Permit GraphShortlistSan Francisco building permits since 2000

Kangrong Construction Corporation

Contractor license
1089388
State license record
Based in
San Francisco
On San Francisco permits
Dec 2022 to Jul 2026
Last 24 months
8 permits filed

19 permits since 2000: 15 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllDeck 1Kitchen remodel 6Bathroom remodel 8
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 22, 2026In progress
issued Aug 2026
2123 16th Avfirst floor remodel: convert family room to a bedroom and storage room to a family room.
Details
Permit
202607225422
Permit issued
Aug 28, 2026

first floor remodel: convert family room to a bedroom and storage room to a family room.

Open the permit page

$8,000
Jun 30, 2026In progress
issued Aug 2026
2123 16th Avaddition of rear deck at 2nd floor
Details
Permit
202606304281
Permit issued
Aug 28, 2026

addition of rear deck at 2nd floor

Open the permit page

$5,000
Jun 22, 2026Completed
final sign-off Oct 2026
655 39th Av2nd fl: convert (e) closets to a full bathroom, rewire and add 1 new electrical sub-panel
Details
Permit
202606223620
Permit issued
Jun 24, 2026
Final sign-off
Oct 2, 2026

2nd fl: convert (e) closets to a full bathroom, rewire and add 1 new electrical sub-panel

Open the permit page

$50,000
Jan 7, 2026Completed
final sign-off Mar 2026
267 London Stinstall insulation and gypsum boards, approx. 500-600 sq ft wall area, all interior
Details
Permit
202601073358
Permit issued
Jan 7, 2026
Final sign-off
Mar 19, 2026

install insulation and gypsum boards, approx. 500-600 sq ft wall area, all interior

Open the permit page

$30,000
Dec 30, 2025Completed
final sign-off Jul 2026
51 Castillo Stremodel 1st fl. add shower, kitchen w 2 electric burner, partion wall on 1st fl
Details
Permit
202512302936
Permit issued
May 21, 2026
Final sign-off
Jul 28, 2026

remodel 1st fl. add shower, kitchen w 2 electric burner, partion wall on 1st fl

Open the permit page

$30,000
Oct 28, 2025Completed
final sign-off Jan 2026
1831 Fulton St4th/f: convert e) laundry/closet into a nursery, add a walk0in closet & laundry closet in the primary bedroom.
Details
Permit
202510288283
Permit issued
Nov 12, 2025
Final sign-off
Jan 2, 2026

4th/f: convert e) laundry/closet into a nursery, add a walk0in closet & laundry closet in the primary bedroom.

Open the permit page

$24,000
Jun 9, 2025Completed
final sign-off Oct 2025
479 Pacheco Stremodel one full bathroom in kind with shower in kind.
Details
Permit
202506098193
Permit issued
Jun 9, 2025
Final sign-off
Oct 2, 2025

remodel one full bathroom in kind with shower in kind.

Open the permit page

$20,000
May 14, 2025Completed
final sign-off Jan 2026
711 14th Av2nd floor- remodel one full bathroom and one powder room in kind. no change to floor layout. no change to wall layout. no structural work.
Details
Permit
202505146447
Permit issued
May 14, 2025
Final sign-off
Jan 16, 2026

2nd floor- remodel one full bathroom and one powder room in kind. no change to floor layout. no change to wall layout. no structural work.

Open the permit page

$36,000
Oct 3, 2024Completed
final sign-off Apr 2025
1132 Anza Stremodel kitchen with new fixtures, cabinets, and counters. no wall change.
Details
Permit
202410032255
Permit issued
Oct 3, 2024
Final sign-off
Apr 18, 2025

remodel kitchen with new fixtures, cabinets, and counters. no wall change.

Open the permit page

$35,000
Aug 22, 2023Completed
final sign-off Apr 2024
2654 17th Avreplace (e) 15 windows with new, same size. 2 street facing on 3rd fl. 3 windows in left lightwell not seen from street. 3 windows in right lightwell not seen from street. 7 windows facing backyard. marvin elevate windows. max u-factor 0.30.
Details
Permit
202308224961
Permit issued
Aug 22, 2023
Final sign-off
Apr 3, 2024

replace (e) 15 windows with new, same size. 2 street facing on 3rd fl. 3 windows in left lightwell not seen from street. 3 windows in right lightwell not seen from street. 7 windows facing backyard. marvin elevate windows. max u-factor 0.30.

Open the permit page

$11,000
Jul 6, 2023Expired or cancelled
cancelled Apr 2025
1100 Holloway Av1) replace all exterior stucco (all four sides), same texture. same style. no design change. 2) replace all exterior windows, 2nd floor, same style, aluminum-wood clad windows.
Details
Permit
202307061587
Permit issued
Jul 12, 2023

1) replace all exterior stucco (all four sides), same texture. same style. no design change. 2) replace all exterior windows, 2nd floor, same style, aluminum-wood clad windows.

Open the permit page

$70,000
Jun 13, 2023Completed
final sign-off Oct 2025
1100 Holloway Avrevision to 202305127691. minor revision to 2nd fl and gr fl layout from prvious permit. no exterior change. proposed from prev permit. voluntary structural and seismic strengthening to accompany prev 202305127691 permit gr fl. add 2 full bath on 1st floor & 2nd floor.
Details
Permit
202306139938
Permit issued
Jun 16, 2023
Final sign-off
Oct 31, 2025

revision to 202305127691. minor revision to 2nd fl and gr fl layout from prvious permit. no exterior change. proposed from prev permit. voluntary structural and seismic strengthening to accompany prev 202305127691 permit gr fl. add 2 full bath on 1st floor & 2nd floor.

Open the permit page

$80,000
May 16, 2023Completed
final sign-off Mar 2025
290 Turk Stt.i. in basement (file storage). no structural work. no change to path of travel. total area to be renovated of 524sf.
Details
Permit
202305167895
Permit issued
Apr 3, 2024
Final sign-off
Mar 21, 2025

t.i. in basement (file storage). no structural work. no change to path of travel. total area to be renovated of 524sf.

Open the permit page

$105,000
May 12, 2023Completed
final sign-off Nov 2025
1100 Holloway Avcomply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100
Details
Permit
202305127691
Permit issued
Jun 7, 2023
Final sign-off
Nov 12, 2025

comply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100

Open the permit page

$150,000
Mar 2, 2023Completed
final sign-off Apr 2024
2654 17th Avrenovation of extg kitchen, living room, bathrooms and kitchen cabinets, floor, sheet rock, bathroom fixtures
Details
Permit
202303022962
Permit issued
Jun 8, 2023
Final sign-off
Apr 3, 2024

renovation of extg kitchen, living room, bathrooms and kitchen cabinets, floor, sheet rock, bathroom fixtures

Open the permit page

$115,000
Jan 26, 2023Never finaled
issued Jan 2023, no final
3817 Anza Stto comply with nov 202301159: replace electrical fixture. repair buckled floor to eliminate tripping hazard. replace bathtub fixture only. replace kitchen sink fixture.
Details
Permit
202301260821
Permit issued
Jan 26, 2023

to comply with nov 202301159: replace electrical fixture. repair buckled floor to eliminate tripping hazard. replace bathtub fixture only. replace kitchen sink fixture.

Open the permit page

$3,500
Dec 30, 2022Completed
final sign-off Aug 2023
110 15th Avremodel one full bathroom with lavatory wall hung toilet and shower
Details
Permit
202212309486
Permit issued
Dec 30, 2022
Final sign-off
Aug 21, 2023

remodel one full bathroom with lavatory wall hung toilet and shower

Open the permit page

$18,000
Dec 29, 2022Completed
final sign-off May 2023
1499 Clayton Stlower level: add kitchenette. main level: remodel kitchen and bathroom, replace 2 windows, the same sizes (not facing street). upper level: add 1 skylight and remodel closet.
Details
Permit
202212299388
Permit issued
Dec 30, 2022
Final sign-off
May 25, 2023

lower level: add kitchenette. main level: remodel kitchen and bathroom, replace 2 windows, the same sizes (not facing street). upper level: add 1 skylight and remodel closet.

Open the permit page

$58,000
Dec 20, 2022Completed
final sign-off Dec 2023
3835 Anza St1/f: add kitchenette.
Details
Permit
202212208792
Permit issued
Dec 22, 2022
Final sign-off
Dec 21, 2023

1/f: add kitchenette.

Open the permit page

$5,000