Block 0330, lot 014
140 Mason St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 7
- Building
- 34,188 sq ft
- Lot
- 4,464 sq ft
- Zoning
- C3G
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
56 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 20, 2024 | In progress issued Jan 2025 | 140 Mason St | Bobcomm Llc Dba Pacific Das Llc. | as-built revision to existing errcs permitDetails
as-built revision to existing errcs permit | $20,000 |
| Apr 18, 2022 | Never finaled issued Jun 2022, no final | 140 Mason St | Discount Signs & Neon Inc | install 1 electric, projecting, double faced sign. (bo de ga). 11" x 39".Details
install 1 electric, projecting, double faced sign. (bo de ga). 11" x 39". | $4,000 |
| Nov 26, 2019 | Completed final sign-off Nov 2020 | 140 Mason St | International Commercial Awning, Inc. | install 2 canvas awnings over storefront.Details
install 2 canvas awnings over storefront. | $4,000 |
| Aug 6, 2019 | Never finaled filed Aug 2019, never issued | 140 Mason St | |||
| Jul 26, 2019 | Never finaled issued Aug 2019, no final | 140 Mason St | Centric Construction Inc | all floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a.Details
all floors: evacuation signage related to pa 2016-1115-2731 interior signs only. maher n/a. | $20,000 |
| Jul 26, 2019 | Completed final sign-off Oct 2019 | 140 Mason St | International Fire Equip | install ul300 fire system. ref #201808076625.Details
install ul300 fire system. ref #201808076625. | $8,000 |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 140 Mason St | street space onlyDetails
street space only | ||
| Apr 23, 2019 | Never finaled issued Apr 2019, no final | 140 Mason St | Tri-Signal Integration Inc. | emergency communication system 1 command center with 1 distribution module, 1 supervising module, 1 power supply with 1 add 1 module, and 7 call station. ref pa 2018-0731-5972Details
emergency communication system 1 command center with 1 distribution module, 1 supervising module, 1 power supply with 1 add 1 module, and 7 call station. ref pa 2018-0731-5972 | $37,000 |
| Apr 23, 2019 | Never finaled issued Apr 2019, no final | 140 Mason St | Tri-Signal Integration Inc. | fire alarm system ti - add errcs supervision: 1 rp-10 module, 1 smoke detector, add 1 annunciator to existing fire alarm system. ref pa 2018-0731-5972Details
fire alarm system ti - add errcs supervision: 1 rp-10 module, 1 smoke detector, add 1 annunciator to existing fire alarm system. ref pa 2018-0731-5972 | $3,000 |
| Apr 4, 2019 | Never finaled issued Jun 2019, no final | 140 Mason St | Leaf Communications Inc | installing an emergency responder radio system (errcs) throught bldg. includes install (1) bi-directional amplifier,(6) omni-directional antennas, (1) outdoor antenna, and 12 hr battery backupDetails
installing an emergency responder radio system (errcs) throught bldg. includes install (1) bi-directional amplifier,(6) omni-directional antennas, (1) outdoor antenna, and 12 hr battery backup | |
| Mar 14, 2019 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | rev to 201611152731, 201806252863, 201603152111. relocate gas meter per jis requirements, reconfigure luggage storage rm, add dropped decorative ceiling over bar. mep, fa, fs sep permitDetails
rev to 201611152731, 201806252863, 201603152111. relocate gas meter per jis requirements, reconfigure luggage storage rm, add dropped decorative ceiling over bar. mep, fa, fs sep permit | |
| Mar 13, 2019 | Never finaled issued Mar 2019, no final | 140 Mason St | street spaceDetails
street space | ||
| Mar 12, 2019 | Never finaled filed Mar 2019, never issued | 140 Mason St | street spaceDetails
street space | ||
| Feb 12, 2019 | Never finaled issued Mar 2019, no final | 140 Mason St | Centric Construction Inc | revision to pa 201611152731. ti permit. electrical revisions onlyDetails
revision to pa 201611152731. ti permit. electrical revisions only | |
| Feb 8, 2019 | Never finaled issued Mar 2019, no final | 140 Mason St | Alpha Architectural Signs & Lighting | install 1 illuminated metal canopy; sign under sep permit #201902082477.Details
install 1 illuminated metal canopy; sign under sep permit #201902082477. | $4,000 |
| Feb 8, 2019 | Never finaled issued Mar 2019, no final | 140 Mason St | Alpha Architectural Signs & Lighting | install 1 illuminated single-faced sign onto canopy. "found" canopy under sep permit #201902082478.Details
install 1 illuminated single-faced sign onto canopy. "found" canopy under sep permit #201902082478. | $3,000 |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 140 Mason St | Pioneer Fire Inc. | existing fire sprinkler system ti and clothes chute sprinklers. 88 sprinklers. ref pa 2018-0417-6564 r1Details
existing fire sprinkler system ti and clothes chute sprinklers. 88 sprinklers. ref pa 2018-0417-6564 r1 | $44,000 |
| Jan 28, 2019 | Completed final sign-off May 2019 | 140 Mason St | Bay Area Window Pros | replace 59 total no front windows to vinyl single hungs in existing opening. u factor max .32. same size and location.Details
replace 59 total no front windows to vinyl single hungs in existing opening. u factor max .32. same size and location. | $35,000 |
| Jan 15, 2019 | Never finaled issued Mar 2019, no final | 140 Mason St | Centric Construction Inc | revision to 201611152731 and 201806252863. revises configuration of suspended decorative ceiling at street level reatuarant & hotel lobby. mech, elec, rev under seperate permit. fa fs under sep permitDetails
revision to 201611152731 and 201806252863. revises configuration of suspended decorative ceiling at street level reatuarant & hotel lobby. mech, elec, rev under seperate permit. fa fs under sep permit | |
| Sep 27, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to 201611150214, 20180520126. scope adds suspended ceiling along corridor 2-7. mep, fa, fs under sep permit. no increase to occpancyDetails
revision to 201611150214, 20180520126. scope adds suspended ceiling along corridor 2-7. mep, fa, fs under sep permit. no increase to occpancy | $20,000 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 140 Mason St | street spaceDetails
street space | ||
| Aug 22, 2018 | Completed final sign-off May 2019 | 140 Mason St | Centric Construction Inc | replacement of 54 windows facing mason streetDetails
replacement of 54 windows facing mason street | $45,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to app#201611152731 and 201806252863. revision to proposed kitchen equipment layout at basement and ground level. remove sheets ka-1 to kb-4. new euipment for existing kitchen.Details
revision to app#201611152731 and 201806252863. revision to proposed kitchen equipment layout at basement and ground level. remove sheets ka-1 to kb-4. new euipment for existing kitchen. | |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 140 Mason St | Centric Construction Inc | revision to app#201611021718. relocate proposed passanger ada curb rampDetails
revision to app#201611021718. relocate proposed passanger ada curb ramp | |
| Jul 31, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Tri-Signal Integration Inc. | (n) fire alarm system includes: 1-facu; 1-udact, 2 dialer; 1-ipgsm dialer; 4-power supplies; 116-addressable smoke detectors; 8-addressable duct detectors; 61-addressable modules; 1-manual pucl station; 12-control relays; 1-power supply for door holders; 8-door holders; 26-horns/strobes; 12-strobes;Details
(n) fire alarm system includes: 1-facu; 1-udact, 2 dialer; 1-ipgsm dialer; 4-power supplies; 116-addressable smoke detectors; 8-addressable duct detectors; 61-addressable modules; 1-manual pucl station; 12-control relays; 1-power supply for door holders; 8-door holders; 26-horns/strobes; 12-strobes; | $165,000 |
| Jun 25, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to 201611152731 & 201802141310. relocate proposed accessible restrooms on the ground flr and minor modifications to basement utility room and hotel back of house space. mep/fa/fs under sep permitDetails
revision to 201611152731 & 201802141310. relocate proposed accessible restrooms on the ground flr and minor modifications to basement utility room and hotel back of house space. mep/fa/fs under sep permit | |
| May 24, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | layout revision to app#201611152731. scope of work includes revisions to proposed accessible guestroom bath types, standard bathrooms, and shared kitchen/jaundry, mep, fa, fs under seperate permit. no increase to occupancy. no rduction to sro count. to comply with nov 201459891.Details
layout revision to app#201611152731. scope of work includes revisions to proposed accessible guestroom bath types, standard bathrooms, and shared kitchen/jaundry, mep, fa, fs under seperate permit. no increase to occupancy. no rduction to sro count. to comply with nov 201459891. | |
| Apr 17, 2018 | Completed final sign-off Jun 2025 | 140 Mason St | Pioneer Fire Inc. | install a new fire sprinkler system and relace fire pump through-out the building with stanpipes per nfpa 13,14 and 20 using existing fire service. 423 sprinkler. ref 201611152731Details
install a new fire sprinkler system and relace fire pump through-out the building with stanpipes per nfpa 13,14 and 20 using existing fire service. 423 sprinkler. ref 201611152731 | $211,500 |
| Mar 19, 2018 | Never finaled filed Mar 2018, never issued | 140 Mason St | street space permit (201611021718)Details
street space permit (201611021718) | ||
| Mar 19, 2018 | Never finaled issued Mar 2018, no final | 140 Mason St | street space permit (201611021718)Details
street space permit (201611021718) | ||
| Feb 14, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | revision to app#2011611152731. relocates proposed gurney elevator location to extg atrium.Details
revision to app#2011611152731. relocates proposed gurney elevator location to extg atrium. | |
| Dec 26, 2017 | Never finaled issued Dec 2017, no final | 140 Mason St | street space/mta metersDetails
street space/mta meters | ||
| Oct 17, 2017 | Never finaled issued Oct 2017, no final | 140 Mason St | streetspaceDetails
streetspace | ||
| Nov 15, 2016 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | comply with nov# 201459891. cpmplete renovation of all m.e.p. systems on building. addition of 37 guest bathroom & conversion of dining room & basement into restaurant on basement & ground floor. upgrade includes installation of new gurney sized elevator. sprinkler & fire alarm under seperate permitDetails
comply with nov# 201459891. cpmplete renovation of all m.e.p. systems on building. addition of 37 guest bathroom & conversion of dining room & basement into restaurant on basement & ground floor. upgrade includes installation of new gurney sized elevator. sprinkler & fire alarm under seperate permit | $5,500,000 |
| Nov 2, 2016 | Never finaled issued Mar 2018, no final | 140 Mason St | J M L Engineering & Construction | replacement of (e) sidewalk and installation of new pge electric vault in franchise space. sidewalk improvement includes installation of accessible level landings at all doorsDetails
replacement of (e) sidewalk and installation of new pge electric vault in franchise space. sidewalk improvement includes installation of accessible level landings at all doors | $650,000 |
| Jul 29, 2016 | Completed final sign-off Oct 2019 | 140 Mason St | Centric Construction Inc | basement-7/f- limit non-structural demo includes remove of interior finishes to face of framing demo, demo (e) plumbing fixtures, electrical & steam system. decommissioning of (e) elevator, scope under ab017 to comply with nov 201459891 and 201622776. # of res. rooms remain the same.Details
basement-7/f- limit non-structural demo includes remove of interior finishes to face of framing demo, demo (e) plumbing fixtures, electrical & steam system. decommissioning of (e) elevator, scope under ab017 to comply with nov 201459891 and 201622776. # of res. rooms remain the same. | $140,000 |
| Mar 15, 2016 | Expired or cancelled withdrawn Mar 2016 | 140 Mason St | install non-illuminated double faced projecting banner.Details
install non-illuminated double faced projecting banner. | $1,200 | |
| Mar 15, 2016 | Never finaled issued Oct 2017, no final | 140 Mason St | Centric Construction Inc | install an illuminated double faced projecting sign.Details
install an illuminated double faced projecting sign. | $4,200 |
| Mar 15, 2016 | Never finaled issued Oct 2017, no final | 140 Mason St | Centric Construction Inc | replacement of fabric canopy w/new framed canopy. replacement of (e) exterior signage w/new marquee signage & banner. replacement of (e) aluminum storefront w/new aluminum storefront. addition of (5) light scongs on facade. exterior work only - arch and all other ti under separate permitDetails
replacement of fabric canopy w/new framed canopy. replacement of (e) exterior signage w/new marquee signage & banner. replacement of (e) aluminum storefront w/new aluminum storefront. addition of (5) light scongs on facade. exterior work only - arch and all other ti under separate permit | $18,000 |
| May 22, 2014 | Never finaled issued May 2014, no final | 140 Mason St | to comply with nov# 201459891 provide grab bars in all community bathrooms 1st flr 1 grab bar, 2nd floor, 4 grab bars 3rd flr, 2 grab bars will be installed ,load rating 250Details
to comply with nov# 201459891 provide grab bars in all community bathrooms 1st flr 1 grab bar, 2nd floor, 4 grab bars 3rd flr, 2 grab bars will be installed ,load rating 250 | $350 | |
| Apr 18, 2013 | Completed final sign-off Apr 2014 | 136 Mason St | to comply with ces nov#200672059. remove storage from corridor, install light & handrail in stairway.Details
to comply with ces nov#200672059. remove storage from corridor, install light & handrail in stairway. | $400 | |
| Feb 6, 2009 | Completed final sign-off Apr 2009 | 140 Mason St | repair drywall in existing community kitchen & replace cabinets per nov# 200986304. kitchen use existing. permit for drywall & cabinets only.Details
repair drywall in existing community kitchen & replace cabinets per nov# 200986304. kitchen use existing. permit for drywall & cabinets only. | $2,000 | |
| Oct 3, 2007 | Never finaled issued Oct 2007, no final | 136 Mason St | Grace Roofing & Construction | reroofingDetails
reroofing | $22,000 |
| Sep 30, 2005 | Completed final sign-off Nov 2005 | 136 Mason St | Michael Bovo & Associates | repair work only. correct all item per nov# 200563363. task force. nov attached. handrail at entry, transition stripes at stairs where needed.Details
repair work only. correct all item per nov# 200563363. task force. nov attached. handrail at entry, transition stripes at stairs where needed. | $1,000 |
| Jun 7, 2005 | Completed final sign-off Jun 2005 | 140 Mason St | Fire Protection Retrofit Specialist | to renew expired permit app 200301245845 final inspectionDetails
to renew expired permit app 200301245845 final inspection | |
| May 24, 2005 | Never finaled issued May 2005, no final | 140 Mason St | Innovative Technologies | monitor exist fire alarm sys.the purpose is to submit as-built drawings for city record for.........Details
monitor exist fire alarm sys.the purpose is to submit as-built drawings for city record for......... | |
| Apr 20, 2005 | Never finaled filed Apr 2005, never issued | 136 Mason St | tenant improvements with minor structural work consolidation of (e) massage establishment toDetails
tenant improvements with minor structural work consolidation of (e) massage establishment to | $200,000 | |
| Apr 20, 2005 | Never finaled issued Apr 2005, no final | 136 Mason St | additional house numberDetails
additional house number | ||
| Dec 23, 2004 | Never finaled issued Dec 2004, no final | 140 Mason St | Life Safety & Security | monitor sprinkler waterflow switches.Details
monitor sprinkler waterflow switches. | $7,000 |
| Oct 28, 2004 | Completed final sign-off Feb 2006 | 140 Mason St | revision to pa #2004/02/13/6468. chnage front entrance from cross beam to moment frame.Details
revision to pa #2004/02/13/6468. chnage front entrance from cross beam to moment frame. | ||
| Feb 13, 2004 | Completed final sign-off Feb 2006 | 140 Mason St | cont wk 9919209 for umb spec procedure upgrade of exist building. no chg in occupancy nor unit countDetails
cont wk 9919209 for umb spec procedure upgrade of exist building. no chg in occupancy nor unit count | $80,000 | |
| Jan 24, 2003 | Never finaled issued Mar 2003, no final | 140 Mason St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply with ordinance 170-02 to comply with violation 200235763Details
to install fire sprinkler system to comply with ordinance 170-02 to comply with violation 200235763 | $2,800 |
| Apr 20, 2001 | Expired or cancelled expired Aug 2001 | 140 Mason St | Zebra Awning Co Inc | hand paint 1 logo on entry awningDetails
hand paint 1 logo on entry awning | $300 |
| Apr 20, 2001 | Expired or cancelled expired Aug 2001 | 140 Mason St | Zebra Awning Co Inc | fabricate & install 2 awning.Details
fabricate & install 2 awning. | $1,300 |
| Apr 10, 2001 | Expired or cancelled expired Aug 2001 | 140 Mason St | street spaceDetails
street space | ||
| Feb 22, 2000 | Completed final sign-off Feb 2006 | 140 Mason St | umb retrofitDetails
umb retrofit | $88,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.