Back to kitchen remodel contractors
Del Plata Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Oct 2026
- Last 24 months
- 8 permits filed
25 permits since 2000: 18 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 434 days from filing to permit and 737 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2022 | Completed final sign-off Jun 2025 | 525 10th Av | infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldgDetails
infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldg | $200,000 |
| Oct 29, 2021 | Completed final sign-off Nov 2023 | 2113 Broderick St | general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellarDetails
general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellar | $15,000 |
| Apr 21, 2021 | Completed final sign-off May 2025 | 41 05th Av | install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath,Details
install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath, | $427,065 |