Block 0346, lot 006
390 Golden Gate Ave
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 5
- Units
- 111
- Rooms
- 110 bathrooms
- Building
- 74,390 sq ft
- Lot
- 18,906 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
78 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 390 Golden Gate Av | One Hat One Hand Llc | add new exterior mounted security gate. no interior work. all work on exterior of restaurant. no work related to residential use.Details
add new exterior mounted security gate. no interior work. all work on exterior of restaurant. no work related to residential use. | $60,000 |
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 422 Larkin St | recommencement and completion of work approved under pa#2022-0802-9729.Details
recommencement and completion of work approved under pa#2022-0802-9729. | $14,000 | |
| Dec 15, 2025 | Completed final sign-off Mar 2026 | 378 Golden Gate Av | J T & M Hardwood Flooring Construcing | unit# 326: none structural remodel all kinds. one kitchen - replace cabinets, countertop, new flooring. one bathroom - replace tub, shower valve, vanity, tile shower and floor. non structural. all remodels in kind.Details
unit# 326: none structural remodel all kinds. one kitchen - replace cabinets, countertop, new flooring. one bathroom - replace tub, shower valve, vanity, tile shower and floor. non structural. all remodels in kind. | $35,000 |
| Nov 20, 2025 | In progress issued Apr 2026 | 374 Golden Gate Av | Tovany's General Construction | interior tenant improvement at the ground floor. new service counter, shelving & sink. (e) ada restroom to remain. no structural or exterior work. no work to the basement which is not accessible to the public.Details
interior tenant improvement at the ground floor. new service counter, shelving & sink. (e) ada restroom to remain. no structural or exterior work. no work to the basement which is not accessible to the public. | $100,000 |
| Mar 11, 2025 | In progress filed Mar 2025, not yet issued | 366 Golden Gate Av | Core Glass & Aluminum Inc | replace security gate and shorten 40 inches on each side. replac 4 pieces of tempered glassDetails
replace security gate and shorten 40 inches on each side. replac 4 pieces of tempered glass | $12,000 |
| Feb 21, 2025 | Completed final sign-off Mar 2025 | 378 Golden Gate Av | Astorga Construction Inc | to comply w/ nov 202532544, remove air fan not in use. at court yard at ground floor. (no plans to remove per mh noted on nov 2//21/25)Details
to comply w/ nov 202532544, remove air fan not in use. at court yard at ground floor. (no plans to remove per mh noted on nov 2//21/25) | $2,500 |
| Feb 21, 2025 | Completed final sign-off Jun 2025 | 378 Golden Gate Av | J T & M Hardwood Flooring Construcing | apt 245: non structural remodel. upgrade 1 kitchen, replace cabinets, counter top, flooring. 1 bath, replace tub shower valve,vanity, toilet, tile shower wall and floor. no removal of wallsDetails
apt 245: non structural remodel. upgrade 1 kitchen, replace cabinets, counter top, flooring. 1 bath, replace tub shower valve,vanity, toilet, tile shower wall and floor. no removal of walls | $35,000 |
| Feb 21, 2025 | Completed final sign-off Jul 2025 | 378 Golden Gate Av | J T & M Hardwood Flooring Construcing | apt 427: non structural remodel. upgrade 1 kitchen, replace cabinets, counter top, flooring. 1 bath, replace tub shower valve,vanity, toilet, tile shower wall and floor. no removal of wallsDetails
apt 427: non structural remodel. upgrade 1 kitchen, replace cabinets, counter top, flooring. 1 bath, replace tub shower valve,vanity, toilet, tile shower wall and floor. no removal of walls | $35,000 |
| Feb 21, 2025 | Completed final sign-off Aug 2025 | 378 Golden Gate Av | J T & M Hardwood Flooring Construcing | apt 449: non structural remodel. 1 bath, replace tub, shower valve, vanity, toilet,tile shower,floor. no removal of wallsDetails
apt 449: non structural remodel. 1 bath, replace tub, shower valve, vanity, toilet,tile shower,floor. no removal of walls | $10,000 |
| Jan 30, 2025 | Completed final sign-off Mar 2025 | 426 Larkin St | Ningzhi Hu Signs Company | new awning 28" x 16'8" x 36" cover with blue color aluminumDetails
new awning 28" x 16'8" x 36" cover with blue color aluminum | $3,000 |
| Jan 30, 2025 | Completed final sign-off Mar 2025 | 426 Larkin St | Ningzhi Hu Signs Company | letters on blue awning " vietnamese sandwich & noodle" 96" x 24"Details
letters on blue awning " vietnamese sandwich & noodle" 96" x 24" | $300 |
| Jan 29, 2025 | Completed final sign-off Mar 2025 | 390 Golden Gate Av | Ningzhi Hu Signs Company | 1 new awning 12'6: x3' x3' framing with burgundy canvas cover.Details
1 new awning 12'6: x3' x3' framing with burgundy canvas cover. | $2,000 |
| Oct 18, 2024 | Completed final sign-off Dec 2024 | 378 Golden Gate Av | West Peak Construction | rev 202408017742- update plans to comply with building complaint 202314798 ite s 2 and 3 coorective acitons . correct dryer vent exhaust with mechnical plansDetails
rev 202408017742- update plans to comply with building complaint 202314798 ite s 2 and 3 coorective acitons . correct dryer vent exhaust with mechnical plans | $10,000 |
| Aug 6, 2024 | Completed final sign-off Sep 2026 | 418 Larkin St | One Hat One Hand Llc | replacement of exterior mounted security gates with new gates. no interior work. all work on exterior of restaurants. no work related to residential use.Details
replacement of exterior mounted security gates with new gates. no interior work. all work on exterior of restaurants. no work related to residential use. | $60,000 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 378 Golden Gate Av | West Peak Construction | revision to 202312212974 to show mechanical work on plans: comply w/ nov 202314798 item #2 & 3 - correct dryer vent exhaust w/ mechanical plansDetails
revision to 202312212974 to show mechanical work on plans: comply w/ nov 202314798 item #2 & 3 - correct dryer vent exhaust w/ mechanical plans | $10,000 |
| Dec 21, 2023 | Completed final sign-off Dec 2024 | 378 Golden Gate Av | West Peak Construction | comply with building complaint#202314798 item #2, 3 in correctionto comply with nov: 202312471: items #2 and #3. dryer vent to exterior without proper end.Details
comply with building complaint#202314798 item #2, 3 in correctionto comply with nov: 202312471: items #2 and #3. dryer vent to exterior without proper end. | $1,500 |
| Sep 26, 2023 | Completed final sign-off Apr 2024 | 374 Golden Gate Av | Mendez-Ortiz Contractors | ground fl retail. new exterior storefront and accessible entrance per abe# 2023092228707. no work for tenant interiorDetails
ground fl retail. new exterior storefront and accessible entrance per abe# 2023092228707. no work for tenant interior | $35,000 |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 378 Golden Gate Av | G M Building And Construction Inc | units #544 and #432: comply w/ nov # 202313460; replace 2 kitchen cabinets in kind with new counter top replace 2 bathrooms vanities with new one plumbing as neededDetails
units #544 and #432: comply w/ nov # 202313460; replace 2 kitchen cabinets in kind with new counter top replace 2 bathrooms vanities with new one plumbing as needed | $36,000 |
| May 31, 2023 | In progress issued Dec 2024 | 378 Golden Gate Av | Safe And Sound Fire Alarm, C & E Electric & Fire Alarm Services | fire system replacement & mandoatory low frequency horn upgrade to meed sffc 2022 sec 1103.7.6.1Details
fire system replacement & mandoatory low frequency horn upgrade to meed sffc 2022 sec 1103.7.6.1 | $78,400 |
| Jan 9, 2023 | Completed final sign-off Apr 2023 | 378 Golden Gate Av | G M Building And Construction Inc | to comply with complaint 202298017: replace shower fiber glass pan rremove shower wall to repair water damage on bathroom repair in kindDetails
to comply with complaint 202298017: replace shower fiber glass pan rremove shower wall to repair water damage on bathroom repair in kind | $7,000 |
| Nov 17, 2022 | Completed final sign-off Nov 2022 | 378 Golden Gate Av | Mendez-Ortiz Contractors | to comply with nov 202294198: revision on permit 202209233044: shed under 100sqft was attached to building which was not to code. separate shed from building. unattached shed to be under 100sqft.Details
to comply with nov 202294198: revision on permit 202209233044: shed under 100sqft was attached to building which was not to code. separate shed from building. unattached shed to be under 100sqft. | $2,000 |
| Sep 23, 2022 | Completed final sign-off Nov 2022 | 378 Golden Gate Av | Mendez-Ortiz Contractors | to comply with nov 202294198: remove trash chute and enclosure garbage bin roomDetails
to comply with nov 202294198: remove trash chute and enclosure garbage bin room | $2,000 |
| Aug 2, 2022 | Never finaled issued Aug 2022, no final | 422 Larkin St | Brinkerhoff Construction | install a new countertop in (e) location with stone (36inx97in) for pos bar. new electrical and plumbing modifications.no layout or wall modifications. no structural work.Details
install a new countertop in (e) location with stone (36inx97in) for pos bar. new electrical and plumbing modifications.no layout or wall modifications. no structural work. | $15,630 |
| Jul 28, 2022 | Completed final sign-off Aug 2022 | 378 Golden Gate Av | Mendez-Ortiz Contractors | to obtain final inspection for work approved under pa# 201810294422. all work is complete.Details
to obtain final inspection for work approved under pa# 201810294422. all work is complete. | |
| Nov 13, 2019 | Completed final sign-off Dec 2019 | 378 Golden Gate Av | Speedy Construction Inc | apt 530 only - renovate kitchen and bathroom, plumbing & electrical as needed . no walls moved, added or infilled. all (e) layouts to remain unchangedDetails
apt 530 only - renovate kitchen and bathroom, plumbing & electrical as needed . no walls moved, added or infilled. all (e) layouts to remain unchanged | $15,000 |
| May 7, 2019 | Completed final sign-off Jun 2019 | 378 Golden Gate Av | Mendez-Ortiz Contractors | renovate kitchen & bathroom in-kind, plumbing & electrical as needed, comply w/ cec 150.0(k)3 & ced 150.0(k)5Details
renovate kitchen & bathroom in-kind, plumbing & electrical as needed, comply w/ cec 150.0(k)3 & ced 150.0(k)5 | $15,000 |
| Mar 1, 2019 | Completed final sign-off Jun 2019 | 378 Golden Gate Av | Mendez-Ortiz Contractors | unit 540: renovate (1) kitchen and (1) bathroom all in kind. no walls removed. plumbing and electrical as needed.Details
unit 540: renovate (1) kitchen and (1) bathroom all in kind. no walls removed. plumbing and electrical as needed. | $16,000 |
| Oct 29, 2018 | Never finaled issued Oct 2018, no final | 378 Golden Gate Av | Mendez-Ortiz Contractors | unit 436 only - renovate itchenand bathroom plm,ele as needed . no walls moved, added or infilled. all (e) layouts to remain unchangedDetails
unit 436 only - renovate itchenand bathroom plm,ele as needed . no walls moved, added or infilled. all (e) layouts to remain unchanged | $15,000 |
| Aug 1, 2018 | Never finaled issued Aug 2018, no final | 378 Golden Gate Av | Mendez-Ortiz Contractors | renovate kitchen and 1 bath in kind. plumbing and elec as neededDetails
renovate kitchen and 1 bath in kind. plumbing and elec as needed | $18,000 |
| Jun 28, 2018 | Completed final sign-off Aug 2018 | 378 Golden Gate Av | apt #339 - kitchen & bathroom remodel in kind. not moving walls.Details
apt #339 - kitchen & bathroom remodel in kind. not moving walls. | $20,000 | |
| May 9, 2018 | Completed final sign-off Jul 2018 | 378 Golden Gate Av | J T & M Hardwood Flooring Construcing | unit #329: none structural interior remodel. kitchen-replace cabinets, counter top, tiles, floor. bathroom- replace bath tub, vanity, shower valve, tile shower and floorDetails
unit #329: none structural interior remodel. kitchen-replace cabinets, counter top, tiles, floor. bathroom- replace bath tub, vanity, shower valve, tile shower and floor | $15,000 |
| Dec 7, 2017 | Never finaled issued Dec 2017, no final | 418 Larkin St | street spaceDetails
street space | ||
| Feb 22, 2016 | Never finaled issued Feb 2016, no final | 378 Golden Gate Av | Jack Strong Plumbing & Building Services | kithcen cabinets, counter , flooring and faucet, remove bathtubm, shower valve, toilet, sink & flooring, install new bathtub sub/shoer valve, toilet & sink cabinet, faucet, new tile floor paint unit. in unit 546Details
kithcen cabinets, counter , flooring and faucet, remove bathtubm, shower valve, toilet, sink & flooring, install new bathtub sub/shoer valve, toilet & sink cabinet, faucet, new tile floor paint unit. in unit 546 | $25,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 378 Golden Gate Av | Jack Strong Plumbing & Building Services | unit 442: replace kitchen cabinets & flooring, faucets, angle stops, tub/shower valve, bathroom rixtures & flooring. repair plumbing hot/cold water supplies & drain as needed, replace electrical outlets, light fixtures & subpanel as needed; no walls to be removed or altered.Details
unit 442: replace kitchen cabinets & flooring, faucets, angle stops, tub/shower valve, bathroom rixtures & flooring. repair plumbing hot/cold water supplies & drain as needed, replace electrical outlets, light fixtures & subpanel as needed; no walls to be removed or altered. | $8,500 |
| Sep 11, 2015 | Completed final sign-off Nov 2015 | 378 Golden Gate Av | Umadhay Construction & Design | kitchen and bath remodel, new bathtub, mixing valve, angle stops, electrical where needed, new dishwasher, move drain lines,Details
kitchen and bath remodel, new bathtub, mixing valve, angle stops, electrical where needed, new dishwasher, move drain lines, | $13,000 |
| Mar 25, 2015 | Completed final sign-off Aug 2016 | 378 Golden Gate Av | Allied Security Alarms | like for like voluntary fire alarm system replacement. replace existing unit with new control unit at same location in the lobby. replace exist 54 smokes, 14 pull stations with new at the same location. tie in existing 18 bells, waterflow and tamper to new panel. no record or ul certs for previousDetails
like for like voluntary fire alarm system replacement. replace existing unit with new control unit at same location in the lobby. replace exist 54 smokes, 14 pull stations with new at the same location. tie in existing 18 bells, waterflow and tamper to new panel. no record or ul certs for previous | $18,750 |
| Jan 13, 2015 | Completed final sign-off Apr 2016 | 378 Golden Gate Av | Jack Strong Plumbing & Building Services | unit 448: remove and replace kitchen cabinets, counters and tile floors. repair plumbing drains, vents and hot/cold water supplies in kitchen and bathroom as needed. no walls moved, removed or added. all layouts remain unchanged. compliance with maher ordinance no 155-13 not required.Details
unit 448: remove and replace kitchen cabinets, counters and tile floors. repair plumbing drains, vents and hot/cold water supplies in kitchen and bathroom as needed. no walls moved, removed or added. all layouts remain unchanged. compliance with maher ordinance no 155-13 not required. | $18,000 |
| Aug 21, 2014 | Completed final sign-off Sep 2014 | 370 Golden Gate Av | International Fire Equip | install ul300 fire system. ref app#201405085227. n/a for the maher ordinance #155-13Details
install ul300 fire system. ref app#201405085227. n/a for the maher ordinance #155-13 | $2,500 |
| Aug 7, 2014 | Completed final sign-off Aug 2014 | 422 Larkin St | Trim Fit Constr. - O'reilly Engineering | to comply with nov 201468971 - construction of 4 sided acoustic shroud around evaporative (swamp) cooler as ordered by sfdph to mitigate noise (rear of building)Details
to comply with nov 201468971 - construction of 4 sided acoustic shroud around evaporative (swamp) cooler as ordered by sfdph to mitigate noise (rear of building) | $800 |
| May 8, 2014 | Completed final sign-off Oct 2014 | 370 Golden Gate Av | J A P Construction | fire damage repair: 5/8" type x gyp.bd. all affected areas. upgrade one ada compliant unisex toilet and automatic door opener., new commercial hood. maher ordinance #155-13 n/a.Details
fire damage repair: 5/8" type x gyp.bd. all affected areas. upgrade one ada compliant unisex toilet and automatic door opener., new commercial hood. maher ordinance #155-13 n/a. | $70,000 |
| Dec 16, 2013 | Completed final sign-off Mar 2014 | 378 Golden Gate Av | Precision Design & Drafting Inc, Slc Inc | to comply with nov#201387805 & pnoe 12281. removal of towerstream wifi antennas: 4 antennas & keep one otard.Details
to comply with nov#201387805 & pnoe 12281. removal of towerstream wifi antennas: 4 antennas & keep one otard. | $500 |
| Nov 1, 2013 | Never finaled issued Nov 2013, no final | 378 Golden Gate Av | M H M Construction | replace in-kind rotte fence with pt 2x4, 1x6x6 - 12x6 area. six feet max height.Details
replace in-kind rotte fence with pt 2x4, 1x6x6 - 12x6 area. six feet max height. | $500 |
| Jun 26, 2013 | Never finaled issued Jun 2013, no final | 378 Golden Gate Av | street space & mtaDetails
street space & mta | ||
| Jun 19, 2013 | Completed final sign-off May 2015 | 374 Golden Gate Av | Mina-Tree Signs, Inc | install (1) illuminated wall sign.compliance with ord 155-13 not requiredDetails
install (1) illuminated wall sign.compliance with ord 155-13 not required | $3,000 |
| May 28, 2013 | Completed final sign-off Oct 2013 | 378 Golden Gate Av | M H M Construction | bldg has fire damage a 2nd-5 flr #241,341,441,541- roof scope of damages is limited to a lightwell, bldg storages rm & apartment adjacent to light well, work inc repl of damages surfaces, framing & fixtures, no walls will be added or move, replace all fixture & windows in e location, wallsDetails
bldg has fire damage a 2nd-5 flr #241,341,441,541- roof scope of damages is limited to a lightwell, bldg storages rm & apartment adjacent to light well, work inc repl of damages surfaces, framing & fixtures, no walls will be added or move, replace all fixture & windows in e location, walls | $50,000 |
| Apr 5, 2013 | Completed final sign-off Jun 2013 | 378 Golden Gate Av | M H M Construction | 2nd-5th, demo only.no structrual work. remove lath-plaster @ walls & ceiling. remove wd trim and wed base. remove wall insulation as req. remove door same trim, remove window, remove flooring & plywood. sub flooring at bld sto only. remove all plumbing fixtures. remove restaurant flue & hardware.Details
2nd-5th, demo only.no structrual work. remove lath-plaster @ walls & ceiling. remove wd trim and wed base. remove wall insulation as req. remove door same trim, remove window, remove flooring & plywood. sub flooring at bld sto only. remove all plumbing fixtures. remove restaurant flue & hardware. | $5,000 |
| Mar 25, 2013 | Completed final sign-off Aug 2013 | 378 Golden Gate Av | M H M Construction | install 5/8 type x sheet rock on damages area affected by water on five floors common and hallways areas. interior finish walls affected by sffd, residental work only. note: replacement of shaft-restaurant-ceiling under seperate permitDetails
install 5/8 type x sheet rock on damages area affected by water on five floors common and hallways areas. interior finish walls affected by sffd, residental work only. note: replacement of shaft-restaurant-ceiling under seperate permit | $2,000 |
| Mar 13, 2013 | Completed final sign-off Jun 2013 | 378 Golden Gate Av | Ideal Restoration Inc | demo interiors wall affected by water 5 units. 5 common hallways. interior finished walls affected by fire suppression by sffd. remove finish to dry structure. no structural work. reconstruct by different contractor. units to remain vacantDetails
demo interiors wall affected by water 5 units. 5 common hallways. interior finished walls affected by fire suppression by sffd. remove finish to dry structure. no structural work. reconstruct by different contractor. units to remain vacant | $65,000 |
| Feb 28, 2013 | Completed final sign-off Mar 2013 | 378 Golden Gate Av | M H M Construction | entry door to unit, 20 min, fire rated, 36x80 13/4 with pic hole. 58" from the bottom door. replacing min door, apts, damages, bx fire dept. replace in kind, 18 doors. to comply with nov# 201388931Details
entry door to unit, 20 min, fire rated, 36x80 13/4 with pic hole. 58" from the bottom door. replacing min door, apts, damages, bx fire dept. replace in kind, 18 doors. to comply with nov# 201388931 | $1,000 |
| Sep 22, 2011 | Completed final sign-off Mar 2012 | 426 Larkin St | M-Tran Construction Inc | resturant tenant improvement. replace part of the tile floor in dinning area. new counter and sitting area. mech, electrical and plumbing under seperate permit.Details
resturant tenant improvement. replace part of the tile floor in dinning area. new counter and sitting area. mech, electrical and plumbing under seperate permit. | $5,000 |
| Jul 29, 2010 | Completed final sign-off Aug 2010 | 426 Larkin St | Universal Fire Equipment Co | install fire supression system to protect hood, duct, plennum and cooking equipment under the hoodDetails
install fire supression system to protect hood, duct, plennum and cooking equipment under the hood | $2,800 |
| May 27, 2010 | Completed final sign-off Aug 2010 | 426 Larkin St | Yama Construction | tenant improvemnet. install new kitchen hood and exhaust system cooking equipment to (e) restaurantDetails
tenant improvemnet. install new kitchen hood and exhaust system cooking equipment to (e) restaurant | $32,688 |
| Mar 12, 2010 | Expired or cancelled expired Mar 2013 | 370 Golden Gate Av | H K Fire Protection Inc.* Check I.D. *** | upgrade automatic fire suppression system to ul 300 for kitchen hoodDetails
upgrade automatic fire suppression system to ul 300 for kitchen hood | $4,000 |
| Oct 9, 2009 | Completed final sign-off Apr 2010 | 422 Larkin St | H K Fire Protection Inc.* Check I.D. *** | installed automatic fire suppression system for exhaust hood using range guard ul-300 systemDetails
installed automatic fire suppression system for exhaust hood using range guard ul-300 system | $3,000 |
| Feb 27, 2009 | Never finaled issued Feb 2009, no final | 422 Larkin St | street space permit. ref 200901140180.Details
street space permit. ref 200901140180. | ||
| Jan 26, 2009 | Never finaled issued Jan 2009, no final | 422 Larkin St | street space permit only.Details
street space permit only. | ||
| Jan 14, 2009 | Completed final sign-off Apr 2010 | 422 Larkin St | V L Construction | change of use from casing office to restaurant, remove existing non handycap assessible restroom, new unisex restroom and kitchen, remove t-bar ceiling & new 1 hr ceiling. kitchen hood & duct we chem system under separate permit.Details
change of use from casing office to restaurant, remove existing non handycap assessible restroom, new unisex restroom and kitchen, remove t-bar ceiling & new 1 hr ceiling. kitchen hood & duct we chem system under separate permit. | $95,000 |
| Aug 5, 2008 | Never finaled issued Aug 2008, no final | 378 Golden Gate Av | street space only.Details
street space only. | ||
| Jun 18, 2008 | Completed final sign-off Sep 2008 | 378 Golden Gate Av | work on unit#229. kitchen-new cabinets & tile floor. remove murphy bed. bath-tile floor & new accessories. no structural 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescant or on au occupant sensor.Details
work on unit#229. kitchen-new cabinets & tile floor. remove murphy bed. bath-tile floor & new accessories. no structural 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescant or on au occupant sensor. | $15,000 | |
| May 22, 2008 | Never finaled issued Aug 2008, no final | 366 Golden Gate Av | Johnson United Inc Dba United Sign Syste | errect a new sign for "california cashing stores"Details
errect a new sign for "california cashing stores" | |
| Nov 14, 2007 | Completed final sign-off Feb 2008 | 378 Golden Gate Av | kitchen remodel at unit 538.Details
kitchen remodel at unit 538. | $15,000 | |
| Sep 19, 2007 | Completed final sign-off Jan 2008 | 378 Golden Gate Av | work @ unit# 145 only. kitchen, new cabinets, tile foor. remove murphy bed. bath: tile floor new accessaries. no fire sprinkler system.Details
work @ unit# 145 only. kitchen, new cabinets, tile foor. remove murphy bed. bath: tile floor new accessaries. no fire sprinkler system. | $14,625 | |
| Sep 19, 2007 | Completed final sign-off Dec 2007 | 378 Golden Gate Av | work @ unit# 539 only. kitchen, new cabinets, tile foor. remove murphy bed. bath: tile floor new accessaries. no fire sprinkler system.Details
work @ unit# 539 only. kitchen, new cabinets, tile foor. remove murphy bed. bath: tile floor new accessaries. no fire sprinkler system. | $14,625 | |
| Sep 19, 2007 | Completed final sign-off Feb 2008 | 378 Golden Gate Av | work @ unit# 340 only. kitchen, new cabinets, tile foor. remove murphy bed. bath: tile floor new accessaries. no fire sprinkler system.Details
work @ unit# 340 only. kitchen, new cabinets, tile foor. remove murphy bed. bath: tile floor new accessaries. no fire sprinkler system. | $14,625 | |
| May 2, 2007 | Completed final sign-off Jul 2007 | 366 Golden Gate Av | replace damaged storefront (vehicle). install handicap sign at (e)accessible entry and at restroom.Details
replace damaged storefront (vehicle). install handicap sign at (e)accessible entry and at restroom. | $11,150 | |
| Dec 5, 2006 | Completed final sign-off Dec 2006 | 418 Larkin St | San Francisco Fire Protection | modigy existing fire alarm sytem, connect kitchen amsul & new pull station, relocate one trobe/horm.Details
modigy existing fire alarm sytem, connect kitchen amsul & new pull station, relocate one trobe/horm. | $1,000 |
| Nov 14, 2006 | Completed final sign-off Dec 2006 | 418 Larkin St | A-1 Steam & Fire Protection | install fire suppression system to kitchen hood.Details
install fire suppression system to kitchen hood. | $2,000 |
| Oct 19, 2006 | Expired or cancelled cancelled Dec 2006 | 418 Larkin St | revision to app #200606144017 for kchn, restroom and hollyway ceiling lights. revision. no other changeDetails
revision to app #200606144017 for kchn, restroom and hollyway ceiling lights. revision. no other change | $200 | |
| Sep 21, 2006 | Completed final sign-off Dec 2006 | 418 Larkin St | revision to 200606144017 and 200605020426 upgrade disable entrance, install automatic door opener iwth swithes at outside door no other any workDetails
revision to 200606144017 and 200605020426 upgrade disable entrance, install automatic door opener iwth swithes at outside door no other any work | ||
| Jun 14, 2006 | Completed final sign-off Dec 2006 | 418 Larkin St | revision to pa# 2006/05/02/0426. design change: warm table changto to store front. re-arrange kitchen plan.Details
revision to pa# 2006/05/02/0426. design change: warm table changto to store front. re-arrange kitchen plan. | ||
| May 2, 2006 | Completed final sign-off Dec 2006 | 418 Larkin St | remodel restaurant: installing restaurant equipment, c.d.a main entrance and restroom. separate permits for fire extinguishing system, electric, plumbing anbd mechanical (except for kitchen hood).Details
remodel restaurant: installing restaurant equipment, c.d.a main entrance and restroom. separate permits for fire extinguishing system, electric, plumbing anbd mechanical (except for kitchen hood). | $40,000 | |
| Dec 21, 2004 | Completed final sign-off Apr 2005 | 374 Golden Gate Av | Mina-Tree Signs, Inc | sign permit - electric, wall, single faced, replacement.Details
sign permit - electric, wall, single faced, replacement. | |
| Dec 3, 2003 | Never finaled issued Dec 2003, no final | 380 Golden Gate Av | International Commercial Awning, Inc. | install new awning over store frontDetails
install new awning over store front | $980 |
| Apr 8, 2003 | Never finaled issued May 2003, no final | 380 Golden Gate Av | proposed a new coffee shop to existing vacant. ratail store at grd fl. (no machanical , no lightingDetails
proposed a new coffee shop to existing vacant. ratail store at grd fl. (no machanical , no lighting | $35,000 | |
| Jul 10, 2001 | Completed final sign-off Mar 2002 | 378 Golden Gate Av | Ac And Company | install new sink replace drywall install 1 utility circuitDetails
install new sink replace drywall install 1 utility circuit | $2,000 |
| Jun 1, 2001 | Completed final sign-off Mar 2002 | 378 Golden Gate Av | Ac And Company | amend pa#200103285388 to include apts,145,146,325, 44,8,532,543, 546,549. submit drawings of #546 rDetails
amend pa#200103285388 to include apts,145,146,325, 44,8,532,543, 546,549. submit drawings of #546 r | $8,000 |
| Mar 28, 2001 | Completed final sign-off Mar 2002 | 378 Golden Gate Av | Ac And Company | correct existing violations per nov 200114676 20015194 and 100115224Details
correct existing violations per nov 200114676 20015194 and 100115224 | $2,000 |
| Jan 21, 2000 | Expired or cancelled expired Sep 2001 | 366 Golden Gate Av | Arrow Sign Company | replace one existing single faced wall cabinetDetails
replace one existing single faced wall cabinet | $3,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.