Wl Construction Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Dec 2025
- Last 24 months
- 6 permits filed
16 permits since 2000: 9 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 3 completed, 2 in progress, 3 never finaled. Typically 84 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2025 | In progress issued Feb 2026 | 2625 Balboa St | relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate.Details
relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate. | $100,000 |
| Jul 23, 2025 | Completed final sign-off Aug 2025 | 1986 19th Av | unit 1986 & 1988: bathroom repair full tearout of (e) fixtures due to water damage to subfloor and 2nd flr ceiling below. repair bathtub, shower pan, (e) fixtures. replace gate buzzer lines for 2nd flr/3rd flr. reseal roof edges where exposed. replace water damaged wall & ceiling in 2nd flr bathroomDetails
unit 1986 & 1988: bathroom repair full tearout of (e) fixtures due to water damage to subfloor and 2nd flr ceiling below. repair bathtub, shower pan, (e) fixtures. replace gate buzzer lines for 2nd flr/3rd flr. reseal roof edges where exposed. replace water damaged wall & ceiling in 2nd flr bathroom | $30,000 |
| Mar 31, 2025 | In progress issued Oct 2025 | 1369 Quesada Av | conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairsDetails
conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairs | $100,000 |
| May 24, 2024 | Completed final sign-off Jun 2025 | 81 Lakeshore Dr | remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylightsDetails
remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylights | $100,000 |
| Feb 1, 2023 | Never finaled issued Feb 2023, no final | 436 Rolph St | administrative permit only to correct the work descpirtion to state: "approved adu under pa# 202003167147 for 2 bedrooms and 2 bathrooms is in fact a 3 bedroom and 3 bathroom as per plan.Details
administrative permit only to correct the work descpirtion to state: "approved adu under pa# 202003167147 for 2 bedrooms and 2 bathrooms is in fact a 3 bedroom and 3 bathroom as per plan. | |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 5135 Geary Bl | change of use from retail/showroom and office to daycare. new 3ft heater and rmeove ada bathroom door per plan. no work on the commercial unit at rear. classification as an "e" occupancyDetails
change of use from retail/showroom and office to daycare. new 3ft heater and rmeove ada bathroom door per plan. no work on the commercial unit at rear. classification as an "e" occupancy | $1,000 |
| Apr 13, 2021 | Never finaled issued May 2023, no final | 1501 Kirkwood Av | 1st fl: legalize (1) unit per ordinance 43-14. unit #8: remodel bath, add (2) bedrooms & kitchen.Details
1st fl: legalize (1) unit per ordinance 43-14. unit #8: remodel bath, add (2) bedrooms & kitchen. | $20,000 |
| Mar 16, 2020 | Never finaled issued Mar 2022, no final | 436 Rolph St | reconfigure & convert existing garage,family room & bedroom to 2 bedrooms,2 bath adu per ordinance #95-17Details
reconfigure & convert existing garage,family room & bedroom to 2 bedrooms,2 bath adu per ordinance #95-17 | $20,000 |