Back to kitchen remodel contractors
Wl Construction Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2018 to Dec 2025
- Last 24 months
- 6 permits filed
16 permits since 2000: 9 completed, 4 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 2 completed, 4 in progress, 1 never finaled. Typically 183 days from filing to permit and 367 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | In progress issued Jun 2026 | 121 Denslowe Dr | interior modication level1b&2b, minor upgrades at level 2. kitchen and dining remodel with removal of (2) interior walls, new casework and countertops, relocation of kitchen sink, and new finishes. demolition of (e) level 2b restrooms and construction of expanded new restrooms with new plumbing.Details
interior modication level1b&2b, minor upgrades at level 2. kitchen and dining remodel with removal of (2) interior walls, new casework and countertops, relocation of kitchen sink, and new finishes. demolition of (e) level 2b restrooms and construction of expanded new restrooms with new plumbing. | $200,000 |
| Sep 25, 2025 | In progress issued Feb 2026 | 2625 Balboa St | relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate.Details
relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate. | $100,000 |
| Mar 31, 2025 | In progress issued Oct 2025 | 1369 Quesada Av | conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairsDetails
conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairs | $100,000 |
| Dec 31, 2024 | Completed final sign-off Jul 2026 | 750 26th Av | prop h: commercial ti interior renovation to restroom remodel, new minor interior non-bearing partition, relocate kitchen area and install new hvac system.Details
prop h: commercial ti interior renovation to restroom remodel, new minor interior non-bearing partition, relocate kitchen area and install new hvac system. | $200,000 |
| Sep 5, 2024 | In progress issued Sep 2024 | 7515 Geary Bl | one complete kitchen remodel like for like. no wall changes or layout changesDetails
one complete kitchen remodel like for like. no wall changes or layout changes | $30,000 |
| May 24, 2024 | Completed final sign-off Jun 2025 | 81 Lakeshore Dr | remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylightsDetails
remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylights | $100,000 |
| Apr 13, 2021 | Never finaled issued May 2023, no final | 1501 Kirkwood Av | 1st fl: legalize (1) unit per ordinance 43-14. unit #8: remodel bath, add (2) bedrooms & kitchen.Details
1st fl: legalize (1) unit per ordinance 43-14. unit #8: remodel bath, add (2) bedrooms & kitchen. | $20,000 |