William Wickett
- License
- C30971
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Houston / Tyner Architects
- Based in
- Torrance
- On San Francisco permits
- Jan 2023 to Jun 2026
4 permits since 2000 (architect on 4 permits): 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Construction Inc (3)
- Engineers
- Peter Kraut (2), Felix Roth, Felix Roth, Joseph Stewart, Susan Golen, Thomas Luning
- Authorized agents
- Gary Houston
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | Centric Construction Inc | upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811.Details
upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811. | $145,000 |
| Mar 3, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | Centric Construction Inc | lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipmentDetails
lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipment | $785,000 |
| Nov 8, 2024 | Expired or cancelled withdrawn Sep 2025 | 2620 Jones St | renovate (e) non-accessible and (1) accessible guestrooms. conversion of(6)2-bay suites into (12) single bay guestrooms. (addition of 6 guestroom keys). replace lighting fixture at elevator lobbies (total 6 fixtures).Details
renovate (e) non-accessible and (1) accessible guestrooms. conversion of(6)2-bay suites into (12) single bay guestrooms. (addition of 6 guestroom keys). replace lighting fixture at elevator lobbies (total 6 fixtures). | $150,000 | |
| Jan 23, 2023 | Completed final sign-off Apr 2026 | 335 Powell St | Centric Construction Inc | replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level.Details
replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level. | $375,000 |