Permit GraphShortlistSan Francisco building permits since 2000

Block 0345, lot 002

145 Leavenworth St

City’s use
Commercial Misc
Built
2023
Stories
8
Units
96
Building
42,056 sq ft
Lot
6,873 sq ft
Zoning
C3G
Construction type
REI

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

15 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 14, 2022Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Increvision 201804136335 s3 to document the revised area with the mechanical room at roof level
Details
Permit
202210144426
Status
complete
Filed
Oct 14, 2022
Permit issued
Nov 17, 2022
Final sign-off
May 16, 2023
Address
145 Leavenworth St

revision 201804136335 s3 to document the revised area with the mechanical room at roof level

Open the permit page

Oct 7, 2022Completed
final sign-off Nov 2022
145 Leavenworth StIncom Mechanical Incas-built 90 degree underground added. revision to pa#202108065974.
Details
Permit
202210073996
Status
complete
Filed
Oct 7, 2022
Permit issued
Oct 20, 2022
Final sign-off
Nov 4, 2022
Address
145 Leavenworth St

as-built 90 degree underground added. revision to pa#202108065974.

Open the permit page

Mar 31, 2022Completed
final sign-off Apr 2023
145 Leavenworth StCentric Construction Increvision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.
Details
Permit
202203311305
Status
complete
Filed
Mar 31, 2022
Permit issued
Apr 7, 2023
Final sign-off
Apr 24, 2023
Address
145 Leavenworth St

revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.

Open the permit page

Dec 29, 2021Completed
final sign-off Mar 2023
145 Leavenworth StBlue Water Projects Incevac signs for base building see site permit 201804136335.
Details
Permit
202112295173
Status
complete
Filed
Dec 29, 2021
Permit issued
Jan 13, 2022
Final sign-off
Mar 17, 2023
Declared cost
$6,000
Address
145 Leavenworth St

evac signs for base building see site permit 201804136335.

Open the permit page

$6,000
Oct 18, 2021Never finaled
issued Jan 2022, no final
145 Leavenworth Stsign c: non illuminated 16 inch by 16 inch aluminum plaque with letters (tl145)
Details
Permit
202110180653
Status
issued
Filed
Oct 18, 2021
Permit issued
Jan 14, 2022
Declared cost
$500
Address
145 Leavenworth St

sign c: non illuminated 16 inch by 16 inch aluminum plaque with letters (tl145)

Open the permit page

$500
Oct 18, 2021Never finaled
issued Jan 2022, no final
145 Leavenworth StBlue Water Projects Incsign a: non illuminated 10 inch aluminum letters (tl145)
Details
Permit
202110180650
Status
issued
Filed
Oct 18, 2021
Permit issued
Jan 14, 2022
Declared cost
$3,000
Address
145 Leavenworth St

sign a: non illuminated 10 inch aluminum letters (tl145)

Open the permit page

$3,000
Oct 18, 2021Never finaled
issued Jan 2022, no final
145 Leavenworth StBlue Water Projects Incsign b: non illuminated 5 inch aluminum letters (tl145)
Details
Permit
202110180652
Status
issued
Filed
Oct 18, 2021
Permit issued
Jan 14, 2022
Declared cost
$2,500
Address
145 Leavenworth St

sign b: non illuminated 5 inch aluminum letters (tl145)

Open the permit page

$2,500
Sep 22, 2021Completed
final sign-off May 2023
145 Leavenworth StSun Light & Powernew roof mounted solar water heater(7) collectors total,(18.2) kwth,(4) storage tanks at (119) gal each.
Details
Permit
202109228949
Status
complete
Filed
Sep 22, 2021
Permit issued
Feb 24, 2022
Final sign-off
May 16, 2023
Declared cost
$79,915
Address
145 Leavenworth St

new roof mounted solar water heater(7) collectors total,(18.2) kwth,(4) storage tanks at (119) gal each.

Open the permit page

$79,915
Aug 6, 2021Completed
final sign-off Nov 2022
145 Leavenworth StIncom Mechanical Incfire underground only. install new 6" underground service - 14 feet on vacant lot. see site permit 201804136335 (s). sprinkler/sprinkler monitoring under sep permits.
Details
Permit
202108065974
Status
complete
Filed
Aug 6, 2021
Permit issued
Aug 12, 2021
Final sign-off
Nov 4, 2022
Declared cost
$15,000
Address
145 Leavenworth St

fire underground only. install new 6" underground service - 14 feet on vacant lot. see site permit 201804136335 (s). sprinkler/sprinkler monitoring under sep permits.

Open the permit page

$15,000
May 12, 2021Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Incstormwater systempermit for future construction of building at 145 leavenworth under pa #201804136335-s
Details
Permit
202105120194
Status
complete
Filed
May 12, 2021
Permit issued
Jun 18, 2021
Final sign-off
May 16, 2023
Declared cost
$10,000
Address
145 Leavenworth St

stormwater systempermit for future construction of building at 145 leavenworth under pa #201804136335-s

Open the permit page

$10,000
Oct 16, 2020Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Incmayor dir 17-02. revision to pa #201804136335s1, changes include: ground floor load map updated to arch plans, shift shear walls as needed. update elevator shaft dimensions.
Details
Permit
202010166616
Status
complete
Filed
Oct 16, 2020
Permit issued
Mar 31, 2022
Final sign-off
May 16, 2023
Address
145 Leavenworth St

mayor dir 17-02. revision to pa #201804136335s1, changes include: ground floor load map updated to arch plans, shift shear walls as needed. update elevator shaft dimensions.

Open the permit page

Sep 29, 2020Completed
final sign-off Nov 2022
145 Leavenworth Sttower crane foundation & erect tower crane. mayor ed 17-02 project.
Details
Permit
202009295468
Status
complete
Filed
Sep 29, 2020
Permit issued
Nov 18, 2020
Final sign-off
Nov 2, 2022
Declared cost
$180,000
Address
145 Leavenworth St

tower crane foundation & erect tower crane. mayor ed 17-02 project.

Open the permit page

$180,000
Sep 23, 2020Completed
final sign-off Feb 2023
145 Leavenworth StCentric Construction Incmayor dir# 17-02. rev to pa# 201804136335-s9. 46 ri columns were added in vicenity of tower crane. these ri's are shown in plan review on attached & also highlighted in ri column section. dimension of added "c" type ri's are same as "a" type ri's but they are on a 4' spacing instead of 8'spacing.
Details
Permit
202009234762
Status
complete
Filed
Sep 23, 2020
Permit issued
Nov 3, 2020
Final sign-off
Feb 1, 2023
Address
145 Leavenworth St

mayor dir# 17-02. rev to pa# 201804136335-s9. 46 ri columns were added in vicenity of tower crane. these ri's are shown in plan review on attached & also highlighted in ri column section. dimension of added "c" type ri's are same as "a" type ri's but they are on a 4' spacing instead of 8'spacing.

Open the permit page

May 31, 2019Expired or cancelled
withdrawn Apr 2023
145 Leavenworth StCentric Construction Incexcavation of (e) soil to sub-grade to prepare for (n) construction
Details
Permit
201905312192
Status
withdrawn
Filed
May 31, 2019
Declared cost
$250,500
Address
145 Leavenworth St

excavation of (e) soil to sub-grade to prepare for (n) construction

Open the permit page

$250,500
Apr 13, 2018Completed
final sign-off May 2023
145 Leavenworth StCentric Construction Inc, Swinerton Buildersto erect 9 stories, 1 basement, type 1-b, 94 units residential covered multi family dwellings with ground floor restaurant tenant space . (r-2, a-2, a-3) ** maher: n/a **
Details
Permit
201804136335
Status
complete
Filed
Apr 13, 2018
Permit issued
Dec 7, 2018
Final sign-off
May 16, 2023
Declared cost
$30,000,000
Address
145 Leavenworth St

to erect 9 stories, 1 basement, type 1-b, 94 units residential covered multi family dwellings with ground floor restaurant tenant space . (r-2, a-2, a-3) ** maher: n/a **

Open the permit page

$30,000,000

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.