Del Plata Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Oct 2026
- Last 24 months
- 8 permits filed
25 permits since 2000: 18 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 in progress, 1 never finaled. Typically 34 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jun 2026 | 2113 Broderick St | basement level flooded. replace all finishes @ bathroom - living - tv room. replace cabinets + vanity + tile flooring and wall. replace can lights. all work in kind. no wall stud demolition or construction.Details
basement level flooded. replace all finishes @ bathroom - living - tv room. replace cabinets + vanity + tile flooring and wall. replace can lights. all work in kind. no wall stud demolition or construction. | $80,000 |
| Jun 20, 2025 | Completed final sign-off Oct 2025 | 131 10th Av | bathroom remodel on 2nd floor with wall demolition and construction.Details
bathroom remodel on 2nd floor with wall demolition and construction. | $40,000 |
| Sep 30, 2024 | Completed final sign-off Sep 2025 | 28 Hillway Av | infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight.Details
infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight. | $150,000 |
| Aug 22, 2023 | Completed final sign-off Mar 2024 | 301 Mission St | replace in kind bath tile(3 bathrooms) plumbing fixtures and finishes, cabinets face and counter tops, elec finishes, remove dry wall bed #1, convert bath into powder roomDetails
replace in kind bath tile(3 bathrooms) plumbing fixtures and finishes, cabinets face and counter tops, elec finishes, remove dry wall bed #1, convert bath into powder room | $100,000 |
| Apr 21, 2021 | Completed final sign-off May 2025 | 41 05th Av | install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath,Details
install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath, | $427,065 |
| Mar 30, 2021 | Never finaled issued Jun 2021, no final | 1518 Guerrero St | the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1.Details
the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1. | $50,000 |
| Sep 30, 2019 | Completed final sign-off Jul 2020 | 20 Caselli Av | remodel (e) bathroom, add one half bathroom @ 3rd level. no changes to exterior.Details
remodel (e) bathroom, add one half bathroom @ 3rd level. no changes to exterior. | $50,000 |
| Aug 2, 2019 | Completed final sign-off Jun 2020 | 1584 08th Av | interior remodel to 2nd fl. reconfigure and remodel e bath. water closet same location. no horiz vert additions, no work visible from streetDetails
interior remodel to 2nd fl. reconfigure and remodel e bath. water closet same location. no horiz vert additions, no work visible from street | $30,000 |