Del Plata Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Oct 2026
- Last 24 months
- 8 permits filed
25 permits since 2000: 18 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 46 Wilmot St | relocate powder room. 3rd flr electrical. stair railing, new dining room.Details
relocate powder room. 3rd flr electrical. stair railing, new dining room. | $150,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 138 Arguello Bl | replace stairs ballusters in kind, replace windows sashes in-kind paintDetails
replace stairs ballusters in kind, replace windows sashes in-kind paint | $30,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 325 Lawton St | rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding.Details
rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding. | $55,000 |
| Jun 24, 2026 | In progress issued Jun 2026 | 2113 Broderick St | basement level flooded. replace all finishes @ bathroom - living - tv room. replace cabinets + vanity + tile flooring and wall. replace can lights. all work in kind. no wall stud demolition or construction.Details
basement level flooded. replace all finishes @ bathroom - living - tv room. replace cabinets + vanity + tile flooring and wall. replace can lights. all work in kind. no wall stud demolition or construction. | $80,000 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 138 Arguello Bl | replace (9) back windows in kind. install new insulation in upper level (ceiling only). replace lights in upper level (approx. 44). remove fireplace- chimney in two upper levels. new furnace upper level. replace (6)skylightsDetails
replace (9) back windows in kind. install new insulation in upper level (ceiling only). replace lights in upper level (approx. 44). remove fireplace- chimney in two upper levels. new furnace upper level. replace (6)skylights | $60,000 |
| Jun 20, 2025 | Completed final sign-off Oct 2025 | 131 10th Av | bathroom remodel on 2nd floor with wall demolition and construction.Details
bathroom remodel on 2nd floor with wall demolition and construction. | $40,000 |
| Apr 28, 2025 | Completed final sign-off May 2025 | 41 05th Av | to obtain final inspection for work approved under pa# 202105251020 + 202107275189. all work is complete.Details
to obtain final inspection for work approved under pa# 202105251020 + 202107275189. all work is complete. | |
| Mar 12, 2025 | Completed final sign-off Aug 2025 | 321 Lake St | replace 9 windows in the back in-kindDetails
replace 9 windows in the back in-kind | $8,000 |
| Sep 30, 2024 | Completed final sign-off Sep 2025 | 28 Hillway Av | infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight.Details
infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight. | $150,000 |
| Aug 22, 2023 | Completed final sign-off Mar 2024 | 301 Mission St | replace in kind bath tile(3 bathrooms) plumbing fixtures and finishes, cabinets face and counter tops, elec finishes, remove dry wall bed #1, convert bath into powder roomDetails
replace in kind bath tile(3 bathrooms) plumbing fixtures and finishes, cabinets face and counter tops, elec finishes, remove dry wall bed #1, convert bath into powder room | $100,000 |
| Apr 11, 2023 | Completed final sign-off May 2025 | 41 05th Av | remove drywall for exploratory demo to view current condition. demo limited to walls and ceilings. limit to 100 sqft of demo per story. repairs to be done under permit# 202104219055.Details
remove drywall for exploratory demo to view current condition. demo limited to walls and ceilings. limit to 100 sqft of demo per story. repairs to be done under permit# 202104219055. | $10,000 |
| Jun 2, 2022 | Completed final sign-off Jun 2025 | 525 10th Av | infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldgDetails
infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldg | $200,000 |
| Jan 20, 2022 | Completed final sign-off Feb 2022 | 3145 23rd St | revision to permit 202107124198. decrease footing size.Details
revision to permit 202107124198. decrease footing size. | |
| Oct 29, 2021 | Completed final sign-off Nov 2023 | 2113 Broderick St | general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellarDetails
general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellar | $15,000 |
| Oct 26, 2021 | Completed final sign-off May 2025 | 41 05th Av | lateral interior upgrade only. no wall changes.Details
lateral interior upgrade only. no wall changes. | $387,000 |
| Jul 12, 2021 | Completed final sign-off Feb 2022 | 3145 23rd St | replace fence in-kind. visible from street. wood material, metal post. 8' total height.Details
replace fence in-kind. visible from street. wood material, metal post. 8' total height. | $10,000 |
| Apr 21, 2021 | Completed final sign-off May 2025 | 41 05th Av | install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath,Details
install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath, | $427,065 |
| Mar 30, 2021 | Never finaled issued Jun 2021, no final | 1518 Guerrero St | the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1.Details
the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1. | $50,000 |
| Dec 21, 2020 | Completed final sign-off Feb 2023 | 935 Shotwell St | remodel (e) 2nd fl, (n) raised roof @ rear. (n) exterior doors & windows, (n) skylight. (n) rear 2nd fl deck & stair.Details
remodel (e) 2nd fl, (n) raised roof @ rear. (n) exterior doors & windows, (n) skylight. (n) rear 2nd fl deck & stair. | $120,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 1584 08th Av | street spaceDetails
street space | |
| Dec 18, 2019 | Never finaled issued Jan 2020, no final | 1584 08th Av | revision to pa# 2019-0802-7755: install new window & new interior cased openingDetails
revision to pa# 2019-0802-7755: install new window & new interior cased opening | $2,000 |
| Sep 30, 2019 | Completed final sign-off Jul 2020 | 20 Caselli Av | remodel (e) bathroom, add one half bathroom @ 3rd level. no changes to exterior.Details
remodel (e) bathroom, add one half bathroom @ 3rd level. no changes to exterior. | $50,000 |
| Aug 6, 2019 | Completed final sign-off Feb 2020 | 1584 08th Av | to obtain final inspection for work approved under pa # 201108011398. all work is complete.Details
to obtain final inspection for work approved under pa # 201108011398. all work is complete. | |
| Aug 2, 2019 | Completed final sign-off Jun 2020 | 1584 08th Av | interior remodel to 2nd fl. reconfigure and remodel e bath. water closet same location. no horiz vert additions, no work visible from streetDetails
interior remodel to 2nd fl. reconfigure and remodel e bath. water closet same location. no horiz vert additions, no work visible from street | $30,000 |
| Jun 20, 2019 | Completed final sign-off Sep 2022 | 2548 Mission St | tenant build out of a (n) ground level cafe & 2nd fl. design suiteDetails
tenant build out of a (n) ground level cafe & 2nd fl. design suite | $30,000 |