Loring Willie
- License
- S1648
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S1648 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2022 to Jun 2026
4 permits since 2000 (engineer on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dajani Construction (2)
- Architects
- Douglass S Gawoski, E B Min, Harold Howell, Robert S. Connelly
- Engineers
- Harold Howell
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 1, 2026 | In progress issued Jun 2026 | 660 22nd St | Dajani Construction | install of new accessible ramp and stairs and interior glazing.Details
install of new accessible ramp and stairs and interior glazing. | $44,275 |
| Jun 27, 2024 | In progress issued Sep 2024 | 2415 03rd St | Dajani Construction | ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit.Details
ste# 297: change of occupancy from warehouse to manufacturing on 2/f. building a fabrication studio and loft in a proposed manufacturing space. mep under separate permit. | $70,000 |
| May 2, 2022 | Completed final sign-off Dec 2022 | 1052 Montgomery St | frame exterior deck on roof.Details
frame exterior deck on roof. | $7,500 | |
| Mar 21, 2022 | Completed final sign-off Mar 2024 | 940 Laguna Honda Bl | voluntary structural seismic upgrade. accessibility code upgradesDetails
voluntary structural seismic upgrade. accessibility code upgrades | $2,000,000 |