Block 4109, lot 001
1060 Illinois St
- City’s use
- Industrial
- Built
- 1924
- Stories
- 4
- Units
- 4
- Rooms
- 20 bathrooms
- Lot
- 173,198 sq ft
- Zoning
- M2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1060 Illinois St | ti. improvement of 2 new plumbing fixtures: installatin of 1 handwashing sink and 1 three compartment sink in (e) bar counter.Details
ti. improvement of 2 new plumbing fixtures: installatin of 1 handwashing sink and 1 three compartment sink in (e) bar counter. | $40,500 | |
| Sep 22, 2026 | In progress issued Sep 2026 | 2427 03rd St | Dajani Construction | ti improvements, interior renovation with ada all gender restrooms, new stairs to 2nd floor space, new finishes to prepare space for future restaurant tenant.Details
ti improvements, interior renovation with ada all gender restrooms, new stairs to 2nd floor space, new finishes to prepare space for future restaurant tenant. | $25,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 1030 Illinois St | C T W Mechanical | add one type i hood to (e) kitchen, install two split type heatpumps an exhaust fanDetails
add one type i hood to (e) kitchen, install two split type heatpumps an exhaust fan | $45,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 660 22nd St | Dajani Construction | install of new accessible ramp and stairs and interior glazing.Details
install of new accessible ramp and stairs and interior glazing. | $44,275 |
| Mar 12, 2026 | In progress issued Apr 2026 | 2475 03rd St | Dajani Construction | suite #269: tenant improvement renovation of an existing 2058 sqft space into research laboratoryDetails
suite #269: tenant improvement renovation of an existing 2058 sqft space into research laboratory | $75,000 |
| Dec 10, 2025 | In progress issued Dec 2025 | 2415 03rd St | C T W Mechanical | suite 257-267: install four split heatpump systemsDetails
suite 257-267: install four split heatpump systems | $79,000 |
| Oct 15, 2025 | Completed final sign-off Oct 2025 | 2495 03rd St | Safe Assurance Fire Protection | modifty (e) fire suppression system for changes made to cooking equipment. ref t.i. 202505136342.Details
modifty (e) fire suppression system for changes made to cooking equipment. ref t.i. 202505136342. | $5,500 |
| Aug 22, 2025 | In progress filed Aug 2025, not yet issued | 2415 03rd St | Dajani Construction | remove "mechanical under separate permit" from bpa #202406275448.Details
remove "mechanical under separate permit" from bpa #202406275448. | |
| Aug 7, 2025 | Completed final sign-off Aug 2026 | 2345 03rd St | L.D. Strobel Co Ltd | remove (12) antennas, install (8) new antennas, install (e) remote radios behind antennas. install antennas connector shrouds at existing verizon wireless roof facility.Details
remove (12) antennas, install (8) new antennas, install (e) remote radios behind antennas. install antennas connector shrouds at existing verizon wireless roof facility. | $48,750 |
| May 13, 2025 | Completed final sign-off Mar 2026 | 2495 03rd St | Dajani Construction | commerical ti: interior remodel of (e) restaurant space. non bearing partitions, finishes & furnishing + lighting in dining areas. remove (e) bar for smaller service bar. accessibility improvements at bathroom & entry. (e) commercial kitchen to remain, repair finishes. no mechanical workDetails
commerical ti: interior remodel of (e) restaurant space. non bearing partitions, finishes & furnishing + lighting in dining areas. remove (e) bar for smaller service bar. accessibility improvements at bathroom & entry. (e) commercial kitchen to remain, repair finishes. no mechanical work | $297,000 |
| Apr 15, 2025 | In progress issued Apr 2025 | 660 22nd St | Dajani Construction | relocate tenant demising partition between 2 existing retail spaces. relocate existing tenant bathrooms.Details
relocate tenant demising partition between 2 existing retail spaces. relocate existing tenant bathrooms. | $12,000 |
| Mar 28, 2025 | Completed final sign-off Apr 2025 | 2415 03rd St | Safe Assurance Fire Protection | suite #297 ref pa # 2024-0627-5448 modification of an (e) fire sprinkler system for ti improvements- add 11 fire sprinkler headsDetails
suite #297 ref pa # 2024-0627-5448 modification of an (e) fire sprinkler system for ti improvements- add 11 fire sprinkler heads | $6,000 |
| Dec 2, 2024 | In progress filed Dec 2024, not yet issued | 2325 03rd St | 4/fl-ste 410-411-install 5 prefab phone boothsDetails
4/fl-ste 410-411-install 5 prefab phone booths | $30,000 | |
| Dec 2, 2024 | Completed final sign-off Aug 2025 | 2345 03rd St | Dajani Construction | removal of brick infill facade at ground floor at southwest corner of the building and install 5 new windows to match (e) windows.Details
removal of brick infill facade at ground floor at southwest corner of the building and install 5 new windows to match (e) windows. | $25,000 |
| Nov 21, 2024 | Completed final sign-off Dec 2024 | 2345 03rd St | Mid-Peninsula Roofing Inc | no hot works- roof repair: overlay existing mineral surface cap sheet (1 layer) with fully adhered 115mil fleece bark tpo membrane 90sq sri 75Details
no hot works- roof repair: overlay existing mineral surface cap sheet (1 layer) with fully adhered 115mil fleece bark tpo membrane 90sq sri 75 | $85,200 |
| Oct 24, 2024 | In progress filed Oct 2024, not yet issued | 2301 03rd St | dish wireless: install 6 new antennas, 12 new rrus, 1 new equipment rack, 1 new electrical panel. no proposed batteries.Details
dish wireless: install 6 new antennas, 12 new rrus, 1 new equipment rack, 1 new electrical panel. no proposed batteries. | $150,000 | |
| Jul 29, 2024 | Completed final sign-off Aug 2025 | 2345 03rd St | Battalion One Fire Protection | freight elevator #4 modernization. install new smoke detectors at elevator landings. new smokes and heats in the elevator machine room with modules for elevator monitoring.Details
freight elevator #4 modernization. install new smoke detectors at elevator landings. new smokes and heats in the elevator machine room with modules for elevator monitoring. | $6,000 |
| Jun 27, 2024 | In progress issued Sep 2024 | 2415 03rd St | Dajani Construction | ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit.Details
ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit. | $70,000 |
| Jun 5, 2024 | In progress filed Jun 2024, not yet issued | 2345 03rd St | (verizon wireless) the current facility is a rooftop wireless communications facility with 12 flush mounted antennas on the side of the building. the proposal involves removing the 12 antennas and installing 6 new antennas on the side of the building and penthouse. a small rf screenwall will be instDetails
(verizon wireless) the current facility is a rooftop wireless communications facility with 12 flush mounted antennas on the side of the building. the proposal involves removing the 12 antennas and installing 6 new antennas on the side of the building and penthouse. a small rf screenwall will be inst | $48,750 | |
| Jun 3, 2024 | In progress issued Sep 2024 | 2415 03rd St | Dajani Construction | rev 202402025206- office ti for interiro revisions. minor changes to layout exterior window wall.Details
rev 202402025206- office ti for interiro revisions. minor changes to layout exterior window wall. | |
| May 23, 2024 | Completed final sign-off May 2025 | 2343 03rd St | C T W Mechanical | ste 330: install split system heatpump for humidity control. condensing unit on roofDetails
ste 330: install split system heatpump for humidity control. condensing unit on roof | $15,000 |
| Apr 9, 2024 | Expired or cancelled withdrawn Dec 2024 | 2495 03rd St | Dajani Construction | install nw window at front elevation - no interior changes.Details
install nw window at front elevation - no interior changes. | $18,000 |
| Feb 2, 2024 | Completed final sign-off Jul 2024 | 2415 03rd St | Dajani Construction | 2/f: demolition of some ceiling partitions, new partition walls, tenant improvements. ti to establish office use per permitnumber 2018-0615-1968Details
2/f: demolition of some ceiling partitions, new partition walls, tenant improvements. ti to establish office use per permitnumber 2018-0615-1968 | $175,000 |
| Dec 1, 2023 | In progress issued Feb 2024 | 2301 03rd St | Tilson Technology Management Inc | removing all t-mobile(sprint)equipment,antenna,lines,all cabinets on the ground,ice bridge and any associated hardware. there will be no new installation of equipment and no other alerations to the building.Details
removing all t-mobile(sprint)equipment,antenna,lines,all cabinets on the ground,ice bridge and any associated hardware. there will be no new installation of equipment and no other alerations to the building. | $16,280 |
| Jun 23, 2023 | Completed final sign-off Jan 2025 | 2341 03rd St | modify existing retail space into barber shop. existing accessible restroom to remain. no extrerior work proposed. satisfy nov 202305053Details
modify existing retail space into barber shop. existing accessible restroom to remain. no extrerior work proposed. satisfy nov 202305053 | $45,000 | |
| Dec 27, 2022 | Completed final sign-off Dec 2023 | 2475 03rd St | C T W Mechanical | suite # 253: revison to pa# 2022-0929-3447- delete one added fancoil & heatpump.Details
suite # 253: revison to pa# 2022-0929-3447- delete one added fancoil & heatpump. | |
| Dec 27, 2022 | Completed final sign-off Dec 2023 | 2475 03rd St | C T W Mechanical | suite # 250: install new cooling coil & outdoor condenser for existing furnace.Details
suite # 250: install new cooling coil & outdoor condenser for existing furnace. | $6,000 |
| Sep 29, 2022 | Completed final sign-off Dec 2023 | 2475 03rd St | C T W Mechanical | space 253 - install 2 coils and condensers for two (e) furnances install 1 split type heat pump for (e) conference roomDetails
space 253 - install 2 coils and condensers for two (e) furnances install 1 split type heat pump for (e) conference room | $20,000 |
| Jun 28, 2022 | Never finaled issued Jun 2022, no final | 1080 Illinois St | change address at pa #202104027851 from 610 22nd st to 1080 illinois st at apn 4109/001Details
change address at pa #202104027851 from 610 22nd st to 1080 illinois st at apn 4109/001 | ||
| Jan 13, 2022 | Expired or cancelled cancelled Jan 2026 | 2325 03rd St | t-mobile: install 9 new rrus; install 6 new antennas behind 2 new frp screens; remove 3 (e) antennas; remove 1 (e) rack; install 2 new racks; install new batteries; install new 100a breaker.Details
t-mobile: install 9 new rrus; install 6 new antennas behind 2 new frp screens; remove 3 (e) antennas; remove 1 (e) rack; install 2 new racks; install new batteries; install new 100a breaker. | $75,000 | |
| Dec 1, 2021 | Completed final sign-off Oct 2022 | 2345 03rd St | Battalion One Fire Protection | remove and replace smoke detectors & relay modules for the elevator t.i.Details
remove and replace smoke detectors & relay modules for the elevator t.i. | $5,500 |
| Dec 1, 2021 | Completed final sign-off Feb 2022 | 970 Illinois St | Battalion One Fire Protection | add monitor modules to monitor the fan coil units. duct detectors and relay modules are by others.Details
add monitor modules to monitor the fan coil units. duct detectors and relay modules are by others. | $2,500 |
| Nov 18, 2021 | Completed final sign-off Feb 2022 | 2325 03rd St | suites 213 and 214: remodeling an extg manufactoring space into a lab and office suite. new accessible restroom and conference room.Details
suites 213 and 214: remodeling an extg manufactoring space into a lab and office suite. new accessible restroom and conference room. | $98,000 | |
| Sep 1, 2021 | Expired or cancelled withdrawn Apr 2024 | 2345 03rd St | Centric Construction Inc | t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permitDetails
t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit | $653,000 |
| Aug 25, 2021 | Completed final sign-off Feb 2022 | 2325 03rd St | Dajani Construction | suite #422:modifying an extg manufacturing facility to add a lab component. new accessible restroom and 2 staff kitchenettes. no exterior changes to exterior of building. no structural work. fully sprinkler unit suite #422Details
suite #422:modifying an extg manufacturing facility to add a lab component. new accessible restroom and 2 staff kitchenettes. no exterior changes to exterior of building. no structural work. fully sprinkler unit suite #422 | $253,000 |
| Aug 5, 2021 | Expired or cancelled withdrawn Oct 2023 | 2345 03rd St | modify existing rooftop wireless telecom facility. remove 12 antennas, flush mounted to sides o builing and rooftop. replace 9 new antennas into new rooftop mounted rf screened box.Details
modify existing rooftop wireless telecom facility. remove 12 antennas, flush mounted to sides o builing and rooftop. replace 9 new antennas into new rooftop mounted rf screened box. | $97,100 | |
| Jul 1, 2021 | Completed final sign-off Jun 2023 | 2325 03rd St | Dajani Construction | suite 327 & 328:modifying an existing manufacturing space into a cancer research lab. no exterior facade changes.Details
suite 327 & 328:modifying an existing manufacturing space into a cancer research lab. no exterior facade changes. | $101,000 |
| Apr 2, 2021 | Completed final sign-off Apr 2022 | 610 22nd St | Dajani Construction | alteration to facade and interior to include new storefront entry on illinois st, new entry lobby with stair & ada lift.Details
alteration to facade and interior to include new storefront entry on illinois st, new entry lobby with stair & ada lift. | $150,000 |
| Mar 9, 2021 | Completed final sign-off Jan 2022 | 2325 03rd St | Dajani Construction | ste #403: modifying a vacant manufacturing space into a covid-19 testing lab and kit distribution center. no structural work.Details
ste #403: modifying a vacant manufacturing space into a covid-19 testing lab and kit distribution center. no structural work. | $101,000 |
| Dec 18, 2020 | Expired or cancelled cancelled Jan 2026 | 2325 03rd St | suite #215-219: pdr space only. work includes adjustments to restrooms and breakroom areas. no structural or mep work. no change of use.Details
suite #215-219: pdr space only. work includes adjustments to restrooms and breakroom areas. no structural or mep work. no change of use. | $15,000 | |
| Oct 19, 2020 | Completed final sign-off Jun 2021 | 2455 03rd St | Dajani Construction | modifying an existing industrial space into a tattoo art salon and retial shop. install 10 treatment rooms.Details
modifying an existing industrial space into a tattoo art salon and retial shop. install 10 treatment rooms. | $75,000 |
| Sep 26, 2020 | Never finaled issued Nov 2020, no final | 2415 03rd St | create mail room in an exist warehouse spaceDetails
create mail room in an exist warehouse space | $15,000 | |
| Aug 24, 2020 | Completed final sign-off Mar 2022 | 966 Illinois St | Dajani Construction | modify existing distribution space into a food processing and research space. new walk-in refridgerator. new electrical & plumbing layout.Details
modify existing distribution space into a food processing and research space. new walk-in refridgerator. new electrical & plumbing layout. | $208,000 |
| Jul 1, 2020 | Completed final sign-off Apr 2022 | 2347 03rd St | D & R Const | expand (e) restaurant into (e) storage space. add new walk in cooler. no changes to (e) kitchen. sprinkler under sep permit.Details
expand (e) restaurant into (e) storage space. add new walk in cooler. no changes to (e) kitchen. sprinkler under sep permit. | $45,000 |
| Jun 19, 2020 | Never finaled issued Jun 2020, no final | 2345 03rd St | street spaceDetails
street space | ||
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 2345 03rd St | street spaceDetails
street space | ||
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 2345 03rd St | street spaceDetails
street space | ||
| Dec 31, 2019 | Never finaled issued Dec 2019, no final | 2345 03rd St | street spaceDetails
street space | ||
| Dec 24, 2019 | Expired or cancelled cancelled Jan 2026 | 2325 03rd St | Jose Viera | unit #410: remove old break room kitchen and install new kitchen with new cabinets, dishwasher, sink and shelves.Details
unit #410: remove old break room kitchen and install new kitchen with new cabinets, dishwasher, sink and shelves. | $25,000 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 2345 03rd St | Acco Engineered Systems Inc. Dba Acco En | add new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maherDetails
add new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maher | $530,000 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 2339 03rd St | Jose Viera | revision to appoved pa #2019-0703-5099: relocate new wall shown on plansDetails
revision to appoved pa #2019-0703-5099: relocate new wall shown on plans | |
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 2339 03rd St | C T W Mechanical | remove existing baseboard heaters and install 2 rooftop heatpumps and 1 split heatpump unit to replace existingDetails
remove existing baseboard heaters and install 2 rooftop heatpumps and 1 split heatpump unit to replace existing | $40,000 |
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 2345 03rd St | street spaceDetails
street space | ||
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 2345 03rd St | Battalion One Fire Protection | due to elevator modernization on the south side of the bldg, new smoke detectors & relay modules will be installed for elevator recall & relay modules to release door holders for the south stairwell. new devices will be tie-in to existin control panel. ref pa 2018-0510-8764Details
due to elevator modernization on the south side of the bldg, new smoke detectors & relay modules will be installed for elevator recall & relay modules to release door holders for the south stairwell. new devices will be tie-in to existin control panel. ref pa 2018-0510-8764 | $5,000 |
| Oct 22, 2019 | Expired or cancelled cancelled Jan 2026 | 2301 03rd St | install new fiber through conduitDetails
install new fiber through conduit | $11,100 | |
| Oct 10, 2019 | Never finaled issued Jan 2020, no final | 2345 03rd St | street spaceDetails
street space | ||
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 2325 03rd St | Sprk Fire S F | fire protection wet pipe (e) system to be modified to conform to new layout nfpa#13Details
fire protection wet pipe (e) system to be modified to conform to new layout nfpa#13 | $1,850 |
| Sep 12, 2019 | Completed final sign-off Nov 2019 | 605 20th St | Battalion One Fire Protection | add and/or relocate (e) upright & pendant sprinklers to accomodate the (n) wall & ceiling layout for the tenant improvementDetails
add and/or relocate (e) upright & pendant sprinklers to accomodate the (n) wall & ceiling layout for the tenant improvement | $105,000 |
| Aug 27, 2019 | Never finaled issued Aug 2019, no final | 2345 03rd St | street spaceDetails
street space | ||
| Aug 5, 2019 | Completed final sign-off Aug 2019 | 2325 03rd St | Sprk Fire S F | ste 205 - fire protection wet pipe/arrange to conform to nfpa 13; existing system add fire head. ref pa 2019-0614-3427Details
ste 205 - fire protection wet pipe/arrange to conform to nfpa 13; existing system add fire head. ref pa 2019-0614-3427 | $2,200 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 2345 03rd St | street spaceDetails
street space | ||
| Jul 3, 2019 | Completed final sign-off Aug 2020 | 2339 03rd St | Jose Viera | 4th flr, ste 4r modifiying (e) production, fabrication and office space into a(n) production, literature processing and archive storage area. (e) restrooms to remain. mep under separate permit. 6463 sq ft on 4th flr. no exterior or structural workDetails
4th flr, ste 4r modifiying (e) production, fabrication and office space into a(n) production, literature processing and archive storage area. (e) restrooms to remain. mep under separate permit. 6463 sq ft on 4th flr. no exterior or structural work | $135,000 |
| Jun 27, 2019 | Completed final sign-off Nov 2019 | 605 20th St | Battalion One Fire Protection | 1st fl and mezzanine - install new power supply panel & smoke detector above at new tenant space on 1st fl. install notification devices thru out for complete coverage. new devices will be tied in to existing control panel located at 2325 3rd st. ref pa 2019-0305-4412 and 2018-0510-8764Details
1st fl and mezzanine - install new power supply panel & smoke detector above at new tenant space on 1st fl. install notification devices thru out for complete coverage. new devices will be tied in to existing control panel located at 2325 3rd st. ref pa 2019-0305-4412 and 2018-0510-8764 | $14,000 |
| Jun 14, 2019 | Completed final sign-off Jan 2020 | 2325 03rd St | Huff Construction Company Inc | revision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205Details
revision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205 | |
| May 30, 2019 | Expired or cancelled expired Feb 2025 | 2325 03rd St | Jose Viera | ste 4r - demo non-structural partitions. no plumbing or elec demoDetails
ste 4r - demo non-structural partitions. no plumbing or elec demo | $15,000 |
| May 29, 2019 | Completed final sign-off Oct 2020 | 605 20th St | Truebeck Construction | mechanical work per pa 2019-0305-4412. hvac & cooling system for manufacturing spaceDetails
mechanical work per pa 2019-0305-4412. hvac & cooling system for manufacturing space | $1,250,000 |
| May 1, 2019 | Never finaled issued May 2019, no final | 2345 03rd St | street spaceDetails
street space | ||
| Mar 12, 2019 | Never finaled issued Mar 2019, no final | 2345 03rd St | street spaceDetails
street space | ||
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 2347 03rd St | Edison Fire Extinguisher Company Inc | 1st fl: ul 300 fire system installation. n/a for maherDetails
1st fl: ul 300 fire system installation. n/a for maher | $1,000 |
| Mar 5, 2019 | Completed final sign-off Oct 2020 | 605 20th St | Truebeck Construction | new tenant improvement for new manufacturing space, mezzanine & office. mep deferred submittal. n/a for maher.Details
new tenant improvement for new manufacturing space, mezzanine & office. mep deferred submittal. n/a for maher. | $1,300,000 |
| Feb 26, 2019 | Completed final sign-off Apr 2019 | 2347 03rd St | Battalion One Fire Protection | due to interior remodel @ 2347 for new tenant, new monitor module will be installed to connect ansul system to (e) panel to be monitor. ref pa 2018-0424-7241 and 2018-0510-8764Details
due to interior remodel @ 2347 for new tenant, new monitor module will be installed to connect ansul system to (e) panel to be monitor. ref pa 2018-0424-7241 and 2018-0510-8764 | $1,000 |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 2427 03rd St | Collier-Ostrom Enterprise | to obtain final inspection for work approved under pa#201703091058. all work is completeDetails
to obtain final inspection for work approved under pa#201703091058. all work is complete | |
| Jan 30, 2019 | Never finaled issued Jan 2019, no final | 605 20th St | Aquamatic Fire Protection | 1/f:demo 25 pendent fire sprinklers and supply piping ref 201812319395. no underground work.Details
1/f:demo 25 pendent fire sprinklers and supply piping ref 201812319395. no underground work. | $6,800 |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 2345 03rd St | street spaceDetails
street space | ||
| Dec 31, 2018 | Completed final sign-off May 2019 | 605 20th St | Rossi Builders Inc. | demo to existing offices (non structural) partitions, glazing and doors. use approval for new 22,000 sf build out and planning use approval for space design. no change of use. full accessibility compliance to be filed per ab-017 for tenant improvement.Details
demo to existing offices (non structural) partitions, glazing and doors. use approval for new 22,000 sf build out and planning use approval for space design. no change of use. full accessibility compliance to be filed per ab-017 for tenant improvement. | $55,000 |
| Dec 6, 2018 | Never finaled issued Dec 2018, no final | 2415 03rd St | M C S Construction Services | ste 237 - ref pa 2018-0917-05007 & 2018-1126-6699 mep upgrades t24 compliant exsitng plumbing, mechanical and electrical to be utilizedDetails
ste 237 - ref pa 2018-0917-05007 & 2018-1126-6699 mep upgrades t24 compliant exsitng plumbing, mechanical and electrical to be utilized | $95,000 |
| Nov 26, 2018 | Never finaled issued Dec 2018, no final | 2415 03rd St | M C S Construction Services | revision 201809170507: double wall partitions changed to single wall; revision to lighting, revision to outlets. remove furred out wallsDetails
revision 201809170507: double wall partitions changed to single wall; revision to lighting, revision to outlets. remove furred out walls | |
| Nov 15, 2018 | Completed final sign-off Nov 2018 | 2419 03rd St | Battalion One Fire Protection | due to interior remodeling - new tenant, new monitor will be install to connect to ansul syste, & relay modules to shut down 2 duct detectors. new devices will be tie in to (e) panel @#2325. ref 201712217117, 201805108746Details
due to interior remodeling - new tenant, new monitor will be install to connect to ansul syste, & relay modules to shut down 2 duct detectors. new devices will be tie in to (e) panel @#2325. ref 201712217117, 201805108746 | $3,200 |
| Nov 14, 2018 | Completed final sign-off Dec 2018 | 2419 03rd St | E B Gilmore & Sons Mech Svcs Inc | supply & install 1 exhaust hood type 1 & make up air system; supply & install 1 forced air furnace & bathroom exhaustDetails
supply & install 1 exhaust hood type 1 & make up air system; supply & install 1 forced air furnace & bathroom exhaust | $95,000 |
| Nov 5, 2018 | Completed final sign-off Apr 2024 | 2415 03rd St | Dajani Construction | suite 271: remodeling of (e) production, distribution and office space into an office space. new accessible toilet added. no eterior work proposed. no structural work. mep deffered. maher n/a.Details
suite 271: remodeling of (e) production, distribution and office space into an office space. new accessible toilet added. no eterior work proposed. no structural work. mep deffered. maher n/a. | $215,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2018 | 2419 03rd St | Huff Construction Company Inc | electrical title 24 for pa 201712217117. maher n/aDetails
electrical title 24 for pa 201712217117. maher n/a | |
| Oct 30, 2018 | Never finaled issued Oct 2018, no final | 2345 03rd St | street spaceDetails
street space | ||
| Oct 23, 2018 | Expired or cancelled withdrawn Oct 2021 | 2301 03rd St | remove and replace 3 extg antennas w/3 proposed antennas, 1 per sector(painted to match bldg). r/r 3 extg 2.5 rru w/(3)(p) 2.5 rru, 1 per sector. install (3) 800 rru and (3) 1900 rru, 1 of each per sector. r/r 1 extg equip rack w/1 indoor equip cabinet & 1 battery cabinet. r/r 3 extg cables w/3Details
remove and replace 3 extg antennas w/3 proposed antennas, 1 per sector(painted to match bldg). r/r 3 extg 2.5 rru w/(3)(p) 2.5 rru, 1 per sector. install (3) 800 rru and (3) 1900 rru, 1 of each per sector. r/r 1 extg equip rack w/1 indoor equip cabinet & 1 battery cabinet. r/r 3 extg cables w/3 | $15,000 | |
| Oct 22, 2018 | Never finaled issued Oct 2018, no final | 2345 03rd St | street spaceDetails
street space | ||
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 2345 03rd St | street spaceDetails
street space | ||
| Oct 4, 2018 | Completed final sign-off Dec 2018 | 2415 03rd St | Pioneer Fire Inc. | ste 237 - relocate 7 pendents. ref pa 2018-0917-0507Details
ste 237 - relocate 7 pendents. ref pa 2018-0917-0507 | $5,659 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 2415 03rd St | Truebeck Construction | suite 270: revision to permit #201808308730. add additional steel support to stair landing.Details
suite 270: revision to permit #201808308730. add additional steel support to stair landing. | $5,000 |
| Sep 18, 2018 | Completed final sign-off Dec 2018 | 2419 03rd St | International Fire Equip | ref pa# 201712217117; install ul 300 fire system n/a maherDetails
ref pa# 201712217117; install ul 300 fire system n/a maher | $6,500 |
| Sep 17, 2018 | Never finaled issued Oct 2018, no final | 2415 03rd St | M C S Construction Services | interior t.i.-renovation of (e) aiv studio including 2 new studios, new acoustical treatments, partitions, lighting, new doors, renovate (e) ada restroom. no exterior changes, mep permits are separate.Details
interior t.i.-renovation of (e) aiv studio including 2 new studios, new acoustical treatments, partitions, lighting, new doors, renovate (e) ada restroom. no exterior changes, mep permits are separate. | $115,000 |
| Aug 30, 2018 | Completed final sign-off Jan 2020 | 2325 03rd St | Truebeck Construction | revision to 201806151968 to install guard rail at (e) non-operable roll up door. also cantilever and joist detail change maher naDetails
revision to 201806151968 to install guard rail at (e) non-operable roll up door. also cantilever and joist detail change maher na | $15,000 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 2419 03rd St | Battalion One Fire Protection | revision to 201808036368 - revised for field conditions, supply to adjacent area from own riserDetails
revision to 201808036368 - revised for field conditions, supply to adjacent area from own riser | |
| Aug 3, 2018 | Completed final sign-off Nov 2018 | 2419 03rd St | Battalion One Fire Protection | modification of sprinkler system for tenant improvements. 25 sprinklers. ref# 2017-1221-7117.Details
modification of sprinkler system for tenant improvements. 25 sprinklers. ref# 2017-1221-7117. | $15,000 |
| Jul 25, 2018 | Never finaled issued Jul 2018, no final | 2419 03rd St | street spaceDetails
street space | ||
| Jul 20, 2018 | Completed final sign-off Sep 2018 | 2415 03rd St | Battalion One Fire Protection | due to interior remodeling in suite #270 new power supply and smoke detector above will be install on 2nd floor. new notification appliances will be install thu-out. relay modules to shut down duct detectors. new devices will be tie-in to extg panel at #2325 3rd st. #201806252784 and 201806151968Details
due to interior remodeling in suite #270 new power supply and smoke detector above will be install on 2nd floor. new notification appliances will be install thu-out. relay modules to shut down duct detectors. new devices will be tie-in to extg panel at #2325 3rd st. #201806252784 and 201806151968 | $10,000 |
| Jul 20, 2018 | Never finaled issued Jul 2018, no final | 2345 03rd St | Battalion One Fire Protection | as built to app#201805108464. revised devices address point members to reflect the job site. install relay module for freight elev. recallDetails
as built to app#201805108464. revised devices address point members to reflect the job site. install relay module for freight elev. recall | |
| Jul 13, 2018 | Completed final sign-off Sep 2018 | 2325 03rd St | Battalion One Fire Protection | fire sprinkler system modifications for a new tenant. 66 new sprinklers. n/a for maher.Details
fire sprinkler system modifications for a new tenant. 66 new sprinklers. n/a for maher. | $80,000 |
| Jul 11, 2018 | Never finaled issued Sep 2018, no final | 2475 03rd St | Dajani Construction | adding an accessible restroom closet and changing room to an (e) office and manfu space on the 3rd flrDetails
adding an accessible restroom closet and changing room to an (e) office and manfu space on the 3rd flr | $50,000 |
| Jun 29, 2018 | Completed final sign-off Jan 2020 | 2325 03rd St | Decker Electric Co Inc Electrical Contra | electrical improvements referring to application #201806151968 n/a for maher= 2nd and mezz. mechnical 201806252784- sprinklers and fire alarm separate permitDetails
electrical improvements referring to application #201806151968 n/a for maher= 2nd and mezz. mechnical 201806252784- sprinklers and fire alarm separate permit | $200,000 |
| Jun 25, 2018 | Completed final sign-off Feb 2020 | 2325 03rd St | Acco Engineered Systems Inc. Dba Acco En | mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher naDetails
mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na | $450,000 |
| Jun 19, 2018 | Expired or cancelled expired Feb 2025 | 2325 03rd St | Dajani Construction | suite #405-406: remodeling an extg office space on the 4th floor of a four story building. n/a for maher mep deferred submittalDetails
suite #405-406: remodeling an extg office space on the 4th floor of a four story building. n/a for maher mep deferred submittal | $52,000 |
| Jun 15, 2018 | Completed final sign-off Feb 2020 | 2325 03rd St | Truebeck Construction | project consists of demo of non structural elements only including interior partitions,millwork, doors, ceilings, powers, lighting, finishes in suite 270.build out new int partitions, doors, finishe, ceilings, lighting for open office spaces meeting rooms, lounge space, break area,male female restrmDetails
project consists of demo of non structural elements only including interior partitions,millwork, doors, ceilings, powers, lighting, finishes in suite 270.build out new int partitions, doors, finishe, ceilings, lighting for open office spaces meeting rooms, lounge space, break area,male female restrm | $2,500,000 |
| Jun 5, 2018 | Completed final sign-off Feb 2019 | 2325 03rd St | Quality Telecom Consultants | attach pull box to extg bldg, run approx. 350 of 2" conduit through extg bldg. all interial. n/a for maherDetails
attach pull box to extg bldg, run approx. 350 of 2" conduit through extg bldg. all interial. n/a for maher | $23,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 2419 03rd St | street spaceDetails
street space | ||
| May 21, 2018 | Completed final sign-off Sep 2018 | 2419 03rd St | Huff Construction Company Inc | revised structural drawings for pa #201712217117. delete mechanical mezz. add columns under new mezz. in lieu of connection to building columns. does not affect occupant load count in the resturant.Details
revised structural drawings for pa #201712217117. delete mechanical mezz. add columns under new mezz. in lieu of connection to building columns. does not affect occupant load count in the resturant. | |
| May 10, 2018 | Never finaled issued May 2018, no final | 2345 03rd St | Battalion One Fire Protection | like for like fire system replacement w/ new control panel smoke & heat detectors pull stations at the same location install relay modules for existing elev. recall monitor modules to tie-in ex flow & tampers switches. install radio comm. connect ex. notification devices to new panelDetails
like for like fire system replacement w/ new control panel smoke & heat detectors pull stations at the same location install relay modules for existing elev. recall monitor modules to tie-in ex flow & tampers switches. install radio comm. connect ex. notification devices to new panel | $18,000 |
| Apr 24, 2018 | Completed final sign-off May 2019 | 2347 03rd St | C T W Mechanical | install type 1 hood, exhaust fan, makeup air fan ref 201608165132 maher not reqDetails
install type 1 hood, exhaust fan, makeup air fan ref 201608165132 maher not req | $30,000 |
| Mar 21, 2018 | Never finaled issued Mar 2018, no final | 2419 03rd St | street space permitDetails
street space permit | ||
| Feb 26, 2018 | Never finaled issued May 2018, no final | 2325 03rd St | Huff Construction Company Inc, Edenavow Construction & Design | create a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the extDetails
create a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the ext | $12,500 |
| Jan 16, 2018 | Completed final sign-off Apr 2018 | 2419 03rd St | Huff Construction Company Inc | ground floor - demolition of interior partition walls & one bathroom. no structural or exteriro work per ab-017. n/a maher ordinanceDetails
ground floor - demolition of interior partition walls & one bathroom. no structural or exteriro work per ab-017. n/a maher ordinance | $507 |
| Dec 21, 2017 | Completed final sign-off Dec 2018 | 2419 03rd St | Huff Construction Company Inc | change of use from f-2 to a-2. ground floor - interior tenant improvement for new restaurant space will be limited to new mezzanine, commercial ktichen, bar, bathrooms & storage. no exterior work. n/a maher ordinanceDetails
change of use from f-2 to a-2. ground floor - interior tenant improvement for new restaurant space will be limited to new mezzanine, commercial ktichen, bar, bathrooms & storage. no exterior work. n/a maher ordinance | $316,890 |
| Dec 6, 2017 | Expired or cancelled cancelled Jan 2026 | 2445 03rd St | modifying an extg pdr-1 space into a wine sales center. extg led lighting to remain, extg accessible entrance to space not disturbed. n/a for maherDetails
modifying an extg pdr-1 space into a wine sales center. extg led lighting to remain, extg accessible entrance to space not disturbed. n/a for maher | $17,000 | |
| Sep 25, 2017 | Expired or cancelled cancelled Jan 2026 | 2341 03rd St | ground fl: remodeling an (e) production, distribution and manufacturing space into an accessory retail space. new shelving and casework. no electrical & plumbing work proposed. maher naDetails
ground fl: remodeling an (e) production, distribution and manufacturing space into an accessory retail space. new shelving and casework. no electrical & plumbing work proposed. maher na | $15,000 | |
| Sep 11, 2017 | Never finaled issued Sep 2017, no final | 2495 03rd St | Dajani Construction | installed lighting in new restroom. deferred submittal per pa 2017-0721-2673Details
installed lighting in new restroom. deferred submittal per pa 2017-0721-2673 | |
| Jul 31, 2017 | Never finaled issued Jul 2017, no final | 2495 03rd St | Dajani Construction | demolition only per ab 017, remove old hardwood floors and interior furnishings and replace with new. n/a for maher. all fire ratings maintained during constructionDetails
demolition only per ab 017, remove old hardwood floors and interior furnishings and replace with new. n/a for maher. all fire ratings maintained during construction | $15,000 |
| Jul 28, 2017 | Expired or cancelled expired Feb 2025 | 2325 03rd St | Dajani Construction | 3/f #329- remodeling an existing office space into a design studio and administration center/business office. n/a ordinance #155-13Details
3/f #329- remodeling an existing office space into a design studio and administration center/business office. n/a ordinance #155-13 | $75,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2017 | 2495 03rd St | remodeling (e) restaurant space w/new light fixtures and minimal electrical work. remodeled dining room and bar extension. no changes to existing structural support members.Details
remodeling (e) restaurant space w/new light fixtures and minimal electrical work. remodeled dining room and bar extension. no changes to existing structural support members. | $62,000 | |
| May 30, 2017 | Completed final sign-off Jun 2017 | 2419 03rd St | Pro Plumbing & Fire Sprinkler Inc | add one sprinkler head in bathroom maher naDetails
add one sprinkler head in bathroom maher na | $2,000 |
| May 16, 2017 | Expired or cancelled expired Feb 2025 | 2495 03rd St | Dajani Construction | 2 new street level windows, 1 new window in entry portico. new secondary exit door. windows are non-openable.Details
2 new street level windows, 1 new window in entry portico. new secondary exit door. windows are non-openable. | $12,000 |
| Apr 10, 2017 | Never finaled issued Apr 2017, no final | 2435 03rd St | street spaceDetails
street space | ||
| Mar 24, 2017 | Expired or cancelled expired Feb 2025 | 2435 03rd St | revision to app#201607142325 to reconfigure restroom. n/a for maherDetails
revision to app#201607142325 to reconfigure restroom. n/a for maher | ||
| Mar 24, 2017 | Completed final sign-off Aug 2017 | 2325 03rd St | Dajani Construction | remodeling an extg manufacturing space into a chocolate production facility. new light fixtures an minimal electrical work. new kitchen equipment and some plumbing work. n/a for maherDetails
remodeling an extg manufacturing space into a chocolate production facility. new light fixtures an minimal electrical work. new kitchen equipment and some plumbing work. n/a for maher | $45,000 |
| Mar 15, 2017 | Completed final sign-off Mar 2017 | 2405 03rd St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | installation of fire sprinklers under new mezzanine ref pa 2016-0114-7144Details
installation of fire sprinklers under new mezzanine ref pa 2016-0114-7144 | $1,500 |
| Mar 9, 2017 | Never finaled issued Sep 2017, no final | 2427 03rd St | Collier-Ostrom Enterprise | expand an (e) restaurant kitchen into an adajacent space maher naDetails
expand an (e) restaurant kitchen into an adajacent space maher na | $7,500 |
| Mar 6, 2017 | Completed final sign-off Mar 2017 | 2347 03rd St | Pro Plumbing & Fire Sprinkler Inc | 1st flr: add 5 fire sprinklers at new area.. maher naDetails
1st flr: add 5 fire sprinklers at new area.. maher na | $4,500 |
| Mar 3, 2017 | Never finaled issued Mar 2017, no final | 2435 03rd St | street spaceDetails
street space | ||
| Feb 28, 2017 | Never finaled issued Feb 2017, no final | 2475 03rd St | Peninsula Fire Protection Inc | #247 - install (7) new heads per nfpa #13. ref t.i. #201604195103. n/a maher ordinanceDetails
#247 - install (7) new heads per nfpa #13. ref t.i. #201604195103. n/a maher ordinance | $1,800 |
| Feb 28, 2017 | Completed final sign-off Mar 2017 | 2325 03rd St | Peninsula Fire Protection Inc | #410 & #411 - install (4) new sprinklers per nfpa #13. ref #201611152729. n/a maher ordinanceDetails
#410 & #411 - install (4) new sprinklers per nfpa #13. ref #201611152729. n/a maher ordinance | $1,200 |
| Dec 12, 2016 | Expired or cancelled withdrawn Jun 2018 | 2325 03rd St | remodeling an (e) office space on the 4th floor, new light fixtures and minimal electrical work. new conference room.Details
remodeling an (e) office space on the 4th floor, new light fixtures and minimal electrical work. new conference room. | $22,000 | |
| Nov 15, 2016 | Expired or cancelled expired Feb 2025 | 2325 03rd St | Dajani Construction | suite 410/411 - remodeling an (e) manufactoring & distribution/office space to create a small conference room within the space. new light fixtures and minimal electrical work. expand (e) office and production space into additional suite. fire and mechanical under separate permit.Details
suite 410/411 - remodeling an (e) manufactoring & distribution/office space to create a small conference room within the space. new light fixtures and minimal electrical work. expand (e) office and production space into additional suite. fire and mechanical under separate permit. | $20,000 |
| Nov 4, 2016 | Expired or cancelled expired Feb 2025 | 2405 03rd St | Eleney Electric | revision to 201601147144: change of lighting new title 24 maher naDetails
revision to 201601147144: change of lighting new title 24 maher na | |
| Aug 16, 2016 | Completed final sign-off Mar 2017 | 2347 03rd St | J C Builders | change of use from a limited (b) restaurant to a full (a) restaurant. expanding existing restaurant into adjacent detail & manufacturing space. create an accessible reatroom & expand commercial kitchen space. n/a maher ordinanceDetails
change of use from a limited (b) restaurant to a full (a) restaurant. expanding existing restaurant into adjacent detail & manufacturing space. create an accessible reatroom & expand commercial kitchen space. n/a maher ordinance | $85,000 |
| Aug 5, 2016 | Never finaled issued Aug 2016, no final | 2445 03rd St | per pa #201607142325, create new address for new commercial space at block 4109, lot 001 as; 2445 3rd streetDetails
per pa #201607142325, create new address for new commercial space at block 4109, lot 001 as; 2445 3rd street | ||
| Jul 14, 2016 | Expired or cancelled expired Feb 2025 | 2435 03rd St | modify (e) non-accessible entrance & install ada compliant entry door in (e) industrial space. new accessible restroom & communal sink, remove (e) single-hung windows & replace with new accessible entry doors. n/a ordinance #155-13Details
modify (e) non-accessible entrance & install ada compliant entry door in (e) industrial space. new accessible restroom & communal sink, remove (e) single-hung windows & replace with new accessible entry doors. n/a ordinance #155-13 | $21,000 | |
| Jul 8, 2016 | Completed final sign-off Jul 2017 | 2419 03rd St | modify an (e) and install an ada compliant entry door )broinze door & window system) in an (e) industrial space to match 2421 3rd st. new accessible restroom. new double exit doors to 9e) fire rated corridor. maher naDetails
modify an (e) and install an ada compliant entry door )broinze door & window system) in an (e) industrial space to match 2421 3rd st. new accessible restroom. new double exit doors to 9e) fire rated corridor. maher na | $21,000 | |
| May 26, 2016 | Expired or cancelled withdrawn Nov 2018 | 2301 03rd St | sprint pcs to remove 3 panel antennas and rrhs, 1 microwave antenna and odu, gps antenna, equip rack, cable ladders, conduit and support. fiber junction box, antenna brackets, signage, generator plugDetails
sprint pcs to remove 3 panel antennas and rrhs, 1 microwave antenna and odu, gps antenna, equip rack, cable ladders, conduit and support. fiber junction box, antenna brackets, signage, generator plug | $5,000 | |
| May 6, 2016 | Never finaled filed May 2016, never issued | 2345 03rd St | install (n) covered pedestrian bridge over 22nd st. to replace a pedestrian bridge that was removed in the 1950's. the (n) bridge will utilize the same (e) openings as the previous bridge. on (e) buildings either side of 22nd st. the bridge will include a full weather enclosure, roof walls. a slopedDetails
install (n) covered pedestrian bridge over 22nd st. to replace a pedestrian bridge that was removed in the 1950's. the (n) bridge will utilize the same (e) openings as the previous bridge. on (e) buildings either side of 22nd st. the bridge will include a full weather enclosure, roof walls. a sloped | $350,000 | |
| Apr 19, 2016 | Never finaled issued Jul 2016, no final | 2475 03rd St | Dajani Construction | suite # 247: modifying a recently vacated print shop and business office into a business office and prototype manufacturing firm. work includes adding an accessisible restroom, reduce size of extg conference room, new kitchenette and storage closets. n/a for maher.Details
suite # 247: modifying a recently vacated print shop and business office into a business office and prototype manufacturing firm. work includes adding an accessisible restroom, reduce size of extg conference room, new kitchenette and storage closets. n/a for maher. | $55,000 |
| Apr 6, 2016 | Completed final sign-off Apr 2016 | 2325 03rd St | The Lunt Marymor Co. Inc. | suite # 434: as built drawing submittal. ref app#201602250537. notes have been updated to show the use of ul listed viega megapress. pipe fittings for schedule 40 steel pipe 1" - 2". n/a for maherDetails
suite # 434: as built drawing submittal. ref app#201602250537. notes have been updated to show the use of ul listed viega megapress. pipe fittings for schedule 40 steel pipe 1" - 2". n/a for maher | |
| Mar 24, 2016 | Never finaled issued Mar 2016, no final | 2475 03rd St | Justin Farrelly Incorporated | revisio to ref pa 2015 1223 5851: lighting and rcp, t-24 maher naDetails
revisio to ref pa 2015 1223 5851: lighting and rcp, t-24 maher na | |
| Feb 25, 2016 | Completed final sign-off Apr 2016 | 2325 03rd St | The Lunt Marymor Co. Inc. | #434 : fire sprinkler alteration for office t.i. add 4 heads, relocate 4 heads, and cap one head. ref app#201602028657. n/a for maher.Details
#434 : fire sprinkler alteration for office t.i. add 4 heads, relocate 4 heads, and cap one head. ref app#201602028657. n/a for maher. | $9,950 |
| Feb 2, 2016 | Completed final sign-off Apr 2016 | 2325 03rd St | Matarozzi/Pelsinger Builders Inc. | remodel existing office suite. new light fixtures, new kitchenette, new phone rooms, conference room. 4th fl suite 434Details
remodel existing office suite. new light fixtures, new kitchenette, new phone rooms, conference room. 4th fl suite 434 | $123,000 |
| Jan 29, 2016 | Never finaled issued Jan 2016, no final | 2475 03rd St | Justin Farrelly Incorporated | revision to 201512235851, 1 sheet a-703 title 24 mandatory lighting control declaration statementsDetails
revision to 201512235851, 1 sheet a-703 title 24 mandatory lighting control declaration statements | |
| Jan 14, 2016 | Completed final sign-off Mar 2017 | 2405 03rd St | T K Systems Inc- Dba A M F I | modification of an extg industrial distribution space into a bicycle repair and storage facility with retail. new light fixtures and minimal electrical work. new storage mezzanine. n/a for maher.Details
modification of an extg industrial distribution space into a bicycle repair and storage facility with retail. new light fixtures and minimal electrical work. new storage mezzanine. n/a for maher. | $110,000 |
| Dec 23, 2015 | Completed final sign-off Jan 2017 | 2475 03rd St | Justin Farrelly Incorporated | #253 - commercial t.i. for office space merge suites #253 & 258, alter exisitng & add non-load bearing partition walls. remodel bath to current accessibility standards, lighitng in conference room & work room.Details
#253 - commercial t.i. for office space merge suites #253 & 258, alter exisitng & add non-load bearing partition walls. remodel bath to current accessibility standards, lighitng in conference room & work room. | $60,000 |
| Nov 16, 2015 | Completed final sign-off Jan 2016 | 2475 03rd St | Battalion One Fire Protection | revision to app#201503050045. install a dedicated elevator recall unit for elevator recall and supervisory function due to the elevator modernization. install smoke det. and control modules for monitoring elev. recall. new control unit will be tie-in to extg fire control panel. ref app#201411252554.Details
revision to app#201503050045. install a dedicated elevator recall unit for elevator recall and supervisory function due to the elevator modernization. install smoke det. and control modules for monitoring elev. recall. new control unit will be tie-in to extg fire control panel. ref app#201411252554. | $5,000 |
| Sep 16, 2015 | Completed final sign-off Sep 2015 | 2495 03rd St | Battalion One Fire Protection | adding sprinklers to protect a lofted space used as an office. per inspector planka. n/a for maher.Details
adding sprinklers to protect a lofted space used as an office. per inspector planka. n/a for maher. | $5,000 |
| Sep 4, 2015 | Expired or cancelled cancelled Aug 2022 | 610 22nd St | change of occupancy. tenant improvement for (n) restaurant including kitchen, dining area, (n) ada restroom, hvac, electrical, plumbing, mechanical, mezzanine, (n) dining mezzanine, (n) fixtrures & finishes. ** maher: compliance with ordinance no# 155-13 not required **Details
change of occupancy. tenant improvement for (n) restaurant including kitchen, dining area, (n) ada restroom, hvac, electrical, plumbing, mechanical, mezzanine, (n) dining mezzanine, (n) fixtrures & finishes. ** maher: compliance with ordinance no# 155-13 not required ** | $250,000 | |
| Aug 14, 2015 | Completed final sign-off Aug 2015 | 1030 Illinois St | Alwest Fire Protection | install 8 fire sprinklers within walk-in coolers on 1st floor.Details
install 8 fire sprinklers within walk-in coolers on 1st floor. | $3,400 |
| Aug 6, 2015 | Never finaled issued Aug 2015, no final | 2335 03rd St | Justin Farrelly Incorporated | no construction work. for field confirmation of assembly occupant load for 201501075137 as requested by fire inspector. maher not req.Details
no construction work. for field confirmation of assembly occupant load for 201501075137 as requested by fire inspector. maher not req. | |
| Aug 3, 2015 | Expired or cancelled cancelled Jan 2026 | 2335 03rd St | Needham Electric | application for t-24 electrical submitted and permit application. and to change use from limite3d restaurant to full restaurant. ref to pa# 201501075137 & ref to pa# 201503191291Details
application for t-24 electrical submitted and permit application. and to change use from limite3d restaurant to full restaurant. ref to pa# 201501075137 & ref to pa# 201503191291 | $500 |
| Jul 30, 2015 | Never finaled issued Jul 2015, no final | 2335 03rd St | Peninsula Fire Protection Inc | install new fire suppression system to 14' hood and duct- change of occupancy under 2015-01-07-5137Details
install new fire suppression system to 14' hood and duct- change of occupancy under 2015-01-07-5137 | $4,500 |
| Jul 22, 2015 | Completed final sign-off Oct 2015 | 2325 03rd St | add new ada restroom to an space. fully sprinkleredDetails
add new ada restroom to an space. fully sprinklered | $17,500 | |
| Jul 10, 2015 | Never finaled issued Jul 2015, no final | 1030 Illinois St | Cool Solutions Manufactoring,Inc | installation of interior walk-in cooler/freezer and related mep. upgrage accessible restroom per plan. maher n/a.Details
installation of interior walk-in cooler/freezer and related mep. upgrage accessible restroom per plan. maher n/a. | $40,000 |
| Jun 18, 2015 | Completed final sign-off Aug 2015 | 2335 03rd St | Battalion One Fire Protection | fire alarm-new facp for hood and duct fp system, inter-connect with existing fire sprinkler monitoring system for first floor plant cafe- includes smoke detector and pull station. compliance with maher ordinance no 155-13 not required.Details
fire alarm-new facp for hood and duct fp system, inter-connect with existing fire sprinkler monitoring system for first floor plant cafe- includes smoke detector and pull station. compliance with maher ordinance no 155-13 not required. | $14,000 |
| May 27, 2015 | Completed final sign-off Feb 2016 | 2425 03rd St | Dajani Construction | tenant improvement new food prep area in existing cheese shop. new stainless steel prep tables, two new refrigerators, new food preparation equipment + storage shelves. new walk in refrigerator. n/a maher ordinanceDetails
tenant improvement new food prep area in existing cheese shop. new stainless steel prep tables, two new refrigerators, new food preparation equipment + storage shelves. new walk in refrigerator. n/a maher ordinance | $12,000 |
| Apr 2, 2015 | Never finaled issued Apr 2015, no final | 2421 03rd St | add 2421 - 03rd street to 4109/001 for commercial space. ref appl #2015-03-25-1852.Details
add 2421 - 03rd street to 4109/001 for commercial space. ref appl #2015-03-25-1852. | ||
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 2421 03rd St | subdivide a large commercial space into 2 leaseable spaces with 2 - new accessible restrooms. new front facade (store front). maher - not req'dDetails
subdivide a large commercial space into 2 leaseable spaces with 2 - new accessible restrooms. new front facade (store front). maher - not req'd | $35,000 | |
| Mar 19, 2015 | Never finaled issued Mar 2015, no final | 2335 03rd St | Justin Farrelly Incorporated | application to correct address for application number 201501075137 from 2345 3rd st to 2335 3rd stDetails
application to correct address for application number 201501075137 from 2345 3rd st to 2335 3rd st | |
| Mar 9, 2015 | Never finaled issued Mar 2015, no final | 2335 03rd St | Bayside Mechanical Inc | install hood and duct work ref 201501075137 aka 2245 3rd st; maher n/aDetails
install hood and duct work ref 201501075137 aka 2245 3rd st; maher n/a | $34,000 |
| Mar 5, 2015 | Completed final sign-off Dec 2015 | 2475 03rd St | Battalion One Fire Protection | connection to existing sprinkler monitoring system for new ada elevator system upgrade. elevator recall. n/a for the maher ordinance.Details
connection to existing sprinkler monitoring system for new ada elevator system upgrade. elevator recall. n/a for the maher ordinance. | $6,000 |
| Feb 25, 2015 | Completed final sign-off Dec 2015 | 2475 03rd St | C T W Mechanical | install exhaust fan for elevator machine room. n/a ordinance #155-13Details
install exhaust fan for elevator machine room. n/a ordinance #155-13 | $1,000 |
| Feb 17, 2015 | Never finaled issued Feb 2015, no final | 2335 03rd St | add 2335 - 3rd st to 4109/001.Details
add 2335 - 3rd st to 4109/001. | ||
| Feb 5, 2015 | Completed final sign-off Apr 2015 | 2325 03rd St | Westower Communications | removal of metro pcs telecommunications site. n/a maher ordinanceDetails
removal of metro pcs telecommunications site. n/a maher ordinance | $10,000 |
| Jan 7, 2015 | Never finaled issued Feb 2015, no final | 2345 03rd St | Justin Farrelly Incorporated | new cafe and finishing kitchen in existing shell space to support existing commercial kitchen. new raised patio area and new ada compliante restrooms with communal sinkDetails
new cafe and finishing kitchen in existing shell space to support existing commercial kitchen. new raised patio area and new ada compliante restrooms with communal sink | $100,000 |
| Nov 25, 2014 | Completed final sign-off Dec 2015 | 2475 03rd St | Justin Farrelly Incorporated | installing a new elevator in an existing elevator shaft. n/a ordinance #155-13. life safety aspects of elevator to be on deferred submittal if required.Details
installing a new elevator in an existing elevator shaft. n/a ordinance #155-13. life safety aspects of elevator to be on deferred submittal if required. | $125,000 |
| Sep 19, 2014 | Expired or cancelled withdrawn Jan 2016 | 2405 03rd St | t.i for new restaurant including kitchen, dining, new ada restrooms, havc, electrical, plumbing, mezzanine and platform, new fixtures and finishes.n/a for the maher ordinance #155-13Details
t.i for new restaurant including kitchen, dining, new ada restrooms, havc, electrical, plumbing, mezzanine and platform, new fixtures and finishes.n/a for the maher ordinance #155-13 | $250,000 | |
| Sep 3, 2014 | Never finaled issued Sep 2014, no final | 660 22nd St | street spaceDetails
street space | ||
| Aug 28, 2014 | Expired or cancelled cancelled Nov 2024 | 2325 03rd St | install a 30 kw diesel generator on roof of the existing building. maher ord n/a.Details
install a 30 kw diesel generator on roof of the existing building. maher ord n/a. | $50,000 | |
| Aug 22, 2014 | Never finaled issued Sep 2014, no final | 2475 03rd St | Justin Farrelly Incorporated | 2nd flr: commercial t.i. improvement for office space, no use change proposed. add office cubicle new non-struct walls modification to restroom, new lights & switching; maher n/aDetails
2nd flr: commercial t.i. improvement for office space, no use change proposed. add office cubicle new non-struct walls modification to restroom, new lights & switching; maher n/a | $45,000 |
| Jul 28, 2014 | Completed final sign-off Mar 2015 | 2331 03rd St | modifing an existing manufacturing retail space to add wall and create 2 new tenant spaces. separte permits for ti for both spaces. mep & sprinkler under separate permit. removal of window to add new entry door. maher ordinance # 155-13 n/a.Details
modifing an existing manufacturing retail space to add wall and create 2 new tenant spaces. separte permits for ti for both spaces. mep & sprinkler under separate permit. removal of window to add new entry door. maher ordinance # 155-13 n/a. | $45,000 | |
| Jun 30, 2014 | Completed final sign-off Dec 2014 | 2343 03rd St | Dajani Construction | remodel a vacant retail production space into a commercial kitchen and bakery retail space. revision to appl. 201310240159. change use from f-2 to f-1 commercialwarehouse to commercial kitchen f-1. maher ordinance #155-13 n/a.Details
remodel a vacant retail production space into a commercial kitchen and bakery retail space. revision to appl. 201310240159. change use from f-2 to f-1 commercialwarehouse to commercial kitchen f-1. maher ordinance #155-13 n/a. | $69,000 |
| May 30, 2014 | Never finaled issued May 2014, no final | 2341 03rd St | per pa #201310240159, new address to subdivision space at block 4109, lot 001 as; 2341 3rd street.Details
per pa #201310240159, new address to subdivision space at block 4109, lot 001 as; 2341 3rd street. | ||
| May 9, 2014 | Completed final sign-off Nov 2015 | 2475 03rd St | modify an extg non-compliant bldg entrance and create new ada entrance with new stair case and new elevator under separate permit. (e) lighting & hvac to remain. n/a for the maher ordinance #155-13Details
modify an extg non-compliant bldg entrance and create new ada entrance with new stair case and new elevator under separate permit. (e) lighting & hvac to remain. n/a for the maher ordinance #155-13 | $85,500 | |
| May 6, 2014 | Never finaled issued May 2014, no final | 660 22nd St | street spaceDetails
street space | ||
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 980 Illinois St | add warehouse address to block 4109, lot 001 as; 980 illinois st.Details
add warehouse address to block 4109, lot 001 as; 980 illinois st. | ||
| Feb 21, 2014 | Never finaled issued Feb 2014, no final | 610 22nd St | street spaceDetails
street space | ||
| Dec 27, 2013 | Expired or cancelled withdrawn Aug 2015 | 610 22nd St | build new grocery/deli at former warehouse space. provide new ada entrance/lift and new ada restroomsDetails
build new grocery/deli at former warehouse space. provide new ada entrance/lift and new ada restrooms | $125,000 | |
| Nov 15, 2013 | Expired or cancelled cancelled Nov 2014 | 2349 03rd St | verizon wireless proposes to replace 1 (e) 2' antenna & 2 (e) 4' antennas w/ 3 (n) 51" panel antennas, add 3 (n) rrh units, 2 raycaps, 2 hybrid cables, 2 ret cables, ac power & inverter device at alpha sector. paint antennas to match bldg.Details
verizon wireless proposes to replace 1 (e) 2' antenna & 2 (e) 4' antennas w/ 3 (n) 51" panel antennas, add 3 (n) rrh units, 2 raycaps, 2 hybrid cables, 2 ret cables, ac power & inverter device at alpha sector. paint antennas to match bldg. | $18,000 | |
| Nov 13, 2013 | Completed final sign-off Feb 2014 | 2347 03rd St | C T W Mechanical | install exhaust fan and makeup air fan. mechanical only.Details
install exhaust fan and makeup air fan. mechanical only. | $3,000 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 2325 03rd St | alteration of floor/equipment to show addition of plug in hang convection oven. no construction.Details
alteration of floor/equipment to show addition of plug in hang convection oven. no construction. | ||
| Nov 8, 2013 | Completed final sign-off Nov 2013 | 2347 03rd St | Pro Plumbing | add 6 sprinkler heads under mezzanine to (e) tenant improvement pa# 2013.09.30.8087.Details
add 6 sprinkler heads under mezzanine to (e) tenant improvement pa# 2013.09.30.8087. | $4,000 |
| Oct 24, 2013 | Completed final sign-off Dec 2014 | 2343 03rd St | modify existing warehouse space to creat 2 separate space with 2 new entrances at street levelDetails
modify existing warehouse space to creat 2 separate space with 2 new entrances at street level | $23,000 | |
| Sep 30, 2013 | Completed final sign-off Feb 2014 | 2347 03rd St | modifying an existing take out sandwich shop into a new pizza cafe & carry out existing plumbing to be relocated. sprinkler retrofit under separate permit.Details
modifying an existing take out sandwich shop into a new pizza cafe & carry out existing plumbing to be relocated. sprinkler retrofit under separate permit. | $55,400 | |
| Jul 12, 2013 | Expired or cancelled withdrawn Oct 2021 | 2301 03rd St | Overland Contracting Inc | perform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units.Details
perform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units. | $45,000 |
| Nov 26, 2012 | Expired or cancelled cancelled Mar 2020 | 2325 03rd St | modification to an (e) wireless facility consisting of the addition of one (1) 1' microwave dish & one (1) 2' microwave dish.Details
modification to an (e) wireless facility consisting of the addition of one (1) 1' microwave dish & one (1) 2' microwave dish. | $1,500 | |
| Aug 23, 2012 | Completed final sign-off Oct 2012 | 2325 03rd St | modify (e) production dist. office space & add restroom upgrade.Details
modify (e) production dist. office space & add restroom upgrade. | $11,400 | |
| Jun 15, 2012 | Completed final sign-off Nov 2012 | 2425 03rd St | Diviney Construction | new cheese shop in existing retail space, new furnishing + equipment for display of emrchandise; prep table for food prep & packaging, new washroom with triple sink, prep sink, mop sink, new wall between washrom & storage.Details
new cheese shop in existing retail space, new furnishing + equipment for display of emrchandise; prep table for food prep & packaging, new washroom with triple sink, prep sink, mop sink, new wall between washrom & storage. | $14,000 |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 2455 03rd St | for increase of occupancy only prior approved pa #2011.07.05.9480 shows assembly for tasting room/wine making (158 people). request to increase to 348 occupants (a-2), no renovation or construction.Details
for increase of occupancy only prior approved pa #2011.07.05.9480 shows assembly for tasting room/wine making (158 people). request to increase to 348 occupants (a-2), no renovation or construction. | ||
| Nov 3, 2011 | Completed final sign-off Nov 2011 | 2455 03rd St | Alpha Fire Suppression | install two new pendent sprinkelrs in two new bathrooms on first floor.Details
install two new pendent sprinkelrs in two new bathrooms on first floor. | $1,500 |
| Oct 27, 2011 | Completed final sign-off Nov 2011 | 2427 03rd St | International Fire Equip | install ul 300 fire system.Details
install ul 300 fire system. | $4,500 |
| Sep 30, 2011 | Completed final sign-off Jan 2012 | 2427 03rd St | E B Gilmore & Sons Mech Svcs Inc | 1) supply and install one cooking hood and grease duct with exhaust fan.2)supply and install one make up air fan with duct work.Details
1) supply and install one cooking hood and grease duct with exhaust fan.2)supply and install one make up air fan with duct work. | $15,200 |
| Aug 26, 2011 | Completed final sign-off Nov 2011 | 610 22nd St | Cleveland Wrecking Company | emergency order - demolish roof tower concrete platform only, on a 4 story, retail/office building.Details
emergency order - demolish roof tower concrete platform only, on a 4 story, retail/office building. | $40,000 |
| Aug 18, 2011 | Expired or cancelled cancelled Jan 2026 | 2325 03rd St | emergency permit. emergency demolition permit to remove concrete water tower. repair existing roof, baricade perimeter during demolition. not visible from streetDetails
emergency permit. emergency demolition permit to remove concrete water tower. repair existing roof, baricade perimeter during demolition. not visible from street | $55,000 | |
| Jul 18, 2011 | Never finaled issued Aug 2011, no final | 2427 03rd St | Collier Ostrom Enterpises | install interior partitions to define restaurant kitchen area. install commercial kitchen equipment. construct fixed bar counter, bathroom and demising wall previously constructed by building owner under permit #2011-0207-9748. kitchen hood installed under separate permit by building owner.Details
install interior partitions to define restaurant kitchen area. install commercial kitchen equipment. construct fixed bar counter, bathroom and demising wall previously constructed by building owner under permit #2011-0207-9748. kitchen hood installed under separate permit by building owner. | $60,000 |
| Jul 15, 2011 | Expired or cancelled cancelled Jan 2026 | 2325 03rd St | International Fire Equip | install ansul system ul 300 kitchen fire system at gr flDetails
install ansul system ul 300 kitchen fire system at gr fl | $1,000 |
| Jul 15, 2011 | Completed final sign-off Sep 2011 | 2325 03rd St | International Fire Equip | floor 4, #409 -install ansul system ul 300 kitchen fire system.Details
floor 4, #409 -install ansul system ul 300 kitchen fire system. | $1,000 |
| Jul 5, 2011 | Completed final sign-off Dec 2011 | 2455 03rd St | Martin Heid Design/Build | modify (e) entry to make ada complianet. remoev step/build new 4' long ramp, new door. remove/relocate non-ada restrooms and build (n) ada restrooms near entry, new lighting and finishesDetails
modify (e) entry to make ada complianet. remoev step/build new 4' long ramp, new door. remove/relocate non-ada restrooms and build (n) ada restrooms near entry, new lighting and finishes | $28,000 |
| Jun 30, 2011 | Completed final sign-off Feb 2013 | 2325 03rd St | tenant improvements to (e) office space & add employee kitchen, new walls & doorsDetails
tenant improvements to (e) office space & add employee kitchen, new walls & doors | $12,000 | |
| Feb 23, 2011 | Never finaled issued Feb 2011, no final | 928 Illinois St | add addresses for existing commercial spaces. 928, 950, 952, 954 & 956 illinois street.Details
add addresses for existing commercial spaces. 928, 950, 952, 954 & 956 illinois street. | ||
| Feb 23, 2011 | Never finaled issued Feb 2011, no final | 1028 Illinois St | add addresses for existing commercial spaces. 1028, 1060, 1072, 1074 & 1076 illinois street.Details
add addresses for existing commercial spaces. 1028, 1060, 1072, 1074 & 1076 illinois street. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.