Del Plata Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Oct 2026
- Last 24 months
- 8 permits filed
25 permits since 2000: 18 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
7 stairs permits: 3 completed, 3 in progress, 1 never finaled. Typically 56 days from filing to permit and 512 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 46 Wilmot St | relocate powder room. 3rd flr electrical. stair railing, new dining room.Details
relocate powder room. 3rd flr electrical. stair railing, new dining room. | $150,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 138 Arguello Bl | replace stairs ballusters in kind, replace windows sashes in-kind paintDetails
replace stairs ballusters in kind, replace windows sashes in-kind paint | $30,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 325 Lawton St | rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding.Details
rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding. | $55,000 |
| Jun 2, 2022 | Completed final sign-off Jun 2025 | 525 10th Av | infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldgDetails
infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldg | $200,000 |
| Oct 29, 2021 | Completed final sign-off Nov 2023 | 2113 Broderick St | general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellarDetails
general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellar | $15,000 |
| Mar 30, 2021 | Never finaled issued Jun 2021, no final | 1518 Guerrero St | the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1.Details
the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1. | $50,000 |
| Dec 21, 2020 | Completed final sign-off Feb 2023 | 935 Shotwell St | remodel (e) 2nd fl, (n) raised roof @ rear. (n) exterior doors & windows, (n) skylight. (n) rear 2nd fl deck & stair.Details
remodel (e) 2nd fl, (n) raised roof @ rear. (n) exterior doors & windows, (n) skylight. (n) rear 2nd fl deck & stair. | $120,000 |