Block 0345, lot 017
361 Turk St
- City’s use
- Multi-Family Residential
- Stories
- 9
- Units
- 147
- Building
- 68,900 sq ft
- Lot
- 10,263 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2022 | Completed final sign-off Apr 2023 | 361 Turk St | Centric Construction Inc | revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.Details
revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space. | |
| Dec 29, 2021 | Completed final sign-off Sep 2022 | 361 Turk St | Blue Water Projects Inc | evac signs for base building see arch/ mep addendum under 201804136327 s3.Details
evac signs for base building see arch/ mep addendum under 201804136327 s3. | $6,000 |
| Oct 19, 2021 | Expired or cancelled withdrawn Dec 2022 | 361 Turk St | sign c: non illuminated aluminum 16" x 16" plaque (tl 361)Details
sign c: non illuminated aluminum 16" x 16" plaque (tl 361) | $500 | |
| Oct 19, 2021 | Expired or cancelled withdrawn Dec 2022 | 361 Turk St | sign b: non illuminated aluminum 5 inch letters (tl 361)Details
sign b: non illuminated aluminum 5 inch letters (tl 361) | $2,500 | |
| Oct 19, 2021 | Completed final sign-off Nov 2022 | 361 Turk St | Blue Water Projects Inc | sign a: non illuminated aluminum 10 inch letters (tl 361)Details
sign a: non illuminated aluminum 10 inch letters (tl 361) | $3,000 |
| Aug 25, 2021 | Completed final sign-off Apr 2023 | 361 Turk St | Sun Light & Power | (n) roof-mounted, solar water heating system (10) collectors, 26.0 kwthDetails
(n) roof-mounted, solar water heating system (10) collectors, 26.0 kwth | $105,384 |
| Jul 23, 2021 | Never finaled issued Aug 2021, no final | 361 Turk St | Centric Construction Inc | revision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwateDetails
revision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwate | |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 361 Turk St | Centric Construction Inc | plumbing only: stormwater system permit for future construction of building at 361 turk street under pa# 201804136327.Details
plumbing only: stormwater system permit for future construction of building at 361 turk street under pa# 201804136327. | $10,000 |
| Apr 15, 2021 | Completed final sign-off Nov 2022 | 361 Turk St | Incom Mechanical Inc | fire underground only: install new 6" underground fire service from curb to inside of new building. bldg is low-rise residential. see site permit #2018-0413-6327.Details
fire underground only: install new 6" underground fire service from curb to inside of new building. bldg is low-rise residential. see site permit #2018-0413-6327. | $20,000 |
| Aug 26, 2020 | Completed final sign-off Apr 2023 | 361 Turk St | Centric Construction Inc | mayor dir# 17-02. rev to pa# 201804136327-s2. level 2 re-designed to incorporated new skylight @ courtyard. minor updated to level a code formed steel stud framing; dimensions clarified & details cleaned up & vertical stiffeners removed from details 14 + 15/s4.64. no changes made to lateral system.Details
mayor dir# 17-02. rev to pa# 201804136327-s2. level 2 re-designed to incorporated new skylight @ courtyard. minor updated to level a code formed steel stud framing; dimensions clarified & details cleaned up & vertical stiffeners removed from details 14 + 15/s4.64. no changes made to lateral system. | $20,000 |
| Jul 15, 2020 | Completed final sign-off Apr 2023 | 361 Turk St | Centric Construction Inc | mayor dir# 17-02. revision to pa# 201804136327-s1. work includes changes to shear walls. location of steps & depressions. dimension cleanups for coordination purposes. ** maher: n/a **Details
mayor dir# 17-02. revision to pa# 201804136327-s1. work includes changes to shear walls. location of steps & depressions. dimension cleanups for coordination purposes. ** maher: n/a ** | |
| Feb 7, 2020 | Completed final sign-off Oct 2022 | 361 Turk St | Centric Construction Inc | revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditionsDetails
revision to pa 2019-0726-7068 and 2019-0919-2189 add cap beams along turk street side. add soldier beams for future tower crane elevator pit and lagging along north wall. update details and minesions per field conditions | $50,000 |
| Jan 9, 2020 | Completed final sign-off Oct 2022 | 361 Turk St | Centric Construction Inc | tower crane foundation and erect tower craneDetails
tower crane foundation and erect tower crane | $50,000 |
| Nov 14, 2019 | Never finaled issued Nov 2019, no final | 361 Turk St | street spaceDetails
street space | ||
| Sep 19, 2019 | Completed final sign-off Oct 2022 | 361 Turk St | Drill Tech Drilling & Shoring Inc | revision to app#201907267068: 1)add new lean concrete underpinning below new elevator pit to prevent surcharge on extg 351 turk foundation. 2)additional "i" beams along west side because of neighbors request. n/a for maher.Details
revision to app#201907267068: 1)add new lean concrete underpinning below new elevator pit to prevent surcharge on extg 351 turk foundation. 2)additional "i" beams along west side because of neighbors request. n/a for maher. | $60,000 |
| Jul 26, 2019 | Completed final sign-off Oct 2022 | 361 Turk St | Ace Drilling & Excavation | temporary shoring, excavation and grading to prepare site for future construction under pa 201804136335Details
temporary shoring, excavation and grading to prepare site for future construction under pa 201804136335 | $300,000 |
| May 31, 2019 | Expired or cancelled withdrawn Jul 2019 | 361 Turk St | Centric Construction Inc | excavation of (e) soil to allow for (n) building constructionDetails
excavation of (e) soil to allow for (n) building construction | $300,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2023 | 361 Turk St | Centric Construction Inc, Swinerton Builders | to erect 9 stories, 1 basement, type 1-b, 146 units residential covered multi family dwellings with ground floor restaurant space. (r-2, a-2, a-3) ** maher: n/a **Details
to erect 9 stories, 1 basement, type 1-b, 146 units residential covered multi family dwellings with ground floor restaurant space. (r-2, a-2, a-3) ** maher: n/a ** | $33,000,000 |
| Sep 23, 2014 | Never finaled issued Sep 2014, no final | 361 Turk St | add 361 turk st to 0345/017.Details
add 361 turk st to 0345/017. | ||
| Feb 1, 2012 | Completed final sign-off Feb 2012 | 351 Turk St | M. Gaehwiler Construction Inc | drawings area for administration and documentation purposes to correct unit count from guest rooms to apartments. no work to be performed. drawings match existing field conditionsDetails
drawings area for administration and documentation purposes to correct unit count from guest rooms to apartments. no work to be performed. drawings match existing field conditions | |
| Apr 7, 2010 | Never finaled issued Apr 2010, no final | 351 Turk St | street space permitDetails
street space permit |