Permit GraphShortlistSan Francisco building permits since 2000

Block 0059, lot 167

156 Lombard St

City’s use
Single Family Residential
Built
1975
Stories
1
Units
1
Rooms
2 bathrooms
Building
1,642 sq ft
Zoning
RC4
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

14 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 27, 2021Completed
final sign-off Jun 2022
156 Lombard StCentric Building Inc.revision to pa 2021-0415-8647 & 2021-0910-3837 scope includes backing up all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 min battery backup at 100% load; re-circuiting of select light fixtures in residential corridors to (e) emergency lighting circuit
Details
Permit
202108277297
Status
complete
Filed
Aug 27, 2021
Permit issued
Aug 31, 2021
Final sign-off
Jun 7, 2022
Address
156 Lombard St

revision to pa 2021-0415-8647 & 2021-0910-3837 scope includes backing up all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 min battery backup at 100% load; re-circuiting of select light fixtures in residential corridors to (e) emergency lighting circuit

Open the permit page

Apr 15, 2021Completed
final sign-off Jun 2022
156 Lombard StCentric Building Inc.arch work under pa# 202009103837. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areas
Details
Permit
202104158647
Status
complete
Filed
Apr 15, 2021
Permit issued
Apr 28, 2021
Final sign-off
Jun 7, 2022
Declared cost
$20,000
Address
156 Lombard St

arch work under pa# 202009103837. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areas

Open the permit page

$20,000
Sep 10, 2020Completed
final sign-off Jun 2022
156 Lombard StCentric Construction Inccommon area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code.
Details
Permit
202009103837
Status
complete
Filed
Sep 10, 2020
Permit issued
Oct 22, 2020
Final sign-off
Jun 7, 2022
Declared cost
$35,000
Address
156 Lombard St

common area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code.

Open the permit page

$35,000
Jul 29, 2015Completed
final sign-off Jan 2016
156 Lombard StMc Cutcheon Construction Co.unit #11 - revision to appl #2015.0617.9159 - for structural wall engineering specs. n/a maher ordinance
Details
Permit
201507292774
Status
complete
Filed
Jul 29, 2015
Permit issued
Aug 5, 2015
Final sign-off
Jan 11, 2016
Address
156 Lombard St

unit #11 - revision to appl #2015.0617.9159 - for structural wall engineering specs. n/a maher ordinance

Open the permit page

Jul 10, 2015Never finaled
issued Jul 2015, no final
156 Lombard Ststreet space
Details
Permit
M602587
Status
issued
Filed
Jul 10, 2015
Permit issued
Jul 10, 2015
Address
156 Lombard St

street space

Open the permit page

Jun 17, 2015Completed
final sign-off Jan 2016
156 Lombard StMc Cutcheon Construction Co.unit #11 - kitchen, master bath renovation, electrical upgrades. n/a maher ordinance
Details
Permit
201506179159
Status
complete
Filed
Jun 17, 2015
Permit issued
Jun 17, 2015
Final sign-off
Jan 11, 2016
Declared cost
$85,000
Address
156 Lombard St

unit #11 - kitchen, master bath renovation, electrical upgrades. n/a maher ordinance

Open the permit page

$85,000
Nov 25, 2013Completed
final sign-off Jul 2014
156 Lombard StRobert L Brown Construction Inc.repair of dry rot areas. 4 locations (see plans), common areas, like-for-like
Details
Permit
201311252815
Status
complete
Filed
Nov 25, 2013
Permit issued
Nov 27, 2013
Final sign-off
Jul 15, 2014
Declared cost
$2,500
Address
156 Lombard St

repair of dry rot areas. 4 locations (see plans), common areas, like-for-like

Open the permit page

$2,500
Sep 8, 2006Never finaled
issued Sep 2006, no final
156 Lombard Ststreet space permit
Details
Permit
M41203
Status
issued
Filed
Sep 8, 2006
Permit issued
Sep 8, 2006
Address
156 Lombard St

street space permit

Open the permit page

May 1, 2006Completed
final sign-off Oct 2006
156 Lombard StAlpha Restoration & Wateproofremove (e) roof deck membrane and plywood(not structural plywood). no mechanical roof areas. install new plywood and membrane similar to (e). perform similar typp of work to the small privacy decks on the 4th flr, excluding: #18,20,22,30,32,34.non structural all mailing relocation kind building #4,
Details
Permit
200605010293
Status
complete
Filed
May 1, 2006
Permit issued
May 1, 2006
Final sign-off
Oct 27, 2006
Declared cost
$220,000
Address
156 Lombard St

remove (e) roof deck membrane and plywood(not structural plywood). no mechanical roof areas. install new plywood and membrane similar to (e). perform similar typp of work to the small privacy decks on the 4th flr, excluding: #18,20,22,30,32,34.non structural all mailing relocation kind building #4,

Open the permit page

$220,000
Feb 4, 2003Never finaled
issued Feb 2003, no final
156 Lombard Stgeneral upgrade & maintence to (e) building lobby & common hallways, work includes general maintenan
Details
Permit
200302046642
Status
issued
Filed
Feb 4, 2003
Permit issued
Feb 4, 2003
Declared cost
$20,000
Address
156 Lombard St

general upgrade & maintence to (e) building lobby & common hallways, work includes general maintenan

Open the permit page

$20,000
Jan 30, 2001Expired or cancelled
expired Dec 2001
156 Lombard StCas Constructionto renew permit#2000/04/17/7398 for final inspection.
Details
Permit
200101300881
Status
expired
Filed
Jan 30, 2001
Permit issued
Jan 30, 2001
Address
156 Lombard St

to renew permit#2000/04/17/7398 for final inspection.

Open the permit page

Apr 17, 2000Expired or cancelled
expired Oct 2001
156 Lombard StCas Constructionreplace kitchen cabinets, retile bath floor in unit #37
Details
Permit
200004177398
Status
expired
Filed
Apr 17, 2000
Permit issued
Apr 17, 2000
Declared cost
$4,000
Address
156 Lombard St

replace kitchen cabinets, retile bath floor in unit #37

Open the permit page

$4,000
Jan 7, 2000Expired or cancelled
expired May 2000
156 Lombard Strenewal of pa 9417673
Details
Permit
20000107506
Status
expired
Filed
Jan 7, 2000
Permit issued
Jan 7, 2000
Address
156 Lombard St

renewal of pa 9417673

Open the permit page

Jan 5, 2000Expired or cancelled
expired Jul 2000
156 Lombard StSure, Inc.kitchen remodeling
Details
Permit
20000105315
Status
expired
Filed
Jan 5, 2000
Permit issued
Jan 5, 2000
Declared cost
$6,000
Address
156 Lombard St

kitchen remodeling

Open the permit page

$6,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Cas Construction (2), Centric Building Inc. (2), Mc Cutcheon Construction Co. (2), Alpha Restoration & Wateproof, Centric Construction Inc, Robert L Brown Construction Inc., Sure, Inc.
Architects
D. Ian Bevilacqua, Patricia Motzkin
Engineers
David Rodriguez (2), Tek Pe

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.