Block 4173, lot 001
2565 03rd St
- City’s use
- Industrial
- Built
- 1955
- Stories
- 3
- Rooms
- 9 bathrooms
- Lot
- 160,161 sq ft
- Zoning
- M2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
183 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2026 | In progress issued Mar 2026 | 2565 03rd St | Dajani Construction | unit #309 & 310: expansion of commercial kitchen facility including: cookline w/ hood, plumbing, finishes.Details
unit #309 & 310: expansion of commercial kitchen facility including: cookline w/ hood, plumbing, finishes. | $150,000 |
| Jun 26, 2025 | In progress filed Jun 2025, not yet issued | 2501 03rd St | modification of (e) wireless facility consisting of: add sector d+e install: 6 panel antennas; 2 air antennas behind (n) frp screen; 93' cable tray to (n) sector; (n) walk pads; barricades, rf stripping & signs; r/r (9) & add 12 (n) rrus on back-back mounts; 2 dc9, power/fiber to (n) sectorDetails
modification of (e) wireless facility consisting of: add sector d+e install: 6 panel antennas; 2 air antennas behind (n) frp screen; 93' cable tray to (n) sector; (n) walk pads; barricades, rf stripping & signs; r/r (9) & add 12 (n) rrus on back-back mounts; 2 dc9, power/fiber to (n) sector | $85,000 | |
| Jun 20, 2025 | Completed final sign-off Jul 2025 | 2565 03rd St | Safe Assurance Fire Protection | #322. install a new fire suppression system to a 12' hood & ducts. ref #202502059758Details
#322. install a new fire suppression system to a 12' hood & ducts. ref #202502059758 | $7,000 |
| Apr 29, 2025 | Completed final sign-off May 2025 | 657 22nd St | Ningzhi Hu Signs Company | install 1) doubld faced blade sign w/ plastic faces "shipyard k9 supplies"Details
install 1) doubld faced blade sign w/ plastic faces "shipyard k9 supplies" | $1,900 |
| Feb 5, 2025 | Completed final sign-off Jul 2025 | 2565 03rd St | Dajani Construction | #322: vacant industrial tenant space to be converted into an industrial kitchen and prep facility.Details
#322: vacant industrial tenant space to be converted into an industrial kitchen and prep facility. | $35,000 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 2525 03rd St | Eco Fire Sprinklers Inc | install 4 new pendent sprinklers for modified ceiling in area of work for ti on 1st fl. building permit ref: (voluntary work for inspection correction).Details
install 4 new pendent sprinklers for modified ceiling in area of work for ti on 1st fl. building permit ref: (voluntary work for inspection correction). | $7,000 |
| Jul 29, 2024 | Completed final sign-off Mar 2025 | 2565 03rd St | Battalion One Fire Protection | fire alarm t.i. for freight elevator #9 modernization. install new smoke detectors at elevator landings, new smokes and heats in the elevator machine room with modules for elevator monitoring.Details
fire alarm t.i. for freight elevator #9 modernization. install new smoke detectors at elevator landings, new smokes and heats in the elevator machine room with modules for elevator monitoring. | $6,000 |
| May 13, 2024 | Completed final sign-off Jun 2024 | 2525 03rd St | Fire Stop Sprinkler Company | relocate 5 sprinkler headsDetails
relocate 5 sprinkler heads | $10,000 |
| Mar 18, 2024 | Completed final sign-off Feb 2025 | 2525 03rd St | Dome Construction Corp | construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external workDetails
construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external work | $75,000 |
| Mar 15, 2024 | Completed final sign-off Jul 2024 | 2565 03rd St | Dajani Construction | new dishline to existing manufacturing spaceDetails
new dishline to existing manufacturing space | $23,000 |
| Dec 7, 2023 | Completed final sign-off Jun 2024 | 2501 03rd St | Metropolitan Electrical Construction | revision to pa #202208160595. install (4) (n) kickers to (e) frp wall @ sector c.Details
revision to pa #202208160595. install (4) (n) kickers to (e) frp wall @ sector c. | $10,000 |
| Sep 7, 2023 | Never finaled filed Sep 2023, never issued | 2565 03rd St | verizon install (9)(n) antennas (3) sectors, (12)(n) radio units in (3) sectors, all sectors will be screened by frp to match bldg, (4)(n) surge suppressors, (1) meter panel in (e) electrical rm, (1) step down transformer, 1 ppc distribution panel, 3 (n) hybrid cables 1 per sector, 1 gen plug, 1 gpsDetails
verizon install (9)(n) antennas (3) sectors, (12)(n) radio units in (3) sectors, all sectors will be screened by frp to match bldg, (4)(n) surge suppressors, (1) meter panel in (e) electrical rm, (1) step down transformer, 1 ppc distribution panel, 3 (n) hybrid cables 1 per sector, 1 gen plug, 1 gps | $330,000 | |
| Apr 26, 2023 | Never finaled issued Apr 2023, no final | 2565 03rd St | Mid-Peninsula Roofing Inc | remove existing gravel 2) install rigid insulation 3) install fully adhered tpo roof membrane 900 sqftDetails
remove existing gravel 2) install rigid insulation 3) install fully adhered tpo roof membrane 900 sqft | $870,000 |
| Apr 11, 2023 | Completed final sign-off Jun 2023 | 2565 03rd St | Dajani Construction | ste #320 installation of self contained cooking units for the preparation of pet food. ada restroom upgrade. change of use from light manufacturing to light nanufacturing no overnight pet boarding.Details
ste #320 installation of self contained cooking units for the preparation of pet food. ada restroom upgrade. change of use from light manufacturing to light nanufacturing no overnight pet boarding. | $102,000 |
| Feb 14, 2023 | Never finaled issued Feb 2023, no final | 2525 03rd St | Dsignart | 1-non electric double faced projected sign "w".Details
1-non electric double faced projected sign "w". | $3,902 |
| Sep 30, 2022 | Completed final sign-off Feb 2023 | 2525 03rd St | Eco Fire Sprinklers Inc | t.i., demo (e) sprinklers, relocate (2) & add (82) new sprinklersDetails
t.i., demo (e) sprinklers, relocate (2) & add (82) new sprinklers | $53,000 |
| Sep 23, 2022 | Never finaled issued Sep 2022, no final | 657 22nd St | replace commerical address of 665 - 22nd street with 657 - 22nd street per property owner request; refer to bpa 202208049873 for additional details.Details
replace commerical address of 665 - 22nd street with 657 - 22nd street per property owner request; refer to bpa 202208049873 for additional details. | ||
| Sep 7, 2022 | Expired or cancelled withdrawn Dec 2022 | 2525 03rd St | Eco Fire Sprinklers Inc | modify existing fire sprinkler system for new tenantDetails
modify existing fire sprinkler system for new tenant | $45,000 |
| Aug 16, 2022 | Completed final sign-off Jun 2024 | 2501 03rd St | Metropolitan Electrical Construction | att modifcation of unmanned telecom facility, remove (9)panel antennas, (6)new, remove (3)rrus, install (3)6 awg power trunk cables. new rf safety signs, barricade/striping rooftop, install (1)new rectifier in e dc power plant, (1)new 6648 baseband unit in existing purcell cabinetDetails
att modifcation of unmanned telecom facility, remove (9)panel antennas, (6)new, remove (3)rrus, install (3)6 awg power trunk cables. new rf safety signs, barricade/striping rooftop, install (1)new rectifier in e dc power plant, (1)new 6648 baseband unit in existing purcell cabinet | $55,000 |
| Aug 4, 2022 | Expired or cancelled expired Feb 2025 | 665 22nd St | Dajani Construction | install a new accessible restroom in a vacant spaceDetails
install a new accessible restroom in a vacant space | $25,000 |
| Jul 1, 2022 | Completed final sign-off May 2023 | 2525 03rd St | Dome Construction Corp | mechanical, electrical, and plumbing work for approved pa# 202205063728.Details
mechanical, electrical, and plumbing work for approved pa# 202205063728. | $750,000 |
| Jun 28, 2022 | Completed final sign-off Dec 2022 | 601 22nd St | Dajani Construction | modify an existing manufacturing space into a limited restaurant/ to go kitchen. no publuc access to space.Details
modify an existing manufacturing space into a limited restaurant/ to go kitchen. no publuc access to space. | $125,000 |
| Jun 27, 2022 | Completed final sign-off Jul 2022 | 2505 03rd St | International Fire Equipment Co Incorpor | revision to 202206166455: ul 300 fire system coverage for new kitchen equipment ref 202204222829Details
revision to 202206166455: ul 300 fire system coverage for new kitchen equipment ref 202204222829 | $6,000 |
| Jun 27, 2022 | Completed final sign-off Jul 2022 | 2505 03rd St | International Fire Equipment Co Incorpor | shift sprinker pipe next to new wall 4 ft. ref 202204222829Details
shift sprinker pipe next to new wall 4 ft. ref 202204222829 | $3,000 |
| Jun 16, 2022 | Completed final sign-off Jul 2022 | 2505 03rd St | International Fire Equipment Co Incorpor | ul300 fire system coverage for new kitchen equipment. ref pa# 202204222829.Details
ul300 fire system coverage for new kitchen equipment. ref pa# 202204222829. | $6,000 |
| May 24, 2022 | Never finaled issued May 2022, no final | 2505 03rd St | Martin Sign Co Inc. | the fabrication and installation of projecting blade sign "souvla" onto exterior wall.Details
the fabrication and installation of projecting blade sign "souvla" onto exterior wall. | $1,900 |
| May 20, 2022 | Expired or cancelled suspend Sep 2025 | 2505 03rd St | Martin Sign Co Inc. | the fabrication and installation of projecting blade sign "souvla" onto exterior wall.Details
the fabrication and installation of projecting blade sign "souvla" onto exterior wall. | $1,900 |
| May 6, 2022 | Completed final sign-off May 2023 | 2525 03rd St | Dome Construction Corp | renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work.Details
renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work. | $3,242,000 |
| Apr 27, 2022 | Expired or cancelled cancelled Jan 2026 | 2505 03rd St | Dome Construction Corp | interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep workDetails
interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep work | $3,242 |
| Apr 22, 2022 | Completed final sign-off Jul 2022 | 2505 03rd St | Pacific Rim Design + Build | tenant improvement (e) restaurant inc (n) partitions, lighting, equipment, transaction counter, and revised ada restroom. no change to exterior, no change to hvac.Details
tenant improvement (e) restaurant inc (n) partitions, lighting, equipment, transaction counter, and revised ada restroom. no change to exterior, no change to hvac. | $50,000 |
| Apr 1, 2022 | Expired or cancelled withdrawn Jun 2022 | 601 22nd St | Dajani Construction | modifying an existing manufactoring space into a food production facility with walk up window.Details
modifying an existing manufactoring space into a food production facility with walk up window. | $125,000 |
| Nov 2, 2021 | Completed final sign-off Mar 2022 | 2565 03rd St | Dajani Construction | 3/f suite 329-331: new accessible single user restroom in the location of an existing restroom which was removed. existing mechanical and plumbing hook-ups to be reused.Details
3/f suite 329-331: new accessible single user restroom in the location of an existing restroom which was removed. existing mechanical and plumbing hook-ups to be reused. | $9,500 |
| Jul 26, 2021 | Completed final sign-off Aug 2021 | 2573 03rd St | Pro Plumbing & Fire Sprinkler Inc | t.i: relocation of existing heads per new lockers and utility rooms layouts. ref. pa 201807194937. total sprinklers 46.Details
t.i: relocation of existing heads per new lockers and utility rooms layouts. ref. pa 201807194937. total sprinklers 46. | $25,000 |
| Jul 2, 2021 | Completed final sign-off Oct 2021 | 2565 03rd St | C T W Mechanical | ste 308 (3rd fl): remove (e) exhaust fan & install new exhaust fan & make up air fanDetails
ste 308 (3rd fl): remove (e) exhaust fan & install new exhaust fan & make up air fan | $10,000 |
| May 6, 2021 | Never finaled issued Jun 2021, no final | 1192 Illinois St | Aaa Restaurant Fire Control/Dba Aaa Fire | as-builts for review/approvalDetails
as-builts for review/approval | |
| Mar 24, 2021 | Never finaled issued Apr 2021, no final | 1192 Illinois St | Aaa Restaurant Fire Control/Dba Aaa Fire | add (9) new sprinkler headsDetails
add (9) new sprinkler heads | |
| Mar 9, 2021 | Expired or cancelled cancelled Jan 2026 | 2565 03rd St | ste 222/223: modify existing shell manufacturing space into a food snack production facility. no structural work.Details
ste 222/223: modify existing shell manufacturing space into a food snack production facility. no structural work. | $80,000 | |
| Dec 29, 2020 | Never finaled issued Feb 2021, no final | 2565 03rd St | Battalion One Fire Protection | due to interior remodeling in s. #221, new monitor module will be install to monitor one duct detector (installed by others) & tie-in to existing control panel at s. #2505 #2020-0829-2924, #2020-0527-7873Details
due to interior remodeling in s. #221, new monitor module will be install to monitor one duct detector (installed by others) & tie-in to existing control panel at s. #2505 #2020-0829-2924, #2020-0527-7873 | $2,000 |
| Oct 17, 2020 | Expired or cancelled cancelled Nov 2024 | 1160 Illinois St | remove 9 antennas. install new antennas & radios. install 6x12 hybrid cable. remove (e) rru's. replace power wall new rack & battery. modification to underpanel telecommunications facility.Details
remove 9 antennas. install new antennas & radios. install 6x12 hybrid cable. remove (e) rru's. replace power wall new rack & battery. modification to underpanel telecommunications facility. | $25,000 | |
| Sep 29, 2020 | Completed final sign-off May 2021 | 1192 Illinois St | Jose Viera | modifying as (e) manufactoring and distribution spaceinto a food processing facility and retial store. install new walk-in coolors and freezer. no exterior changes proposed.Details
modifying as (e) manufactoring and distribution spaceinto a food processing facility and retial store. install new walk-in coolors and freezer. no exterior changes proposed. | $150,000 |
| Sep 27, 2020 | Never finaled issued Nov 2020, no final | 2573 03rd St | Russell Olson | rev 201807194937: remove metal joist framed celing of t.i. frame new partitions g/f to concrete mezzanine.Details
rev 201807194937: remove metal joist framed celing of t.i. frame new partitions g/f to concrete mezzanine. | |
| Sep 21, 2020 | Completed final sign-off Dec 2020 | 2565 03rd St | Dajani Construction | suite 321: modifying an existing manufacturing space into a new packaging and distribution center. new walk-in cooler to be installed. no public consumption allowed. not for retail purposes.Details
suite 321: modifying an existing manufacturing space into a new packaging and distribution center. new walk-in cooler to be installed. no public consumption allowed. not for retail purposes. | $50,000 |
| Aug 29, 2020 | Completed final sign-off Jul 2021 | 2565 03rd St | ste #221: install mechanical system with new hvac system. ref pa# 202005277873Details
ste #221: install mechanical system with new hvac system. ref pa# 202005277873 | $17,500 | |
| Jun 18, 2020 | Never finaled issued Jul 2020, no final | 1160 Illinois St | Betacom, Incorporated | commencement of work not started under previously approved pa# 201603091634. (install-relocate rfp screens - relocate two (2) antenna in screens - relocate two (2) antenna in screens- install one (1) antenna and rru)Details
commencement of work not started under previously approved pa# 201603091634. (install-relocate rfp screens - relocate two (2) antenna in screens - relocate two (2) antenna in screens- install one (1) antenna and rru) | $25,000 |
| Jun 17, 2020 | Completed final sign-off Oct 2020 | 2569 03rd St | Battalion One Fire Protection | add pendent & upright sprinklers to accomodate new bath created by tenant improvement.Details
add pendent & upright sprinklers to accomodate new bath created by tenant improvement. | $1,000 |
| Jun 11, 2020 | Completed final sign-off Jul 2020 | 655 22nd St | Safe Assurance Fire Protection | install (10) new fire sprinklers under new mezzanine only per nfpa #13.Details
install (10) new fire sprinklers under new mezzanine only per nfpa #13. | $4,000 |
| May 27, 2020 | Completed final sign-off Feb 2021 | 2565 03rd St | Thomas Engel | removal of 1 non-structural, metal framed sheet rock partition wall and 2 sides of non-structural metal framed sheets rock walls at bathroom. no further demo work. all work performed in unit #221. building is asbestos free. sprinkler under sep permit.Details
removal of 1 non-structural, metal framed sheet rock partition wall and 2 sides of non-structural metal framed sheets rock walls at bathroom. no further demo work. all work performed in unit #221. building is asbestos free. sprinkler under sep permit. | $173,000 |
| May 19, 2020 | Completed final sign-off Aug 2022 | 2501 03rd St | Mastec Network Solutions Inc | at&t modification: swap 3 existing antennas; remove 6 (e) rru's, install 6 (n) rrus, install other small equipment, install 1 (n) battery cabinet with (n) batteries.Details
at&t modification: swap 3 existing antennas; remove 6 (e) rru's, install 6 (n) rrus, install other small equipment, install 1 (n) battery cabinet with (n) batteries. | $28,000 |
| Feb 3, 2020 | Never finaled issued Mar 2020, no final | 2565 03rd St | C T W Mechanical | #322: install duct & exhaust fan, ef-1 for dishwasher exhaust. also install fresh air duct with backdraft damper & filters. reference pa #2019-1217-9762.Details
#322: install duct & exhaust fan, ef-1 for dishwasher exhaust. also install fresh air duct with backdraft damper & filters. reference pa #2019-1217-9762. | $25,000 |
| Jan 8, 2020 | Completed final sign-off Jul 2020 | 2565 03rd St | Edison Fire Extinguisher Company Inc | suite #202: revision to pa #2019-0723-6601 - install ul300 fire systemDetails
suite #202: revision to pa #2019-0723-6601 - install ul300 fire system | $1,400 |
| Dec 17, 2019 | Expired or cancelled expired Feb 2025 | 2565 03rd St | J C Builders | ste 322: commercial ti non-structural. modify (e) production distribution space to commercial kitchen (no cooking at this facility). new ada restroom. mep under separate prmit.Details
ste 322: commercial ti non-structural. modify (e) production distribution space to commercial kitchen (no cooking at this facility). new ada restroom. mep under separate prmit. | $75,000 |
| Oct 17, 2019 | Completed final sign-off Jun 2020 | 655 22nd St | Huff Construction Company Inc | install interoir fixtures for grocery store. install new retail racks and display casesDetails
install interoir fixtures for grocery store. install new retail racks and display cases | $20,000 |
| Sep 4, 2019 | Completed final sign-off Jul 2020 | 2565 03rd St | Battalion One Fire Protection | due to interior remodeling on 2nd flr #202, new monitor modules will be installed to monitor 2 duct det & ansul system (installed by others) & tie in to (e) control panel ref 201704168058 & 201907236601Details
due to interior remodeling on 2nd flr #202, new monitor modules will be installed to monitor 2 duct det & ansul system (installed by others) & tie in to (e) control panel ref 201704168058 & 201907236601 | $2,000 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 2565 03rd St | Battalion One Fire Protection | due to interior remodeling on ground floor in s#337, new monitor modules will be installed to monitor duct detector on roof & ansul system (installed by other) and tie-in to existing control panel at #2505. ref pa 2019-0325-6143Details
due to interior remodeling on ground floor in s#337, new monitor modules will be installed to monitor duct detector on roof & ansul system (installed by other) and tie-in to existing control panel at #2505. ref pa 2019-0325-6143 | $2,000 |
| Aug 9, 2019 | Completed final sign-off Sep 2020 | 655 22nd St | Golden Gate Sign Company Inc. | install 1 electric projecting double faced blade sign for "mainstay markets".Details
install 1 electric projecting double faced blade sign for "mainstay markets". | $17,000 |
| Jul 29, 2019 | Never finaled issued Jul 2019, no final | 2565 03rd St | street spaceDetails
street space | ||
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 2565 03rd St | International Fire Equip | revision to pa #201907115593. ul300 fire system coverage for new kitchen equipment.Details
revision to pa #201907115593. ul300 fire system coverage for new kitchen equipment. | |
| Jul 23, 2019 | Never finaled issued Jul 2019, no final | 2565 03rd St | Edison Fire Extinguisher Company Inc | ste 202 - ul 300 fire system installationDetails
ste 202 - ul 300 fire system installation | $1,400 |
| Jul 19, 2019 | Completed final sign-off Nov 2021 | 2565 03rd St | remove loading dock, install ada ramp, new mail room. new storefront.Details
remove loading dock, install ada ramp, new mail room. new storefront. | $150,000 | |
| Jul 11, 2019 | Completed final sign-off Sep 2019 | 2565 03rd St | International Fire Equip | install ul300 fire system ref pa 2019-0325-6143Details
install ul300 fire system ref pa 2019-0325-6143 | $6,000 |
| Jul 5, 2019 | Completed final sign-off Oct 2019 | 2565 03rd St | Sprk Fire S F | ref pa# 201904168058; fire protection coverage/rearrangement,conform to dfpa #13, add 10 dry pendents to new wall in collers, ordinay hazard groupii grocery storeDetails
ref pa# 201904168058; fire protection coverage/rearrangement,conform to dfpa #13, add 10 dry pendents to new wall in collers, ordinay hazard groupii grocery store | $3,700 |
| Jun 18, 2019 | Completed final sign-off Jun 2019 | 2505 03rd St | Battalion One Fire Protection | add 15 sprinklers for construction of a (n) restroom and prep room. n/a for maher.Details
add 15 sprinklers for construction of a (n) restroom and prep room. n/a for maher. | $20,000 |
| Jun 12, 2019 | Expired or cancelled cancelled Jan 2026 | 2565 03rd St | unit 202. install exhaust hood at commercial kitchenDetails
unit 202. install exhaust hood at commercial kitchen | $20,000 | |
| May 30, 2019 | Expired or cancelled cancelled Jan 2026 | 1160 Illinois St | t mobile modification to replace 3 antennas with new and install 3 rrusDetails
t mobile modification to replace 3 antennas with new and install 3 rrus | $25,000 | |
| May 21, 2019 | Completed final sign-off May 2019 | 2535 03rd St | International Fire Equip | ul 300 fire system coverage for repositioned cooking equipment ref 201901180771Details
ul 300 fire system coverage for repositioned cooking equipment ref 201901180771 | $11,000 |
| May 8, 2019 | Never finaled issued May 2019, no final | 2565 03rd St | street space only.Details
street space only. | ||
| Apr 16, 2019 | Completed final sign-off Jun 2020 | 2565 03rd St | Huff Construction Company Inc | unit #202 - installation of a commercial kitchen on the 2nd flr. mep deffered no exterior workDetails
unit #202 - installation of a commercial kitchen on the 2nd flr. mep deffered no exterior work | $185,000 |
| Mar 25, 2019 | Never finaled issued May 2019, no final | 2565 03rd St | Peter Nestler Builder | installation of new type 1 hood, new equipment install, kitchen upgradeDetails
installation of new type 1 hood, new equipment install, kitchen upgrade | $75,000 |
| Mar 11, 2019 | Expired or cancelled expired Feb 2025 | 655 22nd St | Dajani Construction | interior ti for a grocery store (mainstay market). new storage mezzanine. health review deferred. grocery store t.i. under sep permit.Details
interior ti for a grocery store (mainstay market). new storage mezzanine. health review deferred. grocery store t.i. under sep permit. | $25,000 |
| Feb 26, 2019 | Completed final sign-off Dec 2021 | 601 22nd St | Dajani Construction | interior work to add ramp to loading dock to existing manufacturing space. new storefront beyond facade. new roll up door. new accessible restroom. floor level change and minimal foundation work. removal of curbcut on 22nd st/illinois.Details
interior work to add ramp to loading dock to existing manufacturing space. new storefront beyond facade. new roll up door. new accessible restroom. floor level change and minimal foundation work. removal of curbcut on 22nd st/illinois. | $240,000 |
| Feb 13, 2019 | Completed final sign-off Jul 2019 | 2505 03rd St | Hasz Construction Inc | t.i. of a event space, restroom, bar, & associated mep. **maher n/a**Details
t.i. of a event space, restroom, bar, & associated mep. **maher n/a** | $119,850 |
| Feb 7, 2019 | Never finaled issued Feb 2019, no final | 2535 03rd St | new electric projecting sign, daily driverDetails
new electric projecting sign, daily driver | $4,000 | |
| Feb 6, 2019 | Completed final sign-off May 2019 | 2535 03rd St | Battalion One Fire Protection | interior remodel gr fl, new relay modules, installed to shut down duct detectors, monitor module to monitor ansul system. new devices tied into e control panel ref 201803234453, 201901180771Details
interior remodel gr fl, new relay modules, installed to shut down duct detectors, monitor module to monitor ansul system. new devices tied into e control panel ref 201803234453, 201901180771 | $3,000 |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 2535 03rd St | street space.Details
street space. | ||
| Jan 18, 2019 | Completed final sign-off May 2019 | 2535 03rd St | International Fire Equip | installation of 2 ul 300 fire system.Details
installation of 2 ul 300 fire system. | $11,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 2535 03rd St | Battalion One Fire Protection | fire sprinkl system modification for a new tenant 66 sprinklers maher naDetails
fire sprinkl system modification for a new tenant 66 sprinklers maher na | $40,000 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 2535 03rd St | street spaceDetails
street space | ||
| Oct 17, 2018 | Never finaled issued Nov 2018, no final | 2505 03rd St | Hasz Construction Inc | revise occupant load for beer garden, lower level added and extg restaurant. extg permit #201805229804. total occupant load for resturant 112 beer garden 103 and beer tasting area is 49. total occupant load for a2 is 264Details
revise occupant load for beer garden, lower level added and extg restaurant. extg permit #201805229804. total occupant load for resturant 112 beer garden 103 and beer tasting area is 49. total occupant load for a2 is 264 | |
| Oct 4, 2018 | Completed final sign-off May 2019 | 2535 03rd St | Alsterlind Construction Inc. | revision to app#201803234453. assembly of walls, fire rating of extg demising walls. fully sprinkled building. n/a for maherDetails
revision to app#201803234453. assembly of walls, fire rating of extg demising walls. fully sprinkled building. n/a for maher | |
| Oct 2, 2018 | Completed final sign-off Oct 2018 | 2505 03rd St | Hasz Construction Inc | revise occupancy code for proposed use of restaurant existing permit 2018-0522-9804Details
revise occupancy code for proposed use of restaurant existing permit 2018-0522-9804 | |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 2505 03rd St | Battalion One Fire Protection | add 7 fire srpinklers and relocate 3 dire sprinklers for new walls and ceiling for tenant improvement. ref pa 2018-0522-9804. maher naDetails
add 7 fire srpinklers and relocate 3 dire sprinklers for new walls and ceiling for tenant improvement. ref pa 2018-0522-9804. maher na | $8,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 2505 03rd St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install 1 ansul r102 fire supression system in main kitchen area. fire supressionDetails
furnish and install 1 ansul r102 fire supression system in main kitchen area. fire supression | $6,500 |
| Aug 31, 2018 | Never finaled issued Sep 2018, no final | 2505 03rd St | Hasz Construction Inc | revision to bpa# 2018-0522-9804. revise restroom layout and add prep room with associated eletrical.Details
revision to bpa# 2018-0522-9804. revise restroom layout and add prep room with associated eletrical. | $2,500 |
| Jul 19, 2018 | Completed final sign-off Dec 2021 | 2573 03rd St | Russell Olson | modify an existing adjacent space (5,700 sqft) for the expansion of an indoor rock clibing bouldering facility and bathroomsDetails
modify an existing adjacent space (5,700 sqft) for the expansion of an indoor rock clibing bouldering facility and bathrooms | $60,000 |
| Jun 28, 2018 | Completed final sign-off May 2019 | 2535 03rd St | Alsterlind Construction Inc. | mep only. food production to include kitchen hood, plumbing, power plan. previous approved architectural appln #201803234453Details
mep only. food production to include kitchen hood, plumbing, power plan. previous approved architectural appln #201803234453 | $80,000 |
| Jun 26, 2018 | Never finaled issued Jun 2018, no final | 2565 03rd St | street spaceDetails
street space | ||
| Jun 15, 2018 | Completed final sign-off Jun 2019 | 2505 03rd St | Hasz Construction Inc | demo of extg restaurant seating, partial walls, doors, railing and beer cooler with ab-017. t.i. under seperate permit #201805229804. n/a for maherDetails
demo of extg restaurant seating, partial walls, doors, railing and beer cooler with ab-017. t.i. under seperate permit #201805229804. n/a for maher | $10,000 |
| May 22, 2018 | Completed final sign-off Oct 2018 | 2505 03rd St | Hasz Construction Inc | remodel (e) restaurant to include new exhaust head, equipment and sheathing, remodel new beer garden w/seating w/associated plumbing, mech and electricalDetails
remodel (e) restaurant to include new exhaust head, equipment and sheathing, remodel new beer garden w/seating w/associated plumbing, mech and electrical | $518,000 |
| May 15, 2018 | Never finaled issued May 2018, no final | 2565 03rd St | street spaceDetails
street space | ||
| Mar 29, 2018 | Never finaled issued Mar 2018, no final | 2565 03rd St | street spaceDetails
street space | ||
| Mar 23, 2018 | Completed final sign-off May 2019 | 2535 03rd St | Awesome Construction Solutions*See Note*, Alsterlind Construction Inc. | renovation of extg tenant space for the purpose of wholesale food production and accessory retail use (not exceed 10%). mep deferred. n/a for maherDetails
renovation of extg tenant space for the purpose of wholesale food production and accessory retail use (not exceed 10%). mep deferred. n/a for maher | $1,200,000 |
| Feb 27, 2018 | Never finaled issued Feb 2018, no final | 2565 03rd St | street spaceDetails
street space | ||
| Feb 23, 2018 | Never finaled issued Mar 2018, no final | 2585 03rd St | creating an alternative stair access to loading dock new door and panic hardware, maher naDetails
creating an alternative stair access to loading dock new door and panic hardware, maher na | $9,000 | |
| Jan 12, 2018 | Never finaled issued Jan 2018, no final | 2565 03rd St | Everest Waterproofing & Restoration Inc. | street spaceDetails
street space | |
| Jan 11, 2018 | Completed final sign-off Feb 2018 | 2565 03rd St | Battalion One Fire Protection | 3/f - #301: add 1 new dry ssp head in new freezer box. ref t.i. 201710131263. maher n/a.Details
3/f - #301: add 1 new dry ssp head in new freezer box. ref t.i. 201710131263. maher n/a. | $2,500 |
| Jan 5, 2018 | Completed final sign-off Jan 2019 | 2501 03rd St | Parsons Environment & Infrasteructure, Electric Tech Construction Inc | remove (3) rrus and install (6) rrus. **maher n/a**Details
remove (3) rrus and install (6) rrus. **maher n/a** | $15,000 |
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 2565 03rd St | street space permitDetails
street space permit | ||
| Oct 13, 2017 | Expired or cancelled expired Feb 2025 | 2565 03rd St | 3/f: install bakery equipment for commissary kitchen, new 3-comp sink, walk-in refrigerators. maher n/a. new owen. mep under separate permit.Details
3/f: install bakery equipment for commissary kitchen, new 3-comp sink, walk-in refrigerators. maher n/a. new owen. mep under separate permit. | $65,000 | |
| Sep 11, 2017 | Never finaled issued Sep 2017, no final | 2565 03rd St | street space permit - renewal of permit # m819109Details
street space permit - renewal of permit # m819109 | ||
| Aug 15, 2017 | Never finaled issued Aug 2017, no final | 2565 03rd St | street spaceDetails
street space | ||
| May 12, 2017 | Never finaled issued May 2017, no final | 1150 Illinois St | Archeon Construction | ground fl: t.i. new ada bathroom and vent (e) furnace.Details
ground fl: t.i. new ada bathroom and vent (e) furnace. | $7,750 |
| Apr 14, 2017 | Completed final sign-off Jul 2017 | 2501 03rd St | Electric Tech Construction Inc | att modification: 9 n rrus, r r 2 e dvs41 with new dvs5216, 2 xmv, install 4 new 7/8" coatDetails
att modification: 9 n rrus, r r 2 e dvs41 with new dvs5216, 2 xmv, install 4 new 7/8" coat | $26,000 |
| Mar 30, 2017 | Completed final sign-off May 2017 | 2565 03rd St | Battalion One Fire Protection | 310-311 to repipe extg ul300 ansul system and add a tank. revision to app#201610200744. n/a for maherDetails
310-311 to repipe extg ul300 ansul system and add a tank. revision to app#201610200744. n/a for maher | $1,500 |
| Feb 28, 2017 | Completed final sign-off Mar 2017 | 2565 03rd St | Peninsula Fire Protection Inc | #309 - install (9) new heads per nfpa #13. ref t.i. #201612074342. n/a maher ordinanceDetails
#309 - install (9) new heads per nfpa #13. ref t.i. #201612074342. n/a maher ordinance | $4,000 |
| Feb 28, 2017 | Completed final sign-off Mar 2017 | 2565 03rd St | Peninsula Fire Protection Inc | #313 - install (2) new heads per nfpa #13. ref t.i. #201602250508. n/a maher ordinanceDetails
#313 - install (2) new heads per nfpa #13. ref t.i. #201602250508. n/a maher ordinance | $600 |
| Dec 7, 2016 | Expired or cancelled expired Feb 2025 | 2565 03rd St | Dajani Construction | ste 309: modifying an extg non conforming restroom into an ada cmpliant restroom and a new storage mezzanine at suite #309 on the 3rd floor. new led light fixtures and minimal electrical work. n/a for maherDetails
ste 309: modifying an extg non conforming restroom into an ada cmpliant restroom and a new storage mezzanine at suite #309 on the 3rd floor. new led light fixtures and minimal electrical work. n/a for maher | $45,000 |
| Oct 20, 2016 | Completed final sign-off May 2017 | 2565 03rd St | Battalion One Fire Protection | #310 & #311: expand piping and coverage for extg ul300 system. n/a for maher. ref app#201609016602Details
#310 & #311: expand piping and coverage for extg ul300 system. n/a for maher. ref app#201609016602 | $1,500 |
| Sep 1, 2016 | Never finaled issued Sep 2016, no final | 2565 03rd St | C T W Mechanical | #311- add 4' hood for oven and connecting duct only. n/a ordinance #155-13Details
#311- add 4' hood for oven and connecting duct only. n/a ordinance #155-13 | $3,000 |
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 2501 03rd St | street spaceDetails
street space | ||
| Jun 7, 2016 | Expired or cancelled expired Feb 2025 | 2565 03rd St | J C Builders | revision to pa 2016-0225-0508 to add non-structural partition walls to creat individual floral design suites. maher naDetails
revision to pa 2016-0225-0508 to add non-structural partition walls to creat individual floral design suites. maher na | $8,000 |
| Mar 9, 2016 | Expired or cancelled expired Apr 2021 | 1160 Illinois St | I T C Service Group Acquisition Llc, Process Cellular Inc Dba Procell | t-mobile proposes to modify an (e)telecom facility by installing(3)(n)antennas,installing(1)(n) microwave,relocating(2)(e)antennas to a (n)location on the roof,installing new frp screen walls,install (3)(n)rru's; maher n/aDetails
t-mobile proposes to modify an (e)telecom facility by installing(3)(n)antennas,installing(1)(n) microwave,relocating(2)(e)antennas to a (n)location on the roof,installing new frp screen walls,install (3)(n)rru's; maher n/a | $40,000 |
| Feb 25, 2016 | Never finaled issued Mar 2016, no final | 2565 03rd St | Dajani Construction | unit #313: floral design studio and workshop in an extg manufacturing space. which includes modifying an extg restroom into an ada compliant one, new conference room and storage closet. new light fixtures, minimal electrical work. fully sprinklered bldg. n/a for maherDetails
unit #313: floral design studio and workshop in an extg manufacturing space. which includes modifying an extg restroom into an ada compliant one, new conference room and storage closet. new light fixtures, minimal electrical work. fully sprinklered bldg. n/a for maher | $60,000 |
| Feb 11, 2016 | Completed final sign-off Apr 2016 | 2569 03rd St | Thomas Engel | interior renovation of gift shop: removal of non-load bearing partial height partitons addition of new fixed casework and shelfing unit. n/a for maher.Details
interior renovation of gift shop: removal of non-load bearing partial height partitons addition of new fixed casework and shelfing unit. n/a for maher. | $30,000 |
| Dec 14, 2015 | Completed final sign-off Feb 2017 | 2501 03rd St | Triton Tower Inc | at&t wireless facility - installation of unmanned wireless facility on rooftop. fully screened on the south west corner of the building. screen wall painted to match. support equipment and (4) antennas per sector behind screen wall. no height increas is proposed. maher naDetails
at&t wireless facility - installation of unmanned wireless facility on rooftop. fully screened on the south west corner of the building. screen wall painted to match. support equipment and (4) antennas per sector behind screen wall. no height increas is proposed. maher na | $315,000 |
| Nov 5, 2015 | Completed final sign-off Dec 2016 | 2569 03rd St | Thomas Engel | electric double faced signDetails
electric double faced sign | $7,000 |
| Oct 29, 2015 | Never finaled issued Dec 2015, no final | 2535 03rd St | Narrowback Construction Co. | the scope of this project is limited to an interior alteration to provide an accessibel primary bldg entrance for the space. the new entrance storefront is recessed behind extg roll-up door, which will remain. no exterior alterations. the space is on the 1st floor of a sprinklered bldg.Details
the scope of this project is limited to an interior alteration to provide an accessibel primary bldg entrance for the space. the new entrance storefront is recessed behind extg roll-up door, which will remain. no exterior alterations. the space is on the 1st floor of a sprinklered bldg. | $15,000 |
| Sep 23, 2015 | Expired or cancelled withdrawn Oct 2015 | 2535 03rd St | this app is limited to an interior alteration to create an accessible primary bldg entrance for a commercial space. the new entrance storefront is recessed behind extg roll-up door, which will remain. no exterior alterations. n/a for maher.Details
this app is limited to an interior alteration to create an accessible primary bldg entrance for a commercial space. the new entrance storefront is recessed behind extg roll-up door, which will remain. no exterior alterations. n/a for maher. | $5,000 | |
| Jul 22, 2015 | Expired or cancelled cancelled Sep 2016 | 2565 03rd St | International Fire Equip | ansul r102 ul300 fire system coverage for new kitchen equipment.; maher n/aDetails
ansul r102 ul300 fire system coverage for new kitchen equipment.; maher n/a | $1,500 |
| Jun 18, 2015 | Completed final sign-off Dec 2020 | 1192 Illinois St | Evans & Wallace | interior tenant improvement, no change to envelope or exterior. new accessible entry door beyond e overhead door, new stairs, guardrail, handrails, new cswk and interior finishes, new accessible restroom in e location, new lighting. mech sep permit maher not requiredDetails
interior tenant improvement, no change to envelope or exterior. new accessible entry door beyond e overhead door, new stairs, guardrail, handrails, new cswk and interior finishes, new accessible restroom in e location, new lighting. mech sep permit maher not required | $80,000 |
| May 22, 2015 | Never finaled issued Jun 2015, no final | 1192 Illinois St | Evans & Wallace | non structural demo permit,removal of old stairs,water heater,plumbing fixtures & old concrete ramp, per ab 017Details
non structural demo permit,removal of old stairs,water heater,plumbing fixtures & old concrete ramp, per ab 017 | $12,000 |
| Mar 27, 2015 | Never finaled issued Jan 2016, no final | 2575 03rd St | Melvin Construction | all work is interior demo: extg restroom and office, remodel includes new glass roll up door to replace extg metal door. new accessible restrooms, new program rooms for climbing, new climbing walls. new lighting, new hvac, new plmbg. n/a for maher.Details
all work is interior demo: extg restroom and office, remodel includes new glass roll up door to replace extg metal door. new accessible restrooms, new program rooms for climbing, new climbing walls. new lighting, new hvac, new plmbg. n/a for maher. | $150,000 |
| Jun 30, 2014 | Expired or cancelled withdrawn May 2022 | 2501 03rd St | at&t mobility proposes to install a wireless temp-to-perm facility consist 12 new antennas on 3 new sled mounts,2 ne gps units,24 new rrh units,8 per sector.install at&t equip within interior space,bring power,telco&fiber to site location.paint exposed to match bldg. temp antennas vald thrgh 3/31/15Details
at&t mobility proposes to install a wireless temp-to-perm facility consist 12 new antennas on 3 new sled mounts,2 ne gps units,24 new rrh units,8 per sector.install at&t equip within interior space,bring power,telco&fiber to site location.paint exposed to match bldg. temp antennas vald thrgh 3/31/15 | $25,000 | |
| May 30, 2014 | Completed final sign-off Sep 2014 | 2565 03rd St | J C Builders | #337: modifying an existing food production space to create a commissary kitchen, office area, packing area. hood installation under separate permit. state of california reg no. 52362 (no sfdph).compliance with ord 155-13 not rquiredDetails
#337: modifying an existing food production space to create a commissary kitchen, office area, packing area. hood installation under separate permit. state of california reg no. 52362 (no sfdph).compliance with ord 155-13 not rquired | $35,000 |
| Apr 25, 2014 | Completed final sign-off Jun 2014 | 2565 03rd St | International Fire Equip | install 3 dry pendents sprinklers in 2 coolers in suite 337.Details
install 3 dry pendents sprinklers in 2 coolers in suite 337. | $1,800 |
| Mar 31, 2014 | Completed final sign-off Apr 2014 | 2505 03rd St | Battalion One Fire Protection | monitor new waterflow/valve tamper, kitchen hood with duct monitor module (provided by others) manual pull station, horn strobe at main lobby ref 201105055411, 2013-0913-6781, 2013-1219-4548.Details
monitor new waterflow/valve tamper, kitchen hood with duct monitor module (provided by others) manual pull station, horn strobe at main lobby ref 201105055411, 2013-0913-6781, 2013-1219-4548. | $6,250 |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 2505 03rd St | street space & sidewalk repair.Details
street space & sidewalk repair. | ||
| Dec 19, 2013 | Completed final sign-off Apr 2014 | 2505 03rd St | Certified Fire & Safety Co | install ul300 ansul fire system to protect kitchen hood and cooking equipment, ref. 201105055411Details
install ul300 ansul fire system to protect kitchen hood and cooking equipment, ref. 201105055411 | $3,000 |
| Dec 19, 2013 | Never finaled issued Feb 2014, no final | 2505 03rd St | Justin Farrelly Incorporated | revision to pa#2011-05-05-5411. building boiler room & connecting additional storage space (s2) to support brewery. (2) new double doors (90 min), (n) floor sink. no lighting, no exterior work on this submittal.Details
revision to pa#2011-05-05-5411. building boiler room & connecting additional storage space (s2) to support brewery. (2) new double doors (90 min), (n) floor sink. no lighting, no exterior work on this submittal. | $20,000 |
| Sep 13, 2013 | Completed final sign-off Apr 2014 | 2505 03rd St | Alpha Fire Suppression | install new fire sprinkler system below new mezzanine & refrigeration box.Details
install new fire sprinkler system below new mezzanine & refrigeration box. | $12,500 |
| Apr 10, 2013 | Completed final sign-off May 2013 | 2505 03rd St | Alpha Fire Suppression | suite #310-311:modify existing fire sprinkler system. add 6 pendents, 2 relocatesDetails
suite #310-311:modify existing fire sprinkler system. add 6 pendents, 2 relocates | $5,860 |
| Mar 21, 2013 | Completed final sign-off Mar 2013 | 2573 03rd St | change address on permit 201211063671 from 2501 3rd st unit 2573 to 2573 3rd st. all work on original permit 201211063671 is performed at actual address 2573 3rd st. same building, same ownerDetails
change address on permit 201211063671 from 2501 3rd st unit 2573 to 2573 3rd st. all work on original permit 201211063671 is performed at actual address 2573 3rd st. same building, same owner | ||
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 2501 03rd St | street spaceDetails
street space | ||
| Feb 12, 2013 | Completed final sign-off May 2013 | 2565 03rd St | International Fire Equip | install ul 300 fire system in commercial catering kitchenDetails
install ul 300 fire system in commercial catering kitchen | $1,800 |
| Feb 6, 2013 | Completed final sign-off Mar 2013 | 2501 03rd St | Pro Plumbing | revision to app#201301238573 on pipe straps in locker room.Details
revision to app#201301238573 on pipe straps in locker room. | |
| Jan 23, 2013 | Completed final sign-off Mar 2013 | 2501 03rd St | Pro Plumbing | unit 2573:t.i. of extg fire sprinkler system. ref #201211063671 r1Details
unit 2573:t.i. of extg fire sprinkler system. ref #201211063671 r1 | $15,000 |
| Jan 17, 2013 | Never finaled issued Jan 2013, no final | 2501 03rd St | street space for unit 2573.Details
street space for unit 2573. | ||
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 2569 03rd St | Oliver & Company Inc. | revision to app#201205220941 eliminate walls and ceilings. add furring walls. enlarge door. reconfigure storefront headers.Details
revision to app#201205220941 eliminate walls and ceilings. add furring walls. enlarge door. reconfigure storefront headers. | |
| Nov 27, 2012 | Completed final sign-off May 2013 | 2565 03rd St | suite 310-311 3rd floor- develop a commissary kitchen in an (e) production distrubution space. b occupancy- new walk in cooler, exhaust hood under this permit. new offices & conference room - fire protection in hood and duct sprinklers and fire alarm separate permit.Details
suite 310-311 3rd floor- develop a commissary kitchen in an (e) production distrubution space. b occupancy- new walk in cooler, exhaust hood under this permit. new offices & conference room - fire protection in hood and duct sprinklers and fire alarm separate permit. | $85,400 | |
| Nov 6, 2012 | Completed final sign-off Mar 2013 | 2501 03rd St | interior renovations to make an indoor rock climbing gym, included will be building walls, mens's and womens restrooms with lockers and showers. new accessible entry and storefront on 3rd street. new ventilation mechanical for restrooms and general open space.Details
interior renovations to make an indoor rock climbing gym, included will be building walls, mens's and womens restrooms with lockers and showers. new accessible entry and storefront on 3rd street. new ventilation mechanical for restrooms and general open space. | $350,000 | |
| Nov 6, 2012 | Never finaled issued Nov 2012, no final | 2505 03rd St | Martin Heid Design/Build | modification to permit #201105055411. change location of entry door and interior adjustments due to site conditions.Details
modification to permit #201105055411. change location of entry door and interior adjustments due to site conditions. | |
| Oct 16, 2012 | Never finaled issued Oct 2012, no final | 2569 03rd St | add address per pa 201205220941. change use from warehouse to musemu. blk 4173, lot 001 as; 2569 3rd st.Details
add address per pa 201205220941. change use from warehouse to musemu. blk 4173, lot 001 as; 2569 3rd st. | ||
| Sep 18, 2012 | Completed final sign-off Nov 2012 | 2565 03rd St | Aquamatic Fire Protection | relocate 10 (e) sprinkler & add 9 due to interior remodel. ti pa# 2012-0522-0941 (not yet issued/approved)Details
relocate 10 (e) sprinkler & add 9 due to interior remodel. ti pa# 2012-0522-0941 (not yet issued/approved) | $4,500 |
| Aug 28, 2012 | Completed final sign-off Oct 2012 | 2565 03rd St | ste #233 - revision to permit #2012.0730.6078; ada restroom relocation.Details
ste #233 - revision to permit #2012.0730.6078; ada restroom relocation. | ||
| Jul 31, 2012 | Expired or cancelled cancelled Jan 2026 | 2565 03rd St | Details
| $21,000 | |
| Jul 30, 2012 | Completed final sign-off Oct 2012 | 2565 03rd St | modifying (e) fabrication workshop & add 21 work stations & improve (e) restoom facility to ada complaint. (n) partition walls. no change to lightings.Details
modifying (e) fabrication workshop & add 21 work stations & improve (e) restoom facility to ada complaint. (n) partition walls. no change to lightings. | $21,000 | |
| May 22, 2012 | Completed final sign-off Feb 2013 | 2565 03rd St | Oliver & Company Inc. | tenant improvement for ground floor, change of use from warehouse to museum. construction of glass storefront system, platform infill and stair at entry, construct interior wall partitons, plumbing and electric work and modification to existing mechanical. fire sprinker separate permit.Details
tenant improvement for ground floor, change of use from warehouse to museum. construction of glass storefront system, platform infill and stair at entry, construct interior wall partitons, plumbing and electric work and modification to existing mechanical. fire sprinker separate permit. | $187,000 |
| May 15, 2012 | Completed final sign-off Aug 2012 | 2565 03rd St | Dajani Construction | tenant improvement for new kitchen, upgrade (e) restrooms to be d.a complaint & install new 12'x5' stainless steel type 2 hoodDetails
tenant improvement for new kitchen, upgrade (e) restrooms to be d.a complaint & install new 12'x5' stainless steel type 2 hood | $25,000 |
| Apr 27, 2012 | Completed final sign-off Jan 2013 | 2565 03rd St | Oliver & Company Inc. | 1st floor -demolition of interior aprtitons, partiasl concrete slab on grade as well as pipes, plumbing fixtures, & electrical panels, space remain vacant until future tenant build out.Details
1st floor -demolition of interior aprtitons, partiasl concrete slab on grade as well as pipes, plumbing fixtures, & electrical panels, space remain vacant until future tenant build out. | $6,400 |
| Aug 5, 2011 | Completed final sign-off Aug 2011 | 2565 03rd St | Integrity Mechanical Systems Corporation | revision to pa# 2011.05.25.6747. install one type 2 hood. install one ef and one make up air fanDetails
revision to pa# 2011.05.25.6747. install one type 2 hood. install one ef and one make up air fan | $7,895 |
| May 25, 2011 | Completed final sign-off Aug 2011 | 2565 03rd St | modifying an extg prep kitchen space to create a commissary kitchen. new ada bathroomDetails
modifying an extg prep kitchen space to create a commissary kitchen. new ada bathroom | $42,000 | |
| May 5, 2011 | Never finaled issued Dec 2011, no final | 2505 03rd St | Martin Heid Design/Build | build new brewry & restaurant w/mezzanine @ former cafe/warehouse space. sprinkler modification & ansul system under sep. permit. mech/elec/plumbing permits to be pulled separately.Details
build new brewry & restaurant w/mezzanine @ former cafe/warehouse space. sprinkler modification & ansul system under sep. permit. mech/elec/plumbing permits to be pulled separately. | $225,000 |
| Dec 15, 2010 | Never finaled issued Dec 2010, no final | 1140 Illinois St | add additional addresses to 1160 illinois street.Details
add additional addresses to 1160 illinois street. | ||
| Dec 15, 2010 | Never finaled issued Dec 2010, no final | 601 22nd St | add additional addresses to 1160 illinois street.Details
add additional addresses to 1160 illinois street. | ||
| Dec 15, 2010 | Never finaled issued Dec 2010, no final | 2525 03rd St | add additional addresses to 1160 illinois street.Details
add additional addresses to 1160 illinois street. | ||
| Dec 15, 2010 | Never finaled issued Dec 2010, no final | 1180 Illinois St | add additional addresses to 1160 illinois street.Details
add additional addresses to 1160 illinois street. | ||
| Nov 19, 2010 | Never finaled issued Nov 2010, no final | 2565 03rd St | E B Gilmore & Sons Mech Svcs Inc | supply & install (1) type 1 hood & exhaust fan supply & install (1) make up air fan supply & install all sheet metal duct pertaining to the hvac system. ti approved underthis # 2010 0010 4419Details
supply & install (1) type 1 hood & exhaust fan supply & install (1) make up air fan supply & install all sheet metal duct pertaining to the hvac system. ti approved underthis # 2010 0010 4419 | $35,000 |
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 2565 03rd St | Alpha Fire Suppression | modification of (e) fire sprinkler system unit 323Details
modification of (e) fire sprinkler system unit 323 | $5,000 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 2565 03rd St | Zack De Vito Inc | ste #323 -interior tenant improvement for a wholesale bakery. work to include (n) plumbing & electrical & mechanical. (n) kitchen equipment, a new ada bathroom & a (n) storage mezzanine. as a wholesale food prep facility only state health dept. approval req. sprinkler under spearate permit.Details
ste #323 -interior tenant improvement for a wholesale bakery. work to include (n) plumbing & electrical & mechanical. (n) kitchen equipment, a new ada bathroom & a (n) storage mezzanine. as a wholesale food prep facility only state health dept. approval req. sprinkler under spearate permit. | $45,000 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 1160 Illinois St | Transceive Communications Inc. | revision to pa# 2009.10.13.8862 to change wood stud partition to metal stud partition. to document reduction of to scope of work. change no. of antenna, relocate energy generator plug from ground level to lease area and change e&d meter to pg&e meter.Details
revision to pa# 2009.10.13.8862 to change wood stud partition to metal stud partition. to document reduction of to scope of work. change no. of antenna, relocate energy generator plug from ground level to lease area and change e&d meter to pg&e meter. | $500 |
| Feb 24, 2010 | Completed final sign-off Jul 2010 | 2565 03rd St | International Fire Equip | complete installation of ul 300 fire systemDetails
complete installation of ul 300 fire system | $4,000 |
| Jan 11, 2010 | Never finaled issued Jan 2010, no final | 2505 03rd St | Dryco Construction Inc - Dba - Dryco | to complete work and obtain final inspectionfor work approved under pa # 200807156764Details
to complete work and obtain final inspectionfor work approved under pa # 200807156764 | $27,000 |
| Jan 8, 2010 | Never finaled filed Jan 2010, never issued | 2505 03rd St | Dryco Construction Inc - Dba - Dryco | renew 200807156764 to complete workDetails
renew 200807156764 to complete work | $27,000 |
| Jan 4, 2010 | Never finaled issued Feb 2010, no final | 2565 03rd St | convert (e) food manufaturing to food catering ( alfred schilling & co. catering). remove partition walls, install new equipment for catering kitchen inc. (n) sinks. work on thr floor. mep under separate permitDetails
convert (e) food manufaturing to food catering ( alfred schilling & co. catering). remove partition walls, install new equipment for catering kitchen inc. (n) sinks. work on thr floor. mep under separate permit | $18,000 | |
| Dec 24, 2009 | Completed final sign-off Apr 2010 | 699 22nd St | Hive Builds Inc. | tenant improvements to be ice cream retail. new counter service, new office, new ice cream room, new prep area, new dishwash area, new dry storage area, new mop room.Details
tenant improvements to be ice cream retail. new counter service, new office, new ice cream room, new prep area, new dishwash area, new dry storage area, new mop room. | $30,000 |
| Dec 21, 2009 | Completed final sign-off May 2010 | 2501 03rd St | install ada restrooms as reference to permit ap #200807156764. for unit 699-22nd. st. & 2505-3rd. st.Details
install ada restrooms as reference to permit ap #200807156764. for unit 699-22nd. st. & 2505-3rd. st. | $22,000 | |
| Nov 30, 2009 | Never finaled issued Nov 2009, no final | 699 22nd St | request additional address to block 4173 lot 001 new address requested #699- 22nd streetDetails
request additional address to block 4173 lot 001 new address requested #699- 22nd street | ||
| Nov 19, 2009 | Expired or cancelled cancelled Jan 2026 | 2565 03rd St | third floor. supply and install one exhaust hood and fan for cooking, one make up air for make up air, and all sheet metal duct work pertaining to the systems. no exterior work.Details
third floor. supply and install one exhaust hood and fan for cooking, one make up air for make up air, and all sheet metal duct work pertaining to the systems. no exterior work. | $20,000 | |
| Nov 13, 2009 | Completed final sign-off Feb 2010 | 2565 03rd St | International Fire Equip | installation of ul 300 fire systemDetails
installation of ul 300 fire system | $800 |
| Nov 10, 2009 | Never finaled issued Nov 2009, no final | 2565 03rd St | building permit tio install new kitchen equipment. kitchen hood under separate permit.Details
building permit tio install new kitchen equipment. kitchen hood under separate permit. | ||
| Oct 13, 2009 | Completed final sign-off Jul 2010 | 1160 Illinois St | Delta Groups Construction Inc, Transceive Communications Inc. | install 6 panel antennas and 1 gps antenna to exterior penthouse wall and 1 panel antenna to east side building parapet wall. install cabling from new antennas through roof penetration to new equip area 1 floor below roof level. partition off with wood framing and drywall and air condition aDetails
install 6 panel antennas and 1 gps antenna to exterior penthouse wall and 1 panel antenna to east side building parapet wall. install cabling from new antennas through roof penetration to new equip area 1 floor below roof level. partition off with wood framing and drywall and air condition a | $75,000 |
| Sep 10, 2009 | Never finaled issued Sep 2009, no final | 2565 03rd St | Starlite Electric Inc. | install a sprinkler monitor panel, install one smoke detector, install one pull station, install one horn/strobes, install three electric bells & six monitor module.Details
install a sprinkler monitor panel, install one smoke detector, install one pull station, install one horn/strobes, install three electric bells & six monitor module. | $6,000 |
| Sep 15, 2008 | Never finaled issued Sep 2008, no final | 2505 03rd St | street space permit.Details
street space permit. | ||
| Jul 15, 2008 | Never finaled issued Sep 2008, no final | 2505 03rd St | Dryco Construction Inc - Dba - Dryco | demo existing walls for new openings w/windows, add interior foundation & new walls, new concrete floor slab, new storefront to include two new windows & two accessable doors.Details
demo existing walls for new openings w/windows, add interior foundation & new walls, new concrete floor slab, new storefront to include two new windows & two accessable doors. | $165,000 |
| Mar 30, 2004 | Never finaled issued Mar 2004, no final | 1160 Illinois St | house number assignmentDetails
house number assignment | ||
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 1120 Illinois St | house numberDetails
house number | ||
| Mar 25, 2002 | Completed final sign-off Aug 2002 | 2565 03rd St | A F S Automatic Fir Safety | revision to 200111092803: legal present use is archtiectual model shop, seperate fire alarm controlDetails
revision to 200111092803: legal present use is archtiectual model shop, seperate fire alarm control | |
| Feb 5, 2002 | Completed final sign-off Jun 2002 | 2565 03rd St | Added Dimensions Inc. | demo 5 (e) walls @ 2/fl levelDetails
demo 5 (e) walls @ 2/fl level | $2,000 |
| Jan 31, 2002 | Completed final sign-off Jun 2002 | 2565 03rd St | Added Dimensions Inc. | install new 8' high partitions/i full ht deminsing wall @2/flDetails
install new 8' high partitions/i full ht deminsing wall @2/fl | $48,000 |
| Nov 29, 2001 | Completed final sign-off Aug 2002 | 2565 03rd St | Daniel Bruce Libby | installation of industrial sheet metal spraybooth in unit 323 on 3rd flr.rev #200110110408 rolocateDetails
installation of industrial sheet metal spraybooth in unit 323 on 3rd flr.rev #200110110408 rolocate | $100 |
| Nov 9, 2001 | Completed final sign-off Aug 2002 | 2565 03rd St | A F S Automatic Fir Safety | overhead sprinkler piping plan for spray booth. inst addition to the existing fire sprinkler system.Details
overhead sprinkler piping plan for spray booth. inst addition to the existing fire sprinkler system. | $4,000 |
| Oct 11, 2001 | Completed final sign-off Aug 2002 | 2565 03rd St | Daniel Bruce Libby | installan of industrl sheet metal spraybooth in unit 323 3rd floor, fire protn sep permit bench filtDetails
installan of industrl sheet metal spraybooth in unit 323 3rd floor, fire protn sep permit bench filt | $12,000 |
| Jan 29, 2001 | Completed final sign-off Mar 2001 | 2565 03rd St | H K Fire Protection Inc.* Check I.D. *** | install fire suppression system to the cooking hoodDetails
install fire suppression system to the cooking hood | $900 |
| Jan 25, 2001 | Completed final sign-off Mar 2001 | 2565 03rd St | Central Mechanical Co. | replace existing 10'0 type 2 hood install new 12'0 hood type 1 systemDetails
replace existing 10'0 type 2 hood install new 12'0 hood type 1 system | $8,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.