Russel Tyner
- Listed as
- architect
- Firm
- Houston / Tyner
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Jan 2021
43 permits since 2000 (architect on 43 permits): 29 completed, 8 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2021 | Completed final sign-off Apr 2021 | 335 Powell St | Trainor Commercial Construction Inc. | rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations.Details
rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations. | |
| Aug 29, 2020 | Completed final sign-off Mar 2021 | 335 Powell St | Trainor Commercial Construction Inc. | demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restroomsDetails
demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restrooms | $158,000 |
| Feb 28, 2020 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | t.i. to extg 13th floor offices to include demolition and replacement of floor finishes, wall finishes, selected partitons, clg fixtures & light fixtures. installation of new hvac & ada upgrade modifications to extg restrooms incl. new plmg fixtures as noted.Details
t.i. to extg 13th floor offices to include demolition and replacement of floor finishes, wall finishes, selected partitons, clg fixtures & light fixtures. installation of new hvac & ada upgrade modifications to extg restrooms incl. new plmg fixtures as noted. | $132,000 | |
| Jun 3, 2019 | Expired or cancelled cancelled Jan 2026 | 55 04th St | replacement of the (e) 4th & 5th floor lights nad lighting controls. lighting upgrades to meet t-24 reqs. new lighting is to be tied into emergency powerDetails
replacement of the (e) 4th & 5th floor lights nad lighting controls. lighting upgrades to meet t-24 reqs. new lighting is to be tied into emergency power | $120,000 | |
| Mar 8, 2019 | Completed final sign-off May 2019 | 55 04th St | Turner Construction Co | revision to permit #201803295009. removing electrical work from scope.Details
revision to permit #201803295009. removing electrical work from scope. | |
| Feb 19, 2019 | Completed final sign-off Aug 2019 | 55 04th St | Turner Construction Co | this work includes a 3-hour fire/smoke rated drop down, non egress door as detailed on the approved lobby. ti. permit ref. permit#201810304485. indicated work is on ground floorDetails
this work includes a 3-hour fire/smoke rated drop down, non egress door as detailed on the approved lobby. ti. permit ref. permit#201810304485. indicated work is on ground floor | |
| Feb 5, 2019 | Completed final sign-off Mar 2020 | 2620 Jones St | Smc Constracting Inc | revision to pa #201805179403Details
revision to pa #201805179403 | |
| Feb 5, 2019 | Completed final sign-off Dec 2020 | 2620 Jones St | Smc Constracting Inc | conversion of (1) guest lounge to (1) standard guestroom. (n) rated walls 2hr to re-establish allowable building areas per table 5-c ubc 1973. area separation through all 3 floors.Details
conversion of (1) guest lounge to (1) standard guestroom. (n) rated walls 2hr to re-establish allowable building areas per table 5-c ubc 1973. area separation through all 3 floors. | $10,000 |
| Jan 22, 2019 | Completed final sign-off Aug 2019 | 780 Mission St | Turner Construction Co | revision to bpa# 2018-0924-1133. ground floor & repalce driveway topping elements to perform waterproofing repairs for the porte cochere insf marriot, for relocation of ada parking spots and pavingsDetails
revision to bpa# 2018-0924-1133. ground floor & repalce driveway topping elements to perform waterproofing repairs for the porte cochere insf marriot, for relocation of ada parking spots and pavings | |
| Oct 9, 2018 | Never finaled issued Dec 2018, no final | 55 04th St | Turner Construction Co | revision to permit app#201808207752 to reverse swing of door 1118b n/a for maherDetails
revision to permit app#201808207752 to reverse swing of door 1118b n/a for maher | |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 480 Sutter St | Continental Contractors Inc | lobby: title 24 compliance. electrical. replace (e) decorative lighting with new decorative lightin. replace a portion of 9e) decotrat lighting with new led can lights. add al imited amount of convience power. maher n/a.Details
lobby: title 24 compliance. electrical. replace (e) decorative lighting with new decorative lightin. replace a portion of 9e) decotrat lighting with new led can lights. add al imited amount of convience power. maher n/a. | $25,000 |
| Oct 3, 2018 | Completed final sign-off Oct 2019 | 480 Sutter St | Continental Contractors Inc | renovate existing lobby level - renovation to include demo and construction of new walls, new interior glass pivot doors and new finishes throughout.nw stone top at extg buffet & extg bar hvac is existing to remain. nw lighting & electrical under separate permit. modification to extg ada bar.Details
renovate existing lobby level - renovation to include demo and construction of new walls, new interior glass pivot doors and new finishes throughout.nw stone top at extg buffet & extg bar hvac is existing to remain. nw lighting & electrical under separate permit. modification to extg ada bar. | $147,000 |
| Oct 1, 2018 | Never finaled issued Nov 2018, no final | 55 04th St | Turner Construction Co | 1/f lobby: this work includes renovation to the lobby lounge and extg men and womens restrooms. n/a for maherDetails
1/f lobby: this work includes renovation to the lobby lounge and extg men and womens restrooms. n/a for maher | $85,000 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 55 04th St | Turner Construction Co | title 24 energy calcs for lobby level.Details
title 24 energy calcs for lobby level. | $30,000 |
| Aug 30, 2018 | Completed final sign-off Jun 2019 | 55 04th St | Turner Construction Co | the work includes renovation to the registration area and screen between the lobby and restaurant. no exterior work. maher naDetails
the work includes renovation to the registration area and screen between the lobby and restaurant. no exterior work. maher na | $210,000 |
| Aug 30, 2018 | Completed final sign-off Dec 2020 | 2620 Jones St | Smc Constracting Inc | demolish extg staff offices and market to construct new staff offices and market including floor, wall, and ceiling finishes, hvac, plmbg and electrical. n/a for maherDetails
demolish extg staff offices and market to construct new staff offices and market including floor, wall, and ceiling finishes, hvac, plmbg and electrical. n/a for maher | $180,000 |
| Aug 30, 2018 | Completed final sign-off Feb 2019 | 1250 Columbus Av | Hathaway Dinwiddie Co. | first floor-renovate interiors of existing lobby (revise tv location & ada ramp correction). lighting revisions to existing golden gate meeting room. no structural work, mechanical work, or plumbing work. no exterior work. n/a for maher.Details
first floor-renovate interiors of existing lobby (revise tv location & ada ramp correction). lighting revisions to existing golden gate meeting room. no structural work, mechanical work, or plumbing work. no exterior work. n/a for maher. | $55,000 |
| Aug 23, 2018 | Completed final sign-off Dec 2020 | 2620 Jones St | Smc Constracting Inc | garage level - renovation to garage level office, housekeeping, employee restrooms and storage access & related mep systems. maher n/a.Details
garage level - renovation to garage level office, housekeeping, employee restrooms and storage access & related mep systems. maher n/a. | $290,000 |
| Aug 15, 2018 | Completed final sign-off Dec 2020 | 2620 Jones St | Smc Constracting Inc | non structural ti to hotel lobby level - demo of staff office, kitchen, staff restrooms, dining & mtg room, relocate mep systems. new work to include new staff restrooms, break rooms, offices, sales gallery & new finishes & relocated mep systems. ada path of travel is compliant & fire alarm/fireDetails
non structural ti to hotel lobby level - demo of staff office, kitchen, staff restrooms, dining & mtg room, relocate mep systems. new work to include new staff restrooms, break rooms, offices, sales gallery & new finishes & relocated mep systems. ada path of travel is compliant & fire alarm/fire | $385,000 |
| Jul 26, 2018 | Never finaled issued Aug 2018, no final | 480 Sutter St | Continental Contractors Inc | 7/f -renovate existing fitness center, renovate to include replacement of finishes & equipment. reconfigure entry to fitness center. hvac is existing to remain. existing 2x2 fluorescent lighting isto be replaced with led. new can lights are to be led. maher n/a.Details
7/f -renovate existing fitness center, renovate to include replacement of finishes & equipment. reconfigure entry to fitness center. hvac is existing to remain. existing 2x2 fluorescent lighting isto be replaced with led. new can lights are to be led. maher n/a. | $23,000 |
| Jul 19, 2018 | Completed final sign-off Apr 2020 | 55 04th St | Hathaway Dinwiddie Co. | renovate non-accessible guestrooms on 4th & 5th fl. includes n finishes & fixtures, tub to shower conversion, n illuminated mirror, hvac & lighting e to remain. two n outlets. renovate to e corridors including new finishes only. only ffe sconces are replaced in kind. all other lighting e to remain.Details
renovate non-accessible guestrooms on 4th & 5th fl. includes n finishes & fixtures, tub to shower conversion, n illuminated mirror, hvac & lighting e to remain. two n outlets. renovate to e corridors including new finishes only. only ffe sconces are replaced in kind. all other lighting e to remain. | $825,000 |
| Jun 28, 2018 | Completed final sign-off Apr 2020 | 55 04th St | Hathaway Dinwiddie Co. | 32nd fl: interior renovation to presidential suite room 3230. new finishes throughout, some new lighting, tub/shower conversion, plumbing fixture relocation/replacement, new millwork, some modifications to walls. reducting only. (e) hvac unit to remain.Details
32nd fl: interior renovation to presidential suite room 3230. new finishes throughout, some new lighting, tub/shower conversion, plumbing fixture relocation/replacement, new millwork, some modifications to walls. reducting only. (e) hvac unit to remain. | $80,000 |
| Jun 19, 2018 | Expired or cancelled cancelled Jan 2026 | 55 04th St | room #3230: renovation of (e) non-accessible presidential suite. work includes new finishes & fixtures, toilet & sink relocation within existing bathroom and tub to shower conversion. hvac is existing to remain. all new lighting to be led where occurs with much of the existing lighting to remain.Details
room #3230: renovation of (e) non-accessible presidential suite. work includes new finishes & fixtures, toilet & sink relocation within existing bathroom and tub to shower conversion. hvac is existing to remain. all new lighting to be led where occurs with much of the existing lighting to remain. | $50,000 | |
| May 17, 2018 | Expired or cancelled withdrawn Feb 2019 | 2620 Jones St | lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replaceDetails
lobby: demo staff offices/restrms, kitch, market, dining area, confer rm. construt staff offi/restrms, kitch & sales office/gallery. renov/upgrade public restrms. garage a&b: demo storage, boh, mech rm, restrm. const boh office, storage, break rm, laundry, restrm, add 2 exit to e stairwells. replace | $800,000 | |
| May 17, 2018 | Never finaled issued Dec 2018, no final | 2620 Jones St | Smc Constracting Inc | corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated wallsDetails
corridors: remove & replace e wall sconces & recessed light fixtures in (e) soffits. guestrms: demo e entry door & hardware. install secondary acoustical window at bay st side rms. convert 1 typical guestroom to acces. suite. elec/linen closets: patch & repair e opening in 1hr & 2hr fire rated walls | $650,000 |
| Mar 29, 2018 | Completed final sign-off May 2019 | 55 04th St | Turner Construction Co | renovation to meeting rooms on levels b-1,b-2,2,4, & 5. work includes addition of operable partitions, new soffits, ada improvements, new lighting, some new electrical, replacement of fcu's and replacement of plumbing fixtures. n/a for maherDetails
renovation to meeting rooms on levels b-1,b-2,2,4, & 5. work includes addition of operable partitions, new soffits, ada improvements, new lighting, some new electrical, replacement of fcu's and replacement of plumbing fixtures. n/a for maher | $280,000 |
| Mar 27, 2018 | Never finaled filed Mar 2018, never issued | 55 04th St | interior renovation to public spaces of lobby area, incl lobby, registration, entry area, back of house area, administractive office, porte cochere, valet, cashier, valet storage, a new revolving door system & exit doors, lobby area and related 1st restrooms. maher n/a.Details
interior renovation to public spaces of lobby area, incl lobby, registration, entry area, back of house area, administractive office, porte cochere, valet, cashier, valet storage, a new revolving door system & exit doors, lobby area and related 1st restrooms. maher n/a. | $2,301,175 | |
| Mar 27, 2018 | Completed final sign-off Jun 2020 | 55 04th St | Hathaway Dinwiddie Co. | interior renovation of (e) non-accessible & accessible guestrooms, corridor,new finishes &fixtures, bathrms tub to shower conversions, new lighting very limited partition & rated wall const, no change to major plumbing & electrical. maher n/a.Details
interior renovation of (e) non-accessible & accessible guestrooms, corridor,new finishes &fixtures, bathrms tub to shower conversions, new lighting very limited partition & rated wall const, no change to major plumbing & electrical. maher n/a. | $2,800,000 |
| Nov 30, 2017 | Completed final sign-off Jul 2018 | 55 04th St | Hathaway Dinwiddie Co. | revision to 201709219211 scope is 1 tub to shower conversion to room 2433 maher naDetails
revision to 201709219211 scope is 1 tub to shower conversion to room 2433 maher na | $5,000 |
| Sep 21, 2017 | Completed final sign-off Mar 2019 | 55 04th St | Hathaway Dinwiddie Co. | removate 3 extg guestrooms as "model" rooms - portion of 1 corridor, rooms 1731, 1833 and 1933. remodel includes new finishes, 1 tub to shower conversion and replacement of outlets to tamper proof outlets, replacement of thermostat. n/a for maher.Details
removate 3 extg guestrooms as "model" rooms - portion of 1 corridor, rooms 1731, 1833 and 1933. remodel includes new finishes, 1 tub to shower conversion and replacement of outlets to tamper proof outlets, replacement of thermostat. n/a for maher. | $70,000 |
| Jul 5, 2017 | Completed final sign-off Aug 2019 | 55 04th St | Turner Construction Co | repair exterior soffit facciaDetails
repair exterior soffit faccia | $30,000 |
| Jul 14, 2016 | Completed final sign-off Oct 2017 | 1250 Columbus Av | Cw Horton General Contractor | renovate 285 (e) guestrooms include tub to shower pluming conversion. new fl & wall finishes & new ff & e. upgrade 10 (e) guestrm for accessiblity req. conversion of 17 (e) guestrm to communication rm. renovate (e) cordidors include replace decorative light fixture in kind. new led light in elevatoDetails
renovate 285 (e) guestrooms include tub to shower pluming conversion. new fl & wall finishes & new ff & e. upgrade 10 (e) guestrm for accessiblity req. conversion of 17 (e) guestrm to communication rm. renovate (e) cordidors include replace decorative light fixture in kind. new led light in elevato | $900,000 |
| Feb 18, 2016 | Completed final sign-off Oct 2016 | 480 Sutter St | Continental Contractors Inc | 2/f & 30/f - replacing finishes, replacing wall sconces, replacing decorative light fixtures & relocae electrical devices. n/a ordinance #155-13Details
2/f & 30/f - replacing finishes, replacing wall sconces, replacing decorative light fixtures & relocae electrical devices. n/a ordinance #155-13 | $62,560 |
| Jul 8, 2015 | Completed final sign-off Mar 2016 | 55 04th St | Hathaway Dinwiddie Co. | renovate existing 2nd floor concierge "m lounge" including new finishes & furnishings. n/a maher ordinanceDetails
renovate existing 2nd floor concierge "m lounge" including new finishes & furnishings. n/a maher ordinance | $95,000 |
| Jul 8, 2015 | Completed final sign-off Dec 2016 | 55 04th St | Hathaway Dinwiddie Co. | renovate (e) 4th flr fitness center & existing men's & women's locker rooms & add (4) new treatment rooms incl. new fcu's ductwrok & lighting. renovate (e) 5th flr pool deck & convert to fitness center. infill (e) pool & spa & remove (e) shower & restrm. new finishes & equip thru n/a maher ordinanceDetails
renovate (e) 4th flr fitness center & existing men's & women's locker rooms & add (4) new treatment rooms incl. new fcu's ductwrok & lighting. renovate (e) 5th flr pool deck & convert to fitness center. infill (e) pool & spa & remove (e) shower & restrm. new finishes & equip thru n/a maher ordinance | $450,000 |
| Jul 8, 2015 | Expired or cancelled cancelled Jan 2026 | 55 04th St | convert existing 18th floor concierge lounge to (4) guestroom keys with guest baths including new fcu's, plumbing fixtures & lighting. n/a maher ordinanceDetails
convert existing 18th floor concierge lounge to (4) guestroom keys with guest baths including new fcu's, plumbing fixtures & lighting. n/a maher ordinance | $140,000 | |
| Feb 12, 2015 | Completed final sign-off Mar 2016 | 55 04th St | Hathaway Dinwiddie Co. | remove extg lobby level starbucks and convert to grab "n" go market. n/a for the maher. including furnishings and fixtures, equipment (no hood), ceiling reconfiguration and new walkin cooler. fire alarm and sprinkler on separate permits.Details
remove extg lobby level starbucks and convert to grab "n" go market. n/a for the maher. including furnishings and fixtures, equipment (no hood), ceiling reconfiguration and new walkin cooler. fire alarm and sprinkler on separate permits. | $125,000 |
| Jan 31, 2014 | Completed final sign-off May 2016 | 32 Battery St | Principal Builders Inc. | interior improvement to ground level parking garage, includes new ceiling, lighting, painting, valet desk, screens and fences, exterior improvements to streeet facade include painting and reforms, new signage; compliance with ord 155-13 not requiredDetails
interior improvement to ground level parking garage, includes new ceiling, lighting, painting, valet desk, screens and fences, exterior improvements to streeet facade include painting and reforms, new signage; compliance with ord 155-13 not required | $160,000 |
| May 24, 2013 | Completed final sign-off Jan 2014 | 55 04th St | Cw Horton General Contractor | revision to pa 201209270830. disable access voluntary upgrades to public spaces or hotel - omit partial slope to 4th street bar and grill. add men and women's dry sauna modifications. - add mission a2.5 sheetDetails
revision to pa 201209270830. disable access voluntary upgrades to public spaces or hotel - omit partial slope to 4th street bar and grill. add men and women's dry sauna modifications. - add mission a2.5 sheet | |
| Jan 4, 2013 | Completed final sign-off Dec 2013 | 55 04th St | Cw Horton General Contractor | revision to app#201209270830. new added scope is to install new disabled access pool lifts(2) to extg indoor pool and spa located on 5th level of hotel.Details
revision to app#201209270830. new added scope is to install new disabled access pool lifts(2) to extg indoor pool and spa located on 5th level of hotel. | $8,000 |
| Feb 23, 2012 | Completed final sign-off Jul 2013 | 55 04th St | Cw Horton General Contractor | 40 guestroom ada modifications; remodel to conciege lounge & pantry guestroom bathroom backlit mirrors (electrical work - 1500 rooms).Details
40 guestroom ada modifications; remodel to conciege lounge & pantry guestroom bathroom backlit mirrors (electrical work - 1500 rooms). | $650,000 |
| Oct 27, 2005 | Expired or cancelled expired Dec 2013 | 55 04th St | renovation of club room, view lounge, new finishes, replace door 7 frames, vanities, light fixtures.Details
renovation of club room, view lounge, new finishes, replace door 7 frames, vanities, light fixtures. | $420,000 | |
| Mar 31, 2005 | Never finaled issued Jun 2005, no final | 55 04th St | renovation of conclerge lounge & forty (e) suites, including two ada suites w/rool in showers.Details
renovation of conclerge lounge & forty (e) suites, including two ada suites w/rool in showers. | $400,000 |