Tommy Lee
- Listed as
- architect, authorized agent-others, designer, engineer, lessee
- Firm
- Tommy Lee Consulting
- Based in
- San Francisco
- On San Francisco permits
- Dec 2003 to Aug 2026
167 permits since 2000 (engineer on 90 permits, designer on 65 permits, architect on 9 permits, authorized agent-others on 2 permits, lessee on 1 permit): 136 completed, 8 in progress, 8 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 167.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Aug 2026 | 2463 Alemany Bl | Jhw Construction | rev 202603127448: structural revision to add 2x10 df at 16in o.c. per plan.Details
rev 202603127448: structural revision to add 2x10 df at 16in o.c. per plan. | $1,000 |
| Jul 14, 2026 | Expired or cancelled suspend Aug 2026 | 2463 Alemany Bl | Jhw Construction | rev 202603127448: new deck at rear (8x20ft) & minor arch layout changes.Details
rev 202603127448: new deck at rear (8x20ft) & minor arch layout changes. | $15,000 |
| Jun 30, 2026 | In progress issued Sep 2026 | 1618 30th Av | remodel 2/f kitchen & add 2 new bathrooms. 1/f: infill under runroom, 2 new bedrooms, family room, new bathroom, wetbar. relocate mech and laundry.Details
remodel 2/f kitchen & add 2 new bathrooms. 1/f: infill under runroom, 2 new bedrooms, family room, new bathroom, wetbar. relocate mech and laundry. | $150,000 | |
| Mar 12, 2026 | In progress issued Mar 2026 | 2463 Alemany Bl | Jhw Construction | 1/f: new office, 2 new baths, bedroom, wet bar. relocate laundry/mech. 2/f: kitchen remodel and 2 new bathrooms.Details
1/f: new office, 2 new baths, bedroom, wet bar. relocate laundry/mech. 2/f: kitchen remodel and 2 new bathrooms. | $280,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 830 37th Av | Rm Wong Construction Company | 1/f: new media room, bedroom, and bathroom with wetbar. 2/f: remodel (e) kitchen & bathroom; 2 new bathrooms. remodel , living and dining room.Details
1/f: new media room, bedroom, and bathroom with wetbar. 2/f: remodel (e) kitchen & bathroom; 2 new bathrooms. remodel , living and dining room. | $200,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 596 Bella Vista Wy | Winder Construction Inc. | 1/f: 1 new bathroom, bedroom, media room with bar and 1/2 bar. infill (e) bay below and 2/f remodel kitchen and 2 new bathrooms.Details
1/f: 1 new bathroom, bedroom, media room with bar and 1/2 bar. infill (e) bay below and 2/f remodel kitchen and 2 new bathrooms. | $180,000 |
| Oct 30, 2025 | In progress issued Dec 2025 | 509 Ulloa St | 1/f: 2 new bedrooms and bathroom, new laundry, new wet bar, radiant heating. 2/f: new bathroom and kitchen. relocate bathroom and widen interior stairs.Details
1/f: 2 new bedrooms and bathroom, new laundry, new wet bar, radiant heating. 2/f: new bathroom and kitchen. relocate bathroom and widen interior stairs. | $158,000 | |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 2341 28th Av | 1/f: (n) media room, playroo, bedroom and 2 new bathrooms with wetbar, replace mech. 2/f: remodel kitchen and 2 new bathrooms, remodel living and dinging. 2-story horizontal additona. replce stucco on all sides in kind.Details
1/f: (n) media room, playroo, bedroom and 2 new bathrooms with wetbar, replace mech. 2/f: remodel kitchen and 2 new bathrooms, remodel living and dinging. 2-story horizontal additona. replce stucco on all sides in kind. | $298,000 | |
| Jul 3, 2025 | In progress issued Jul 2025 | 1730 25th Av | 1/f: at rear sunroom vonlutnary foundation strengthening. amend additional to 202404190386.Details
1/f: at rear sunroom vonlutnary foundation strengthening. amend additional to 202404190386. | $30,000 | |
| Feb 24, 2025 | Completed final sign-off May 2026 | 534 39th Av | 1/f: infill sunroom about 13x10 first story, 2 new bedrooms, 2 new bathrooms, media room. 2/f: remodel kitchen and infill lightwell.Details
1/f: infill sunroom about 13x10 first story, 2 new bedrooms, 2 new bathrooms, media room. 2/f: remodel kitchen and infill lightwell. | $150,000 | |
| Aug 15, 2024 | Completed final sign-off Sep 2025 | 2646 16th Av | rev 202212309542: subpfloor detail and shrink approved half-bathroom on 1/f. 2/f closet change and bathroom. radiant heatingDetails
rev 202212309542: subpfloor detail and shrink approved half-bathroom on 1/f. 2/f closet change and bathroom. radiant heating | $13,000 | |
| Jul 31, 2024 | Completed final sign-off Apr 2025 | 26 Southwood Dr | rev 202208100240: 2/f change psl beam to steel beam and shorten shearwall on 2/f. minor 2/f partition change, 1/f shift bathroom layout.Details
rev 202208100240: 2/f change psl beam to steel beam and shorten shearwall on 2/f. minor 2/f partition change, 1/f shift bathroom layout. | ||
| Jul 17, 2024 | Completed final sign-off Nov 2025 | 1690 24th Av | Jin's Construction Inc | 1/f: infill under sunroom under 10ft., new bedroom, offie, 2 new baths. relocate mech and laundry rooms. 2/f: remodel kitchen, bathroom & add 1 new bathroom. infill lightwell at (e) bathroom.Details
1/f: infill under sunroom under 10ft., new bedroom, offie, 2 new baths. relocate mech and laundry rooms. 2/f: remodel kitchen, bathroom & add 1 new bathroom. infill lightwell at (e) bathroom. | $180,000 |
| Apr 29, 2024 | Completed final sign-off May 2024 | 55 Cresta Vista Dr | rev 202401254658: 2/f: rearrange approved bathroom orientation and one new side window non-visible.Details
rev 202401254658: 2/f: rearrange approved bathroom orientation and one new side window non-visible. | $1,000 | |
| Mar 21, 2024 | Completed final sign-off Sep 2024 | 20 Lakeview Av | Jin's Construction Inc | 1/f: construct new office, bedroom, bathroom with shower, and bar. no other work performed.Details
1/f: construct new office, bedroom, bathroom with shower, and bar. no other work performed. | $101,000 |
| Mar 7, 2024 | Completed final sign-off Aug 2025 | 133 Rae Av | Kingza Construction | 2/f: remodel (e) kitchen and remove closet.Details
2/f: remodel (e) kitchen and remove closet. | $20,000 |
| Feb 29, 2024 | Completed final sign-off Apr 2024 | 2127 35th Av | Bai Yuan Li | rev 202309126387: add (n) 10x10 rear deck. minor arch layout changes on 1/f & 2/f. shift kitchen orientation and revert 2/f shower back to tub.Details
rev 202309126387: add (n) 10x10 rear deck. minor arch layout changes on 1/f & 2/f. shift kitchen orientation and revert 2/f shower back to tub. | $10,000 |
| Feb 29, 2024 | Completed final sign-off Oct 2024 | 639 20th Av | to comply with nov200227168 & complaint 202419011 - 3/f: create 2 (n) partition walls at living room.Details
to comply with nov200227168 & complaint 202419011 - 3/f: create 2 (n) partition walls at living room. | $10,000 | |
| Feb 27, 2024 | Completed final sign-off Mar 2024 | 3855 California St | Lei's Construction Company | ref complaint 202315826: repair damaged interior doors, caulk tub, provide gfci at bathroom, install sink in-kind, install stove hood in-kind and repaint all rooms (items 2-7_ in unit 1.Details
ref complaint 202315826: repair damaged interior doors, caulk tub, provide gfci at bathroom, install sink in-kind, install stove hood in-kind and repaint all rooms (items 2-7_ in unit 1. | $7,000 |
| Feb 20, 2024 | In progress issued Feb 2024 | 558 17th Av | mech rev only to 202103086048: remove one approved water heate, only one water heat for entire house. no other work performed.Details
mech rev only to 202103086048: remove one approved water heate, only one water heat for entire house. no other work performed. | ||
| Feb 20, 2024 | Completed final sign-off Jun 2025 | 454 Orizaba Av | Kelvin Construction | 1/f: infill (e) sunroom 15x15, 2 new bedrooms, construct media, bar sink and bathroom. relocate mech and laundry. 2/f: remodel kitchen and bathroom, 1 new bathroom.Details
1/f: infill (e) sunroom 15x15, 2 new bedrooms, construct media, bar sink and bathroom. relocate mech and laundry. 2/f: remodel kitchen and bathroom, 1 new bathroom. | $140,000 |
| Feb 13, 2024 | Completed final sign-off Mar 2025 | 252 Dalewood Wy | enlarge stair window by 1 foot wide,2 (n) slider,4x4 and 6x4ft fiberglass at front,on left hand side replace (e) 4x4 slide to fiberglass,(n) 3x2 awn fiberglass, 1/f in-kind replacement of window and (n) 2x4 cs next to per plan, grg dr. 1st floor/2nd floor wall modifications. (e) rear deck 50% repairDetails
enlarge stair window by 1 foot wide,2 (n) slider,4x4 and 6x4ft fiberglass at front,on left hand side replace (e) 4x4 slide to fiberglass,(n) 3x2 awn fiberglass, 1/f in-kind replacement of window and (n) 2x4 cs next to per plan, grg dr. 1st floor/2nd floor wall modifications. (e) rear deck 50% repair | ||
| Feb 13, 2024 | Completed final sign-off Mar 2025 | 252 Dalewood Wy | 1/f:remodel kitchen and (n) bathroom, relocate mech, 2/f relocate laundry,(n) media room and bar, replce 4 rear openings inkind,4 wdws on e/s per plan,replce all drywall on all walls and ceilings with 5/8-type x gypsum.Details
1/f:remodel kitchen and (n) bathroom, relocate mech, 2/f relocate laundry,(n) media room and bar, replce 4 rear openings inkind,4 wdws on e/s per plan,replce all drywall on all walls and ceilings with 5/8-type x gypsum. | $120,000 | |
| Feb 13, 2024 | Completed final sign-off Apr 2025 | 172 Los Palmos Dr | Spotlight Construction Groups Inc | 1/f:replace laundry,n bathroom, bedroom, media room. 2/f: remodel kitchen and bathroom, new bathroom, demo fireplace - remove all sheetrock and replce with (n) 5/8in gyp type-x board, (n) 2x2 skylight on flatroof.Details
1/f:replace laundry,n bathroom, bedroom, media room. 2/f: remodel kitchen and bathroom, new bathroom, demo fireplace - remove all sheetrock and replce with (n) 5/8in gyp type-x board, (n) 2x2 skylight on flatroof. | $180,000 |
| Feb 13, 2024 | Completed final sign-off Jan 2025 | 986 Somerset St | 1/f infill sunroom 15x20, 2(n) office, bathrooms, wetbar, & media room - no work 2/fDetails
1/f infill sunroom 15x20, 2(n) office, bathrooms, wetbar, & media room - no work 2/f | $130,000 | |
| Jan 25, 2024 | Completed final sign-off May 2024 | 55 Cresta Vista Dr | Hong Shink Construction | rev to pa202305318907: show 3 (n) skylights on flat roof. additinal beam on 2/f. 1/f correct (e) joists per field conditions to 2x8; minor layout changes per as-zxDetails
rev to pa202305318907: show 3 (n) skylights on flat roof. additinal beam on 2/f. 1/f correct (e) joists per field conditions to 2x8; minor layout changes per as-zx | $4,000 |
| Dec 29, 2023 | Completed final sign-off Aug 2024 | 900 22nd St | change of use from (e) restaurant to coffee shop. dba coffeeshop on 1/f. new coffeeshop equipment.Details
change of use from (e) restaurant to coffee shop. dba coffeeshop on 1/f. new coffeeshop equipment. | $30,000 | |
| Dec 14, 2023 | In progress issued Jan 2024 | 841 Florida St | Prosper Construction Dev Inc. | 2/f: remodel (e) kitchen & bathroom, construct (n) bathroom, widen internal stairscase to be code compliant. 1/f: (n) bedroom, meida room, bathroom, relocate laundry, new bar sink. add 3 skylights on flat roofDetails
2/f: remodel (e) kitchen & bathroom, construct (n) bathroom, widen internal stairscase to be code compliant. 1/f: (n) bedroom, meida room, bathroom, relocate laundry, new bar sink. add 3 skylights on flat roof | $180,000 |
| Dec 5, 2023 | Completed final sign-off Aug 2024 | 119 Gennessee St | Parkson Construction Company | 2/f: remodel kitchen and bathroom. construction (n) bathroom, relocate bedroom to front, replace side and rear windows in-kind, not visible. max u-factor not greater than 0.30.Details
2/f: remodel kitchen and bathroom. construction (n) bathroom, relocate bedroom to front, replace side and rear windows in-kind, not visible. max u-factor not greater than 0.30. | $105,000 |
| Nov 15, 2023 | Completed final sign-off Apr 2025 | 78 Thrift St | 2/f: remodel 2 (e) bathroom in-kind, remodel kitchen and demo fireplace. 1/f: constreuction 1 new bathroom in (e) bedroom, relocate laundry and new bar.Details
2/f: remodel 2 (e) bathroom in-kind, remodel kitchen and demo fireplace. 1/f: constreuction 1 new bathroom in (e) bedroom, relocate laundry and new bar. | $105,000 | |
| Oct 26, 2023 | Completed final sign-off Mar 2025 | 6237 03rd St | to comply nov 202313344 - new ada bathroom, n storage pattions at rear of store, change of use from retial to retail. new drywall 5/8in type-x throughout on 1/f.Details
to comply nov 202313344 - new ada bathroom, n storage pattions at rear of store, change of use from retial to retail. new drywall 5/8in type-x throughout on 1/f. | $30,000 | |
| Oct 26, 2023 | Completed final sign-off May 2024 | 55 Cresta Vista Dr | Hong Shink Construction | rev to 202305318907, 2/f: relocate stairs, kitchen. 1/f: new bathroom, bedroom, media room and relocate laundry.Details
rev to 202305318907, 2/f: relocate stairs, kitchen. 1/f: new bathroom, bedroom, media room and relocate laundry. | $150,000 |
| Oct 10, 2023 | Expired or cancelled withdrawn Nov 2023 | 45 Pinehurst Wy | rev 202212289314: g/f replace 2 rear windows in-kind, max u-factor 0.30, replace approvedlaundry, new door to yard at back. chagne to radiant heating. 2/f: remodel bath in-kind and relace aproved bathroom.Details
rev 202212289314: g/f replace 2 rear windows in-kind, max u-factor 0.30, replace approvedlaundry, new door to yard at back. chagne to radiant heating. 2/f: remodel bath in-kind and relace aproved bathroom. | $30,000 | |
| Oct 10, 2023 | Expired or cancelled expired Jan 2026 | 54 Chenery St | Winwin Construction Inc | rev to pa 202205157800: new subfloor detail per bid field c/n.Details
rev to pa 202205157800: new subfloor detail per bid field c/n. | $4,000 |
| Oct 5, 2023 | Completed final sign-off Apr 2025 | 171 Rey St | rev 202009265142 to comply with 20197701 & 202052541 and 2022-00643enf: 1/f - new bedroom, media room, bathroom, mech and bar. 2/f: (n) revise bath and kitchen orientation. demo unpermitted 1-story addition over deck at rear per plans. restore front facade per plan and replace front windows.Details
rev 202009265142 to comply with 20197701 & 202052541 and 2022-00643enf: 1/f - new bedroom, media room, bathroom, mech and bar. 2/f: (n) revise bath and kitchen orientation. demo unpermitted 1-story addition over deck at rear per plans. restore front facade per plan and replace front windows. | $101,000 | |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 2127 35th Av | Bai Yuan Li | 1/f: new bedroom, new media room, construct 2 new bathrooms, replace mech, new bar, laundry. 2/f: relocate (e) kitchen, new bedroom and 2 new bathrooms.Details
1/f: new bedroom, new media room, construct 2 new bathrooms, replace mech, new bar, laundry. 2/f: relocate (e) kitchen, new bedroom and 2 new bathrooms. | $250,000 |
| Sep 5, 2023 | Completed final sign-off Oct 2023 | 581 Arch St | 2/f: relocate kitchen & bathroom per plans, convert one shower pan to tube in (e) bathroom on 2/f. no work on 1/f.Details
2/f: relocate kitchen & bathroom per plans, convert one shower pan to tube in (e) bathroom on 2/f. no work on 1/f. | $40,000 | |
| Aug 30, 2023 | Completed final sign-off Dec 2024 | 2550 Moraga St | 1/f: construct 2 new bathrooms, convert (e) office to bedroo, (n) media & bar and 2/f remodel of bathroom, construct (n) bathroom, remodel (e) kitchen and replace sheetrock in bedrooms and livring with 5/8in type x.Details
1/f: construct 2 new bathrooms, convert (e) office to bedroo, (n) media & bar and 2/f remodel of bathroom, construct (n) bathroom, remodel (e) kitchen and replace sheetrock in bedrooms and livring with 5/8in type x. | $188,000 | |
| Aug 30, 2023 | Completed final sign-off Jul 2025 | 721 Green St | Kaifa Construction Inc | rev pa 202204202656 -convert tub to shower pan, add (n) dishwasher to kitchen, alter closet small wall per plan.Details
rev pa 202204202656 -convert tub to shower pan, add (n) dishwasher to kitchen, alter closet small wall per plan. | $1,000 |
| Aug 29, 2023 | Completed final sign-off Apr 2024 | 25 Balceta Av | rev to pa 202302081631: g/f shift bedroom, new bedroom, relocate bathroom, media room, replace g/f rear windows in-kind. minor arch changes. no work on 2/f.Details
rev to pa 202302081631: g/f shift bedroom, new bedroom, relocate bathroom, media room, replace g/f rear windows in-kind. minor arch changes. no work on 2/f. | $10,000 | |
| Aug 4, 2023 | Completed final sign-off Mar 2024 | 153 Idora Av | Hong Shink Construction | 1/f: new bedrooms, media room, bar, bathroom, relocate staircase and mech. 2/f: remodel bathroom, relocate (n) kitchen, (n) bedroom and bathroom per plan. 2 new sliding door at rear, repair minor fire damage .Details
1/f: new bedrooms, media room, bar, bathroom, relocate staircase and mech. 2/f: remodel bathroom, relocate (n) kitchen, (n) bedroom and bathroom per plan. 2 new sliding door at rear, repair minor fire damage . | $300,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2025 | 439 Raymond Av | 1/f: relocate (e) laundry, furnace, water heater and construct (n) bathroom, convert (e) living room to bed, new storage and office. no work on 2/f and basement.Details
1/f: relocate (e) laundry, furnace, water heater and construct (n) bathroom, convert (e) living room to bed, new storage and office. no work on 2/f and basement. | $120,000 | |
| Aug 3, 2023 | Completed final sign-off Mar 2024 | 1119 Girard St | rev 202205124160 per bid: document proposed rear elevation per approved floor plan. modify stairs to reflect as built.Details
rev 202205124160 per bid: document proposed rear elevation per approved floor plan. modify stairs to reflect as built. | ||
| Aug 3, 2023 | Completed final sign-off Dec 2023 | 661 Lakeview Av | 2/f: demo (e) fireplace - two and patch. remodel bathroom, add new bathroom, relocate kitchen and laundry, 2 new sld door at rearyard.Details
2/f: demo (e) fireplace - two and patch. remodel bathroom, add new bathroom, relocate kitchen and laundry, 2 new sld door at rearyard. | $110,000 | |
| Aug 3, 2023 | Completed final sign-off Jan 2025 | 2695 23rd Av | rev 202211176756: show hatch walls as (n) walls for clarification only. no new walls proposed.Details
rev 202211176756: show hatch walls as (n) walls for clarification only. no new walls proposed. | ||
| Jul 21, 2023 | Completed final sign-off Mar 2024 | 254 Brussels St | revision to 202205124166. addition 2 burners and regular size sink in ground fl.Details
revision to 202205124166. addition 2 burners and regular size sink in ground fl. | $500 | |
| Jun 23, 2023 | Expired or cancelled cancelled Jan 2026 | 1646 22nd Av | 1/f: 2 new bedrooms & 2 bathrooms, media room and office/bar; relocate fau and water heater. 2/f: remodel (e) kitchen & dining room, relocate bathroom, interior staircase, add new bathroom,Details
1/f: 2 new bedrooms & 2 bathrooms, media room and office/bar; relocate fau and water heater. 2/f: remodel (e) kitchen & dining room, relocate bathroom, interior staircase, add new bathroom, | $265,000 | |
| Jun 20, 2023 | Completed final sign-off Apr 2024 | 2606 39th Av | Yao Star Construction | 1/f: new bedroom, media room, bathroom and bar. relocate washer/dryer and mech per plans.Details
1/f: new bedroom, media room, bathroom and bar. relocate washer/dryer and mech per plans. | $105,000 |
| Jun 20, 2023 | Completed final sign-off Jan 2026 | 326 La Grande Av | Ruqiu Construction | comply with nov 202306563 - g/f: (n) bedroom, office, bathroom, wet bar and repair interior staircase.Details
comply with nov 202306563 - g/f: (n) bedroom, office, bathroom, wet bar and repair interior staircase. | $110,000 |
| Jun 5, 2023 | Completed final sign-off Jun 2023 | 652 Lakeview Av | amend to 200311240936: front facade as-built changes. change front to siding; remove window detal and change garage door to wood. basement: remove as-built closet, change bathroom orientation; g/f change tub to shower; 2/f: as-built changesto kitchen and bathroom.Details
amend to 200311240936: front facade as-built changes. change front to siding; remove window detal and change garage door to wood. basement: remove as-built closet, change bathroom orientation; g/f change tub to shower; 2/f: as-built changesto kitchen and bathroom. | $20,000 | |
| May 18, 2023 | Completed final sign-off Aug 2023 | 6 Arleta Av | rev pa202212289315 - structural. 2/f: unit 6 - add 2 6x10 df beams per plan. , 3/f: unit 8 add 2 6x10 df beams per plan.Details
rev pa202212289315 - structural. 2/f: unit 6 - add 2 6x10 df beams per plan. , 3/f: unit 8 add 2 6x10 df beams per plan. | $3,000 | |
| May 18, 2023 | Completed final sign-off Nov 2023 | 166 Bright St | rev to pa 202302282795: recess garage door and (n) tradesman door from the front street, like the neighborDetails
rev to pa 202302282795: recess garage door and (n) tradesman door from the front street, like the neighbor | $5,000 | |
| May 12, 2023 | Completed final sign-off Nov 2025 | 1100 Holloway Av | Dliu Construction, Kangrong Construction Corporation, Bejarano Construction 9inc | comply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100Details
comply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100 | $150,000 |
| Apr 27, 2023 | Completed final sign-off Aug 2024 | 454 Union St | remodel kitchen and bathroom, replace breaking down plaster wall to sheetrock on 2/f.Details
remodel kitchen and bathroom, replace breaking down plaster wall to sheetrock on 2/f. | $30,000 | |
| Apr 3, 2023 | Completed final sign-off Oct 2023 | 314 Rome St | rev to pa202212027600, 2/f: demo fireplace, frame bedroom closet, lighting plan forwhole house per bid c/n. all work is non structurl. to comply with 202295042Details
rev to pa202212027600, 2/f: demo fireplace, frame bedroom closet, lighting plan forwhole house per bid c/n. all work is non structurl. to comply with 202295042 | ||
| Feb 17, 2023 | Completed final sign-off Nov 2023 | 1785 09th Av | revision to pa# 201809049000, revise shearwall location and footing. new 1 hr wall hallway.Details
revision to pa# 201809049000, revise shearwall location and footing. new 1 hr wall hallway. | ||
| Jan 31, 2023 | Completed final sign-off Jul 2023 | 1052 Noe St | Yao Star Construction | 1052 noe st: add 1 full bathroom.Details
1052 noe st: add 1 full bathroom. | $25,000 |
| Jan 19, 2023 | Completed final sign-off Apr 2024 | 25 Balceta Av | g/f: voluntary foundation strengthen, excavate no more than 15 cubic yards.Details
g/f: voluntary foundation strengthen, excavate no more than 15 cubic yards. | $60,000 | |
| Dec 30, 2022 | Completed final sign-off May 2024 | 2526 36th Av | 2/f: remodel kitchen, fill-in center patio, g/f: new bathroom, new office, relocate mech, fan.Details
2/f: remodel kitchen, fill-in center patio, g/f: new bathroom, new office, relocate mech, fan. | $50,000 | |
| Dec 30, 2022 | Completed final sign-off Mar 2024 | 564 Joost Av | 1) convert (e) playroom to 2 new bathrooms, 2) new bedrooms, 3) new media room, 4) bar - all on g/f. approx 833 sq/ft of (n) condition space at ground floor. (n) interior staircase per plan.Details
1) convert (e) playroom to 2 new bathrooms, 2) new bedrooms, 3) new media room, 4) bar - all on g/f. approx 833 sq/ft of (n) condition space at ground floor. (n) interior staircase per plan. | $105,000 | |
| Dec 30, 2022 | Completed final sign-off Oct 2023 | 51 De Long St | Bai Yuan Li | g/f: relocate bathroom, new media room, bar, relocate mechanical room. 2/f: new bathroom & remodel (e) kitchen in-kind.Details
g/f: relocate bathroom, new media room, bar, relocate mechanical room. 2/f: new bathroom & remodel (e) kitchen in-kind. | $105,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 2570 31st Av | g/f: 2 new bathrooms, bedrooms, media room with wet bar. 2/f: new bathroom, remodel (e) kitchen, dining room, relocate bedroom.Details
g/f: 2 new bathrooms, bedrooms, media room with wet bar. 2/f: new bathroom, remodel (e) kitchen, dining room, relocate bedroom. | $150,000 | |
| Dec 30, 2022 | Completed final sign-off Sep 2025 | 2646 16th Av | 1) second floor swap front door orientation, 2) infill partial light well,3) add 1 bathroom, 4) remodel ktichen, 5) relocate interior stairs. g/f: 6) add 1 bedroom, 7) add bathroom 8)add media room,9)add bar, 10) relocate mechanical room. all per plans.Details
1) second floor swap front door orientation, 2) infill partial light well,3) add 1 bathroom, 4) remodel ktichen, 5) relocate interior stairs. g/f: 6) add 1 bedroom, 7) add bathroom 8)add media room,9)add bar, 10) relocate mechanical room. all per plans. | $100,000 | |
| Dec 16, 2022 | Completed final sign-off Mar 2024 | 381 Park St | Will P K Ng Construction Inc. | 2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms.Details
2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms. | $109,000 |
| Dec 2, 2022 | Completed final sign-off Feb 2023 | 735 Peralta Av | construction of new deck 6x10ft at rear yard less than 10 feet in height.Details
construction of new deck 6x10ft at rear yard less than 10 feet in height. | $13,000 | |
| Dec 2, 2022 | Completed final sign-off Oct 2023 | 314 Rome St | Chen Herman Construction | 2/f: relocate kitchen, bathroom, new bathroom, and bed. g/f (n) bathroom, media room, relocate furnace.Details
2/f: relocate kitchen, bathroom, new bathroom, and bed. g/f (n) bathroom, media room, relocate furnace. | $105,000 |
| Dec 2, 2022 | Completed final sign-off Jun 2024 | 558 17th Av | rev to pa202111172658: new door in (e) garage door. replace garage door at front.Details
rev to pa202111172658: new door in (e) garage door. replace garage door at front. | ||
| Oct 26, 2022 | Completed final sign-off May 2023 | 1400 25th Av | Alpha Construction & Solutions Inc. | to comply w/nov#202294522, emergency repair to front of building, rebuild wall/foundation in foyer on g/f in-kind per plan, new stucco where damaged in-kind to match front elevation. no other work performed.Details
to comply w/nov#202294522, emergency repair to front of building, rebuild wall/foundation in foyer on g/f in-kind per plan, new stucco where damaged in-kind to match front elevation. no other work performed. | $2,000 |
| Oct 18, 2022 | Never finaled filed Oct 2022, never issued | 721 Naples St | legalize one unit per ordinance 43-14 on g/f. (n) kitchen, one bedroom, office, bath/dining. no exterior work performed. ref complaints 202288540 & 202288612.Details
legalize one unit per ordinance 43-14 on g/f. (n) kitchen, one bedroom, office, bath/dining. no exterior work performed. ref complaints 202288540 & 202288612. | $35,000 | |
| Sep 20, 2022 | Completed final sign-off Feb 2023 | 2022 29th Av | to comply with 2021012215enf, pid202184725,eid202184633 and 202184111,202184008. g/f modifty study room into 2 new bedrooms, rearrange bathroom, new sink and 3 feet retianing wall at rear. dewmo unpermitted rear shet, all work on g/f and rear. trim (e) 4'6' retaining wall to 4'0" to meet sfbc 106a.2Details
to comply with 2021012215enf, pid202184725,eid202184633 and 202184111,202184008. g/f modifty study room into 2 new bedrooms, rearrange bathroom, new sink and 3 feet retianing wall at rear. dewmo unpermitted rear shet, all work on g/f and rear. trim (e) 4'6' retaining wall to 4'0" to meet sfbc 106a.2 | $16,000 | |
| Sep 2, 2022 | Completed final sign-off Jan 2023 | 146 Saint Charles Av | Bing Construction | 2/f: remodel (e) 1 kitchen and add 1 new bathroom.Details
2/f: remodel (e) 1 kitchen and add 1 new bathroom. | $24,000 |
| Aug 29, 2022 | Completed final sign-off Oct 2023 | 2346 31st Av | Kelvin Construction | g/f: relocate (e) bathroom.Details
g/f: relocate (e) bathroom. | $10,000 |
| Aug 19, 2022 | Completed final sign-off Oct 2022 | 622 41st Av | rev 202112174665 - shift bar and laundry /mech lociaton per as-built. 2/f: minor arch as-built revision to bedroom closet and remove linen closet.Details
rev 202112174665 - shift bar and laundry /mech lociaton per as-built. 2/f: minor arch as-built revision to bedroom closet and remove linen closet. | $10,000 | |
| Aug 10, 2022 | Completed final sign-off Apr 2025 | 26 Southwood Dr | Frank Lok Yu Company | g/f: 2 (n) bed, bathroom and 1 laundry with media room with bar. 2/f: remodel kitchen and dining, renovate (e) bedroom and 2 new bathrooms.Details
g/f: 2 (n) bed, bathroom and 1 laundry with media room with bar. 2/f: remodel kitchen and dining, renovate (e) bedroom and 2 new bathrooms. | $110,000 |
| Aug 10, 2022 | Completed final sign-off Feb 2023 | 745 27th Av | Hong Shink Construction | to comply with nov# 202294076: infill both north and south lightwell against blind wall. g/f: add 2 new bedrooms, bathrooms, new office and bar, 2/f: 2 new bathrooms,remodel (e) kitchen, living and dining. ab005 to comply with eg02, approved by lt gilbraithDetails
to comply with nov# 202294076: infill both north and south lightwell against blind wall. g/f: add 2 new bedrooms, bathrooms, new office and bar, 2/f: 2 new bathrooms,remodel (e) kitchen, living and dining. ab005 to comply with eg02, approved by lt gilbraith | $110,000 |
| Aug 2, 2022 | Completed final sign-off Dec 2022 | 2231 16th Av | Yao Star Construction | convert ground floor to storage, (1) bedroom & media room. legalize (e) bath on g/f (no wall change). no work on 2/f.Details
convert ground floor to storage, (1) bedroom & media room. legalize (e) bath on g/f (no wall change). no work on 2/f. | $20,000 |
| Aug 2, 2022 | Completed final sign-off Sep 2022 | 3132 Ulloa St | g/f: rearrange bathroom and closet per as-built. 2/f: convert/rearrange bathroom and half-bathroom and new bathroom. demo fireplace as-built. revision to (e) pa202111182711.Details
g/f: rearrange bathroom and closet per as-built. 2/f: convert/rearrange bathroom and half-bathroom and new bathroom. demo fireplace as-built. revision to (e) pa202111182711. | ||
| Jul 20, 2022 | Completed final sign-off Aug 2023 | 1826 18th Av | Kelvin Construction | g/f: one new bedroom, bathroom, storage and relocate laundry and mech. 2/f: new office, 2 new bathrooms, remodel new kitchen, living / dining. rear (n) fenestration not visible.Details
g/f: one new bedroom, bathroom, storage and relocate laundry and mech. 2/f: new office, 2 new bathrooms, remodel new kitchen, living / dining. rear (n) fenestration not visible. | $130,000 |
| Jul 20, 2022 | Completed final sign-off Oct 2023 | 2211 San Jose Av | to comply with complaint 202292493: g/f: remove and replce sheetrock, provide insulation where neded. refinish 1 bathroom, add 2 new bathrooms. new office and laundry room with sink).Details
to comply with complaint 202292493: g/f: remove and replce sheetrock, provide insulation where neded. refinish 1 bathroom, add 2 new bathrooms. new office and laundry room with sink). | $50,000 | |
| Jul 19, 2022 | Completed final sign-off Jul 2023 | 515 18th Av | remodel 2/f kitchen per plan. enlarge hdr pl plan. no fixture count change.Details
remodel 2/f kitchen per plan. enlarge hdr pl plan. no fixture count change. | $10,000 | |
| Jun 8, 2022 | Completed final sign-off Oct 2022 | 515 03rd Av | (n) deck 10'x14' at rear less than 10 feet in heights. all work performed at rear yard.Details
(n) deck 10'x14' at rear less than 10 feet in heights. all work performed at rear yard. | $4,000 | |
| Jun 8, 2022 | Completed final sign-off Sep 2022 | 801 Moultrie St | Hong Shink Construction | ground floor: 2 new bedroom, 2 bathroom, new office, relocate laundry, extg internal stair, mech. 2nd floor: relocate bedroom, new bathroom, new half bathroom, new living and dinig. new windows at rear non street facing per plan.Details
ground floor: 2 new bedroom, 2 bathroom, new office, relocate laundry, extg internal stair, mech. 2nd floor: relocate bedroom, new bathroom, new half bathroom, new living and dinig. new windows at rear non street facing per plan. | $145,000 |
| Jun 8, 2022 | Completed final sign-off Mar 2023 | 3253 16th St | H Construction Co | revision to pa# 201906203947. revert approved swing outdoor back to existing in swing. all upgrades ada shall remain per pa# 201906203947.Details
revision to pa# 201906203947. revert approved swing outdoor back to existing in swing. all upgrades ada shall remain per pa# 201906203947. | |
| May 18, 2022 | Completed final sign-off Sep 2022 | 1989 San Jose Av | H & Bo Construction Inc. | rev to pa202106152461: see cloud revisions at rear - voluntarity strengthen / rebuild (e) deck in-kind andmodifty (e) 30in width stairscsae to (n) 36in width staircase, same stair orientation.Details
rev to pa202106152461: see cloud revisions at rear - voluntarity strengthen / rebuild (e) deck in-kind andmodifty (e) 30in width stairscsae to (n) 36in width staircase, same stair orientation. | $8,000 |
| May 13, 2022 | Expired or cancelled cancelled Mar 2025 | 2701 Lincoln Wy | Yao Star Construction | (n) 4' 6" patio at rear yard. 5' away from property line.Details
(n) 4' 6" patio at rear yard. 5' away from property line. | $3,000 |
| May 12, 2022 | Completed final sign-off Apr 2023 | 254 Brussels St | g/f: 2 (n) bedrooms, bathrooms, wetbar. (n) office, relocate (e) water heater, fau, and (e) internal stair. 2/f: remodel kitchen living and dining. (n) bathroom & remodel (e) bathroom.Details
g/f: 2 (n) bedrooms, bathrooms, wetbar. (n) office, relocate (e) water heater, fau, and (e) internal stair. 2/f: remodel kitchen living and dining. (n) bathroom & remodel (e) bathroom. | $110,000 | |
| May 12, 2022 | Completed final sign-off Mar 2024 | 1119 Girard St | to comply with nov# 202183391, 202183576, 202184881, pid 202185025, eid 202185022, 202185041 & planning 2021-012276enf. to memoralize kitchen & bath on ground fl & 1 story infill. to remove slanted roof and shed to be 10'x10'. (n) unit within zoning.Details
to comply with nov# 202183391, 202183576, 202184881, pid 202185025, eid 202185022, 202185041 & planning 2021-012276enf. to memoralize kitchen & bath on ground fl & 1 story infill. to remove slanted roof and shed to be 10'x10'. (n) unit within zoning. | $18,000 | |
| May 5, 2022 | Completed final sign-off Feb 2023 | 302 Randolph St | minor arch. revision to bpa #202108307429, modify approved ada bathroom and prep area to as built per plan. deferred mep for bpa 202108307429. new light switches and ceiling light and etc per plan.Details
minor arch. revision to bpa #202108307429, modify approved ada bathroom and prep area to as built per plan. deferred mep for bpa 202108307429. new light switches and ceiling light and etc per plan. | ||
| May 4, 2022 | Completed final sign-off Dec 2022 | 441 Myra Wy | Winwin Construction Inc | g/f: add 1 media room and bathroom. 2/f: change (e) bathroom tub into shower pan/ alter bedroom closet.Details
g/f: add 1 media room and bathroom. 2/f: change (e) bathroom tub into shower pan/ alter bedroom closet. | $38,000 |
| May 4, 2022 | Completed final sign-off Apr 2023 | 2151 28th Av | Quan Remodeling Company | 2/f: alter (e) bathroom and add 1 bathroom. g/f: relocate furnace, water heater, laundry and shft bathroom. no other work performed.Details
2/f: alter (e) bathroom and add 1 bathroom. g/f: relocate furnace, water heater, laundry and shft bathroom. no other work performed. | $36,000 |
| Apr 15, 2022 | Never finaled issued Aug 2022, no final | 1650 Noriega St | Plus One Construction Inc | remodel extg dental office, no change of use, no fixture count change. relocate ada bathroom per plan, repair dryrot less than 50% work only to be performed on dental office only.Details
remodel extg dental office, no change of use, no fixture count change. relocate ada bathroom per plan, repair dryrot less than 50% work only to be performed on dental office only. | $50,000 |
| Mar 25, 2022 | Completed final sign-off May 2022 | 2995 20th Av | rev to pa202111082026: demo fireplace, minor bathroom layout change. no fixture count change and add longer counter per plan per as-buil on g/f. no work on 2/.f.Details
rev to pa202111082026: demo fireplace, minor bathroom layout change. no fixture count change and add longer counter per plan per as-buil on g/f. no work on 2/.f. | ||
| Mar 23, 2022 | Never finaled issued Mar 2022, no final | 53 Venus St | g/f: new bedroom, office and 2 new bathrooms. 2/f: no work done.Details
g/f: new bedroom, office and 2 new bathrooms. 2/f: no work done. | $28,000 | |
| Mar 23, 2022 | Expired or cancelled cancelled Jan 2026 | 455 Goettingen St | g/f: add 2 bedrooms, bathroom, media room with bar. 2/f; no work to be performed.Details
g/f: add 2 bedrooms, bathroom, media room with bar. 2/f; no work to be performed. | $38,000 | |
| Mar 4, 2022 | Completed final sign-off Feb 2023 | 1192 Goettingen St | Winwin Construction Inc | 1) 2nd floor: new bathroom, rearrange extg bathroom. remodel kitchin, living, dining room and relocate bedroom. 2) ground floor: new bedroom, bathroom, media room with bar and relocate water heater and f a u / laundry per plan. 3) no new openings visible to street.Details
1) 2nd floor: new bathroom, rearrange extg bathroom. remodel kitchin, living, dining room and relocate bedroom. 2) ground floor: new bedroom, bathroom, media room with bar and relocate water heater and f a u / laundry per plan. 3) no new openings visible to street. | $68,000 |
| Feb 25, 2022 | Completed final sign-off Feb 2023 | 735 Peralta Av | minor arch revision to refect as buildt condition,relocate ground fl bath,wh/fau & laundry,convert(e) office to bedroom.2/floor minor arch revision to bath & add new bath.no new opening under this bpa.revision to bpa#202105100089. rev to bpa#202009103862.Details
minor arch revision to refect as buildt condition,relocate ground fl bath,wh/fau & laundry,convert(e) office to bedroom.2/floor minor arch revision to bath & add new bath.no new opening under this bpa.revision to bpa#202105100089. rev to bpa#202009103862. | $12,000 | |
| Feb 18, 2022 | Never finaled issued Mar 2022, no final | 1261 Folsom St | revert 1261 folsom st from commericial restaurant back to residential unit. not feasible for restaurant to continue. new residential unit will consit of 2 new bedrooms, living/dinings,modifity bath and add new bathroom, new kitchen. (e) unit already sprinkler.Details
revert 1261 folsom st from commericial restaurant back to residential unit. not feasible for restaurant to continue. new residential unit will consit of 2 new bedrooms, living/dinings,modifity bath and add new bathroom, new kitchen. (e) unit already sprinkler. | $38,000 | |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 5135 Geary Bl | Wl Construction Group | change of use from retail/showroom and office to daycare. new 3ft heater and rmeove ada bathroom door per plan. no work on the commercial unit at rear. classification as an "e" occupancyDetails
change of use from retail/showroom and office to daycare. new 3ft heater and rmeove ada bathroom door per plan. no work on the commercial unit at rear. classification as an "e" occupancy | $1,000 |
| Feb 17, 2022 | Completed final sign-off May 2023 | 942 Naples St | Quan Remodeling Company | to comply with nov202286912 eid202286928. g/f - convert storage to 2 new bedrooms, add 2 bathrooms, one bar and relocate furnace. 2/f remodel kitchen and relocate bathroom and add one bathroom, new 36in type internal staircase.Details
to comply with nov202286912 eid202286928. g/f - convert storage to 2 new bedrooms, add 2 bathrooms, one bar and relocate furnace. 2/f remodel kitchen and relocate bathroom and add one bathroom, new 36in type internal staircase. | $64,000 |
| Feb 10, 2022 | Completed final sign-off Sep 2022 | 1743 La Salle Av | Winwin Construction Inc | response to nov202184753 & 2021012814enf: convert g/f storage rooms into 2 new bedrooms & alter (e) half bath to full. relocate furnace and laundry per plan. reduce (e) shed from 13x25ft to 10x10 and no greater than 8ft ht. no work performed on 2/f.Details
response to nov202184753 & 2021012814enf: convert g/f storage rooms into 2 new bedrooms & alter (e) half bath to full. relocate furnace and laundry per plan. reduce (e) shed from 13x25ft to 10x10 and no greater than 8ft ht. no work performed on 2/f. | $18,000 |