Wl Construction Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Dec 2025
- Last 24 months
- 6 permits filed
16 permits since 2000: 9 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | In progress issued Jun 2026 | 121 Denslowe Dr | interior modication level1b&2b, minor upgrades at level 2. kitchen and dining remodel with removal of (2) interior walls, new casework and countertops, relocation of kitchen sink, and new finishes. demolition of (e) level 2b restrooms and construction of expanded new restrooms with new plumbing.Details
interior modication level1b&2b, minor upgrades at level 2. kitchen and dining remodel with removal of (2) interior walls, new casework and countertops, relocation of kitchen sink, and new finishes. demolition of (e) level 2b restrooms and construction of expanded new restrooms with new plumbing. | $200,000 |
| Sep 25, 2025 | In progress issued Feb 2026 | 2625 Balboa St | relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate.Details
relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate. | $100,000 |
| Jul 23, 2025 | Completed final sign-off Aug 2025 | 1986 19th Av | unit 1986 & 1988: bathroom repair full tearout of (e) fixtures due to water damage to subfloor and 2nd flr ceiling below. repair bathtub, shower pan, (e) fixtures. replace gate buzzer lines for 2nd flr/3rd flr. reseal roof edges where exposed. replace water damaged wall & ceiling in 2nd flr bathroomDetails
unit 1986 & 1988: bathroom repair full tearout of (e) fixtures due to water damage to subfloor and 2nd flr ceiling below. repair bathtub, shower pan, (e) fixtures. replace gate buzzer lines for 2nd flr/3rd flr. reseal roof edges where exposed. replace water damaged wall & ceiling in 2nd flr bathroom | $30,000 |
| Apr 28, 2025 | Completed final sign-off May 2025 | 848 Goettingen St | stucco repair on ront facade by windows and siding replacement of rear facade's (e) wood siding with (n) cement lap siding.Details
stucco repair on ront facade by windows and siding replacement of rear facade's (e) wood siding with (n) cement lap siding. | $25,000 |
| Mar 31, 2025 | In progress issued Oct 2025 | 1369 Quesada Av | conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairsDetails
conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairs | $100,000 |
| Dec 31, 2024 | Completed final sign-off Jul 2026 | 750 26th Av | prop h: commercial ti interior renovation to restroom remodel, new minor interior non-bearing partition, relocate kitchen area and install new hvac system.Details
prop h: commercial ti interior renovation to restroom remodel, new minor interior non-bearing partition, relocate kitchen area and install new hvac system. | $200,000 |
| Sep 5, 2024 | In progress issued Sep 2024 | 7515 Geary Bl | one complete kitchen remodel like for like. no wall changes or layout changesDetails
one complete kitchen remodel like for like. no wall changes or layout changes | $30,000 |
| May 24, 2024 | Completed final sign-off Jun 2025 | 81 Lakeshore Dr | remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylightsDetails
remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylights | $100,000 |
| Apr 5, 2024 | Completed final sign-off May 2024 | 848 Goettingen St | (1) replacement of existing garage door with multi panel garage door with repair of dryrot around garage door.Details
(1) replacement of existing garage door with multi panel garage door with repair of dryrot around garage door. | $2,500 |
| Aug 17, 2023 | Completed final sign-off Nov 2023 | 2615 20th Av | repair and replace exterior siding from left, right, and back side with 1x8 cedar siding. nothing at front.Details
repair and replace exterior siding from left, right, and back side with 1x8 cedar siding. nothing at front. | $10,000 |
| Feb 1, 2023 | Never finaled issued Feb 2023, no final | 436 Rolph St | administrative permit only to correct the work descpirtion to state: "approved adu under pa# 202003167147 for 2 bedrooms and 2 bathrooms is in fact a 3 bedroom and 3 bathroom as per plan.Details
administrative permit only to correct the work descpirtion to state: "approved adu under pa# 202003167147 for 2 bedrooms and 2 bathrooms is in fact a 3 bedroom and 3 bathroom as per plan. | |
| Sep 27, 2022 | Completed final sign-off Feb 2023 | 1895 39th Av | replace 10 wood windows with the sam ewood frame window on 1/f & 2/f. replace 2 wood windows on 2/f with operable window. replace (e) fixed pan with operable windows. u factor .30 maxDetails
replace 10 wood windows with the sam ewood frame window on 1/f & 2/f. replace 2 wood windows on 2/f with operable window. replace (e) fixed pan with operable windows. u factor .30 max | $4,000 |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 5135 Geary Bl | change of use from retail/showroom and office to daycare. new 3ft heater and rmeove ada bathroom door per plan. no work on the commercial unit at rear. classification as an "e" occupancyDetails
change of use from retail/showroom and office to daycare. new 3ft heater and rmeove ada bathroom door per plan. no work on the commercial unit at rear. classification as an "e" occupancy | $1,000 |
| Apr 13, 2021 | Never finaled issued May 2023, no final | 1501 Kirkwood Av | 1st fl: legalize (1) unit per ordinance 43-14. unit #8: remodel bath, add (2) bedrooms & kitchen.Details
1st fl: legalize (1) unit per ordinance 43-14. unit #8: remodel bath, add (2) bedrooms & kitchen. | $20,000 |
| Mar 16, 2020 | Never finaled issued Mar 2022, no final | 436 Rolph St | reconfigure & convert existing garage,family room & bedroom to 2 bedrooms,2 bath adu per ordinance #95-17Details
reconfigure & convert existing garage,family room & bedroom to 2 bedrooms,2 bath adu per ordinance #95-17 | $20,000 |
| Dec 13, 2018 | Completed final sign-off Sep 2020 | 5727 Geary Bl | t.i. (n) day care at the ground fl. with new ada restroomDetails
t.i. (n) day care at the ground fl. with new ada restroom | $40,000 |