Permit GraphShortlistSan Francisco building permits since 2000

Loring Willie

License
S1648
Structural engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up S1648 at the Board for Professional Engineers
Listed as
engineer
On San Francisco permits
Mar 2022 to Jun 2026

4 permits since 2000 (engineer on 4 permits): 2 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Dajani Construction (2)
Architects
Douglass S Gawoski, E B Min, Harold Howell, Robert S. Connelly
Engineers
Harold Howell

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 1, 2026In progress
issued Jun 2026
660 22nd StDajani Constructioninstall of new accessible ramp and stairs and interior glazing.
Details
Permit
202606012235
Permit issued
Jun 23, 2026

install of new accessible ramp and stairs and interior glazing.

Open the permit page

$44,275
Jun 27, 2024In progress
issued Sep 2024
2415 03rd StDajani Constructionste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit.
Details
Permit
202406275448
Permit issued
Sep 13, 2024

ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit.

Open the permit page

$70,000
May 2, 2022Completed
final sign-off Dec 2022
1052 Montgomery Stframe exterior deck on roof.
Details
Permit
202205023370
Permit issued
Sep 15, 2022
Final sign-off
Dec 21, 2022

frame exterior deck on roof.

Open the permit page

$7,500
Mar 21, 2022Completed
final sign-off Mar 2024
940 Laguna Honda Blvoluntary structural seismic upgrade. accessibility code upgrades
Details
Permit
202203210452
Permit issued
Mar 31, 2023
Final sign-off
Mar 18, 2024

voluntary structural seismic upgrade. accessibility code upgrades

Open the permit page

$2,000,000