Trevor Lefler
- Listed as
- architect, engineer
- Firm
- Lefler Engineering, Inc
- Based in
- San Rafael
- On San Francisco permits
- Jun 2018 to May 2026
9 permits since 2000 (engineer on 8 permits, architect on 1 permit): 7 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2026 | In progress issued Jun 2026 | 460 Larkin St | Roman Hunt | existing restaurant remodel: change kitchen hood and add ada compliant restroom. electrical deferred. electrical work requires plans reviewed under a separate building permit.Details
existing restaurant remodel: change kitchen hood and add ada compliant restroom. electrical deferred. electrical work requires plans reviewed under a separate building permit. | $117,000 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 378 Golden Gate Av | West Peak Construction | revision to 202312212974 to show mechanical work on plans: comply w/ nov 202314798 item #2 & 3 - correct dryer vent exhaust w/ mechanical plansDetails
revision to 202312212974 to show mechanical work on plans: comply w/ nov 202314798 item #2 & 3 - correct dryer vent exhaust w/ mechanical plans | $10,000 |
| Apr 22, 2021 | Completed final sign-off May 2023 | 548 Brannan St | Cornerstone Select Builders Inc | remodel existing meter room per pg&e requirement. ref pa 201409106022.Details
remodel existing meter room per pg&e requirement. ref pa 201409106022. | $15,000 |
| Apr 19, 2021 | Never finaled issued May 2021, no final | 65 Raycliff Tr | Stroub Construction | interior remodel of l1 and l2. structural improvments for possible future work. no alterations to exterior building envelope. plumbing, electrical work as required. replacement of (e) exterior windows and doors.Details
interior remodel of l1 and l2. structural improvments for possible future work. no alterations to exterior building envelope. plumbing, electrical work as required. replacement of (e) exterior windows and doors. | $60,000 |
| Apr 15, 2021 | Completed final sign-off Apr 2022 | 205 Jones St | Saarman Construction,Ltd. | 100% affordable housing. scope: fire damage repair to two stacks of dwelling units on all seven floors. repair fire damage and return the damaged units to service for the displaced residents. replacement material to be replaced as close to existing as possible. to comply with nov 202052931.Details
100% affordable housing. scope: fire damage repair to two stacks of dwelling units on all seven floors. repair fire damage and return the damaged units to service for the displaced residents. replacement material to be replaced as close to existing as possible. to comply with nov 202052931. | $1,150,000 |
| Mar 15, 2021 | Completed final sign-off May 2023 | 530 Brannan St | Cornerstone Select Builders Inc | remodel existing meter room per pg&e requirement. ref pa# 201409106016.Details
remodel existing meter room per pg&e requirement. ref pa# 201409106016. | $15,000 |
| Mar 15, 2021 | Completed final sign-off May 2023 | 208 Pennsylvania Av | Cornerstone Select Builders Inc | remodel existing meter room per pg&e requirement. ref pa# 201409106023.Details
remodel existing meter room per pg&e requirement. ref pa# 201409106023. | $15,000 |
| Aug 29, 2020 | Completed final sign-off Jul 2021 | 2565 03rd St | ste #221: install mechanical system with new hvac system. ref pa# 202005277873Details
ste #221: install mechanical system with new hvac system. ref pa# 202005277873 | $17,500 | |
| Jun 25, 2018 | Completed final sign-off Oct 2018 | 44 Montgomery St | Source Planning And Construction Inc | 40th fl/suite 4000; mechanical and electrical for pa#201805088462Details
40th fl/suite 4000; mechanical and electrical for pa#201805088462 | $270,000 |