Permit 201605066837
2345 03rd St
install (n) covered pedestrian bridge over 22nd st. to replace a pedestrian bridge that was removed in the 1950's. the (n) bridge will utilize the same (e) openings as the previous bridge. on (e) buildings either side of 22nd st. the bridge will include a full weather enclosure, roof walls. a sloped
- Outcome
- Never finaled (city status: filed, May 6, 2016)
- Filed
- May 6, 2016
- Declared cost
- $350,000
- Building use
- office
- Neighborhood
- Potrero Hill
- Contractor
- None listed with a license number
- Property
- All permits at this address (block 4109, lot 001)