued
Oct 22, 2024
Final sign-off
Apr 14, 2025
Declared cost
$20,000
Address
335 Powell St

addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387

Open the permit page

$20,000
Mar 5, 2024Completed
final sign-off May 2024
333 Battery StCentric Construction Incref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurant
Details
Permit
202403057096
Status
complete
Filed
Mar 5, 2024
Permit issued
Mar 21, 2024
Final sign-off
May 20, 2024
Address
333 Battery St

ref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurant

Open the permit page

Nov 17, 2023Completed
final sign-off Dec 2023
333 Battery StCentric Construction Increvision pa # 202212138174: revision to mechanical title 24 forms.
Details
Permit
202311171035
Status
complete
Filed
Nov 17, 2023
Permit issued
Nov 28, 2023
Final sign-off
Dec 14, 2023
Address
333 Battery St

revision pa # 202212138174: revision to mechanical title 24 forms.

Open the permit page

Oct 10, 2023Completed
final sign-off Aug 2024
335 Powell StCentric Construction Increvision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space.
Details
Permit
202310108313
Status
complete
Filed
Oct 10, 2023
Permit issued
Jan 16, 2024
Final sign-off
Aug 2, 2024
Address
335 Powell St

revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space.

Open the permit page

Sep 14, 2023Completed
final sign-off May 2024
333 Battery StCentric Construction Increvision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings.
Details
Permit
202309146603
Status
complete
Filed
Sep 14, 2023
Permit issued
Dec 4, 2023
Final sign-off
May 20, 2024
Address
333 Battery St

revision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings.

Open the permit page

Jul 14, 2023Completed
final sign-off Sep 2024
335 Powell StCentric Construction Increnovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain.
Details
Permit
202307142193
Status
complete
Filed
Jul 14, 2023
Permit issued
Sep 21, 2023
Final sign-off
Sep 5, 2024
Declared cost
$202,500
Address
335 Powell St

renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain.

Open the permit page

$202,500
Jun 26, 2023Completed
final sign-off Dec 2023
333 Battery StCentric Construction Incstructural shop drawings and calculations for new 3/f outdoor trellis. (design previously approved under permit 202212138174)
Details
Permit
202306260883
Status
complete
Filed
Jun 26, 2023
Permit issued
Aug 30, 2023
Final sign-off
Dec 14, 2023
Declared cost
$50,000
Address
333 Battery St

structural shop drawings and calculations for new 3/f outdoor trellis. (design previously approved under permit 202212138174)

Open the permit page

$50,000
Jun 23, 2023Completed
final sign-off May 2024
333 Battery StCentric Construction Incnew mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872
Details
Permit
202306230780
Status
complete
Filed
Jun 23, 2023
Permit issued
Nov 9, 2023
Final sign-off
May 20, 2024
Declared cost
$250,000
Address
333 Battery St

new mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872

Open the permit page

$250,000
Jun 15, 2023Completed
final sign-off Sep 2024
335 Powell StCentric Construction Increnovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.
Details
Permit
202306150178
Status
complete
Filed
Jun 15, 2023
Permit issued
Sep 29, 2023
Final sign-off
Sep 18, 2024
Declared cost
$527,000
Address
335 Powell St

renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.

Open the permit page

$527,000
Jun 9, 2023Completed
final sign-off Aug 2026
555 Post StCentric Construction Increplacement of (4) rain gutters & rainwater leaders on north & south elevation of (e) penthouse. addition of coping at the east & west perimeter parapets of building. no work on post st facade
Details
Permit
202306099668
Status
complete
Filed
Jun 9, 2023
Permit issued
Apr 23, 2026
Final sign-off
Aug 20, 2026
Declared cost
$4,000
Address
555 Post St

replacement of (4) rain gutters & rainwater leaders on north & south elevation of (e) penthouse. addition of coping at the east & west perimeter parapets of building. no work on post st facade

Open the permit page

$4,000
Jun 6, 2023Completed
final sign-off Apr 2024
333 Battery StCentric Construction Incbasement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting
Details
Permit
202306069335
Status
complete
Filed
Jun 6, 2023
Permit issued
Aug 22, 2023
Final sign-off
Apr 3, 2024
Declared cost
$20,000
Address
333 Battery St

basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting

Open the permit page

$20,000
May 30, 2023Completed
final sign-off Mar 2024
555 North Point StCentric Construction Incinterior alterations prefunction finishes, lighting, ff&e, ada compliance, door hardware. meeting spaces, finishes, lighting ff+e, public restrooms, layouts to comply with current ada code compliance
Details
Permit
202305308829
Status
complete
Filed
May 30, 2023
Permit issued
Oct 31, 2023
Final sign-off
Mar 2, 2024
Declared cost
$700,000
Address
555 North Point St

interior alterations prefunction finishes, lighting, ff&e, ada compliance, door hardware. meeting spaces, finishes, lighting ff+e, public restrooms, layouts to comply with current ada code compliance

Open the permit page

$700,000
May 23, 2023Completed
final sign-off Sep 2024
335 Powell StCentric Construction Increnovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep
Details
Permit
202305238377
Status
complete
Filed
May 23, 2023
Permit issued
Sep 21, 2023
Final sign-off
Sep 18, 2024
Declared cost
$148,850
Address
335 Powell St

renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep

Open the permit page

$148,850
May 12, 2023Completed
final sign-off Jun 2025
335 Powell StCentric Construction Incproposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittal
Details
Permit
202305127657
Status
complete
Filed
May 12, 2023
Permit issued
Jun 21, 2024
Final sign-off
Jun 5, 2025
Declared cost
$225,000
Address
335 Powell St

proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittal

Open the permit page

$225,000
May 5, 2023Completed
final sign-off Jul 2026
545 Post StCentric Construction Increplace (90) windows along post street facade
Details
Permit
202305057247
Status
complete
Filed
May 5, 2023
Permit issued
Apr 23, 2026
Final sign-off
Jul 31, 2026
Declared cost
$95,000
Address
545 Post St

replace (90) windows along post street facade

Open the permit page

$95,000
May 5, 2023Completed
final sign-off Aug 2026
555 Post StCentric Construction Increplace (44) windows along post street facade
Details
Permit
202305057166
Status
complete
Filed
May 5, 2023
Permit issued
Apr 23, 2026
Final sign-off
Aug 20, 2026
Declared cost
$50,000
Address
555 Post St

replace (44) windows along post street facade

Open the permit page

$50,000
May 5, 2023Completed
final sign-off Sep 2024
335 Powell StCentric Construction Increplace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permit
Details
Permit
202305057233
Status
complete
Filed
May 5, 2023
Permit issued
Sep 21, 2023
Final sign-off
Sep 18, 2024
Declared cost
$40,000
Address
335 Powell St

replace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permit

Open the permit page

$40,000
May 2, 2023Completed
final sign-off May 2024
333 Battery StCentric Construction Incbasement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.
Details
Permit
202305026872
Status
complete
Filed
May 2, 2023
Permit issued
Aug 28, 2023
Final sign-off
May 20, 2024
Declared cost
$1,000,000
Address
333 Battery St

basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.

Open the permit page

$1,000,000
May 1, 2023Expired or cancelled
cancelled Oct 2024
335 Powell StCentric Construction Inclobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms.
Details
Permit
202305016786
Status
cancelled
Filed
May 1, 2023
Permit issued
Sep 29, 2023
Declared cost
$128,000
Address
335 Powell St

lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms.

Open the permit page

$128,000
Apr 5, 2023Completed
final sign-off Jun 2024
1 Kearny StCentric Construction Increvision to pa# 202209122232, add dbi special inspection form for permit, for record keeping purposes only.
Details
Permit
202304055128
Status
complete
Filed
Apr 5, 2023
Permit issued
Apr 6, 2023
Final sign-off
Jun 20, 2024
Address
1 Kearny St

revision to pa# 202209122232, add dbi special inspection form for permit, for record keeping purposes only.

Open the permit page

Mar 29, 2023Completed
final sign-off Jun 2023
1 Kearny StCentric Construction Inc1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of work
Details
Permit
202303294596
Status
complete
Filed
Mar 29, 2023
Permit issued
May 11, 2023
Final sign-off
Jun 28, 2023
Address
1 Kearny St

1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of work

Open the permit page

Jan 30, 2023Never finaled
issued Mar 2023, no final
450 Powell StCentric Construction Increvision to pa# 202206226855 for record keeping purposes only, sffd only permit: plan revised for assembly stamp.
Details
Permit
202301301022
Status
issued
Filed
Jan 30, 2023
Permit issued
Mar 8, 2023
Address
450 Powell St

revision to pa# 202206226855 for record keeping purposes only, sffd only permit: plan revised for assembly stamp.

Open the permit page

Jan 23, 2023Completed
final sign-off Apr 2026
335 Powell StCentric Construction Increplacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level.
Details
Permit
202301230600
Status
complete
Filed
Jan 23, 2023
Permit issued
Jun 10, 2024
Final sign-off
Apr 22, 2026
Declared cost
$375,000
Address
335 Powell St

replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level.

Open the permit page

$375,000
Jan 6, 2023Completed
final sign-off Mar 2026
1940 BroadwayCentric Construction Increvision to bpa#202110221029 to unit #4: omission of floor opening @ showers, concrete wall openings @ north wall of dining room, fake fireplace in study, addition of repair details for unseen conditions
Details
Permit
202301069781
Status
complete
Filed
Jan 6, 2023
Permit issued
Jan 23, 2023
Final sign-off
Mar 23, 2026
Address
1940 Broadway

revision to bpa#202110221029 to unit #4: omission of floor opening @ showers, concrete wall openings @ north wall of dining room, fake fireplace in study, addition of repair details for unseen conditions

Open the permit page

Dec 13, 2022Completed
final sign-off Dec 2023
333 Battery StCentric Construction Incthe project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis.
Details
Permit
202212138174
Status
complete
Filed
Dec 13, 2022
Permit issued
Feb 23, 2023
Final sign-off
Dec 14, 2023
Declared cost
$1,775,000
Address
333 Battery St

the project scope include: level 3. renovation of (e) public restrooms, renovation of (e) restaurant and bar, (n) reception louge and coffee bar. renovation of (e) outdoor patio with (n) outdoor bar, concrete planter, trellis.

Open the permit page

$1,775,000
Oct 31, 2022Completed
final sign-off Oct 2023
450 Powell StCentric Construction Increvision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen.
Details
Permit
202210315581
Status
complete
Filed
Oct 31, 2022
Permit issued
Nov 28, 2022
Final sign-off
Oct 27, 2023
Declared cost
$10,000
Address
450 Powell St

revision to pa# 202108186642. 2nd fl: add beer coolet into scope. add equipment in warming kitchen.

Open the permit page

$10,000
Oct 14, 2022Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Increvision 201804136335 s3 to document the revised area with the mechanical room at roof level
Details
Permit
202210144426
Status
complete
Filed
Oct 14, 2022
Permit issued
Nov 17, 2022
Final sign-off
May 16, 2023
Address
145 Leavenworth St

revision 201804136335 s3 to document the revised area with the mechanical room at roof level

Open the permit page

Sep 12, 2022Completed
final sign-off Jun 2024
1 Kearny StCentric Construction Increpair facade. works includes remove and replace seals, remove and replace waterproofing membrane. e copper slope roof repair seal open joints and seams, replace fasteners. solder open seams
Details
Permit
202209122232
Status
complete
Filed
Sep 12, 2022
Permit issued
Sep 19, 2022
Final sign-off
Jun 20, 2024
Declared cost
$10,000
Address
1 Kearny St

repair facade. works includes remove and replace seals, remove and replace waterproofing membrane. e copper slope roof repair seal open joints and seams, replace fasteners. solder open seams

Open the permit page

$10,000
Aug 26, 2022Completed
final sign-off Jun 2023
1 Kearny StCentric Construction Inc1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit.
Details
Permit
202208261400
Status
complete
Filed
Aug 26, 2022
Permit issued
Dec 22, 2022
Final sign-off
Jun 28, 2023
Declared cost
$65,000
Address
1 Kearny St

1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit.

Open the permit page

$65,000
Aug 26, 2022Completed
final sign-off Dec 2023
333 Battery StCentric Construction Incbasement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a.
Details
Permit
202208261359
Status
complete
Filed
Aug 26, 2022
Permit issued
Nov 22, 2022
Final sign-off
Dec 14, 2023
Declared cost
$400,000
Address
333 Battery St

basement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a.

Open the permit page

$400,000
Aug 17, 2022Completed
final sign-off Dec 2023
333 Battery StCentric Construction Inclevel 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).
Details
Permit
202208170750
Status
complete
Filed
Aug 17, 2022
Permit issued
Dec 20, 2022
Final sign-off
Dec 14, 2023
Declared cost
$600,000
Address
333 Battery St

level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).

Open the permit page

$600,000
Jun 22, 2022Never finaled
issued Jun 2022, no final
450 Powell StCentric Construction Incfor record keeping purposes only. sffd only permit. obtain sffd assembly stamps for approved public space ti under pa 2021-0818-6642. sffd assembly stamps needed for sffd assembly operation permit
Details
Permit
202206226855
Status
issued
Filed
Jun 22, 2022
Permit issued
Jun 28, 2022
Address
450 Powell St

for record keeping purposes only. sffd only permit. obtain sffd assembly stamps for approved public space ti under pa 2021-0818-6642. sffd assembly stamps needed for sffd assembly operation permit

Open the permit page

Apr 5, 2022Completed
final sign-off Sep 2024
1 Kearny StCentric Construction Incthis submittal revised pa#202102164724. changes consist of revised location for new mechanical riser and associated ductwork, revised structural design to accomodate new riser location, and new ceilings.
Details
Permit
202204051589
Status
complete
Filed
Apr 5, 2022
Permit issued
Apr 27, 2022
Final sign-off
Sep 10, 2024
Address
1 Kearny St

this submittal revised pa#202102164724. changes consist of revised location for new mechanical riser and associated ductwork, revised structural design to accomodate new riser location, and new ceilings.

Open the permit page

Mar 31, 2022Completed
final sign-off Apr 2023
361 Turk StCentric Construction Increvision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
Details
Permit
202203311289
Status
complete
Filed
Mar 31, 2022
Permit issued
Apr 25, 2023
Final sign-off
Apr 26, 2023
Address
361 Turk St

revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.

Open the permit page

Mar 31, 2022Completed
final sign-off Apr 2023
145 Leavenworth StCentric Construction Increvision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
Details
Permit
202203311305
Status
complete
Filed
Mar 31, 2022
Permit issued
Apr 7, 2023
Final sign-off
Apr 24, 2023
Address
145 Leavenworth St

revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.

Open the permit page

Mar 18, 2022Completed
final sign-off Nov 2023
432 Powell StCentric Construction Inclower level demo interior finish & non-structural. former scala's bistro location. no ceiling demo is included in this permit. per ab-017a permit showing accessability will be submitted with t.i. permit.
Details
Permit
202203180332
Status
complete
Filed
Mar 18, 2022
Permit issued
Jun 2, 2022
Final sign-off
Nov 3, 2023
Declared cost
$20,000
Address
432 Powell St

lower level demo interior finish & non-structural. former scala's bistro location. no ceiling demo is included in this permit. per ab-017a permit showing accessability will be submitted with t.i. permit.

Open the permit page

$20,000
Mar 1, 2022Completed
final sign-off Nov 2023
450 Powell StCentric Construction Increvision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel.
Details
Permit
202203018943
Status
complete
Filed
Mar 1, 2022
Permit issued
Mar 30, 2022
Final sign-off
Nov 2, 2023
Address
450 Powell St

revision to pa 202108317502. changes include modifications to guestrooms and layout for a partial remodel of an existing 21 story 419 room, tourist hotel.

Open the permit page

Feb 8, 2022Never finaled
issued Apr 2023, no final
450 Powell StQuayle And Company, Centric Construction Incnon-structural partial remodel of exterior facade on powell/sutter st. remove awnings, gooseneck lights, scones & projecting cornices & small portion of damaged (e) street level exterior cladding. add (n) awnings, entrance lights, sconces, planters & replace (e) cladding finish w/ similar (n) finish
Details
Permit
202202087558
Status
issued
Filed
Feb 8, 2022
Permit issued
Apr 5, 2023
Declared cost
$50,000
Address
450 Powell St

non-structural partial remodel of exterior facade on powell/sutter st. remove awnings, gooseneck lights, scones & projecting cornices & small portion of damaged (e) street level exterior cladding. add (n) awnings, entrance lights, sconces, planters & replace (e) cladding finish w/ similar (n) finish

Open the permit page

$50,000
Feb 4, 2022Completed
final sign-off Aug 2022
450 Powell StCentric Construction Increv to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms.
Details
Permit
202202047401
Status
complete
Filed
Feb 4, 2022
Permit issued
Mar 9, 2022
Final sign-off
Aug 19, 2022
Address
450 Powell St

rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms.

Open the permit page

Sep 15, 2021Expired or cancelled
withdrawn Feb 2023
450 Powell StCentric Construction Inclevel 21 -interior remodel of existing space including enlarging an existing kitchen, renovating an existing bar, modifying mechanial, plumbing and electrical systems to accommodate kitchen/bar changes + lighting. new finishes and furniture.
Details
Permit
202109158493
Status
withdrawn
Filed
Sep 15, 2021
Declared cost
$300,000
Address
450 Powell St

level 21 -interior remodel of existing space including enlarging an existing kitchen, renovating an existing bar, modifying mechanial, plumbing and electrical systems to accommodate kitchen/bar changes + lighting. new finishes and furniture.

Open the permit page

$300,000
Sep 1, 2021Expired or cancelled
withdrawn Apr 2024
2345 03rd StCentric Construction Inct.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit
Details
Permit
202109017629
Status
withdrawn
Filed
Sep 1, 2021
Declared cost
$653,000
Address
2345 03rd St

t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit

Open the permit page

$653,000
Aug 31, 2021Completed
final sign-off Nov 2023
450 Powell StCentric Construction Incguestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room work
Details
Permit
202108317502
Status
complete
Filed
Aug 31, 2021
Permit issued
Dec 17, 2021
Final sign-off
Nov 2, 2023
Declared cost
$1,049,000
Address
450 Powell St

guestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room work

Open the permit page

$1,049,000
Aug 18, 2021Completed
final sign-off Oct 2023
450 Powell StCentric Construction Inclower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area...
Details
Permit
202108186642
Status
complete
Filed
Aug 18, 2021
Permit issued
May 2, 2022
Final sign-off
Oct 27, 2023
Declared cost
$2,000,000
Address
450 Powell St

lower lobby lvl: construction of meeting room space. lobby lvl: n lighting/elec outlets, finishes & furniture. mezz lvl: renovate (e) kitchen, convert meeting space to kitch area, n finishes in (e) lounge area, n bar canopy, millwork/equip, n lighting & elec outlets. 2/f: n equip in kitchen area...

Open the permit page

$2,000,000
Aug 11, 2021Completed
final sign-off Nov 2021
400 Winston DrCentric Construction Incracking plan details and structural cals for (n) racking. ref t.i. 201912190042
Details
Permit
202108116219
Status
complete
Filed
Aug 11, 2021
Permit issued
Oct 8, 2021
Final sign-off
Nov 22, 2021
Declared cost
$1,000
Address
400 Winston Dr

racking plan details and structural cals for (n) racking. ref t.i. 201912190042

Open the permit page

$1,000
Jul 23, 2021Never finaled
issued Aug 2021, no final
361 Turk StCentric Construction Increvision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwate
Details
Permit
202107234956
Status
issued
Filed
Jul 23, 2021
Permit issued
Aug 12, 2021
Address
361 Turk St

revision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwate

Open the permit page

Jul 14, 2021Completed
final sign-off Nov 2021
400 Winston DrCentric Construction Increv to pa201912190042: including egress & layout revisions.
Details
Permit
202107144366
Status
complete
Filed
Jul 14, 2021
Permit issued
Jul 26, 2021
Final sign-off
Nov 22, 2021
Address
400 Winston Dr

rev to pa201912190042: including egress & layout revisions.

Open the permit page

Jul 9, 2021Completed
final sign-off Aug 2022
450 Powell StCentric Construction Incinterior non structural demolition of interior partitions and bar area. remodel of extg office spaces and reception area to provide new accessible restrooms. documentation of extg accessibilty hardshi recently approved by sfdbi. minor misecellaneous corrections of accessibility deficiencies.
Details
Permit
202107094114
Status
complete
Filed
Jul 9, 2021
Permit issued
Aug 27, 2021
Final sign-off
Aug 17, 2022
Declared cost
$200,000
Address
450 Powell St

interior non structural demolition of interior partitions and bar area. remodel of extg office spaces and reception area to provide new accessible restrooms. documentation of extg accessibilty hardshi recently approved by sfdbi. minor misecellaneous corrections of accessibility deficiencies.

Open the permit page

$200,000
Jun 17, 2021Completed
final sign-off May 2022
8 Mission StCentric Construction Incinterior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes.
Details
Permit
202106172664
Status
complete
Filed
Jun 17, 2021
Permit issued
Jun 25, 2021
Final sign-off
May 27, 2022
Declared cost
$380,000
Address
8 Mission St

interior renovation (ti)to extg lounge and restaurant dining area at outdoor patio 1st floor. no change in use or occupancy. no new sq footage to include non structural. non bearing partiiton walls, new lighting outlets, now hanging plant shelf, new finishes.

Open the permit page

$380,000
Jun 1, 2021Never finaled
issued Jun 2021, no final
361 Turk StCentric Construction Incplumbing only: stormwater system permit for future construction of building at 361 turk street under pa# 201804136327.
Details
Permit
202106011408
Status
issued
Filed
Jun 1, 2021
Permit issued
Jun 9, 2021
Declared cost
$10,000
Address
361 Turk St

plumbing only: stormwater system permit for future construction of building at 361 turk street under pa# 201804136327.

Open the permit page

$10,000
May 12, 2021Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Incstormwater systempermit for future construction of building at 145 leavenworth under pa #201804136335-s
Details
Permit
202105120194
Status
complete
Filed
May 12, 2021
Permit issued
Jun 18, 2021
Final sign-off
May 16, 2023
Declared cost
$10,000
Address
145 Leavenworth St

stormwater systempermit for future construction of building at 145 leavenworth under pa #201804136335-s

Open the permit page

$10,000
Feb 16, 2021Completed
final sign-off Nov 2022
1 Kearny StCentric Construction Incwork includes (n) exhaust ductwork & equipment serving greast duct system. exterior modification are limited to (n) louvers in (e) wall at 2nd flr of recess in annex facade on geary st. all electrical & plumbing work will be design-build by the general contractor under a separate permit.
Details
Permit
202102164724
Status
complete
Filed
Feb 16, 2021
Permit issued
Dec 17, 2021
Final sign-off
Nov 7, 2022
Declared cost
$259,700
Address
1 Kearny St

work includes (n) exhaust ductwork & equipment serving greast duct system. exterior modification are limited to (n) louvers in (e) wall at 2nd flr of recess in annex facade on geary st. all electrical & plumbing work will be design-build by the general contractor under a separate permit.

Open the permit page

$259,700
Feb 10, 2021Never finaled
issued Feb 2021, no final
8 Mission StCentric Construction Incpatch wall where existing electrical outlet moved (1)
Details
Permit
202102104380
Status
issued
Filed
Feb 10, 2021
Permit issued
Feb 10, 2021
Declared cost
$1,500
Address
8 Mission St

patch wall where existing electrical outlet moved (1)

Open the permit page

$1,500
Feb 4, 2021Completed
final sign-off Jan 2024
500 Sansome StCentric Construction Incdemolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction.
Details
Permit
202102043991
Status
complete
Filed
Feb 4, 2021
Permit issued
May 4, 2021
Final sign-off
Jan 10, 2024
Declared cost
$30,000
Address
500 Sansome St

demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction.

Open the permit page

$30,000
Jan 27, 2021Never finaled
issued Jun 2021, no final
400 Winston DrCentric Construction Incinstall electrical & lighting, heating ventilating & air conditioning system to serve tenant improvement work under pa# 201912190042.
Details
Permit
202101273450
Status
issued
Filed
Jan 27, 2021
Permit issued
Jun 25, 2021
Declared cost
$500,000
Address
400 Winston Dr

install electrical & lighting, heating ventilating & air conditioning system to serve tenant improvement work under pa# 201912190042.

Open the permit page

$500,000
Dec 15, 2020Completed
final sign-off Dec 2024
340 Stockton StCentric Construction Increnovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work.
Details
Permit
202012151046
Status
complete
Filed
Dec 15, 2020
Permit issued
Jul 26, 2024
Final sign-off
Dec 11, 2024
Declared cost
$425,000
Address
340 Stockton St

renovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work.

Open the permit page

$425,000
Nov 20, 2020Completed
final sign-off Dec 2021
500 Sansome StCentric Construction Incdemo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1.
Details
Permit
202011209425
Status
complete
Filed
Nov 20, 2020
Permit issued
Feb 18, 2021
Final sign-off
Dec 9, 2021
Declared cost
$150,000
Address
500 Sansome St

demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1.

Open the permit page

$150,000
Oct 16, 2020Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Incmayor dir 17-02. revision to pa #201804136335s1, changes include: ground floor load map updated to arch plans, shift shear walls as needed. update elevator shaft dimensions.
Details
Permit
202010166616
Status
complete
Filed
Oct 16, 2020
Permit issued
Mar 31, 2022
Final sign-off
May 16, 2023
Address
145 Leavenworth St

mayor dir 17-02. revision to pa #201804136335s1, changes include: ground floor load map updated to arch plans, shift shear walls as needed. update elevator shaft dimensions.

Open the permit page

Sep 23, 2020Completed
final sign-off Feb 2023
145 Leavenworth StCentric Construction Incmayor dir# 17-02. rev to pa# 201804136335-s9. 46 ri columns were added in vicenity of tower crane. these ri's are shown in plan review on attached & also highlighted in ri column section. dimension of added "c" type ri's are same as "a" type ri's but they are on a 4' spacing instead of 8'spacing.
Details
Permit
202009234762
Status
complete
Filed
Sep 23, 2020
Permit issued
Nov 3, 2020
Final sign-off
Feb 1, 2023
Address
145 Leavenworth St

mayor dir# 17-02. rev to pa# 201804136335-s9. 46 ri columns were added in vicenity of tower crane. these ri's are shown in plan review on attached & also highlighted in ri column section. dimension of added "c" type ri's are same as "a" type ri's but they are on a 4' spacing instead of 8'spacing.

Open the permit page

Sep 14, 2020Completed
final sign-off Jun 2022
154 Lombard StCentric Construction Incinterior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations.
Details
Permit
202009144095
Status
complete
Filed
Sep 14, 2020
Permit issued
Oct 13, 2020
Final sign-off
Jun 7, 2022
Declared cost
$35,000
Address
154 Lombard St

interior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations.

Open the permit page

$35,000
Sep 10, 2020Completed
final sign-off Jun 2022
156 Lombard StCentric Construction Inccommon area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code.
Details
Permit
202009103837
Status
complete
Filed
Sep 10, 2020
Permit issued
Oct 22, 2020
Final sign-off
Jun 7, 2022
Declared cost
$35,000
Address
156 Lombard St

common area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code.

Open the permit page

$35,000
Aug 26, 2020Completed
final sign-off Apr 2023
361 Turk StCentric Construction Incmayor dir# 17-02. rev to pa# 201804136327-s2. level 2 re-designed to incorporated new skylight @ courtyard. minor updated to level a code formed steel stud framing; dimensions clarified & details cleaned up & vertical stiffeners removed from details 14 + 15/s4.64. no changes made to lateral system.
Details
Permit
202008262657
Status
complete
Filed
Aug 26, 2020
Permit issued
Dec 29, 2021
Final sign-off
Apr 26, 2023
Declared cost
$20,000
Address
361 Turk St

mayor dir# 17-02. rev to pa# 201804136327-s2. level 2 re-designed to incorporated new skylight @ courtyard. minor updated to level a code formed steel stud framing; dimensions clarified & details cleaned up & vertical stiffeners removed from details 14 + 15/s4.64. no changes made to lateral system.

Open the permit page

$20,000
Jul 15, 2020Completed
final sign-off Apr 2023
361 Turk StCentric Construction Incmayor dir# 17-02. revision to pa# 201804136327-s1. work includes changes to shear walls. location of steps & depressions. dimension cleanups for coordination purposes. ** maher: n/a **
Details
Permit
202007150181
Status
complete
Filed
Jul 15, 2020
Permit issued
Sep 12, 2020
Final sign-off
Apr 26, 2023
Address
361 Turk St

mayor dir# 17-02. revision to pa# 201804136327-s1. work includes changes to shear walls. location of steps & depressions. dimension cleanups for coordination purposes. ** maher: n/a **

Open the permit page

Feb 28, 2020Never finaled
issued Mar 2020, no final
500 Sansome StCentric Construction Incste. #402 - demo of (e) non-load bearing partitions, doors & lighting; construction of (n) non-load bearing partitions, doors, finishing & lighting.
Details
Permit
202002285671
Status
issued
Filed
Feb 28, 2020
Permit issued
Mar 16, 2020
Declared cost
$605,646
Address
500 Sansome St

ste. #402 - demo of (e) non-load bearing partitions, doors & lighting; construction of (n) non-load bearing partitions, doors, finishing & lighting.

Open the permit page

$605,646
Feb 7, 2020Completed
final sign-off Oct 2022
361 Turk StCentric Construction Increvision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditions
Details
Permit
202002073867
Status
complete
Filed
Feb 7, 2020
Permit issued
May 19, 2021
Final sign-off
Oct 27, 2022
Declared cost
$50,000
Address
361 Turk St

revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditions

Open the permit page

$50,000
Feb 3, 2020Completed
final sign-off May 2020
63 Jefferson StCentric Construction Inc, Yesco Signs Llcrevision to pa #2019-1218-9841: revsie glass spec and t24 to performance based analysis for increased u-factor. work on retail space only.
Details
Permit
202002033383
Status
complete
Filed
Feb 3, 2020
Permit issued
Feb 19, 2020
Final sign-off
May 21, 2020
Address
63 Jefferson St

revision to pa #2019-1218-9841: revsie glass spec and t24 to performance based analysis for increased u-factor. work on retail space only.

Open the permit page

Jan 9, 2020Completed
final sign-off Oct 2022
361 Turk StCentric Construction Inctower crane foundation and erect tower crane
Details
Permit
202001091556
Status
complete
Filed
Jan 9, 2020
Permit issued
Jan 16, 2020
Final sign-off
Oct 25, 2022
Declared cost
$50,000
Address
361 Turk St

tower crane foundation and erect tower crane

Open the permit page

$50,000
Dec 20, 2019Never finaled
issued Jan 2020, no final
2620 Buchanan StCentric Construction Increvision to pa# 2015-1009-9357: addition of a 60-minute fire rated parapet to an existing roof.
Details
Permit
201912200213
Status
issued
Filed
Dec 20, 2019
Permit issued
Jan 6, 2020
Declared cost
$2,000
Address
2620 Buchanan St

revision to pa# 2015-1009-9357: addition of a 60-minute fire rated parapet to an existing roof.

Open the permit page

$2,000
Dec 19, 2019Completed
final sign-off Nov 2021
400 Winston DrCentric Construction Incnew non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permit
Details
Permit
201912190042
Status
complete
Filed
Dec 19, 2019
Permit issued
Nov 30, 2020
Final sign-off
Nov 22, 2021
Declared cost
$1,000,000
Address
400 Winston Dr

new non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permit

Open the permit page

$1,000,000
Dec 18, 2019Completed
final sign-off Feb 2020
63 Jefferson StCentric Construction Incspace "l" tenant improvement of retail space of interior and storefront. new partitions, toilet room, fixtures, furnishings, finishes. work also includes modification to storefront
Details
Permit
201912189841
Status
complete
Filed
Dec 18, 2019
Permit issued
Jan 14, 2020
Final sign-off
Feb 26, 2020
Declared cost
$91,602
Address
63 Jefferson St

space "l" tenant improvement of retail space of interior and storefront. new partitions, toilet room, fixtures, furnishings, finishes. work also includes modification to storefront

Open the permit page

$91,602
Dec 13, 2019Never finaled
issued Feb 2021, no final
500 Sutter StCentric Construction Inccomply w/ sf accessible business entry program. this building is a compliance category 3. the sidewalk slope will be modified to eliminate the step and provide an accessible entrance. door and hardware will be upgraded
Details
Permit
201912139557
Status
issued
Filed
Dec 13, 2019
Permit issued
Feb 1, 2021
Declared cost
$15,000
Address
500 Sutter St

comply w/ sf accessible business entry program. this building is a compliance category 3. the sidewalk slope will be modified to eliminate the step and provide an accessible entrance. door and hardware will be upgraded

Open the permit page

$15,000
Oct 17, 2019Completed
final sign-off Nov 2019
250 Beach StCentric Construction Incinterior work only including modification of a few walls, the floor, patching & repair work to be completed as required. work to also include new power outlets/lighting
Details
Permit
201910174861
Status
complete
Filed
Oct 17, 2019
Permit issued
Oct 22, 2019
Final sign-off
Nov 27, 2019
Declared cost
$50,000
Address
250 Beach St

interior work only including modification of a few walls, the floor, patching & repair work to be completed as required. work to also include new power outlets/lighting

Open the permit page

$50,000
Aug 22, 2019Never finaled
issued Nov 2019, no final
1333 Columbus AvCentric Construction Incchange of use and occpancy from restauran/bar to merchantile with assembly space. tenant improvement for mercantile use. new interior walls and finishes. no exterior work. ref pa #201907115596 (for fire damage). maher na
Details
Permit
201908229518
Status
reinstated
Filed
Aug 22, 2019
Permit issued
Nov 22, 2019
Declared cost
$167,000
Address
1333 Columbus Av

change of use and occpancy from restauran/bar to merchantile with assembly space. tenant improvement for mercantile use. new interior walls and finishes. no exterior work. ref pa #201907115596 (for fire damage). maher na

Open the permit page

$167,000
Jul 26, 2019Never finaled
issued Aug 2019, no final
140 Mason StCentric Construction Incall floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a.
Details
Permit
201907267107
Status
issued
Filed
Jul 26, 2019
Permit issued
Aug 13, 2019
Declared cost
$20,000
Address
140 Mason St

all floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a.

Open the permit page

$20,000
Jul 11, 2019Never finaled
issued Aug 2019, no final
1333 Columbus AvCentric Construction Incfire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permit
Details
Permit
201907115596
Status
issued
Filed
Jul 11, 2019
Permit issued
Aug 27, 2019
Declared cost
$320,000
Address
1333 Columbus Av

fire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permit

Open the permit page

$320,000
Jul 8, 2019Completed
final sign-off Mar 2021
595 Clipper StCentric Construction Incas per planning confirmation of demo calculations only for 2018015629enf & 2019012759enf. revision to 201107079682, 201711073406, 201803093281, 201901241098, 201905312200.
Details
Permit
201907085312
Status
complete
Filed
Jul 8, 2019
Permit issued
Jul 18, 2019
Final sign-off
Mar 11, 2021
Address
595 Clipper St

as per planning confirmation of demo calculations only for 2018015629enf & 2019012759enf. revision to 201107079682, 201711073406, 201803093281, 201901241098, 201905312200.

Open the permit page

Jun 26, 2019Never finaled
issued Jun 2019, no final
2741 16th StCentric Construction Incevacuation sign maps
Details
Permit
201906264432
Status
issued
Filed
Jun 26, 2019
Permit issued
Jun 26, 2019
Address
2741 16th St

evacuation sign maps

Open the permit page

Jun 21, 2019Completed
final sign-off May 2021
1076 Howard StCentric Construction Increplacement in kind of 2 windows instead of repair and replacem
Details
Permit
201906214129
Status
complete
Filed
Jun 21, 2019
Permit issued
Jul 19, 2019
Final sign-off
May 27, 2021
Declared cost
$30,000
Address
1076 Howard St

replacement in kind of 2 windows instead of repair and replacem

Open the permit page

$30,000
May 31, 2019Expired or cancelled
withdrawn Apr 2023
145 Leavenworth StCentric Construction Incexcavation of (e) soil to sub-grade to prepare for (n) construction
Details
Permit
201905312192
Status
withdrawn
Filed
May 31, 2019
Declared cost
$250,500
Address
145 Leavenworth St

excavation of (e) soil to sub-grade to prepare for (n) construction

Open the permit page

$250,500
May 31, 2019Expired or cancelled
withdrawn Jul 2019
361 Turk StCentric Construction Incexcavation of (e) soil to allow for (n) building construction
Details
Permit
201905312190
Status
withdrawn
Filed
May 31, 2019
Declared cost
$300,000
Address
361 Turk St

excavation of (e) soil to allow for (n) building construction

Open the permit page

$300,000
May 9, 2019Completed
final sign-off Feb 2020
2741 16th StCentric Construction Increvision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all times
Details
Permit
201905090214
Status
complete
Filed
May 9, 2019
Permit issued
Jun 25, 2019
Final sign-off
Feb 11, 2020
Address
2741 16th St

revision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all times

Open the permit page

Apr 9, 2019Completed
final sign-off Mar 2020
2741 16th StCentric Construction Incunderground fire line ref pa 2019-0226-3812 (install new fire sprinkler system per nfpa 3 through-out existing building with new 4-inch fire service off of 8-inch main on 16th st per nfpa 24. install 271 sprinklers.)
Details
Permit
201904097448
Status
complete
Filed
Apr 9, 2019
Permit issued
Apr 9, 2019
Final sign-off
Mar 4, 2020
Declared cost
$30,000
Address
2741 16th St

underground fire line ref pa 2019-0226-3812 (install new fire sprinkler system per nfpa 3 through-out existing building with new 4-inch fire service off of 8-inch main on 16th st per nfpa 24. install 271 sprinklers.)

Open the permit page

$30,000
Apr 5, 2019Completed
final sign-off Feb 2020
2741 16th StCentric Construction Incelectrical, lighting & power & t-24 for pa #201810183533
Details
Permit
201904057301
Status
complete
Filed
Apr 5, 2019
Permit issued
Apr 8, 2019
Final sign-off
Feb 11, 2020
Declared cost
$350,000
Address
2741 16th St

electrical, lighting & power & t-24 for pa #201810183533

Open the permit page

$350,000
Apr 1, 2019Never finaled
issued Feb 2021, no final
529 Powell StCentric Construction Incbarrier removal modification of an a2 occup located on powell(&sutter) to comply with sf accessible bus entry prog 51-16. cat ii. the threshold will be adjusted for an accessible entrance & ele push button will be installed to allow access. to comply with abe ord 51-16
Details
Permit
201904016785
Status
issued
Filed
Apr 1, 2019
Permit issued
Feb 1, 2021
Declared cost
$15,000
Address
529 Powell St

barrier removal modification of an a2 occup located on powell(&sutter) to comply with sf accessible bus entry prog 51-16. cat ii. the threshold will be adjusted for an accessible entrance & ele push button will be installed to allow access. to comply with abe ord 51-16

Open the permit page

$15,000
Mar 28, 2019Completed
final sign-off Nov 2020
12 04th StCentric Construction Incinterior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixture
Details
Permit
201903286542
Status
complete
Filed
Mar 28, 2019
Permit issued
Apr 4, 2019
Final sign-off
Nov 12, 2020
Declared cost
$65,000
Address
12 04th St

interior to - remove (e) wood floor replace with new tile floor. remove and replace (2) decorative ceiling fixtures (same power location) remove and replace wall mounted lighting fixture

Open the permit page

$65,000
Mar 26, 2019Completed
final sign-off Apr 2019
562 Sutter StCentric Construction Increv to pa201809170423; remove of scope of levl 1 recessed entry. scope includes door j, door h and type a5 eterior wall. this scope under sep pa201811054938. this permit to satisy requ from dcp kelly wong.
Details
Permit
201903266257
Status
complete
Filed
Mar 26, 2019
Permit issued
Apr 4, 2019
Final sign-off
Apr 15, 2019
Address
562 Sutter St

rev to pa201809170423; remove of scope of levl 1 recessed entry. scope includes door j, door h and type a5 eterior wall. this scope under sep pa201811054938. this permit to satisy requ from dcp kelly wong.

Open the permit page