Mark Melzer
- License
- C17918
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Melzer Decker & Ruder Arch
- Based in
- Irvine
- On San Francisco permits
- Aug 2018 to Oct 2026
5 permits since 2000 (architect on 5 permits): 1 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Construction Inc (3)
- Engineers
- Alexander Jankovic, Grant Craig, Jeffrey Ouellette, Sidhu Singh, Stephen Zajicek
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2026 | In progress issued Oct 2026 | 600 Stockton St | Centric Construction Inc | 4/f: minor interior remodel of (e) conference room (393 sf) on 4th floor (entry level). includes new interior storefront, interior finishes, sales displays, and lighting alterations only. no exterior work. (change of use from b=conference to m=retail)Details
4/f: minor interior remodel of (e) conference room (393 sf) on 4th floor (entry level). includes new interior storefront, interior finishes, sales displays, and lighting alterations only. no exterior work. (change of use from b=conference to m=retail) | $45,000 |
| Jun 18, 2026 | In progress issued Jul 2026 | 600 Stockton St | Centric Construction Inc | minor interior remodel of existing retail shop. inlcudes plumbing, hvac, and electrical. no exterior work.Details
minor interior remodel of existing retail shop. inlcudes plumbing, hvac, and electrical. no exterior work. | $145,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 600 Stockton St | Centric Construction Inc | minor interior remodel of (e) lobby lounge/bar (1227 sf) on 4th floor (entry level). includes plumbing and electrical. no exterior work.Details
minor interior remodel of (e) lobby lounge/bar (1227 sf) on 4th floor (entry level). includes plumbing and electrical. no exterior work. | $470,000 |
| Nov 21, 2023 | Expired or cancelled withdrawn Apr 2026 | 600 Stockton St | minor interior remodel of (e) restaurant (3528 sf) and lobby lounge (1757 sf) including hvac, plumbing, electrical.Details
minor interior remodel of (e) restaurant (3528 sf) and lobby lounge (1757 sf) including hvac, plumbing, electrical. | $900,000 | |
| Aug 30, 2018 | Never finaled issued Mar 2021, no final | 600 Stockton St | renovation of (e) 17,000 sf. courtyard. construction of (n) 3,093 sf pavilion. **maher n/a**Details
renovation of (e) 17,000 sf. courtyard. construction of (n) 3,093 sf pavilion. **maher n/a** | $1,100,000 |