Permit GraphShortlistSan Francisco building permits since 2000

Block 4109, lot 001

966 Illinois St

City’s use
Industrial
Built
1924
Stories
4
Units
4
Rooms
20 bathrooms
Lot
173,198 sq ft
Zoning
M2
Construction type
B

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 16, 2026In progress
filed Oct 2026, not yet issued
2339 03rd St2nd floor: scope of work includes t.i. to the existing 2nd floor amenities, including 1 restroom, a breakroom, & flooring improvements. seperate, 1 existing restroom will be upgraded to an ada-compliant restroom in accordance with the da checklist & the applicable 20% disproportionality provisions.
Details
Permit
202610169545

2nd floor: scope of work includes t.i. to the existing 2nd floor amenities, including 1 restroom, a breakroom, & flooring improvements. seperate, 1 existing restroom will be upgraded to an ada-compliant restroom in accordance with the da checklist & the applicable 20% disproportionality provisions.

Open the permit page

$73,115
Sep 25, 2026In progress
filed Sep 2026, not yet issued
1060 Illinois Stti. improvement of 2 new plumbing fixtures: installatin of 1 handwashing sink and 1 three compartment sink in (e) bar counter.
Details
Permit
202609258633

ti. improvement of 2 new plumbing fixtures: installatin of 1 handwashing sink and 1 three compartment sink in (e) bar counter.

Open the permit page

$40,500
Sep 22, 2026In progress
issued Sep 2026
2427 03rd StDajani Constructionti improvements, interior renovation with ada all gender restrooms, new stairs to 2nd floor space, new finishes to prepare space for future restaurant tenant.
Details
Permit
202609228450
Permit issued
Sep 29, 2026

ti improvements, interior renovation with ada all gender restrooms, new stairs to 2nd floor space, new finishes to prepare space for future restaurant tenant.

Open the permit page

$25,000
Jun 15, 2026In progress
issued Jun 2026
1030 Illinois StC T W Mechanicaladd one type i hood to (e) kitchen, install two split type heatpumps an exhaust fan
Details
Permit
202606153201
Permit issued
Jun 15, 2026

add one type i hood to (e) kitchen, install two split type heatpumps an exhaust fan

Open the permit page

$45,000
Jun 1, 2026In progress
issued Jun 2026
660 22nd StDajani Constructioninstall of new accessible ramp and stairs and interior glazing.
Details
Permit
202606012235
Permit issued
Jun 23, 2026

install of new accessible ramp and stairs and interior glazing.

Open the permit page

$44,275
Mar 12, 2026Completed
final sign-off Oct 2026
2475 03rd StDajani Constructionsuite #269: tenant improvement renovation of an existing 2058 sqft space into research laboratory
Details
Permit
202603127466
Permit issued
Apr 6, 2026
Final sign-off
Oct 7, 2026

suite #269: tenant improvement renovation of an existing 2058 sqft space into research laboratory

Open the permit page

$75,000
Dec 10, 2025In progress
issued Dec 2025
2415 03rd StC T W Mechanicalsuite 257-267: install four split heatpump systems
Details
Permit
202512101390
Permit issued
Dec 10, 2025

suite 257-267: install four split heatpump systems

Open the permit page

$79,000
Oct 15, 2025Completed
final sign-off Oct 2025
2495 03rd StSafe Assurance Fire Protectionmodifty (e) fire suppression system for changes made to cooking equipment. ref t.i. 202505136342.
Details
Permit
202510157417
Permit issued
Oct 16, 2025
Final sign-off
Oct 21, 2025

modifty (e) fire suppression system for changes made to cooking equipment. ref t.i. 202505136342.

Open the permit page

$5,500
Aug 22, 2025In progress
filed Aug 2025, not yet issued
2415 03rd StDajani Constructionremove "mechanical under separate permit" from bpa #202406275448.
Details
Permit
202508223745

remove "mechanical under separate permit" from bpa #202406275448.

Open the permit page

Aug 7, 2025Completed
final sign-off Aug 2026
2345 03rd StL.D. Strobel Co Ltdremove (12) antennas, install (8) new antennas, install (e) remote radios behind antennas. install antennas connector shrouds at existing verizon wireless roof facility.
Details
Permit
202508072487
Permit issued
Oct 17, 2025
Final sign-off
Aug 25, 2026

remove (12) antennas, install (8) new antennas, install (e) remote radios behind antennas. install antennas connector shrouds at existing verizon wireless roof facility.

Open the permit page

$48,750
May 13, 2025Completed
final sign-off Mar 2026
2495 03rd StDajani Constructioncommerical ti: interior remodel of (e) restaurant space. non bearing partitions, finishes & furnishing + lighting in dining areas. remove (e) bar for smaller service bar. accessibility improvements at bathroom & entry. (e) commercial kitchen to remain, repair finishes. no mechanical work
Details
Permit
202505136342
Permit issued
Jul 15, 2025
Final sign-off
Mar 19, 2026

commerical ti: interior remodel of (e) restaurant space. non bearing partitions, finishes & furnishing + lighting in dining areas. remove (e) bar for smaller service bar. accessibility improvements at bathroom & entry. (e) commercial kitchen to remain, repair finishes. no mechanical work

Open the permit page

$297,000
Apr 15, 2025In progress
issued Apr 2025
660 22nd StDajani Constructionrelocate tenant demising partition between 2 existing retail spaces. relocate existing tenant bathrooms.
Details
Permit
202504154481
Permit issued
Apr 30, 2025

relocate tenant demising partition between 2 existing retail spaces. relocate existing tenant bathrooms.

Open the permit page

$12,000
Mar 28, 2025Completed
final sign-off Apr 2025
2415 03rd StSafe Assurance Fire Protectionsuite #297 ref pa # 2024-0627-5448 modification of an (e) fire sprinkler system for ti improvements- add 11 fire sprinkler heads
Details
Permit
202503283296
Permit issued
Mar 28, 2025
Final sign-off
Apr 21, 2025

suite #297 ref pa # 2024-0627-5448 modification of an (e) fire sprinkler system for ti improvements- add 11 fire sprinkler heads

Open the permit page

$6,000
Dec 2, 2024In progress
filed Dec 2024, not yet issued
2325 03rd St4/fl-ste 410-411-install 5 prefab phone booths
Details
Permit
202412025952

4/fl-ste 410-411-install 5 prefab phone booths

Open the permit page

$30,000
Dec 2, 2024Completed
final sign-off Aug 2025
2345 03rd StDajani Constructionremoval of brick infill facade at ground floor at southwest corner of the building and install 5 new windows to match (e) windows.
Details
Permit
202412025957
Permit issued
Dec 20, 2024
Final sign-off
Aug 22, 2025

removal of brick infill facade at ground floor at southwest corner of the building and install 5 new windows to match (e) windows.

Open the permit page

$25,000
Nov 21, 2024Completed
final sign-off Dec 2024
2345 03rd StMid-Peninsula Roofing Incno hot works- roof repair: overlay existing mineral surface cap sheet (1 layer) with fully adhered 115mil fleece bark tpo membrane 90sq sri 75
Details
Permit
202411215502
Permit issued
Nov 21, 2024
Final sign-off
Dec 11, 2024

no hot works- roof repair: overlay existing mineral surface cap sheet (1 layer) with fully adhered 115mil fleece bark tpo membrane 90sq sri 75

Open the permit page

$85,200
Oct 24, 2024In progress
filed Oct 2024, not yet issued
2301 03rd Stdish wireless: install 6 new antennas, 12 new rrus, 1 new equipment rack, 1 new electrical panel. no proposed batteries.
Details
Permit
202410243647

dish wireless: install 6 new antennas, 12 new rrus, 1 new equipment rack, 1 new electrical panel. no proposed batteries.

Open the permit page

$150,000
Jul 29, 2024Completed
final sign-off Aug 2025
2345 03rd StBattalion One Fire Protectionfreight elevator #4 modernization. install new smoke detectors at elevator landings. new smokes and heats in the elevator machine room with modules for elevator monitoring.
Details
Permit
202407297426
Permit issued
Jul 29, 2024
Final sign-off
Aug 7, 2025

freight elevator #4 modernization. install new smoke detectors at elevator landings. new smokes and heats in the elevator machine room with modules for elevator monitoring.

Open the permit page

$6,000
Jun 27, 2024In progress
issued Sep 2024
2415 03rd StDajani Constructionste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit.
Details
Permit
202406275448
Permit issued
Sep 13, 2024

ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit.

Open the permit page

$70,000
Jun 5, 2024In progress
filed Jun 2024, not yet issued
2345 03rd St(verizon wireless) the current facility is a rooftop wireless communications facility with 12 flush mounted antennas on the side of the building. the proposal involves removing the 12 antennas and installing 6 new antennas on the side of the building and penthouse. a small rf screenwall will be inst
Details
Permit
202406053741

(verizon wireless) the current facility is a rooftop wireless communications facility with 12 flush mounted antennas on the side of the building. the proposal involves removing the 12 antennas and installing 6 new antennas on the side of the building and penthouse. a small rf screenwall will be inst

Open the permit page

$48,750
Jun 3, 2024In progress
issued Sep 2024
2415 03rd StDajani Constructionrev 202402025206- office ti for interiro revisions. minor changes to layout exterior window wall.
Details
Permit
202406033560
Permit issued
Sep 5, 2024

rev 202402025206- office ti for interiro revisions. minor changes to layout exterior window wall.

Open the permit page

May 23, 2024Completed
final sign-off May 2025
2343 03rd StC T W Mechanicalste 330: install split system heatpump for humidity control. condensing unit on roof
Details
Permit
202405232821
Permit issued
May 23, 2024
Final sign-off
May 9, 2025

ste 330: install split system heatpump for humidity control. condensing unit on roof

Open the permit page

$15,000
Apr 9, 2024Expired or cancelled
withdrawn Dec 2024
2495 03rd StDajani Constructioninstall nw window at front elevation - no interior changes.
Details
Permit
202404099632

install nw window at front elevation - no interior changes.

Open the permit page

$18,000
Feb 2, 2024Completed
final sign-off Jul 2024
2415 03rd StDajani Construction2/f: demolition of some ceiling partitions, new partition walls, tenant improvements. ti to establish office use per permitnumber 2018-0615-1968
Details
Permit
202402025206
Permit issued
Mar 27, 2024
Final sign-off
Jul 12, 2024

2/f: demolition of some ceiling partitions, new partition walls, tenant improvements. ti to establish office use per permitnumber 2018-0615-1968

Open the permit page

$175,000
Dec 1, 2023In progress
issued Feb 2024
2301 03rd StTilson Technology Management Incremoving all t-mobile(sprint)equipment,antenna,lines,all cabinets on the ground,ice bridge and any associated hardware. there will be no new installation of equipment and no other alerations to the building.
Details
Permit
202312011771
Permit issued
Feb 23, 2024

removing all t-mobile(sprint)equipment,antenna,lines,all cabinets on the ground,ice bridge and any associated hardware. there will be no new installation of equipment and no other alerations to the building.

Open the permit page

$16,280
Jun 23, 2023Completed
final sign-off Jan 2025
2341 03rd Stmodify existing retail space into barber shop. existing accessible restroom to remain. no extrerior work proposed. satisfy nov 202305053
Details
Permit
202306230776
Permit issued
Jul 13, 2023
Final sign-off
Jan 31, 2025

modify existing retail space into barber shop. existing accessible restroom to remain. no extrerior work proposed. satisfy nov 202305053

Open the permit page

$45,000
Dec 27, 2022Completed
final sign-off Dec 2023
2475 03rd StC T W Mechanicalsuite # 250: install new cooling coil & outdoor condenser for existing furnace.
Details
Permit
202212279165
Permit issued
Dec 27, 2022
Final sign-off
Dec 27, 2023

suite # 250: install new cooling coil & outdoor condenser for existing furnace.

Open the permit page

$6,000
Dec 27, 2022Completed
final sign-off Dec 2023
2475 03rd StC T W Mechanicalsuite # 253: revison to pa# 2022-0929-3447- delete one added fancoil & heatpump.
Details
Permit
202212279163
Permit issued
Dec 27, 2022
Final sign-off
Dec 27, 2023

suite # 253: revison to pa# 2022-0929-3447- delete one added fancoil & heatpump.

Open the permit page

Sep 29, 2022Completed
final sign-off Dec 2023
2475 03rd StC T W Mechanicalspace 253 - install 2 coils and condensers for two (e) furnances install 1 split type heat pump for (e) conference room
Details
Permit
202209293447
Permit issued
Sep 29, 2022
Final sign-off
Dec 27, 2023

space 253 - install 2 coils and condensers for two (e) furnances install 1 split type heat pump for (e) conference room

Open the permit page

$20,000
Jun 28, 2022Never finaled
issued Jun 2022, no final
1080 Illinois Stchange address at pa #202104027851 from 610 22nd st to 1080 illinois st at apn 4109/001
Details
Permit
M1228108
Permit issued
Jun 28, 2022

change address at pa #202104027851 from 610 22nd st to 1080 illinois st at apn 4109/001

Open the permit page

Jan 13, 2022Expired or cancelled
cancelled Jan 2026
2325 03rd Stt-mobile: install 9 new rrus; install 6 new antennas behind 2 new frp screens; remove 3 (e) antennas; remove 1 (e) rack; install 2 new racks; install new batteries; install new 100a breaker.
Details
Permit
202201135932

t-mobile: install 9 new rrus; install 6 new antennas behind 2 new frp screens; remove 3 (e) antennas; remove 1 (e) rack; install 2 new racks; install new batteries; install new 100a breaker.

Open the permit page

$75,000
Dec 1, 2021Completed
final sign-off Oct 2022
2345 03rd StBattalion One Fire Protectionremove and replace smoke detectors & relay modules for the elevator t.i.
Details
Permit
202112013435
Permit issued
Dec 29, 2021
Final sign-off
Oct 28, 2022

remove and replace smoke detectors & relay modules for the elevator t.i.

Open the permit page

$5,500
Dec 1, 2021Completed
final sign-off Feb 2022
970 Illinois StBattalion One Fire Protectionadd monitor modules to monitor the fan coil units. duct detectors and relay modules are by others.
Details
Permit
202112013456
Permit issued
Dec 14, 2021
Final sign-off
Feb 7, 2022

add monitor modules to monitor the fan coil units. duct detectors and relay modules are by others.

Open the permit page

$2,500
Nov 18, 2021Completed
final sign-off Feb 2022
2325 03rd Stsuites 213 and 214: remodeling an extg manufactoring space into a lab and office suite. new accessible restroom and conference room.
Details
Permit
202111182753
Permit issued
Jan 12, 2022
Final sign-off
Feb 2, 2022

suites 213 and 214: remodeling an extg manufactoring space into a lab and office suite. new accessible restroom and conference room.

Open the permit page

$98,000
Sep 1, 2021Expired or cancelled
withdrawn Apr 2024
2345 03rd StCentric Construction Inct.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit
Details
Permit
202109017629

t.i. in suite 319 & 320: select demo, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit

Open the permit page

$653,000
Aug 25, 2021Completed
final sign-off Feb 2022
2325 03rd StDajani Constructionsuite #422:modifying an extg manufacturing facility to add a lab component. new accessible restroom and 2 staff kitchenettes. no exterior changes to exterior of building. no structural work. fully sprinkler unit suite #422
Details
Permit
202108257148
Permit issued
Oct 13, 2021
Final sign-off
Feb 15, 2022

suite #422:modifying an extg manufacturing facility to add a lab component. new accessible restroom and 2 staff kitchenettes. no exterior changes to exterior of building. no structural work. fully sprinkler unit suite #422

Open the permit page

$253,000
Aug 5, 2021Expired or cancelled
withdrawn Oct 2023
2345 03rd Stmodify existing rooftop wireless telecom facility. remove 12 antennas, flush mounted to sides o builing and rooftop. replace 9 new antennas into new rooftop mounted rf screened box.
Details
Permit
202108055866

modify existing rooftop wireless telecom facility. remove 12 antennas, flush mounted to sides o builing and rooftop. replace 9 new antennas into new rooftop mounted rf screened box.

Open the permit page

$97,100
Jul 1, 2021Completed
final sign-off Jun 2023
2325 03rd StDajani Constructionsuite 327 & 328:modifying an existing manufacturing space into a cancer research lab. no exterior facade changes.
Details
Permit
202107013649
Permit issued
Apr 18, 2023
Final sign-off
Jun 1, 2023

suite 327 & 328:modifying an existing manufacturing space into a cancer research lab. no exterior facade changes.

Open the permit page

$101,000
Apr 2, 2021Completed
final sign-off Apr 2022
610 22nd StDajani Constructionalteration to facade and interior to include new storefront entry on illinois st, new entry lobby with stair & ada lift.
Details
Permit
202104027851
Permit issued
Oct 7, 2021
Final sign-off
Apr 15, 2022

alteration to facade and interior to include new storefront entry on illinois st, new entry lobby with stair & ada lift.

Open the permit page

$150,000
Mar 9, 2021Completed
final sign-off Jan 2022
2325 03rd StDajani Constructionste #403: modifying a vacant manufacturing space into a covid-19 testing lab and kit distribution center. no structural work.
Details
Permit
202103096200
Permit issued
Apr 15, 2021
Final sign-off
Jan 28, 2022

ste #403: modifying a vacant manufacturing space into a covid-19 testing lab and kit distribution center. no structural work.

Open the permit page

$101,000
Dec 18, 2020Expired or cancelled
cancelled Jan 2026
2325 03rd Stsuite #215-219: pdr space only. work includes adjustments to restrooms and breakroom areas. no structural or mep work. no change of use.
Details
Permit
202012181364

suite #215-219: pdr space only. work includes adjustments to restrooms and breakroom areas. no structural or mep work. no change of use.

Open the permit page

$15,000
Oct 19, 2020Completed
final sign-off Jun 2021
2455 03rd StDajani Constructionmodifying an existing industrial space into a tattoo art salon and retial shop. install 10 treatment rooms.
Details
Permit
202010196883
Permit issued
Mar 5, 2021
Final sign-off
Jun 17, 2021

modifying an existing industrial space into a tattoo art salon and retial shop. install 10 treatment rooms.

Open the permit page

$75,000
Sep 26, 2020Never finaled
issued Nov 2020, no final
2415 03rd Stcreate mail room in an exist warehouse space
Details
Permit
202009265107
Permit issued
Nov 16, 2020

create mail room in an exist warehouse space

Open the permit page

$15,000
Aug 24, 2020Completed
final sign-off Mar 2022
966 Illinois StDajani Constructionmodify existing distribution space into a food processing and research space. new walk-in refridgerator. new electrical & plumbing layout.
Details
Permit
202008242525
Permit issued
Feb 18, 2021
Final sign-off
Mar 16, 2022

modify existing distribution space into a food processing and research space. new walk-in refridgerator. new electrical & plumbing layout.

Open the permit page

$208,000
Jul 1, 2020Completed
final sign-off Apr 2022
2347 03rd StD & R Constexpand (e) restaurant into (e) storage space. add new walk in cooler. no changes to (e) kitchen. sprinkler under sep permit.
Details
Permit
202007019422
Permit issued
Dec 30, 2021
Final sign-off
Apr 15, 2022

expand (e) restaurant into (e) storage space. add new walk in cooler. no changes to (e) kitchen. sprinkler under sep permit.

Open the permit page

$45,000
Jun 19, 2020Never finaled
issued Jun 2020, no final
2345 03rd Ststreet space
Details
Permit
M1211811
Permit issued
Jun 22, 2020

street space

Open the permit page

Mar 3, 2020Never finaled
issued Mar 2020, no final
2345 03rd Ststreet space
Details
Permit
M1201407
Permit issued
Mar 3, 2020

street space

Open the permit page

Feb 11, 2020Never finaled
issued Feb 2020, no final
2345 03rd Ststreet space
Details
Permit
M1192787
Permit issued
Feb 11, 2020

street space

Open the permit page

Dec 31, 2019Never finaled
issued Dec 2019, no final
2345 03rd Ststreet space
Details
Permit
M1179347
Permit issued
Dec 31, 2019

street space

Open the permit page

Dec 24, 2019Expired or cancelled
cancelled Jan 2026
2325 03rd StJose Vieraunit #410: remove old break room kitchen and install new kitchen with new cabinets, dishwasher, sink and shelves.
Details
Permit
201912240475

unit #410: remove old break room kitchen and install new kitchen with new cabinets, dishwasher, sink and shelves.

Open the permit page

$25,000
Dec 17, 2019Never finaled
issued Dec 2019, no final
2345 03rd StAcco Engineered Systems Inc. Dba Acco Enadd new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maher
Details
Permit
201912179741
Permit issued
Dec 20, 2019

add new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maher

Open the permit page

$530,000
Dec 9, 2019Never finaled
issued Dec 2019, no final
2339 03rd StJose Vierarevision to appoved pa #2019-0703-5099: relocate new wall shown on plans
Details
Permit
201912099026
Permit issued
Dec 16, 2019

revision to appoved pa #2019-0703-5099: relocate new wall shown on plans

Open the permit page

Nov 12, 2019Never finaled
issued Nov 2019, no final
2339 03rd StC T W Mechanicalremove existing baseboard heaters and install 2 rooftop heatpumps and 1 split heatpump unit to replace existing
Details
Permit
201911127032
Permit issued
Nov 12, 2019

remove existing baseboard heaters and install 2 rooftop heatpumps and 1 split heatpump unit to replace existing

Open the permit page

$40,000
Nov 7, 2019Never finaled
issued Nov 2019, no final
2345 03rd Ststreet space
Details
Permit
M1163567
Permit issued
Nov 7, 2019

street space

Open the permit page

Nov 4, 2019Never finaled
issued Nov 2019, no final
2345 03rd StBattalion One Fire Protectiondue to elevator modernization on the south side of the bldg, new smoke detectors & relay modules will be installed for elevator recall & relay modules to release door holders for the south stairwell. new devices will be tie-in to existin control panel. ref pa 2018-0510-8764
Details
Permit
201911046331
Permit issued
Nov 4, 2019

due to elevator modernization on the south side of the bldg, new smoke detectors & relay modules will be installed for elevator recall & relay modules to release door holders for the south stairwell. new devices will be tie-in to existin control panel. ref pa 2018-0510-8764

Open the permit page

$5,000
Oct 22, 2019Expired or cancelled
cancelled Jan 2026
2301 03rd Stinstall new fiber through conduit
Details
Permit
201910225145

install new fiber through conduit

Open the permit page

$11,100
Oct 10, 2019Never finaled
issued Jan 2020, no final
2345 03rd Ststreet space
Details
Permit
M1151087
Permit issued
Jan 28, 2020

street space

Open the permit page

Sep 24, 2019Completed
final sign-off Oct 2019
2325 03rd StSprk Fire S Ffire protection wet pipe (e) system to be modified to conform to new layout nfpa#13
Details
Permit
201909242450
Permit issued
Sep 24, 2019
Final sign-off
Oct 18, 2019

fire protection wet pipe (e) system to be modified to conform to new layout nfpa#13

Open the permit page

$1,850
Sep 12, 2019Completed
final sign-off Nov 2019
605 20th StBattalion One Fire Protectionadd and/or relocate (e) upright & pendant sprinklers to accomodate the (n) wall & ceiling layout for the tenant improvement
Details
Permit
201909121483
Permit issued
Nov 14, 2019
Final sign-off
Nov 25, 2019

add and/or relocate (e) upright & pendant sprinklers to accomodate the (n) wall & ceiling layout for the tenant improvement

Open the permit page

$105,000
Aug 27, 2019Never finaled
issued Aug 2019, no final
2345 03rd Ststreet space
Details
Permit
M1129567
Permit issued
Aug 27, 2019

street space

Open the permit page

Aug 5, 2019Completed
final sign-off Aug 2019
2325 03rd StSprk Fire S Fste 205 - fire protection wet pipe/arrange to conform to nfpa 13; existing system add fire head. ref pa 2019-0614-3427
Details
Permit
201908057808
Permit issued
Aug 5, 2019
Final sign-off
Aug 27, 2019

ste 205 - fire protection wet pipe/arrange to conform to nfpa 13; existing system add fire head. ref pa 2019-0614-3427

Open the permit page

$2,200
Jul 9, 2019Never finaled
issued Jul 2019, no final
2345 03rd Ststreet space
Details
Permit
M1106269
Permit issued
Jul 9, 2019

street space

Open the permit page

Jul 3, 2019Completed
final sign-off Aug 2020
2339 03rd StJose Viera4th flr, ste 4r modifiying (e) production, fabrication and office space into a(n) production, literature processing and archive storage area. (e) restrooms to remain. mep under separate permit. 6463 sq ft on 4th flr. no exterior or structural work
Details
Permit
201907035099
Permit issued
Aug 20, 2019
Final sign-off
Aug 19, 2020

4th flr, ste 4r modifiying (e) production, fabrication and office space into a(n) production, literature processing and archive storage area. (e) restrooms to remain. mep under separate permit. 6463 sq ft on 4th flr. no exterior or structural work

Open the permit page

$135,000
Jun 27, 2019Completed
final sign-off Nov 2019
605 20th StBattalion One Fire Protection1st fl and mezzanine - install new power supply panel & smoke detector above at new tenant space on 1st fl. install notification devices thru out for complete coverage. new devices will be tied in to existing control panel located at 2325 3rd st. ref pa 2019-0305-4412 and 2018-0510-8764
Details
Permit
201906274577
Permit issued
Jun 27, 2019
Final sign-off
Nov 25, 2019

1st fl and mezzanine - install new power supply panel & smoke detector above at new tenant space on 1st fl. install notification devices thru out for complete coverage. new devices will be tied in to existing control panel located at 2325 3rd st. ref pa 2019-0305-4412 and 2018-0510-8764

Open the permit page

$14,000
Jun 14, 2019Completed
final sign-off Jan 2020
2325 03rd StHuff Construction Company Increvision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205
Details
Permit
201906143427
Permit issued
Jul 23, 2019
Final sign-off
Jan 15, 2020

revision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205

Open the permit page

May 30, 2019Expired or cancelled
expired Feb 2025
2325 03rd StJose Vieraste 4r - demo non-structural partitions. no plumbing or elec demo
Details
Permit
201905302089
Permit issued
Jun 3, 2019

ste 4r - demo non-structural partitions. no plumbing or elec demo

Open the permit page

$15,000
May 29, 2019Completed
final sign-off Oct 2020
605 20th StTruebeck Constructionmechanical work per pa 2019-0305-4412. hvac & cooling system for manufacturing space
Details
Permit
201905291927
Permit issued
Jul 25, 2019
Final sign-off
Oct 27, 2020

mechanical work per pa 2019-0305-4412. hvac & cooling system for manufacturing space

Open the permit page

$1,250,000
May 1, 2019Never finaled
issued May 2019, no final
2345 03rd Ststreet space
Details
Permit
M1073527
Permit issued
May 1, 2019

street space

Open the permit page

Mar 12, 2019Never finaled
issued Mar 2019, no final
2345 03rd Ststreet space
Details
Permit
M1050327
Permit issued
Mar 12, 2019

street space

Open the permit page

Mar 11, 2019Never finaled
issued Mar 2019, no final
2347 03rd StEdison Fire Extinguisher Company Inc1st fl: ul 300 fire system installation. n/a for maher
Details
Permit
201903114848
Permit issued
Mar 11, 2019

1st fl: ul 300 fire system installation. n/a for maher

Open the permit page

$1,000
Mar 5, 2019Completed
final sign-off Oct 2020
605 20th StTruebeck Constructionnew tenant improvement for new manufacturing space, mezzanine & office. mep deferred submittal. n/a for maher.
Details
Permit
201903054412
Permit issued
Jun 6, 2019
Final sign-off
Oct 27, 2020

new tenant improvement for new manufacturing space, mezzanine & office. mep deferred submittal. n/a for maher.

Open the permit page

$1,300,000
Feb 26, 2019Completed
final sign-off Apr 2019
2347 03rd StBattalion One Fire Protectiondue to interior remodel @ 2347 for new tenant, new monitor module will be installed to connect ansul system to (e) panel to be monitor. ref pa 2018-0424-7241 and 2018-0510-8764
Details
Permit
201902263828
Permit issued
Feb 26, 2019
Final sign-off
Apr 19, 2019

due to interior remodel @ 2347 for new tenant, new monitor module will be installed to connect ansul system to (e) panel to be monitor. ref pa 2018-0424-7241 and 2018-0510-8764

Open the permit page

$1,000
Feb 4, 2019Never finaled
issued Feb 2019, no final
2427 03rd StCollier-Ostrom Enterpriseto obtain final inspection for work approved under pa#201703091058. all work is complete
Details
Permit
201902042035
Permit issued
Feb 4, 2019

to obtain final inspection for work approved under pa#201703091058. all work is complete

Open the permit page

Jan 30, 2019Never finaled
issued Jan 2019, no final
605 20th StAquamatic Fire Protection1/f:demo 25 pendent fire sprinklers and supply piping ref 201812319395. no underground work.
Details
Permit
201901301624
Permit issued
Jan 30, 2019

1/f:demo 25 pendent fire sprinklers and supply piping ref 201812319395. no underground work.

Open the permit page

$6,800
Jan 3, 2019Never finaled
issued Jan 2019, no final
2345 03rd Ststreet space
Details
Permit
M1023627
Permit issued
Jan 3, 2019

street space

Open the permit page

Dec 31, 2018Completed
final sign-off May 2019
605 20th StRossi Builders Inc.demo to existing offices (non structural) partitions, glazing and doors. use approval for new 22,000 sf build out and planning use approval for space design. no change of use. full accessibility compliance to be filed per ab-017 for tenant improvement.
Details
Permit
201812319395
Permit issued
Jan 22, 2019
Final sign-off
May 17, 2019

demo to existing offices (non structural) partitions, glazing and doors. use approval for new 22,000 sf build out and planning use approval for space design. no change of use. full accessibility compliance to be filed per ab-017 for tenant improvement.

Open the permit page

$55,000
Dec 6, 2018Never finaled
issued Dec 2018, no final
2415 03rd StM C S Construction Servicesste 237 - ref pa 2018-0917-05007 & 2018-1126-6699 mep upgrades t24 compliant exsitng plumbing, mechanical and electrical to be utilized
Details
Permit
201812067568
Permit issued
Dec 10, 2018

ste 237 - ref pa 2018-0917-05007 & 2018-1126-6699 mep upgrades t24 compliant exsitng plumbing, mechanical and electrical to be utilized

Open the permit page

$95,000
Nov 26, 2018Never finaled
issued Dec 2018, no final
2415 03rd StM C S Construction Servicesrevision 201809170507: double wall partitions changed to single wall; revision to lighting, revision to outlets. remove furred out walls
Details
Permit
201811266699
Permit issued
Dec 10, 2018

revision 201809170507: double wall partitions changed to single wall; revision to lighting, revision to outlets. remove furred out walls

Open the permit page

Nov 15, 2018Completed
final sign-off Nov 2018
2419 03rd StBattalion One Fire Protectiondue to interior remodeling - new tenant, new monitor will be install to connect to ansul syste, & relay modules to shut down 2 duct detectors. new devices will be tie in to (e) panel @#2325. ref 201712217117, 201805108746
Details
Permit
201811155950
Permit issued
Nov 15, 2018
Final sign-off
Nov 30, 2018

due to interior remodeling - new tenant, new monitor will be install to connect to ansul syste, & relay modules to shut down 2 duct detectors. new devices will be tie in to (e) panel @#2325. ref 201712217117, 201805108746

Open the permit page

$3,200
Nov 14, 2018Completed
final sign-off Dec 2018
2419 03rd StE B Gilmore & Sons Mech Svcs Incsupply & install 1 exhaust hood type 1 & make up air system; supply & install 1 forced air furnace & bathroom exhaust
Details
Permit
201811145893
Permit issued
Nov 20, 2018
Final sign-off
Dec 21, 2018

supply & install 1 exhaust hood type 1 & make up air system; supply & install 1 forced air furnace & bathroom exhaust

Open the permit page

$95,000
Nov 5, 2018Completed
final sign-off Apr 2024
2415 03rd StDajani Constructionsuite 271: remodeling of (e) production, distribution and office space into an office space. new accessible toilet added. no eterior work proposed. no structural work. mep deffered. maher n/a.
Details
Permit
201811055021
Permit issued
Nov 13, 2018
Final sign-off
Apr 4, 2024

suite 271: remodeling of (e) production, distribution and office space into an office space. new accessible toilet added. no eterior work proposed. no structural work. mep deffered. maher n/a.

Open the permit page

$215,000
Oct 31, 2018Completed
final sign-off Dec 2018
2419 03rd StHuff Construction Company Incelectrical title 24 for pa 201712217117. maher n/a
Details
Permit
201810314630
Permit issued
Nov 13, 2018
Final sign-off
Dec 20, 2018

electrical title 24 for pa 201712217117. maher n/a

Open the permit page

Oct 30, 2018Never finaled
issued Oct 2018, no final
2345 03rd Ststreet space
Details
Permit
M1000367
Permit issued
Oct 30, 2018

street space

Open the permit page

Oct 23, 2018Expired or cancelled
withdrawn Oct 2021
2301 03rd Stremove and replace 3 extg antennas w/3 proposed antennas, 1 per sector(painted to match bldg). r/r 3 extg 2.5 rru w/(3)(p) 2.5 rru, 1 per sector. install (3) 800 rru and (3) 1900 rru, 1 of each per sector. r/r 1 extg equip rack w/1 indoor equip cabinet & 1 battery cabinet. r/r 3 extg cables w/3
Details
Permit
201810233881

remove and replace 3 extg antennas w/3 proposed antennas, 1 per sector(painted to match bldg). r/r 3 extg 2.5 rru w/(3)(p) 2.5 rru, 1 per sector. install (3) 800 rru and (3) 1900 rru, 1 of each per sector. r/r 1 extg equip rack w/1 indoor equip cabinet & 1 battery cabinet. r/r 3 extg cables w/3

Open the permit page

$15,000
Oct 22, 2018Never finaled
issued Oct 2018, no final
2345 03rd Ststreet space
Details
Permit
M996387
Permit issued
Oct 22, 2018

street space

Open the permit page

Oct 15, 2018Never finaled
issued Oct 2018, no final
2345 03rd Ststreet space
Details
Permit
M993227
Permit issued
Oct 15, 2018

street space

Open the permit page

Oct 4, 2018Completed
final sign-off Dec 2018
2415 03rd StPioneer Fire Inc.ste 237 - relocate 7 pendents. ref pa 2018-0917-0507
Details
Permit
201810042246
Permit issued
Oct 4, 2018
Final sign-off
Dec 31, 2018

ste 237 - relocate 7 pendents. ref pa 2018-0917-0507

Open the permit page

$5,659
Sep 20, 2018Completed
final sign-off Jan 2020
2415 03rd StTruebeck Constructionsuite 270: revision to permit #201808308730. add additional steel support to stair landing.
Details
Permit
201809200869
Permit issued
Sep 20, 2018
Final sign-off
Jan 15, 2020

suite 270: revision to permit #201808308730. add additional steel support to stair landing.

Open the permit page

$5,000
Sep 18, 2018Completed
final sign-off Dec 2018
2419 03rd StInternational Fire Equipref pa# 201712217117; install ul 300 fire system n/a maher
Details
Permit
201809180576
Permit issued
Dec 17, 2018
Final sign-off
Dec 21, 2018

ref pa# 201712217117; install ul 300 fire system n/a maher

Open the permit page

$6,500
Sep 17, 2018Never finaled
issued Oct 2018, no final
2415 03rd StM C S Construction Servicesinterior t.i.-renovation of (e) aiv studio including 2 new studios, new acoustical treatments, partitions, lighting, new doors, renovate (e) ada restroom. no exterior changes, mep permits are separate.
Details
Permit
201809170507
Permit issued
Oct 31, 2018

interior t.i.-renovation of (e) aiv studio including 2 new studios, new acoustical treatments, partitions, lighting, new doors, renovate (e) ada restroom. no exterior changes, mep permits are separate.

Open the permit page

$115,000
Aug 30, 2018Completed
final sign-off Jan 2020
2325 03rd StTruebeck Constructionrevision to 201806151968 to install guard rail at (e) non-operable roll up door. also cantilever and joist detail change maher na
Details
Permit
201808308730
Permit issued
Aug 30, 2018
Final sign-off
Jan 15, 2020

revision to 201806151968 to install guard rail at (e) non-operable roll up door. also cantilever and joist detail change maher na

Open the permit page

$15,000
Aug 15, 2018Never finaled
issued Aug 2018, no final
2419 03rd StBattalion One Fire Protectionrevision to 201808036368 - revised for field conditions, supply to adjacent area from own riser
Details
Permit
201808157431
Permit issued
Aug 15, 2018

revision to 201808036368 - revised for field conditions, supply to adjacent area from own riser

Open the permit page

Aug 3, 2018Completed
final sign-off Nov 2018
2419 03rd StBattalion One Fire Protectionmodification of sprinkler system for tenant improvements. 25 sprinklers. ref# 2017-1221-7117.
Details
Permit
201808036368
Permit issued
Aug 6, 2018
Final sign-off
Nov 19, 2018

modification of sprinkler system for tenant improvements. 25 sprinklers. ref# 2017-1221-7117.

Open the permit page

$15,000
Jul 25, 2018Never finaled
issued Jul 2018, no final
2419 03rd Ststreet space
Details
Permit
M955208
Permit issued
Jul 25, 2018

street space

Open the permit page

Jul 20, 2018Completed
final sign-off Sep 2018
2415 03rd StBattalion One Fire Protectiondue to interior remodeling in suite #270 new power supply and smoke detector above will be install on 2nd floor. new notification appliances will be install thu-out. relay modules to shut down duct detectors. new devices will be tie-in to extg panel at #2325 3rd st. #201806252784 and 201806151968
Details
Permit
201807205073
Permit issued
Jul 27, 2018
Final sign-off
Sep 26, 2018

due to interior remodeling in suite #270 new power supply and smoke detector above will be install on 2nd floor. new notification appliances will be install thu-out. relay modules to shut down duct detectors. new devices will be tie-in to extg panel at #2325 3rd st. #201806252784 and 201806151968

Open the permit page

$10,000
Jul 20, 2018Never finaled
issued Jul 2018, no final
2345 03rd StBattalion One Fire Protectionas built to app#201805108464. revised devices address point members to reflect the job site. install relay module for freight elev. recall
Details
Permit
201807205077
Permit issued
Jul 27, 2018

as built to app#201805108464. revised devices address point members to reflect the job site. install relay module for freight elev. recall

Open the permit page

Jul 13, 2018Completed
final sign-off Sep 2018
2325 03rd StBattalion One Fire Protectionfire sprinkler system modifications for a new tenant. 66 new sprinklers. n/a for maher.
Details
Permit
201807134577
Permit issued
Jul 16, 2018
Final sign-off
Sep 25, 2018

fire sprinkler system modifications for a new tenant. 66 new sprinklers. n/a for maher.

Open the permit page

$80,000
Jul 11, 2018Never finaled
issued Sep 2018, no final
2475 03rd StDajani Constructionadding an accessible restroom closet and changing room to an (e) office and manfu space on the 3rd flr
Details
Permit
201807114342
Permit issued
Sep 14, 2018

adding an accessible restroom closet and changing room to an (e) office and manfu space on the 3rd flr

Open the permit page

$50,000
Jun 29, 2018Completed
final sign-off Jan 2020
2325 03rd StDecker Electric Co Inc Electrical Contraelectrical improvements referring to application #201806151968 n/a for maher= 2nd and mezz. mechnical 201806252784- sprinklers and fire alarm separate permit
Details
Permit
201806293417
Permit issued
Jul 2, 2018
Final sign-off
Jan 15, 2020

electrical improvements referring to application #201806151968 n/a for maher= 2nd and mezz. mechnical 201806252784- sprinklers and fire alarm separate permit

Open the permit page

$200,000
Jun 25, 2018Completed
final sign-off Feb 2020
2325 03rd StAcco Engineered Systems Inc. Dba Acco Enmep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na
Details
Permit
201806252784
Permit issued
Jun 29, 2018
Final sign-off
Feb 27, 2020

mep for pa #201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na

Open the permit page

$450,000
Jun 19, 2018Expired or cancelled
expired Feb 2025
2325 03rd StDajani Constructionsuite #405-406: remodeling an extg office space on the 4th floor of a four story building. n/a for maher mep deferred submittal
Details
Permit
201806192215
Permit issued
Jun 22, 2018

suite #405-406: remodeling an extg office space on the 4th floor of a four story building. n/a for maher mep deferred submittal

Open the permit page

$52,000
Jun 15, 2018Completed
final sign-off Feb 2020
2325 03rd StTruebeck Constructionproject consists of demo of non structural elements only including interior partitions,millwork, doors, ceilings, powers, lighting, finishes in suite 270.build out new int partitions, doors, finishe, ceilings, lighting for open office spaces meeting rooms, lounge space, break area,male female restrm
Details
Permit
201806151968
Permit issued
Jun 27, 2018
Final sign-off
Feb 27, 2020

project consists of demo of non structural elements only including interior partitions,millwork, doors, ceilings, powers, lighting, finishes in suite 270.build out new int partitions, doors, finishe, ceilings, lighting for open office spaces meeting rooms, lounge space, break area,male female restrm

Open the permit page

$2,500,000
Jun 5, 2018Completed
final sign-off Feb 2019
2325 03rd StQuality Telecom Consultantsattach pull box to extg bldg, run approx. 350 of 2" conduit through extg bldg. all interial. n/a for maher
Details
Permit
201806051047
Permit issued
Jan 3, 2019
Final sign-off
Feb 8, 2019

attach pull box to extg bldg, run approx. 350 of 2" conduit through extg bldg. all interial. n/a for maher

Open the permit page

$23,000
May 21, 2018Never finaled
issued May 2018, no final
2419 03rd Ststreet space
Details
Permit
M929148
Permit issued
May 21, 2018

street space

Open the permit page

May 21, 2018Completed
final sign-off Sep 2018
2419 03rd StHuff Construction Company Increvised structural drawings for pa #201712217117. delete mechanical mezz. add columns under new mezz. in lieu of connection to building columns. does not affect occupant load count in the resturant.
Details
Permit
201805219636
Permit issued
Jun 27, 2018
Final sign-off
Sep 17, 2018

revised structural drawings for pa #201712217117. delete mechanical mezz. add columns under new mezz. in lieu of connection to building columns. does not affect occupant load count in the resturant.

Open the permit page

May 10, 2018Never finaled
issued May 2018, no final
2345 03rd StBattalion One Fire Protectionlike for like fire system replacement w/ new control panel smoke & heat detectors pull stations at the same location install relay modules for existing elev. recall monitor modules to tie-in ex flow & tampers switches. install radio comm. connect ex. notification devices to new panel
Details
Permit
201805108764
Permit issued
May 10, 2018

like for like fire system replacement w/ new control panel smoke & heat detectors pull stations at the same location install relay modules for existing elev. recall monitor modules to tie-in ex flow & tampers switches. install radio comm. connect ex. notification devices to new panel

Open the permit page

$18,000
Apr 24, 2018Completed
final sign-off May 2019
2347 03rd StC T W Mechanicalinstall type 1 hood, exhaust fan, makeup air fan ref 201608165132 maher not req
Details
Permit
201804247241
Permit issued
May 1, 2018
Final sign-off
May 3, 2019

install type 1 hood, exhaust fan, makeup air fan ref 201608165132 maher not req

Open the permit page

$30,000
Mar 21, 2018Never finaled
issued Mar 2018, no final
2419 03rd Ststreet space permit
Details
Permit
M902887
Permit issued
Mar 21, 2018

street space permit

Open the permit page

Feb 26, 2018Never finaled
issued May 2018, no final
2325 03rd StHuff Construction Company Inc, Edenavow Construction & Designcreate a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the ext
Details
Permit
201802262265
Permit issued
May 8, 2018

create a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the ext

Open the permit page

$12,500
Jan 16, 2018Completed
final sign-off Apr 2018
2419 03rd StHuff Construction Company Incground floor - demolition of interior partition walls & one bathroom. no structural or exteriro work per ab-017. n/a maher ordinance
Details
Permit
201801168656
Permit issued
Jan 18, 2018
Final sign-off
Apr 11, 2018

ground floor - demolition of interior partition walls & one bathroom. no structural or exteriro work per ab-017. n/a maher ordinance

Open the permit page

$507
Dec 21, 2017Completed
final sign-off Dec 2018
2419 03rd StHuff Construction Company Incchange of use from f-2 to a-2. ground floor - interior tenant improvement for new restaurant space will be limited to new mezzanine, commercial ktichen, bar, bathrooms & storage. no exterior work. n/a maher ordinance
Details
Permit
201712217117
Permit issued
Mar 2, 2018
Final sign-off
Dec 18, 2018

change of use from f-2 to a-2. ground floor - interior tenant improvement for new restaurant space will be limited to new mezzanine, commercial ktichen, bar, bathrooms & storage. no exterior work. n/a maher ordinance

Open the permit page

$316,890
Dec 6, 2017Expired or cancelled
cancelled Jan 2026
2445 03rd Stmodifying an extg pdr-1 space into a wine sales center. extg led lighting to remain, extg accessible entrance to space not disturbed. n/a for maher
Details
Permit
201712065629

modifying an extg pdr-1 space into a wine sales center. extg led lighting to remain, extg accessible entrance to space not disturbed. n/a for maher

Open the permit page

$17,000
Sep 25, 2017Expired or cancelled
cancelled Jan 2026
2341 03rd Stground fl: remodeling an (e) production, distribution and manufacturing space into an accessory retail space. new shelving and casework. no electrical & plumbing work proposed. maher na
Details
Permit
201709259464

ground fl: remodeling an (e) production, distribution and manufacturing space into an accessory retail space. new shelving and casework. no electrical & plumbing work proposed. maher na

Open the permit page

$15,000
Sep 11, 2017Never finaled
issued Sep 2017, no final
2495 03rd StDajani Constructioninstalled lighting in new restroom. deferred submittal per pa 2017-0721-2673
Details
Permit
201709117640
Permit issued
Sep 12, 2017

installed lighting in new restroom. deferred submittal per pa 2017-0721-2673

Open the permit page

Jul 31, 2017Never finaled
issued Jul 2017, no final
2495 03rd StDajani Constructiondemolition only per ab 017, remove old hardwood floors and interior furnishings and replace with new. n/a for maher. all fire ratings maintained during construction
Details
Permit
201707313390
Permit issued
Jul 31, 2017

demolition only per ab 017, remove old hardwood floors and interior furnishings and replace with new. n/a for maher. all fire ratings maintained during construction

Open the permit page

$15,000
Jul 28, 2017Expired or cancelled
expired Feb 2025
2325 03rd StDajani Construction3/f #329- remodeling an existing office space into a design studio and administration center/business office. n/a ordinance #155-13
Details
Permit
201707283281
Permit issued
Aug 15, 2017

3/f #329- remodeling an existing office space into a design studio and administration center/business office. n/a ordinance #155-13

Open the permit page

$75,000
Jul 21, 2017Completed
final sign-off Sep 2017
2495 03rd Stremodeling (e) restaurant space w/new light fixtures and minimal electrical work. remodeled dining room and bar extension. no changes to existing structural support members.
Details
Permit
201707212673
Permit issued
Aug 16, 2017
Final sign-off
Sep 18, 2017

remodeling (e) restaurant space w/new light fixtures and minimal electrical work. remodeled dining room and bar extension. no changes to existing structural support members.

Open the permit page

$62,000
May 30, 2017Completed
final sign-off Jun 2017
2419 03rd StPro Plumbing & Fire Sprinkler Incadd one sprinkler head in bathroom maher na
Details
Permit
201705307878
Permit issued
Jun 1, 2017
Final sign-off
Jun 8, 2017

add one sprinkler head in bathroom maher na

Open the permit page

$2,000
May 16, 2017Expired or cancelled
expired Feb 2025
2495 03rd StDajani Construction2 new street level windows, 1 new window in entry portico. new secondary exit door. windows are non-openable.
Details
Permit
201705166757
Permit issued
Aug 7, 2017

2 new street level windows, 1 new window in entry portico. new secondary exit door. windows are non-openable.

Open the permit page

$12,000
Apr 10, 2017Never finaled
issued Apr 2017, no final
2435 03rd Ststreet space
Details
Permit
M776407
Permit issued
Apr 10, 2017

street space

Open the permit page

Mar 24, 2017Completed
final sign-off Aug 2017
2325 03rd StDajani Constructionremodeling an extg manufacturing space into a chocolate production facility. new light fixtures an minimal electrical work. new kitchen equipment and some plumbing work. n/a for maher
Details
Permit
201703242305
Permit issued
Apr 26, 2017
Final sign-off
Aug 15, 2017

remodeling an extg manufacturing space into a chocolate production facility. new light fixtures an minimal electrical work. new kitchen equipment and some plumbing work. n/a for maher

Open the permit page

$45,000
Mar 24, 2017Expired or cancelled
expired Feb 2025
2435 03rd Strevision to app#201607142325 to reconfigure restroom. n/a for maher
Details
Permit
201703242308
Permit issued
Mar 27, 2017

revision to app#201607142325 to reconfigure restroom. n/a for maher

Open the permit page

Mar 15, 2017Completed
final sign-off Mar 2017
2405 03rd StSteven Yeung Inc Dba Chung Wah Plbg&Fireinstallation of fire sprinklers under new mezzanine ref pa 2016-0114-7144
Details
Permit
201703151495
Permit issued
Mar 15, 2017
Final sign-off
Mar 27, 2017

installation of fire sprinklers under new mezzanine ref pa 2016-0114-7144

Open the permit page

$1,500
Mar 9, 2017Never finaled
issued Sep 2017, no final
2427 03rd StCollier-Ostrom Enterpriseexpand an (e) restaurant kitchen into an adajacent space maher na
Details
Permit
201703091058
Permit issued
Sep 20, 2017

expand an (e) restaurant kitchen into an adajacent space maher na

Open the permit page

$7,500
Mar 6, 2017Completed
final sign-off Mar 2017
2347 03rd StPro Plumbing & Fire Sprinkler Inc1st flr: add 5 fire sprinklers at new area.. maher na
Details
Permit
201703060688
Permit issued
Mar 6, 2017
Final sign-off
Mar 20, 2017

1st flr: add 5 fire sprinklers at new area.. maher na

Open the permit page

$4,500
Mar 3, 2017Never finaled
issued Mar 2017, no final
2435 03rd Ststreet space
Details
Permit
M765691
Permit issued
Mar 3, 2017

street space

Open the permit page

Feb 28, 2017Never finaled
issued Feb 2017, no final
2475 03rd StPeninsula Fire Protection Inc#247 - install (7) new heads per nfpa #13. ref t.i. #201604195103. n/a maher ordinance
Details
Permit
201702280296
Permit issued
Feb 28, 2017

#247 - install (7) new heads per nfpa #13. ref t.i. #201604195103. n/a maher ordinance

Open the permit page

$1,800
Feb 28, 2017Completed
final sign-off Mar 2017
2325 03rd StPeninsula Fire Protection Inc#410 & #411 - install (4) new sprinklers per nfpa #13. ref #201611152729. n/a maher ordinance
Details
Permit
201702280297
Permit issued
Feb 28, 2017
Final sign-off
Mar 8, 2017

#410 & #411 - install (4) new sprinklers per nfpa #13. ref #201611152729. n/a maher ordinance

Open the permit page

$1,200
Dec 12, 2016Expired or cancelled
withdrawn Jun 2018
2325 03rd Stremodeling an (e) office space on the 4th floor, new light fixtures and minimal electrical work. new conference room.
Details
Permit
201612124755

remodeling an (e) office space on the 4th floor, new light fixtures and minimal electrical work. new conference room.

Open the permit page

$22,000
Nov 15, 2016Expired or cancelled
expired Feb 2025
2325 03rd StDajani Constructionsuite 410/411 - remodeling an (e) manufactoring & distribution/office space to create a small conference room within the space. new light fixtures and minimal electrical work. expand (e) office and production space into additional suite. fire and mechanical under separate permit.
Details
Permit
201611152729
Permit issued
Dec 19, 2016

suite 410/411 - remodeling an (e) manufactoring & distribution/office space to create a small conference room within the space. new light fixtures and minimal electrical work. expand (e) office and production space into additional suite. fire and mechanical under separate permit.

Open the permit page

$20,000
Nov 4, 2016Expired or cancelled
expired Feb 2025
2405 03rd StEleney Electricrevision to 201601147144: change of lighting new title 24 maher na
Details
Permit
201611042030
Permit issued
Mar 21, 2017

revision to 201601147144: change of lighting new title 24 maher na

Open the permit page

Aug 16, 2016Completed
final sign-off Mar 2017
2347 03rd StJ C Builderschange of use from a limited (b) restaurant to a full (a) restaurant. expanding existing restaurant into adjacent detail & manufacturing space. create an accessible reatroom & expand commercial kitchen space. n/a maher ordinance
Details
Permit
201608165132
Permit issued
Oct 20, 2016
Final sign-off
Mar 21, 2017

change of use from a limited (b) restaurant to a full (a) restaurant. expanding existing restaurant into adjacent detail & manufacturing space. create an accessible reatroom & expand commercial kitchen space. n/a maher ordinance

Open the permit page

$85,000
Aug 5, 2016Never finaled
issued Aug 2016, no final
2445 03rd Stper pa #201607142325, create new address for new commercial space at block 4109, lot 001 as; 2445 3rd street
Details
Permit
M711307
Permit issued
Aug 5, 2016

per pa #201607142325, create new address for new commercial space at block 4109, lot 001 as; 2445 3rd street

Open the permit page

Jul 14, 2016Expired or cancelled
expired Feb 2025
2435 03rd Stmodify (e) non-accessible entrance & install ada compliant entry door in (e) industrial space. new accessible restroom & communal sink, remove (e) single-hung windows & replace with new accessible entry doors. n/a ordinance #155-13
Details
Permit
201607142325
Permit issued
Jul 19, 2016

modify (e) non-accessible entrance & install ada compliant entry door in (e) industrial space. new accessible restroom & communal sink, remove (e) single-hung windows & replace with new accessible entry doors. n/a ordinance #155-13

Open the permit page

$21,000
Jul 8, 2016Completed
final sign-off Jul 2017
2419 03rd Stmodify an (e) and install an ada compliant entry door )broinze door & window system) in an (e) industrial space to match 2421 3rd st. new accessible restroom. new double exit doors to 9e) fire rated corridor. maher na
Details
Permit
201607081850
Permit issued
Jul 19, 2016
Final sign-off
Jul 10, 2017

modify an (e) and install an ada compliant entry door )broinze door & window system) in an (e) industrial space to match 2421 3rd st. new accessible restroom. new double exit doors to 9e) fire rated corridor. maher na

Open the permit page

$21,000
May 26, 2016Expired or cancelled
withdrawn Nov 2018
2301 03rd Stsprint pcs to remove 3 panel antennas and rrhs, 1 microwave antenna and odu, gps antenna, equip rack, cable ladders, conduit and support. fiber junction box, antenna brackets, signage, generator plug
Details
Permit
201605268495

sprint pcs to remove 3 panel antennas and rrhs, 1 microwave antenna and odu, gps antenna, equip rack, cable ladders, conduit and support. fiber junction box, antenna brackets, signage, generator plug

Open the permit page

$5,000
May 6, 2016Never finaled
filed May 2016, never issued
2345 03rd Stinstall (n) covered pedestrian bridge over 22nd st. to replace a pedestrian bridge that was removed in the 1950's. the (n) bridge will utilize the same (e) openings as the previous bridge. on (e) buildings either side of 22nd st. the bridge will include a full weather enclosure, roof walls. a sloped
Details
Permit
201605066837

install (n) covered pedestrian bridge over 22nd st. to replace a pedestrian bridge that was removed in the 1950's. the (n) bridge will utilize the same (e) openings as the previous bridge. on (e) buildings either side of 22nd st. the bridge will include a full weather enclosure, roof walls. a sloped

Open the permit page

$350,000
Apr 19, 2016Never finaled
issued Jul 2016, no final
2475 03rd StDajani Constructionsuite # 247: modifying a recently vacated print shop and business office into a business office and prototype manufacturing firm. work includes adding an accessisible restroom, reduce size of extg conference room, new kitchenette and storage closets. n/a for maher.
Details
Permit
201604195103
Permit issued
Jul 19, 2016

suite # 247: modifying a recently vacated print shop and business office into a business office and prototype manufacturing firm. work includes adding an accessisible restroom, reduce size of extg conference room, new kitchenette and storage closets. n/a for maher.

Open the permit page

$55,000
Apr 6, 2016Completed
final sign-off Apr 2016
2325 03rd StThe Lunt Marymor Co. Inc.suite # 434: as built drawing submittal. ref app#201602250537. notes have been updated to show the use of ul listed viega megapress. pipe fittings for schedule 40 steel pipe 1" - 2". n/a for maher
Details
Permit
201604064108
Permit issued
Apr 6, 2016
Final sign-off
Apr 22, 2016

suite # 434: as built drawing submittal. ref app#201602250537. notes have been updated to show the use of ul listed viega megapress. pipe fittings for schedule 40 steel pipe 1" - 2". n/a for maher

Open the permit page

Mar 24, 2016Never finaled
issued Mar 2016, no final
2475 03rd StJustin Farrelly Incorporatedrevisio to ref pa 2015 1223 5851: lighting and rcp, t-24 maher na
Details
Permit
201603242950
Permit issued
Mar 24, 2016

revisio to ref pa 2015 1223 5851: lighting and rcp, t-24 maher na

Open the permit page

Feb 25, 2016Completed
final sign-off Apr 2016
2325 03rd StThe Lunt Marymor Co. Inc.#434 : fire sprinkler alteration for office t.i. add 4 heads, relocate 4 heads, and cap one head. ref app#201602028657. n/a for maher.
Details
Permit
201602250537
Permit issued
Feb 25, 2016
Final sign-off
Apr 7, 2016

#434 : fire sprinkler alteration for office t.i. add 4 heads, relocate 4 heads, and cap one head. ref app#201602028657. n/a for maher.

Open the permit page

$9,950
Feb 2, 2016Completed
final sign-off Apr 2016
2325 03rd StMatarozzi/Pelsinger Builders Inc.remodel existing office suite. new light fixtures, new kitchenette, new phone rooms, conference room. 4th fl suite 434
Details
Permit
201602028657
Permit issued
Feb 10, 2016
Final sign-off
Apr 7, 2016

remodel existing office suite. new light fixtures, new kitchenette, new phone rooms, conference room. 4th fl suite 434

Open the permit page

$123,000
Jan 29, 2016Never finaled
issued Jan 2016, no final
2475 03rd StJustin Farrelly Incorporatedrevision to 201512235851, 1 sheet a-703 title 24 mandatory lighting control declaration statements
Details
Permit
201601298384
Permit issued
Jan 29, 2016

revision to 201512235851, 1 sheet a-703 title 24 mandatory lighting control declaration statements

Open the permit page

Jan 14, 2016Completed
final sign-off Mar 2017
2405 03rd StT K Systems Inc- Dba A M F Imodification of an extg industrial distribution space into a bicycle repair and storage facility with retail. new light fixtures and minimal electrical work. new storage mezzanine. n/a for maher.
Details
Permit
201601147144
Permit issued
Apr 29, 2016
Final sign-off
Mar 31, 2017

modification of an extg industrial distribution space into a bicycle repair and storage facility with retail. new light fixtures and minimal electrical work. new storage mezzanine. n/a for maher.

Open the permit page

$110,000
Dec 23, 2015Completed
final sign-off Jan 2017
2475 03rd StJustin Farrelly Incorporated#253 - commercial t.i. for office space merge suites #253 & 258, alter exisitng & add non-load bearing partition walls. remodel bath to current accessibility standards, lighitng in conference room & work room.
Details
Permit
201512235851
Permit issued
Dec 23, 2015
Final sign-off
Jan 18, 2017

#253 - commercial t.i. for office space merge suites #253 & 258, alter exisitng & add non-load bearing partition walls. remodel bath to current accessibility standards, lighitng in conference room & work room.

Open the permit page

$60,000
Nov 16, 2015Completed
final sign-off Jan 2016
2475 03rd StBattalion One Fire Protectionrevision to app#201503050045. install a dedicated elevator recall unit for elevator recall and supervisory function due to the elevator modernization. install smoke det. and control modules for monitoring elev. recall. new control unit will be tie-in to extg fire control panel. ref app#201411252554.
Details
Permit
201511162725
Permit issued
Nov 16, 2015
Final sign-off
Jan 5, 2016

revision to app#201503050045. install a dedicated elevator recall unit for elevator recall and supervisory function due to the elevator modernization. install smoke det. and control modules for monitoring elev. recall. new control unit will be tie-in to extg fire control panel. ref app#201411252554.

Open the permit page

$5,000
Sep 16, 2015Completed
final sign-off Sep 2015
2495 03rd StBattalion One Fire Protectionadding sprinklers to protect a lofted space used as an office. per inspector planka. n/a for maher.
Details
Permit
201509167115
Permit issued
Sep 16, 2015
Final sign-off
Sep 30, 2015

adding sprinklers to protect a lofted space used as an office. per inspector planka. n/a for maher.

Open the permit page

$5,000
Sep 4, 2015Expired or cancelled
cancelled Aug 2022
610 22nd Stchange of occupancy. tenant improvement for (n) restaurant including kitchen, dining area, (n) ada restroom, hvac, electrical, plumbing, mechanical, mezzanine, (n) dining mezzanine, (n) fixtrures & finishes. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201509046241

change of occupancy. tenant improvement for (n) restaurant including kitchen, dining area, (n) ada restroom, hvac, electrical, plumbing, mechanical, mezzanine, (n) dining mezzanine, (n) fixtrures & finishes. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$250,000
Aug 14, 2015Completed
final sign-off Aug 2015
1030 Illinois StAlwest Fire Protectioninstall 8 fire sprinklers within walk-in coolers on 1st floor.
Details
Permit
201508144260
Permit issued
Aug 14, 2015
Final sign-off
Aug 27, 2015

install 8 fire sprinklers within walk-in coolers on 1st floor.

Open the permit page

$3,400
Aug 6, 2015Never finaled
issued Aug 2015, no final
2335 03rd StJustin Farrelly Incorporatedno construction work. for field confirmation of assembly occupant load for 201501075137 as requested by fire inspector. maher not req.
Details
Permit
201508063500
Permit issued
Aug 11, 2015

no construction work. for field confirmation of assembly occupant load for 201501075137 as requested by fire inspector. maher not req.

Open the permit page

Aug 3, 2015Expired or cancelled
cancelled Jan 2026
2335 03rd StNeedham Electricapplication for t-24 electrical submitted and permit application. and to change use from limite3d restaurant to full restaurant. ref to pa# 201501075137 & ref to pa# 201503191291
Details
Permit
201508033160

application for t-24 electrical submitted and permit application. and to change use from limite3d restaurant to full restaurant. ref to pa# 201501075137 & ref to pa# 201503191291

Open the permit page

$500
Jul 30, 2015Never finaled
issued Jul 2015, no final
2335 03rd StPeninsula Fire Protection Incinstall new fire suppression system to 14' hood and duct- change of occupancy under 2015-01-07-5137
Details
Permit
201507302871
Permit issued
Jul 30, 2015

install new fire suppression system to 14' hood and duct- change of occupancy under 2015-01-07-5137

Open the permit page

$4,500
Jul 22, 2015Completed
final sign-off Oct 2015
2325 03rd Stadd new ada restroom to an space. fully sprinklered
Details
Permit
201507222178
Permit issued
Aug 3, 2015
Final sign-off
Oct 1, 2015

add new ada restroom to an space. fully sprinklered

Open the permit page

$17,500
Jul 10, 2015Never finaled
issued Jul 2015, no final
1030 Illinois StCool Solutions Manufactoring,Incinstallation of interior walk-in cooler/freezer and related mep. upgrage accessible restroom per plan. maher n/a.
Details
Permit
201507101219
Permit issued
Jul 14, 2015

installation of interior walk-in cooler/freezer and related mep. upgrage accessible restroom per plan. maher n/a.

Open the permit page

$40,000
Jun 18, 2015Completed
final sign-off Aug 2015
2335 03rd StBattalion One Fire Protectionfire alarm-new facp for hood and duct fp system, inter-connect with existing fire sprinkler monitoring system for first floor plant cafe- includes smoke detector and pull station. compliance with maher ordinance no 155-13 not required.
Details
Permit
201506189303
Permit issued
Jun 18, 2015
Final sign-off
Aug 25, 2015

fire alarm-new facp for hood and duct fp system, inter-connect with existing fire sprinkler monitoring system for first floor plant cafe- includes smoke detector and pull station. compliance with maher ordinance no 155-13 not required.

Open the permit page

$14,000
May 27, 2015Completed
final sign-off Feb 2016
2425 03rd StDajani Constructiontenant improvement new food prep area in existing cheese shop. new stainless steel prep tables, two new refrigerators, new food preparation equipment + storage shelves. new walk in refrigerator. n/a maher ordinance
Details
Permit
201505277303
Permit issued
Jul 14, 2015
Final sign-off
Feb 17, 2016

tenant improvement new food prep area in existing cheese shop. new stainless steel prep tables, two new refrigerators, new food preparation equipment + storage shelves. new walk in refrigerator. n/a maher ordinance

Open the permit page

$12,000
Apr 2, 2015Never finaled
issued Apr 2015, no final
2421 03rd Stadd 2421 - 03rd street to 4109/001 for commercial space. ref appl #2015-03-25-1852.
Details
Permit
M575367
Permit issued
Apr 2, 2015

add 2421 - 03rd street to 4109/001 for commercial space. ref appl #2015-03-25-1852.

Open the permit page

Mar 25, 2015Completed
final sign-off Jan 2016
2421 03rd Stsubdivide a large commercial space into 2 leaseable spaces with 2 - new accessible restrooms. new front facade (store front). maher - not req'd
Details
Permit
201503251852
Permit issued
Apr 2, 2015
Final sign-off
Jan 4, 2016

subdivide a large commercial space into 2 leaseable spaces with 2 - new accessible restrooms. new front facade (store front). maher - not req'd

Open the permit page

$35,000
Mar 19, 2015Never finaled
issued Mar 2015, no final
2335 03rd StJustin Farrelly Incorporatedapplication to correct address for application number 201501075137 from 2345 3rd st to 2335 3rd st
Details
Permit
201503191291
Permit issued
Mar 19, 2015

application to correct address for application number 201501075137 from 2345 3rd st to 2335 3rd st

Open the permit page

Mar 9, 2015Never finaled
issued Mar 2015, no final
2335 03rd StBayside Mechanical Incinstall hood and duct work ref 201501075137 aka 2245 3rd st; maher n/a
Details
Permit
201503090260
Permit issued
Mar 9, 2015

install hood and duct work ref 201501075137 aka 2245 3rd st; maher n/a

Open the permit page

$34,000
Mar 5, 2015Completed
final sign-off Dec 2015
2475 03rd StBattalion One Fire Protectionconnection to existing sprinkler monitoring system for new ada elevator system upgrade. elevator recall. n/a for the maher ordinance.
Details
Permit
201503050045
Permit issued
Mar 5, 2015
Final sign-off
Dec 17, 2015

connection to existing sprinkler monitoring system for new ada elevator system upgrade. elevator recall. n/a for the maher ordinance.

Open the permit page

$6,000
Feb 25, 2015Completed
final sign-off Dec 2015
2475 03rd StC T W Mechanicalinstall exhaust fan for elevator machine room. n/a ordinance #155-13
Details
Permit
201502259334
Permit issued
Feb 25, 2015
Final sign-off
Dec 18, 2015

install exhaust fan for elevator machine room. n/a ordinance #155-13

Open the permit page

$1,000
Feb 17, 2015Never finaled
issued Feb 2015, no final
2335 03rd Stadd 2335 - 3rd st to 4109/001.
Details
Permit
M559987
Permit issued
Feb 17, 2015

add 2335 - 3rd st to 4109/001.

Open the permit page

Feb 5, 2015Completed
final sign-off Apr 2015
2325 03rd StWestower Communicationsremoval of metro pcs telecommunications site. n/a maher ordinance
Details
Permit
201502057603
Permit issued
Feb 10, 2015
Final sign-off
Apr 1, 2015

removal of metro pcs telecommunications site. n/a maher ordinance

Open the permit page

$10,000
Jan 7, 2015Never finaled
issued Feb 2015, no final
2345 03rd StJustin Farrelly Incorporatednew cafe and finishing kitchen in existing shell space to support existing commercial kitchen. new raised patio area and new ada compliante restrooms with communal sink
Details
Permit
201501075137
Permit issued
Feb 25, 2015

new cafe and finishing kitchen in existing shell space to support existing commercial kitchen. new raised patio area and new ada compliante restrooms with communal sink

Open the permit page

$100,000
Nov 25, 2014Completed
final sign-off Dec 2015
2475 03rd StJustin Farrelly Incorporatedinstalling a new elevator in an existing elevator shaft. n/a ordinance #155-13. life safety aspects of elevator to be on deferred submittal if required.
Details
Permit
201411252554
Permit issued
Dec 18, 2014
Final sign-off
Dec 18, 2015

installing a new elevator in an existing elevator shaft. n/a ordinance #155-13. life safety aspects of elevator to be on deferred submittal if required.

Open the permit page

$125,000
Sep 19, 2014Expired or cancelled
withdrawn Jan 2016
2405 03rd Stt.i for new restaurant including kitchen, dining, new ada restrooms, havc, electrical, plumbing, mezzanine and platform, new fixtures and finishes.n/a for the maher ordinance #155-13
Details
Permit
201409196861

t.i for new restaurant including kitchen, dining, new ada restrooms, havc, electrical, plumbing, mezzanine and platform, new fixtures and finishes.n/a for the maher ordinance #155-13

Open the permit page

$250,000
Sep 3, 2014Never finaled
issued Sep 2014, no final
660 22nd Ststreet space
Details
Permit
M515067
Permit issued
Sep 3, 2014

street space

Open the permit page

Aug 28, 2014Expired or cancelled
cancelled Nov 2024
2325 03rd Stinstall a 30 kw diesel generator on roof of the existing building. maher ord n/a.
Details
Permit
201408284994

install a 30 kw diesel generator on roof of the existing building. maher ord n/a.

Open the permit page

$50,000
Aug 22, 2014Never finaled
issued Sep 2014, no final
2475 03rd StJustin Farrelly Incorporated2nd flr: commercial t.i. improvement for office space, no use change proposed. add office cubicle new non-struct walls modification to restroom, new lights & switching; maher n/a
Details
Permit
201408224534
Permit issued
Sep 18, 2014

2nd flr: commercial t.i. improvement for office space, no use change proposed. add office cubicle new non-struct walls modification to restroom, new lights & switching; maher n/a

Open the permit page

$45,000
Jul 28, 2014Completed
final sign-off Mar 2015
2331 03rd Stmodifing an existing manufacturing retail space to add wall and create 2 new tenant spaces. separte permits for ti for both spaces. mep & sprinkler under separate permit. removal of window to add new entry door. maher ordinance # 155-13 n/a.
Details
Permit
201407282346
Permit issued
Jul 31, 2014
Final sign-off
Mar 31, 2015

modifing an existing manufacturing retail space to add wall and create 2 new tenant spaces. separte permits for ti for both spaces. mep & sprinkler under separate permit. removal of window to add new entry door. maher ordinance # 155-13 n/a.

Open the permit page

$45,000
Jun 30, 2014Completed
final sign-off Dec 2014
2343 03rd StDajani Constructionremodel a vacant retail production space into a commercial kitchen and bakery retail space. revision to appl. 201310240159. change use from f-2 to f-1 commercialwarehouse to commercial kitchen f-1. maher ordinance #155-13 n/a.
Details
Permit
201406309992
Permit issued
Jul 30, 2014
Final sign-off
Dec 24, 2014

remodel a vacant retail production space into a commercial kitchen and bakery retail space. revision to appl. 201310240159. change use from f-2 to f-1 commercialwarehouse to commercial kitchen f-1. maher ordinance #155-13 n/a.

Open the permit page

$69,000
May 30, 2014Never finaled
issued May 2014, no final
2341 03rd Stper pa #201310240159, new address to subdivision space at block 4109, lot 001 as; 2341 3rd street.
Details
Permit
M492167
Permit issued
May 30, 2014

per pa #201310240159, new address to subdivision space at block 4109, lot 001 as; 2341 3rd street.

Open the permit page

May 9, 2014Completed
final sign-off Nov 2015
2475 03rd Stmodify an extg non-compliant bldg entrance and create new ada entrance with new stair case and new elevator under separate permit. (e) lighting & hvac to remain. n/a for the maher ordinance #155-13
Details
Permit
201405095426
Permit issued
May 21, 2014
Final sign-off
Nov 16, 2015

modify an extg non-compliant bldg entrance and create new ada entrance with new stair case and new elevator under separate permit. (e) lighting & hvac to remain. n/a for the maher ordinance #155-13

Open the permit page

$85,500
May 6, 2014Never finaled
issued May 2014, no final
660 22nd Ststreet space
Details
Permit
M486027
Permit issued
May 6, 2014

street space

Open the permit page

Mar 25, 2014Never finaled
issued Mar 2014, no final
980 Illinois Stadd warehouse address to block 4109, lot 001 as; 980 illinois st.
Details
Permit
M474067
Permit issued
Mar 25, 2014

add warehouse address to block 4109, lot 001 as; 980 illinois st.

Open the permit page

Feb 21, 2014Never finaled
issued Feb 2014, no final
610 22nd Ststreet space
Details
Permit
M465447
Permit issued
Feb 21, 2014

street space

Open the permit page

Dec 27, 2013Expired or cancelled
withdrawn Aug 2015
610 22nd Stbuild new grocery/deli at former warehouse space. provide new ada entrance/lift and new ada restrooms
Details
Permit
201312275176

build new grocery/deli at former warehouse space. provide new ada entrance/lift and new ada restrooms

Open the permit page

$125,000
Nov 15, 2013Expired or cancelled
cancelled Nov 2014
2349 03rd Stverizon wireless proposes to replace 1 (e) 2' antenna & 2 (e) 4' antennas w/ 3 (n) 51" panel antennas, add 3 (n) rrh units, 2 raycaps, 2 hybrid cables, 2 ret cables, ac power & inverter device at alpha sector. paint antennas to match bldg.
Details
Permit
201311152051

verizon wireless proposes to replace 1 (e) 2' antenna & 2 (e) 4' antennas w/ 3 (n) 51" panel antennas, add 3 (n) rrh units, 2 raycaps, 2 hybrid cables, 2 ret cables, ac power & inverter device at alpha sector. paint antennas to match bldg.

Open the permit page

$18,000
Nov 13, 2013Completed
final sign-off Feb 2014
2347 03rd StC T W Mechanicalinstall exhaust fan and makeup air fan. mechanical only.
Details
Permit
201311131824
Permit issued
Nov 13, 2013
Final sign-off
Feb 5, 2014

install exhaust fan and makeup air fan. mechanical only.

Open the permit page

$3,000
Nov 12, 2013Never finaled
issued Nov 2013, no final
2325 03rd Stalteration of floor/equipment to show addition of plug in hang convection oven. no construction.
Details
Permit
201311121681
Permit issued
Nov 15, 2013

alteration of floor/equipment to show addition of plug in hang convection oven. no construction.

Open the permit page

Nov 8, 2013Completed
final sign-off Nov 2013
2347 03rd StPro Plumbingadd 6 sprinkler heads under mezzanine to (e) tenant improvement pa# 2013.09.30.8087.
Details
Permit
201311081455
Permit issued
Nov 8, 2013
Final sign-off
Nov 25, 2013

add 6 sprinkler heads under mezzanine to (e) tenant improvement pa# 2013.09.30.8087.

Open the permit page

$4,000
Oct 24, 2013Completed
final sign-off Dec 2014
2343 03rd Stmodify existing warehouse space to creat 2 separate space with 2 new entrances at street level
Details
Permit
201310240159
Permit issued
Nov 8, 2013
Final sign-off
Dec 23, 2014

modify existing warehouse space to creat 2 separate space with 2 new entrances at street level

Open the permit page

$23,000
Sep 30, 2013Completed
final sign-off Feb 2014
2347 03rd Stmodifying an existing take out sandwich shop into a new pizza cafe & carry out existing plumbing to be relocated. sprinkler retrofit under separate permit.
Details
Permit
201309308087
Permit issued
Oct 11, 2013
Final sign-off
Feb 6, 2014

modifying an existing take out sandwich shop into a new pizza cafe & carry out existing plumbing to be relocated. sprinkler retrofit under separate permit.

Open the permit page

$55,400
Jul 12, 2013Expired or cancelled
withdrawn Oct 2021
2301 03rd StOverland Contracting Incperform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units.
Details
Permit
201307121757

perform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units.

Open the permit page

$45,000
Nov 26, 2012Expired or cancelled
cancelled Mar 2020
2325 03rd Stmodification to an (e) wireless facility consisting of the addition of one (1) 1' microwave dish & one (1) 2' microwave dish.
Details
Permit
201211264756

modification to an (e) wireless facility consisting of the addition of one (1) 1' microwave dish & one (1) 2' microwave dish.

Open the permit page

$1,500
Aug 23, 2012Completed
final sign-off Oct 2012
2325 03rd Stmodify (e) production dist. office space & add restroom upgrade.
Details
Permit
201208238113
Permit issued
Aug 24, 2012
Final sign-off
Oct 22, 2012

modify (e) production dist. office space & add restroom upgrade.

Open the permit page

$11,400
Jun 15, 2012Completed
final sign-off Nov 2012
2425 03rd StDiviney Constructionnew cheese shop in existing retail space, new furnishing + equipment for display of emrchandise; prep table for food prep & packaging, new washroom with triple sink, prep sink, mop sink, new wall between washrom & storage.
Details
Permit
201206152745
Permit issued
Aug 7, 2012
Final sign-off
Nov 28, 2012

new cheese shop in existing retail space, new furnishing + equipment for display of emrchandise; prep table for food prep & packaging, new washroom with triple sink, prep sink, mop sink, new wall between washrom & storage.

Open the permit page

$14,000
Apr 5, 2012Never finaled
issued Apr 2012, no final
2455 03rd Stfor increase of occupancy only prior approved pa #2011.07.05.9480 shows assembly for tasting room/wine making (158 people). request to increase to 348 occupants (a-2), no renovation or construction.
Details
Permit
201204057750
Permit issued
Apr 16, 2012

for increase of occupancy only prior approved pa #2011.07.05.9480 shows assembly for tasting room/wine making (158 people). request to increase to 348 occupants (a-2), no renovation or construction.

Open the permit page

Nov 3, 2011Completed
final sign-off Nov 2011
2455 03rd StAlpha Fire Suppressioninstall two new pendent sprinkelrs in two new bathrooms on first floor.
Details
Permit
201111038180
Permit issued
Nov 3, 2011
Final sign-off
Nov 18, 2011

install two new pendent sprinkelrs in two new bathrooms on first floor.

Open the permit page

$1,500
Oct 27, 2011Completed
final sign-off Nov 2011
2427 03rd StInternational Fire Equipinstall ul 300 fire system.
Details
Permit
201110277738
Permit issued
Oct 27, 2011
Final sign-off
Nov 2, 2011

install ul 300 fire system.

Open the permit page

$4,500
Sep 30, 2011Completed
final sign-off Jan 2012
2427 03rd StE B Gilmore & Sons Mech Svcs Inc1) supply and install one cooking hood and grease duct with exhaust fan.2)supply and install one make up air fan with duct work.
Details
Permit
201109305922
Permit issued
Oct 7, 2011
Final sign-off
Jan 25, 2012

1) supply and install one cooking hood and grease duct with exhaust fan.2)supply and install one make up air fan with duct work.

Open the permit page

$15,200
Aug 26, 2011Completed
final sign-off Nov 2011
610 22nd StCleveland Wrecking Companyemergency order - demolish roof tower concrete platform only, on a 4 story, retail/office building.
Details
Permit
201108263351
Permit issued
Aug 26, 2011
Final sign-off
Nov 8, 2011

emergency order - demolish roof tower concrete platform only, on a 4 story, retail/office building.

Open the permit page

$40,000
Aug 18, 2011Expired or cancelled
cancelled Jan 2026
2325 03rd Stemergency permit. emergency demolition permit to remove concrete water tower. repair existing roof, baricade perimeter during demolition. not visible from street
Details
Permit
201108182783

emergency permit. emergency demolition permit to remove concrete water tower. repair existing roof, baricade perimeter during demolition. not visible from street

Open the permit page

$55,000
Jul 18, 2011Never finaled
issued Aug 2011, no final
2427 03rd StCollier Ostrom Enterpisesinstall interior partitions to define restaurant kitchen area. install commercial kitchen equipment. construct fixed bar counter, bathroom and demising wall previously constructed by building owner under permit #2011-0207-9748. kitchen hood installed under separate permit by building owner.
Details
Permit
201107180422
Permit issued
Aug 10, 2011

install interior partitions to define restaurant kitchen area. install commercial kitchen equipment. construct fixed bar counter, bathroom and demising wall previously constructed by building owner under permit #2011-0207-9748. kitchen hood installed under separate permit by building owner.

Open the permit page

$60,000
Jul 15, 2011Expired or cancelled
cancelled Jan 2026
2325 03rd StInternational Fire Equipinstall ansul system ul 300 kitchen fire system at gr fl
Details
Permit
201107150341

install ansul system ul 300 kitchen fire system at gr fl

Open the permit page

$1,000
Jul 15, 2011Completed
final sign-off Sep 2011
2325 03rd StInternational Fire Equipfloor 4, #409 -install ansul system ul 300 kitchen fire system.
Details
Permit
201107150344
Permit issued
Jul 19, 2011
Final sign-off
Sep 1, 2011

floor 4, #409 -install ansul system ul 300 kitchen fire system.

Open the permit page

$1,000
Jul 5, 2011Completed
final sign-off Dec 2011
2455 03rd StMartin Heid Design/Buildmodify (e) entry to make ada complianet. remoev step/build new 4' long ramp, new door. remove/relocate non-ada restrooms and build (n) ada restrooms near entry, new lighting and finishes
Details
Permit
201107059480
Permit issued
Jul 28, 2011
Final sign-off
Dec 20, 2011

modify (e) entry to make ada complianet. remoev step/build new 4' long ramp, new door. remove/relocate non-ada restrooms and build (n) ada restrooms near entry, new lighting and finishes

Open the permit page

$28,000
Jun 30, 2011Completed
final sign-off Feb 2013
2325 03rd Sttenant improvements to (e) office space & add employee kitchen, new walls & doors
Details
Permit
201106309323
Permit issued
Jul 6, 2011
Final sign-off
Feb 15, 2013

tenant improvements to (e) office space & add employee kitchen, new walls & doors

Open the permit page

$12,000
Feb 23, 2011Never finaled
issued Feb 2011, no final
928 Illinois Stadd addresses for existing commercial spaces. 928, 950, 952, 954 & 956 illinois street.
Details
Permit
M242886
Permit issued
Feb 24, 2011

add addresses for existing commercial spaces. 928, 950, 952, 954 & 956 illinois street.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Dajani Construction (29), Battalion One Fire Protection (18), C T W Mechanical (10), Justin Farrelly Incorporated (8), Huff Construction Company Inc (6), Truebeck Construction (5), International Fire Equip (4), Jose Viera (4), M C S Construction Services (3), Peninsula Fire Protection Inc (3), Acco Engineered Systems Inc. Dba Acco En (2), Collier-Ostrom Enterprise (2), E B Gilmore & Sons Mech Svcs Inc (2), Pro Plumbing & Fire Sprinkler Inc (2), Safe Assurance Fire Protection (2), Sprk Fire S F (2), The Lunt Marymor Co. Inc. (2), Alpha Fire Suppression, Alwest Fire Protection, Aquamatic Fire Protection, Bayside Mechanical Inc, Centric Construction Inc, Cleveland Wrecking Company, Collier Ostrom Enterpises, Cool Solutions Manufactoring,Inc, D & R Const, Decker Electric Co Inc Electrical Contra, Diviney Construction, Edenavow Construction & Design, Edison Fire Extinguisher Company Inc, Eleney Electric, J C Builders, L.D. Strobel Co Ltd, Martin Heid Design/Build, Matarozzi/Pelsinger Builders Inc., Mid-Peninsula Roofing Inc, Needham Electric, Overland Contracting Inc, Pioneer Fire Inc., Pro Plumbing, Quality Telecom Consultants, Rossi Builders Inc., Steven Yeung Inc Dba Chung Wah Plbg&Fire, T K Systems Inc- Dba A M F I, Tilson Technology Management Inc, Westower Communications
Architects
Harold Howell (8), Christopher Sullivan (5), Matt Hollis (5), Christi Azevedo (3), Seth Boor (3), Ccs Architecture (2), David Cumby (2), E B Min (2), Julie Jackson (2), Rebecca Amato (2), Daniel Connell, Gregory Smith, Harold Howe, Jerome Christensen, Marc Lindsell, Omied Arvin, Thomas Lundberg
Engineers
Harold Howell (27), Matthew Wang (7), Glen Hunt (3), Craig Ristow (2), Loring Willie (2), Christopher Wener, Denis Hugh Morgan, Harold E Howell, Jeffrey Rome, Jim Schuricht, Kevin Sorensen, Leonard Rose, Loring Wyllie, Madhan Samy, Sean Cua, Zhen Chao Xiong
Authorized agents
Mercury Engingering

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.