Christi Azevedo
- Listed as
- architect, designer, engineer
- Firm
- Azevedo Design
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Aug 2026
56 permits since 2000 (architect on 52 permits, designer on 2 permits, engineer on 2 permits): 34 completed, 6 in progress, 7 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 2757 Bryant St | 1/f: repair (e) foundation, (n) slab on grade w/ radiant heat, shift 4 non-load bearing walls, remodel kitchen/bath.Details
1/f: repair (e) foundation, (n) slab on grade w/ radiant heat, shift 4 non-load bearing walls, remodel kitchen/bath. | $157,000 | |
| Aug 24, 2026 | In progress issued Aug 2026 | 3542 24th St | Beam Construction Enterprises Inc | revision 202404240674- replace 42 in half wall guard at stairs of unit 1 at second and third floors with full floor to ceiling wall at kitchen and office. see sheet a1.3.Details
revision 202404240674- replace 42 in half wall guard at stairs of unit 1 at second and third floors with full floor to ceiling wall at kitchen and office. see sheet a1.3. | |
| Jun 2, 2026 | In progress issued Jun 2026 | 363 Douglass St | Thomas Doherty Construction Dba Doherty | revision to pa# 202512151823: repair ext. concrete stairs and add wood landing inside. non load bearing wall at bath and add closet. add 1/2 bath, replace 2 bath windows in-kind; adjust non load bearing wall @ bath & add closetDetails
revision to pa# 202512151823: repair ext. concrete stairs and add wood landing inside. non load bearing wall at bath and add closet. add 1/2 bath, replace 2 bath windows in-kind; adjust non load bearing wall @ bath & add closet | $9,370 |
| Mar 20, 2026 | In progress issued Apr 2026 | 1687 39th Av | floor 1: voluntary seismic upgrade, (n) slab in living areas, rebuild (e) non- compliant stairs in kind, replace window + door with 2 french doors, add bath. floor 2: enlarge + remodel kitchen, reduce bedroom size. remodel bath, replace west windows. 519 sqft of (n) habitable space.Details
floor 1: voluntary seismic upgrade, (n) slab in living areas, rebuild (e) non- compliant stairs in kind, replace window + door with 2 french doors, add bath. floor 2: enlarge + remodel kitchen, reduce bedroom size. remodel bath, replace west windows. 519 sqft of (n) habitable space. | $117,500 | |
| Dec 15, 2025 | In progress issued Dec 2025 | 363 Douglass St | Thomas Doherty Construction Dba Doherty | basement - voluntary seismic upgrade. replace west half of floor with slab on grade and reframe east floor. create tradesman corridor. remove laundry and install wet bar. add bathroom. replace east windows and doors. 1/f - remove bath for breakfast nook. change east door to window. 2/f - add laundryDetails
basement - voluntary seismic upgrade. replace west half of floor with slab on grade and reframe east floor. create tradesman corridor. remove laundry and install wet bar. add bathroom. replace east windows and doors. 1/f - remove bath for breakfast nook. change east door to window. 2/f - add laundry | $108,600 |
| Sep 24, 2025 | In progress issued Sep 2025 | 328 Caselli Av | Triond Remodeling Inc | interior remodel. floor 1: move range & replace (e) patio door with french door. floor 2: move bath wall 17", remodel bath & replace windowDetails
interior remodel. floor 1: move range & replace (e) patio door with french door. floor 2: move bath wall 17", remodel bath & replace window | $57,800 |
| Jun 9, 2025 | Expired or cancelled withdrawn Aug 2025 | 404 Marietta Dr | Bayward Builders | revision 202303214040 and ref 202411185186- add (n) hot tub to rear yard retainging walls at tubDetails
revision 202303214040 and ref 202411185186- add (n) hot tub to rear yard retainging walls at tub | $27,300 |
| Nov 5, 2024 | Expired or cancelled expired Jun 2026 | 53 Sussex St | Ronan O'dea Inc Dba O'dea Ronan Inc | revision to pa # 2024-0712-6421 & 2021-0426-9314 s-1 shoring drainage and moving of a wall in basement floor and adding beams and sistered joists on floor 1Details
revision to pa # 2024-0712-6421 & 2021-0426-9314 s-1 shoring drainage and moving of a wall in basement floor and adding beams and sistered joists on floor 1 | |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 452 Fell St | revision to 202306129885. remove non load bearing walls at floor 2. add 7 sf skylight. more closet at floor 3Details
revision to 202306129885. remove non load bearing walls at floor 2. add 7 sf skylight. more closet at floor 3 | ||
| May 17, 2024 | Completed final sign-off May 2024 | 112 Delano Av | Ronan O'dea Inc Dba O'dea Ronan Inc | rear building: revision to permit 202404170153 (org. permit 201911046323). change rear sliding glass door to single swing door.Details
rear building: revision to permit 202404170153 (org. permit 201911046323). change rear sliding glass door to single swing door. | |
| May 10, 2024 | Completed final sign-off Sep 2026 | 3542 24th St | Beam Construction Enterprises Inc | flr 1: new fdn. convert 1,009 sf of garage/storage to habitable space for unit 1. add 1.5 baths, and add int stair. flr 2: unit 1 remodel kitchen, (2) baths, and laundry, connect flr 1 with int stair. flr 3: unit 2 relocate kitchen and bath. unit 1 (#3542)add bath, office, and int stair flr 2 to 3.Details
flr 1: new fdn. convert 1,009 sf of garage/storage to habitable space for unit 1. add 1.5 baths, and add int stair. flr 2: unit 1 remodel kitchen, (2) baths, and laundry, connect flr 1 with int stair. flr 3: unit 2 relocate kitchen and bath. unit 1 (#3542)add bath, office, and int stair flr 2 to 3. | $817,500 |
| Feb 13, 2024 | Completed final sign-off May 2024 | 148 Otsego Av | t-24 revision to permit #202201286874.Details
t-24 revision to permit #202201286874. | ||
| Jun 12, 2023 | Completed final sign-off Aug 2024 | 452 Fell St | interior remodel: no structural. upgrade electrical as necessary. replace furnace. remodel kitchen and bath. replace 2 windows in-kind and enlarge 3rd window (windows facing rear yard). 3/f: add shower, vanity sink and laundry.Details
interior remodel: no structural. upgrade electrical as necessary. replace furnace. remodel kitchen and bath. replace 2 windows in-kind and enlarge 3rd window (windows facing rear yard). 3/f: add shower, vanity sink and laundry. | $137,000 | |
| Mar 21, 2023 | Completed final sign-off Jan 2026 | 404 Marietta Dr | Bayward Builders | enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylightsDetails
enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylights | $187,000 |
| Apr 29, 2022 | Completed final sign-off May 2024 | 148 Otsego Av | Bayward Builders | revision of 202201286874. update t-24 & foundation detail.Details
revision of 202201286874. update t-24 & foundation detail. | |
| Jan 28, 2022 | Completed final sign-off May 2024 | 148 Otsego Av | Bayward Builders | rear building. convert (e) 450 sf worksthop at back of lot to home office with bathroom & utility sink.Details
rear building. convert (e) 450 sf worksthop at back of lot to home office with bathroom & utility sink. | $127,000 |
| Oct 26, 2021 | Completed final sign-off May 2025 | 41 05th Av | Del Plata Builders Inc | lateral interior upgrade only. no wall changes.Details
lateral interior upgrade only. no wall changes. | $387,000 |
| Sep 2, 2021 | Completed final sign-off Sep 2023 | 112 Delano Av | Ronan O'dea Inc Dba O'dea Ronan Inc | revison to pa# 2019-0701-4830. foundation changes. all interior, no exterior work.**maher n/a**Details
revison to pa# 2019-0701-4830. foundation changes. all interior, no exterior work.**maher n/a** | |
| Jul 27, 2021 | Expired or cancelled expired May 2025 | 41 05th Av | Qse Construction | revision to 202102104429: revise detail 1/55 to maintain extg foundation in northwest portion. extend garage approx 8' to west below grade.Details
revision to 202102104429: revise detail 1/55 to maintain extg foundation in northwest portion. extend garage approx 8' to west below grade. | $50,000 |
| Apr 26, 2021 | Completed final sign-off Jun 2026 | 53 Sussex St | Ronan O'dea Inc Dba O'dea Ronan Inc | basement: add 522 sf including bedroom, family room, wet bar & 1 bath. 1st floor: add stairs to basement, remodel bath/laundry & add 104 sf to bedroom @ rear. rebuild 105 sf of deck. 2nd floor: add 26 sf @ north facade @ kitchen / entry. fill in 42 sf @ sw corner. new ground floor 1125 sf.Details
basement: add 522 sf including bedroom, family room, wet bar & 1 bath. 1st floor: add stairs to basement, remodel bath/laundry & add 104 sf to bedroom @ rear. rebuild 105 sf of deck. 2nd floor: add 26 sf @ north facade @ kitchen / entry. fill in 42 sf @ sw corner. new ground floor 1125 sf. | $173,300 |
| Mar 31, 2021 | Completed final sign-off May 2022 | 515 Gates St | Perez Construction Llc. | basement: add 778 sq. ft. of habitable space including bedroom, office, media room and one bath. 1st flr: add stairs to basement and remodel master bath.Details
basement: add 778 sq. ft. of habitable space including bedroom, office, media room and one bath. 1st flr: add stairs to basement and remodel master bath. | $62,000 |
| Mar 25, 2021 | Completed final sign-off Mar 2026 | 118 Robinhood Dr | Sunset Builders Llc. | remodel kitchen. add 1436 sq.ft. 2nd floor to single story house including 3 bedrooms, 2 baths & 1 laundry room. add stairs between floor 1 & 2.Details
remodel kitchen. add 1436 sq.ft. 2nd floor to single story house including 3 bedrooms, 2 baths & 1 laundry room. add stairs between floor 1 & 2. | $275,000 |
| Mar 11, 2021 | Never finaled issued Aug 2021, no final | 148 Otsego Av | Cronin Construction & Development Inc. | build 742 sqft habitable space at ground floor. excavade 1' to achieve 8' ceiling height. upgrade electrical. remodel kitchen/dining at 2nd fl.Details
build 742 sqft habitable space at ground floor. excavade 1' to achieve 8' ceiling height. upgrade electrical. remodel kitchen/dining at 2nd fl. | $180,000 |
| Feb 10, 2021 | Never finaled issued Apr 2021, no final | 41 05th Av | Qse Construction | perform voluntary siesmic upgrade of basement level. replace existing foundation and enlarge garage. no change to exterior or flr level above garage.Details
perform voluntary siesmic upgrade of basement level. replace existing foundation and enlarge garage. no change to exterior or flr level above garage. | $137,000 |
| Nov 4, 2019 | Expired or cancelled expired Jun 2024 | 112 Delano Av | rear bldg adu per ordinance 162-16. open plan & remodel kitchen & bath. new windows..**maher n/a**Details
rear bldg adu per ordinance 162-16. open plan & remodel kitchen & bath. new windows..**maher n/a** | $50,000 | |
| Oct 3, 2019 | Completed final sign-off Oct 2020 | 1374 45th Av | Rodscape | comply w/ complaint 201981831. construct deck 35'x15' and shed at rear w/ electrical, plumbingDetails
comply w/ complaint 201981831. construct deck 35'x15' and shed at rear w/ electrical, plumbing | $10,000 |
| Jul 1, 2019 | Completed final sign-off Sep 2023 | 112 Delano Av | front bldg: basement- add entry & (n) stair. floor 1- rebuild rear portion as open kitchen. floor 2- add 2nd flr over kitchen to include master bedroom & bath. remodel (e) bath to include laundry. rear structure under separate permit.**maher n/a**Details
front bldg: basement- add entry & (n) stair. floor 1- rebuild rear portion as open kitchen. floor 2- add 2nd flr over kitchen to include master bedroom & bath. remodel (e) bath to include laundry. rear structure under separate permit.**maher n/a** | $150,000 | |
| May 22, 2019 | Completed final sign-off Jun 2019 | 1494 Rhode Island St | Bayward Builders | revistion to pa 201703151553. exterior deck changesDetails
revistion to pa 201703151553. exterior deck changes | |
| May 16, 2019 | Never finaled issued Dec 2020, no final | 1683 Alabama St | Lowe Design And Construction | basement: condition 520 sf of existing garage space. move south footing 2" to proeprty line to add 165 sft. add 2 beds,1 bath, staircase & laundry room. floor 1st: remodel kitchen,dining & bath. alter deck. floor 2: new floor level including bedroom, closet, bath, & 500 sf roof deckDetails
basement: condition 520 sf of existing garage space. move south footing 2" to proeprty line to add 165 sft. add 2 beds,1 bath, staircase & laundry room. floor 1st: remodel kitchen,dining & bath. alter deck. floor 2: new floor level including bedroom, closet, bath, & 500 sf roof deck | $385,000 |
| Sep 27, 2018 | Completed final sign-off Aug 2025 | 2007 15th Av | Bayward Builders | no change to building footprint. 1st fl - reconfigure bath, lower floor in (e) art studio. 2nd fl - remodel kitchen & bath; replace windows @ front floor 2Details
no change to building footprint. 1st fl - reconfigure bath, lower floor in (e) art studio. 2nd fl - remodel kitchen & bath; replace windows @ front floor 2 | $145,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 870 Kansas St | Majestic Scepter* Check Id Or Contr Lic* | owner to provide materials raise floor in basement family rm. build wall to separate storage room, build bathroom, relocate laundry area.replace 8 windows with new vinyl windows.Details
owner to provide materials raise floor in basement family rm. build wall to separate storage room, build bathroom, relocate laundry area.replace 8 windows with new vinyl windows. | $88,000 |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 60 Surrey St | Hubert Penny | remodel basement including - remodel bath & laundry, (n) window, replace (e) windows and door, remove dropped ceiling & add 134 sf of conditioned space (media, tv room, study & bath 1)Details
remodel basement including - remodel bath & laundry, (n) window, replace (e) windows and door, remove dropped ceiling & add 134 sf of conditioned space (media, tv room, study & bath 1) | $37,000 |
| Sep 1, 2017 | Completed final sign-off Aug 2020 | 1719 17th Av | adu ord 95-17. basement 550 sq ft of conditioned space, add adu per ordinance no 95-17 w/ minor expansion under supported room & deck at rear, 1st fl; remodel kitchen & bath, add 50 sq ft at rear, relocate deck & exterior stair. 2nd fl; enlarge rear bedrm & add new bath.Details
adu ord 95-17. basement 550 sq ft of conditioned space, add adu per ordinance no 95-17 w/ minor expansion under supported room & deck at rear, 1st fl; remodel kitchen & bath, add 50 sq ft at rear, relocate deck & exterior stair. 2nd fl; enlarge rear bedrm & add new bath. | $200,000 | |
| Mar 15, 2017 | Completed final sign-off Jun 2019 | 1494 Rhode Island St | Bayward Builders | no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage.Details
no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage. | $250,000 |
| Nov 3, 2016 | Never finaled issued Jun 2017, no final | 45 Laidley St | add exteriorstair to connect floor 1 & 2. steel structure with wood treads. maximum extension from house 42"Details
add exteriorstair to connect floor 1 & 2. steel structure with wood treads. maximum extension from house 42" | $4,000 | |
| May 17, 2016 | Completed final sign-off Sep 2017 | 1374 45th Av | rebuild rear roof & add partial 3rd story (490 sf) at rear. vertical addition for partial 3rd story. add one (n) bedroom & one (n) bath + 2 skylights.Details
rebuild rear roof & add partial 3rd story (490 sf) at rear. vertical addition for partial 3rd story. add one (n) bedroom & one (n) bath + 2 skylights. | $50,000 | |
| May 2, 2016 | Completed final sign-off Sep 2017 | 1374 45th Av | voluntary seismic retrofit. unit 1 relocate interior stair remodel kitchen and bath at floor 2. add skylight over hallway. unit 2 - add new 370 sft unit at floor 1. rehad front porch & build straight-run stair. (n) wood siding to match.Details
voluntary seismic retrofit. unit 1 relocate interior stair remodel kitchen and bath at floor 2. add skylight over hallway. unit 2 - add new 370 sft unit at floor 1. rehad front porch & build straight-run stair. (n) wood siding to match. | $400,000 | |
| Mar 24, 2016 | Never finaled issued Mar 2016, no final | 2475 03rd St | Justin Farrelly Incorporated | revisio to ref pa 2015 1223 5851: lighting and rcp, t-24 maher naDetails
revisio to ref pa 2015 1223 5851: lighting and rcp, t-24 maher na | |
| Jan 29, 2016 | Never finaled issued Jan 2016, no final | 2475 03rd St | Justin Farrelly Incorporated | revision to 201512235851, 1 sheet a-703 title 24 mandatory lighting control declaration statementsDetails
revision to 201512235851, 1 sheet a-703 title 24 mandatory lighting control declaration statements | |
| Jan 14, 2016 | Completed final sign-off Dec 2016 | 715 Commercial St | legaliation of dwelling unit @ basement per ordinance 43-14. no change to unit# 1. unit# 2: install non-load bearing, fire rated wall @ entry. upgrade (e) kitchen lights to high efficency. ** maher: n/a **Details
legaliation of dwelling unit @ basement per ordinance 43-14. no change to unit# 1. unit# 2: install non-load bearing, fire rated wall @ entry. upgrade (e) kitchen lights to high efficency. ** maher: n/a ** | $28,000 | |
| Dec 23, 2015 | Completed final sign-off Jan 2017 | 2475 03rd St | Justin Farrelly Incorporated | #253 - commercial t.i. for office space merge suites #253 & 258, alter exisitng & add non-load bearing partition walls. remodel bath to current accessibility standards, lighitng in conference room & work room.Details
#253 - commercial t.i. for office space merge suites #253 & 258, alter exisitng & add non-load bearing partition walls. remodel bath to current accessibility standards, lighitng in conference room & work room. | $60,000 |
| May 11, 2015 | Never finaled issued May 2015, no final | 45 Laidley St | no change to bld footprint. partial foundation replacement. new windows and doors at rear. remodel kitchen flr 2. reloacte and remodel bath floor 2. remodel 2 bedrooms & 2 baths floor 1. install radiant heating throughout. renuild rear deck in kind, lower floor 1 to achieve 8'-6" head ht.Details
no change to bld footprint. partial foundation replacement. new windows and doors at rear. remodel kitchen flr 2. reloacte and remodel bath floor 2. remodel 2 bedrooms & 2 baths floor 1. install radiant heating throughout. renuild rear deck in kind, lower floor 1 to achieve 8'-6" head ht. | $600,000 | |
| Feb 13, 2015 | Completed final sign-off Aug 2017 | 25 Capp St | revision to permit 201409055555, increase height of bay windows to roof line.Details
revision to permit 201409055555, increase height of bay windows to roof line. | ||
| Nov 21, 2014 | Completed final sign-off Jan 2019 | 145 Bonview St | Watersprout, Cronin Construction & Development Inc. | no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property.Details
no change to main house bldg foorprint.no chg to unit 2. unit 1: add 37 sf of habitable space w/ bay windows at flr 3.relocate interior stair. relocate & remodel kitchen & bath on 2 & 3 flrs. alter pitch of (e) rear roof lines. add 350 sf art studio above (e) parking at soutwest corner of property. | $300,000 |
| Aug 4, 2014 | Completed final sign-off Mar 2015 | 446 Liberty St | Hoover Brindmore Inc. | replace front deckDetails
replace front deck | $35,000 |
| Jul 18, 2014 | Expired or cancelled cancelled Aug 2022 | 315 South Van Ness Av | site pln: add 3 stories r-2 on top west third of (e) bldg. see table on a-0.02. fl 1: (n) foundation & reinforcement, stairwell to new units. fl 2: unit 1, 1 bedrm, 1 bath 473 sf. unit 2: 1 bedrm, 1 bath 786 sf. fl 3-4: unit 3, 3 bedrms, 2 baths, 1,399 sq. unit 4, 2 bedrms. sprnkler/stdp/alarm separDetails
site pln: add 3 stories r-2 on top west third of (e) bldg. see table on a-0.02. fl 1: (n) foundation & reinforcement, stairwell to new units. fl 2: unit 1, 1 bedrm, 1 bath 473 sf. unit 2: 1 bedrm, 1 bath 786 sf. fl 3-4: unit 3, 3 bedrms, 2 baths, 1,399 sq. unit 4, 2 bedrms. sprnkler/stdp/alarm separ | $380,000 | |
| May 22, 2012 | Expired or cancelled expired Feb 2019 | 526 Utah St | rear yard addition, dormer addition w/ bath & closet floor 3. exterior staircase from floor 3 to rear yard. new kitchen, bath, deck floor 2. (n) 2nd unit on bottom 2 floors w/ kitchen, 2 baths, & 2 bedrooms.Details
rear yard addition, dormer addition w/ bath & closet floor 3. exterior staircase from floor 3 to rear yard. new kitchen, bath, deck floor 2. (n) 2nd unit on bottom 2 floors w/ kitchen, 2 baths, & 2 bedrooms. | $200,000 | |
| May 22, 2012 | Expired or cancelled cancelled Sep 2012 | 4317 24th St | relocate kitchen, dining & living to ground floor. add 220 sq ft on ground floor, relocate interior staircase. add deck @ floor 2 at backyard.Details
relocate kitchen, dining & living to ground floor. add 220 sq ft on ground floor, relocate interior staircase. add deck @ floor 2 at backyard. | $130,000 | |
| Feb 16, 2011 | Completed final sign-off Sep 2011 | 715 Commercial St | seismic upgrade, remove non-bearing int walls, relocate & enlarge light well, move laundry from floor 1 to 2, remodel kitchen @ floor 2, remodel 2 baths (2 & 3 level),add floor drains,new conc, slab. bath, bedroom,game room @ basement, add 3 gas fireplaces each level,repair roof & new roof deck.Details
seismic upgrade, remove non-bearing int walls, relocate & enlarge light well, move laundry from floor 1 to 2, remodel kitchen @ floor 2, remodel 2 baths (2 & 3 level),add floor drains,new conc, slab. bath, bedroom,game room @ basement, add 3 gas fireplaces each level,repair roof & new roof deck. | $127,000 | |
| Dec 23, 2010 | Completed final sign-off Jun 2011 | 2655 Harrison St | excavate rear of 1st floor to increase ceiling heights, replace load bearing wall with posts & beams, new partial ground floor slab, replace one rear windows, one door & one lightwell window. remodel 2nd floor bathroomDetails
excavate rear of 1st floor to increase ceiling heights, replace load bearing wall with posts & beams, new partial ground floor slab, replace one rear windows, one door & one lightwell window. remodel 2nd floor bathroom | $53,000 | |
| Mar 17, 2010 | Completed final sign-off Oct 2010 | 73 Del Monte St | bldg. footprint unchaged. add bedroom & bath on ground flr. (+168 sf. cond. space) new furnace & ducts, (n) interior staircase add 2-windows & replace 4 (e) @ rear facade, add 1-skylight, relocate kitchen sink to adjacent wall.Details
bldg. footprint unchaged. add bedroom & bath on ground flr. (+168 sf. cond. space) new furnace & ducts, (n) interior staircase add 2-windows & replace 4 (e) @ rear facade, add 1-skylight, relocate kitchen sink to adjacent wall. | $95,000 | |
| Jan 19, 2010 | Completed final sign-off Jun 2011 | 340 Kearny St | t.i. for shoe repair shop. accessibilty upgrades, 2 restrooms, lighting & electrical throughout. new stairwell & door to belden lane. 2 studio apartments on level 3, access stair & haych to roof & window replacement-site permit.Details
t.i. for shoe repair shop. accessibilty upgrades, 2 restrooms, lighting & electrical throughout. new stairwell & door to belden lane. 2 studio apartments on level 3, access stair & haych to roof & window replacement-site permit. | $280,000 | |
| Oct 29, 2008 | Expired or cancelled expired Aug 2011 | 203 Ellsworth St | Solid State Construction | revision to foundation footings due to unforseen site conditions, addition of 2 point load footings, increase sixe of footings. revision to pa# 2008-0429-0913Details
revision to foundation footings due to unforseen site conditions, addition of 2 point load footings, increase sixe of footings. revision to pa# 2008-0429-0913 | $150,000 |
| Jul 10, 2008 | Completed final sign-off Nov 2009 | 237 Holly Park Cr | demo 2 story east addition, new 2 story addition, new interior stairs, new bath and bedroom on 2nd floor, relocate kitchen to 1st floor and add dining area, new heating system, add skylightDetails
demo 2 story east addition, new 2 story addition, new interior stairs, new bath and bedroom on 2nd floor, relocate kitchen to 1st floor and add dining area, new heating system, add skylight | $250,000 | |
| Apr 29, 2008 | Expired or cancelled expired Aug 2011 | 203 Ellsworth St | Solid State Construction | demo enclosed porch & rear stairs; construct 10' x 16' three story addition; new interior stairs on all levels; two new bathrooms on 3rd floor; relocate kitchen, half bath, install radiant heat on 2nd floor; turn laundry into playroom on 1st floor.Details
demo enclosed porch & rear stairs; construct 10' x 16' three story addition; new interior stairs on all levels; two new bathrooms on 3rd floor; relocate kitchen, half bath, install radiant heat on 2nd floor; turn laundry into playroom on 1st floor. | $225,000 |
| Oct 9, 2007 | Completed final sign-off Feb 2008 | 3269 Mission St | interior ti for credit union branch, partition walls at offices & conference area, teller counter, shelving, lighting and computer cabling.Details
interior ti for credit union branch, partition walls at offices & conference area, teller counter, shelving, lighting and computer cabling. | $90,000 |