Joseph Stewart
- License
- 3065
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Kpff Consulting Engineers
- Based in
- Los Angeles
- On San Francisco permits
- Jan 2013 to Jan 2023
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Construction Inc, Cw Horton General Contractor
- Architects
- Russel Tyner, William Wickett Iv
- Engineers
- Susan Golen, Thomas Luning
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2023 | Completed final sign-off Apr 2026 | 335 Powell St | Centric Construction Inc | replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level.Details
replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level. | $375,000 |
| Jan 4, 2013 | Completed final sign-off Dec 2013 | 55 04th St | Cw Horton General Contractor | revision to app#201209270830. new added scope is to install new disabled access pool lifts(2) to extg indoor pool and spa located on 5th level of hotel.Details
revision to app#201209270830. new added scope is to install new disabled access pool lifts(2) to extg indoor pool and spa located on 5th level of hotel. | $8,000 |