E B Min
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Min/Day
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Jun 2026
41 permits since 2000 (architect on 38 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 28 completed, 8 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 1, 2026 | In progress issued Sep 2026 | 2261 Fillmore St | seismic upgrade. demolition of structural elements & exterior features. shoring for historcal facade protection. make 2261 fillmore st structural independent of 2259 fillmore street. demolition of existing second floor and replace with new flooring framing.Details
seismic upgrade. demolition of structural elements & exterior features. shoring for historcal facade protection. make 2261 fillmore st structural independent of 2259 fillmore street. demolition of existing second floor and replace with new flooring framing. | $457,467 | |
| Jun 1, 2026 | In progress issued Jun 2026 | 660 22nd St | Dajani Construction | install of new accessible ramp and stairs and interior glazing.Details
install of new accessible ramp and stairs and interior glazing. | $44,275 |
| Jun 1, 2026 | In progress issued Sep 2026 | 2259 Fillmore St | seismic upgrade. make 2259 fillmore st. make structurally independent of 2261 fillmore street.Details
seismic upgrade. make 2259 fillmore st. make structurally independent of 2261 fillmore street. | $141,606 | |
| May 29, 2026 | In progress issued Jun 2026 | 1275 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | to document the subject, ground floor tenant space will be used for mercantile purposes rather than the previously approved cafe use; minor, non-structural t.i's within the space. no work proposed in other portions of the building.Details
to document the subject, ground floor tenant space will be used for mercantile purposes rather than the previously approved cafe use; minor, non-structural t.i's within the space. no work proposed in other portions of the building. | $16,200 |
| Apr 7, 2026 | In progress issued Jun 2026 | 2261 Fillmore St | Singular Builders | interior demo of non structural elements and treatment of interior defining features. in preparation for future renovation approved by planning. per ab 017, ti, mep and accessiblity is deferred under a separate permitDetails
interior demo of non structural elements and treatment of interior defining features. in preparation for future renovation approved by planning. per ab 017, ti, mep and accessiblity is deferred under a separate permit | $34,632 |
| Feb 4, 2026 | Completed final sign-off Feb 2026 | 2259 Fillmore St | Hurricane Hauling Inc. | change of use from retail to restaurant. no construction only light demo; restaurant build out under separate permit. accessibility deferred under ab-17Details
change of use from retail to restaurant. no construction only light demo; restaurant build out under separate permit. accessibility deferred under ab-17 | $2,000 |
| Nov 26, 2025 | Expired or cancelled cancelled Jun 2026 | 1275 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | change of existing tenant space occupancy from "m to "b" for a restaurant.Details
change of existing tenant space occupancy from "m to "b" for a restaurant. | $177,220 |
| Sep 25, 2025 | In progress issued Oct 2025 | 2001 Fillmore St | T N T Demolition Dba T N T Construction | at (e) ground floor and mezzanine, interior non structural demo (e) finishes, non structgural walls, fixtures, furnisings within an (e) vacant restaurant space. in accordance with sfbc ab-17 access upgrades will be deferred.Details
at (e) ground floor and mezzanine, interior non structural demo (e) finishes, non structgural walls, fixtures, furnisings within an (e) vacant restaurant space. in accordance with sfbc ab-17 access upgrades will be deferred. | $35,000 |
| Jun 17, 2025 | In progress issued Jul 2025 | 1371 06th Av | Hawke Construction | revision to pa# 202501098027: to include 98 sf horizontal extension (kitchen) at rear yard.Details
revision to pa# 202501098027: to include 98 sf horizontal extension (kitchen) at rear yard. | $6,319 |
| Dec 2, 2024 | Completed final sign-off Aug 2025 | 2345 03rd St | Dajani Construction | removal of brick infill facade at ground floor at southwest corner of the building and install 5 new windows to match (e) windows.Details
removal of brick infill facade at ground floor at southwest corner of the building and install 5 new windows to match (e) windows. | $25,000 |
| Sep 4, 2024 | In progress issued Jul 2025 | 555 07th St | repair & replacement of existing siding on west & northeast elevatyions and rooftop structures with new fiber cement claddingDetails
repair & replacement of existing siding on west & northeast elevatyions and rooftop structures with new fiber cement cladding | $900,000 | |
| Dec 15, 2023 | Completed final sign-off Jan 2024 | 1275 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | removal of existing partition wall (n) partition wall for 210 sqft expansion of restaurant. no change to exterior. no mep work. for work stated only.Details
removal of existing partition wall (n) partition wall for 210 sqft expansion of restaurant. no change to exterior. no mep work. for work stated only. | $30,814 |
| Nov 21, 2023 | Completed final sign-off Jan 2024 | 4576 19th St | A M G Construction | revision to pa# 2023-1011-8457, 2021-1029-1478, 2021-0824-6998, 2021-0824-6998: removal of existing fire place and flueDetails
revision to pa# 2023-1011-8457, 2021-1029-1478, 2021-0824-6998, 2021-0824-6998: removal of existing fire place and flue | |
| Nov 21, 2023 | Completed final sign-off Jun 2024 | 580 Green St | Dajani Construction | installation of trash enclosure on outside of the building on stockton street. no changes to interior of building.Details
installation of trash enclosure on outside of the building on stockton street. no changes to interior of building. | $700 |
| Oct 11, 2023 | Completed final sign-off Jan 2024 | 4576 19th St | A M G Construction | revision to bpa#202108246998, rear siding replacement shown and approved in bpa#202108246998, in-kind framing replacement @ primary bedroomDetails
revision to bpa#202108246998, rear siding replacement shown and approved in bpa#202108246998, in-kind framing replacement @ primary bedroom | |
| Sep 14, 2022 | Completed final sign-off Jun 2023 | 580 Green St | Dajani Construction | demo of nonstructural interior partitions/finishes, no change to (e) structure, electrical, mecahnical, plumbingDetails
demo of nonstructural interior partitions/finishes, no change to (e) structure, electrical, mecahnical, plumbing | $8,500 |
| Jul 13, 2022 | Completed final sign-off Jun 2023 | 580 Green St | Dajani Construction | interior remodel with new partition walls and finishes. exterior work limited to a take out window + egress door lighting to remain. mep on seperate. building change of use from bank to grocery.Details
interior remodel with new partition walls and finishes. exterior work limited to a take out window + egress door lighting to remain. mep on seperate. building change of use from bank to grocery. | $170,466 |
| May 19, 2022 | Completed final sign-off Feb 2023 | 864 Florida St | Leonardo Construction Inc | residential alteration of kitchen and primary bath, window replacements at ground floor and second floor. enlarge garage door.Details
residential alteration of kitchen and primary bath, window replacements at ground floor and second floor. enlarge garage door. | $53,276 |
| Nov 2, 2021 | Completed final sign-off Mar 2022 | 2565 03rd St | Dajani Construction | 3/f suite 329-331: new accessible single user restroom in the location of an existing restroom which was removed. existing mechanical and plumbing hook-ups to be reused.Details
3/f suite 329-331: new accessible single user restroom in the location of an existing restroom which was removed. existing mechanical and plumbing hook-ups to be reused. | $9,500 |
| Oct 29, 2021 | Completed final sign-off Jan 2024 | 4576 19th St | A M G Construction | revision to 202108246998 new shoring and minot modification to proposed structural & foundation. add new concrete wall inside of (e) foundation wall @ basement level.Details
revision to 202108246998 new shoring and minot modification to proposed structural & foundation. add new concrete wall inside of (e) foundation wall @ basement level. | $5,000 |
| Aug 24, 2021 | Completed final sign-off Jan 2024 | 4576 19th St | A M G Construction | rev to pa 202105100059 (kitchen& bathroom remodel) & add 2 bathrs, remodel lower level, interior remodel. replace windows and utilty area in front yard, rear deck repair and add spirale stair.Details
rev to pa 202105100059 (kitchen& bathroom remodel) & add 2 bathrs, remodel lower level, interior remodel. replace windows and utilty area in front yard, rear deck repair and add spirale stair. | $149,744 |
| Sep 12, 2020 | Completed final sign-off Dec 2023 | 660 Sanchez St | Pete Moffat Construction Inc | addition of concrete fence wall on top of (e) retaining wall at perimeter of rear yard.Details
addition of concrete fence wall on top of (e) retaining wall at perimeter of rear yard. | $500 |
| Mar 11, 2020 | Completed final sign-off Aug 2020 | 488 Folsom St | A M G Construction | revised a1.2 rcp upon request of fire inspector. ref pa 2019-1212-9373 rcp showing (e) building fire alarm sounders. no change. minor change to key notes added detailsDetails
revised a1.2 rcp upon request of fire inspector. ref pa 2019-1212-9373 rcp showing (e) building fire alarm sounders. no change. minor change to key notes added details | |
| Nov 14, 2017 | Completed final sign-off Apr 2018 | 220 Montgomery St | Principal Builders Inc. | revision to 201709219223 to remove closer at existing door and change hardware to non locking. maher naDetails
revision to 201709219223 to remove closer at existing door and change hardware to non locking. maher na | |
| Oct 2, 2017 | Completed final sign-off Jan 2019 | 135 Bluxome St | Steven S Donaldson | interior t.i. on 1/f & 2/f. improvements include removal of uncessessary toilets on 1/f and replacement with a mother's room, expansion of (e) pantry. unnecessary showers on 2/f to be replaced with a new break room on the 2/f. n/a ordinance #155-13Details
interior t.i. on 1/f & 2/f. improvements include removal of uncessessary toilets on 1/f and replacement with a mother's room, expansion of (e) pantry. unnecessary showers on 2/f to be replaced with a new break room on the 2/f. n/a ordinance #155-13 | $300,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 220 Montgomery St | Principal Builders Inc. | 7th floor suite 750: tenant improvement - to construct new partitions, millwork, doors, finishes, glazing & mep. life safety & sprinklers under separate permit. n/a maher ordinanceDetails
7th floor suite 750: tenant improvement - to construct new partitions, millwork, doors, finishes, glazing & mep. life safety & sprinklers under separate permit. n/a maher ordinance | $358,200 |
| Feb 16, 2017 | Expired or cancelled cancelled Jan 2025 | 1552 Palou Av | remodel 1st fl to include bedroom, bath, laundry and garage with side entry. 2nd fl remodel kitchen, bath and reconfigure bedroom, office and powder rm. new master bedroom and bath. (e) double hung wood windows to be prepared or replced in-kind.Details
remodel 1st fl to include bedroom, bath, laundry and garage with side entry. 2nd fl remodel kitchen, bath and reconfigure bedroom, office and powder rm. new master bedroom and bath. (e) double hung wood windows to be prepared or replced in-kind. | $235,000 | |
| Feb 16, 2016 | Completed final sign-off Jun 2016 | 111 Ellis St | Modern Construction Inc | 5th floor: interior t.i. within extg office space: include new partition. electrical and lighting new accessible restroom. no change to occupancy or extrerior. mechanical under seperate permit.Details
5th floor: interior t.i. within extg office space: include new partition. electrical and lighting new accessible restroom. no change to occupancy or extrerior. mechanical under seperate permit. | $120,000 |
| Jan 14, 2016 | Completed final sign-off Jan 2019 | 444 Townsend St | Steven S Donaldson | interior ti within (e) office space. improvements include new partitions, electrical & lighting, new accessible restroom facilities are to be added to the 1 & 2/f. no changes to occupancy or exterior are proposed. mep under separate permit. maher naDetails
interior ti within (e) office space. improvements include new partitions, electrical & lighting, new accessible restroom facilities are to be added to the 1 & 2/f. no changes to occupancy or exterior are proposed. mep under separate permit. maher na | $750,000 |
| Jul 7, 2015 | Completed final sign-off Nov 2015 | 1416 Church St | remodel e bath, e kitchen in 2 unit full floor flat building. add new full bath in each unit. replace e wall heaters with new forced air furnace. anchor bolt install at mudsillDetails
remodel e bath, e kitchen in 2 unit full floor flat building. add new full bath in each unit. replace e wall heaters with new forced air furnace. anchor bolt install at mudsill | $73,000 | |
| Jul 7, 2015 | Completed final sign-off Jan 2016 | 1416 Church St | replace e single glazed windows with new windows. replace all front windows in-kind with double hung wood windows with ogee lugs. max u factor 0.32 or better.Details
replace e single glazed windows with new windows. replace all front windows in-kind with double hung wood windows with ogee lugs. max u factor 0.32 or better. | $17,000 | |
| Nov 18, 2014 | Completed final sign-off Jan 2019 | 444 Townsend St | Steven S Donaldson | interior base building tenant improvement for accessible bathrooms, satisfy title 24 by adding ada lift and upgrade stairs within an existing covered recessed entryway; maher n/aDetails
interior base building tenant improvement for accessible bathrooms, satisfy title 24 by adding ada lift and upgrade stairs within an existing covered recessed entryway; maher n/a | $65,000 |
| Feb 25, 2014 | Completed final sign-off Aug 2014 | 49 Geary St | Rylko Builders Inc. | 2nd floor #238- interior t.i. to an (e) commercial class -a office space. improvements include (n) partitions casework & finishes, elec, lighting & plumbing. perform restroom improvements per disabled access 20% rule including relocation of toilet stall partition.Details
2nd floor #238- interior t.i. to an (e) commercial class -a office space. improvements include (n) partitions casework & finishes, elec, lighting & plumbing. perform restroom improvements per disabled access 20% rule including relocation of toilet stall partition. | $75,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 3715 20th St | Mario Sarmento | remove area of (e) roof membrane & sheathing for (n) skylight, expose & paint (e) roof framing, roof + ceiling framing to remain. no new square footage, no work in 1st floor unit. compliance with ordinance #155-13 not requiredDetails
remove area of (e) roof membrane & sheathing for (n) skylight, expose & paint (e) roof framing, roof + ceiling framing to remain. no new square footage, no work in 1st floor unit. compliance with ordinance #155-13 not required | $4,000 |
| Jun 12, 2012 | Completed final sign-off Jul 2013 | 220 Montgomery St | Principal Builders Inc. | 7th floor #700 - 2 new offices in existing office. sprinklers under separate permit.Details
7th floor #700 - 2 new offices in existing office. sprinklers under separate permit. | $21,500 |
| Dec 16, 2011 | Expired or cancelled withdrawn Jan 2012 | 220 Montgomery St | Principal Builders Inc. | 7th floor revision to appl #2011.11.17.9096 - change in previously permitted proposed plan: leave (e) exit doors as it.Details
7th floor revision to appl #2011.11.17.9096 - change in previously permitted proposed plan: leave (e) exit doors as it. | |
| Dec 13, 2011 | Expired or cancelled expired Jul 2014 | 1769 Green St | Mueller Nicholls Inc | interior remodel of (e) upper floor flat, remodel kitchen, bathroom, add 2nd bath. add new electrical, replace (e) rear windows with new sliding doors. no additional square footage.Details
interior remodel of (e) upper floor flat, remodel kitchen, bathroom, add 2nd bath. add new electrical, replace (e) rear windows with new sliding doors. no additional square footage. | $140,000 |
| Nov 30, 2011 | Completed final sign-off Mar 2012 | 220 Montgomery St | Principal Builders Inc. | revision to 201111179096: 7th fl restroom remodel. provide 2 accessible men and womens restrooms.Details
revision to 201111179096: 7th fl restroom remodel. provide 2 accessible men and womens restrooms. | $15,000 |
| Feb 28, 2011 | Completed final sign-off Sep 2011 | 728 Guerrero St | C B Company | build out new internal stair work at 1st & 2nd story only. remodel (e) bathroom & water closet for new chase, replace (e) widnow on 2nd story. add new bathroom, office & rec room, add new windows & door at rear yard on 1st story (garage).Details
build out new internal stair work at 1st & 2nd story only. remodel (e) bathroom & water closet for new chase, replace (e) widnow on 2nd story. add new bathroom, office & rec room, add new windows & door at rear yard on 1st story (garage). | $40,000 |
| Feb 4, 2011 | Completed final sign-off Jul 2011 | 118 02nd St | B Bilt Contruction Inc | tenant improvement to 6th fl of 118 second st/609 mission st. construction of interior partition walls for private and open offices. new outlets, lighting. relocation of existing ducts and registers as req for new officesDetails
tenant improvement to 6th fl of 118 second st/609 mission st. construction of interior partition walls for private and open offices. new outlets, lighting. relocation of existing ducts and registers as req for new offices | $133,000 |
| Jan 13, 2009 | Never finaled issued May 2009, no final | 656 Arkansas St | Mario Sarmento | new garage, rebuild (e) entry stairs, new bathroom in (e) workplaceDetails
new garage, rebuild (e) entry stairs, new bathroom in (e) workplace | $80,000 |