Michael J. Jones
- Listed as
- architect, engineer
- Firm
- Michael Jones Architecture
- Based in
- Pasadena
- On San Francisco permits
- Jan 2012 to Aug 2021
10 permits since 2000 (architect on 8 permits, engineer on 2 permits): 7 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2021 | Completed final sign-off Nov 2023 | 450 Powell St | Centric Construction Inc | guestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room workDetails
guestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room work | $1,049,000 |
| Feb 16, 2021 | Never finaled issued Jul 2021, no final | 231 Cortland Av | rev to pa 201502239096 & 201702169180 - revision to framing at 3/f.Details
rev to pa 201502239096 & 201702169180 - revision to framing at 3/f. | $80,000 | |
| Mar 16, 2016 | Completed final sign-off Aug 2019 | 318 Moraga St | Anne Hart Design Build | replace (e) exterior entry stair with new 1st floor entrance, horizontal addition @ (e) stair. update 2nd floor bay window. window locations minor dormers @ property rear over bathroom & kitchen. all floors upgrade m.e.p. new windows & doors. repair (e) exterior finishes. remove alum siding.Details
replace (e) exterior entry stair with new 1st floor entrance, horizontal addition @ (e) stair. update 2nd floor bay window. window locations minor dormers @ property rear over bathroom & kitchen. all floors upgrade m.e.p. new windows & doors. repair (e) exterior finishes. remove alum siding. | $405,000 |
| May 28, 2015 | Completed final sign-off Feb 2016 | 1447 35th Av | Harrow Construction Corporation | revision to 2015 0506 5514 - remove (e) concrete slab in basement and install a new slab to comprise of gravtise, sand, moisture barrier membrance, #4 rebar and 4" of concrete.Details
revision to 2015 0506 5514 - remove (e) concrete slab in basement and install a new slab to comprise of gravtise, sand, moisture barrier membrance, #4 rebar and 4" of concrete. | $10,350 |
| May 6, 2015 | Completed final sign-off Feb 2016 | 1447 35th Av | Harrow Construction Corporation | rebuild (e) inteiror stair, separate garage /w1-hr rated construction, renovate (e) ground floor bedroom & bath, utility to (n) family room, (n) mudroom room.Details
rebuild (e) inteiror stair, separate garage /w1-hr rated construction, renovate (e) ground floor bedroom & bath, utility to (n) family room, (n) mudroom room. | $74,000 |
| Feb 12, 2014 | Expired or cancelled withdrawn Apr 2014 | 319 Eureka St | renovate existing 2nd fl. bedroom into master bedroom suite & (n) vegetated roof & wood deck, (n) concrete footings & upgraded seismic & gravity structure.Details
renovate existing 2nd fl. bedroom into master bedroom suite & (n) vegetated roof & wood deck, (n) concrete footings & upgraded seismic & gravity structure. | $98,000 | |
| Apr 16, 2013 | Expired or cancelled expired Jan 2024 | 272 Clara St | Polytec Construction Company Inc, A Plus Builder | 2 units vertical addition to existing 2-story bldg. - change of use from b & r-3 to b & r-2. (n) steel structure & conc. footings to support (n) 2 story addition. fire supression in entire building. (to comply with maher ordinance extended ordinance no.155-13 not required)Details
2 units vertical addition to existing 2-story bldg. - change of use from b & r-3 to b & r-2. (n) steel structure & conc. footings to support (n) 2 story addition. fire supression in entire building. (to comply with maher ordinance extended ordinance no.155-13 not required) | $300,000 |
| Mar 1, 2013 | Completed final sign-off Jan 2015 | 283 Mallorca Wy | Portola Design Build Interiors Developme | revision to 201211154281. revise opening between entry, dining, new opening at upstairs bedrooms. revised property line foundation. add support to existing garage/breezeway wallDetails
revision to 201211154281. revise opening between entry, dining, new opening at upstairs bedrooms. revised property line foundation. add support to existing garage/breezeway wall | |
| Nov 15, 2012 | Completed final sign-off Jan 2015 | 283 Mallorca Wy | Soria Construction, Portola Design Build Interiors Developme | proposed interior stair connecting ground flr w/2nd flr residence. ground flr office /utility connverted to bedroom, bath w/new window/door openings to rear yard. new footings,slab @ ground flr. relcoate furnace & water heater to garage area. relocate laundry & modify bedrm, dining walls @ 2nd flrDetails
proposed interior stair connecting ground flr w/2nd flr residence. ground flr office /utility connverted to bedroom, bath w/new window/door openings to rear yard. new footings,slab @ ground flr. relcoate furnace & water heater to garage area. relocate laundry & modify bedrm, dining walls @ 2nd flr | $150,000 |
| Jan 3, 2012 | Completed final sign-off Dec 2012 | 2130 Leavenworth St | Bonilla Construction | apt #4 - renovate existing bedroom, bath, and closet. remove non structural walls in bathroom and dinng room and upgrade interior lighting. installation of a vent free combo electrical washer & dryer.Details
apt #4 - renovate existing bedroom, bath, and closet. remove non structural walls in bathroom and dinng room and upgrade interior lighting. installation of a vent free combo electrical washer & dryer. | $35,888 |