Jin's Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Apr 2026
- Last 24 months
- 12 permits filed
32 permits since 2000: 27 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2026 | Completed final sign-off May 2026 | 1360 48th Av | upgrade kitchen and bath in-kind, change toilet and pantry and change counter top.Details
upgrade kitchen and bath in-kind, change toilet and pantry and change counter top. | $2,800 |
| Apr 20, 2026 | Completed final sign-off May 2026 | 1358 48th Av | recommencement and completion of work approved under pa# 2025-0424-5147Details
recommencement and completion of work approved under pa# 2025-0424-5147 | $4,000 |
| Nov 7, 2025 | In progress issued Sep 2026 | 2469 18th Av | 3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood.Details
3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood. | $400,000 |
| Oct 9, 2025 | Completed final sign-off Dec 2025 | 1824 Ortega St | kitchen upgrade: change countertop and reface cabinet.Details
kitchen upgrade: change countertop and reface cabinet. | $3,000 |
| Sep 19, 2025 | Completed final sign-off Oct 2025 | 1886 39th Av | replace 2 skylights in kind, ufactor </= .55. non street visible.Details
replace 2 skylights in kind, ufactor </= .55. non street visible. | $3,000 |
| Aug 28, 2025 | In progress issued Jan 2026 | 150 Westgate Dr | 1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair.Details
1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair. | $98,000 |
| Jul 23, 2025 | In progress issued Jul 2026 | 442 Wilde Av | converting (e) udu at lower lvl of bldg to adu. proposed adu consists of living/dining area, 1-bedroom, 1-bath and a kitchen that has been converted from a laundry. total adu area is 1,068 sqft.Details
converting (e) udu at lower lvl of bldg to adu. proposed adu consists of living/dining area, 1-bedroom, 1-bath and a kitchen that has been converted from a laundry. total adu area is 1,068 sqft. | $8,000 |
| May 21, 2025 | Completed final sign-off Jun 2025 | 5930 California St | unit 1: administrative permit 202504285323 to correct from unit 3 to unit 1.Details
unit 1: administrative permit 202504285323 to correct from unit 3 to unit 1. | $3,500 |
| Apr 28, 2025 | Completed final sign-off Jun 2025 | 5930 California St | unit# 3. replace bathroom vanity and toilet only, no other work in bathroom. change elec. subpanel box.Details
unit# 3. replace bathroom vanity and toilet only, no other work in bathroom. change elec. subpanel box. | $3,000 |
| Apr 24, 2025 | Expired or cancelled expired May 2026 | 1358 48th Av | to comply with complaint #: 202536514 - removing and replacing about 10 sq. ft. of drywall, patch and paint, replacing new kitchen cabinets and sink, changing new bathroom vanity and toilet.Details
to comply with complaint #: 202536514 - removing and replacing about 10 sq. ft. of drywall, patch and paint, replacing new kitchen cabinets and sink, changing new bathroom vanity and toilet. | $40,000 |
| Oct 24, 2024 | Completed final sign-off Feb 2026 | 2020 20th Av | 1st fl: add 1 office, bedroom, family & full bath. 2nd fl: remodel kitchen, bathroom, relocate 2 bedrooms, living & add 1 full bath. infill lightwell & bottom rearDetails
1st fl: add 1 office, bedroom, family & full bath. 2nd fl: remodel kitchen, bathroom, relocate 2 bedrooms, living & add 1 full bath. infill lightwell & bottom rear | $120,000 |
| Oct 18, 2024 | Completed final sign-off Nov 2024 | 1886 39th Av | water/leak repair at stair landing.Details
water/leak repair at stair landing. | $2,000 |
| Aug 23, 2024 | Completed final sign-off Dec 2025 | 1824 Ortega St | bathroom remodel in kind. replace kitchen skylight in kind. u-factor <0.30Details
bathroom remodel in kind. replace kitchen skylight in kind. u-factor <0.30 | $15,000 |
| Jul 17, 2024 | Completed final sign-off Nov 2025 | 1690 24th Av | 1/f: infill under sunroom under 10ft., new bedroom, offie, 2 new baths. relocate mech and laundry rooms. 2/f: remodel kitchen, bathroom & add 1 new bathroom. infill lightwell at (e) bathroom.Details
1/f: infill under sunroom under 10ft., new bedroom, offie, 2 new baths. relocate mech and laundry rooms. 2/f: remodel kitchen, bathroom & add 1 new bathroom. infill lightwell at (e) bathroom. | $180,000 |
| Mar 21, 2024 | Completed final sign-off Sep 2024 | 20 Lakeview Av | 1/f: construct new office, bedroom, bathroom with shower, and bar. no other work performed.Details
1/f: construct new office, bedroom, bathroom with shower, and bar. no other work performed. | $101,000 |
| Nov 13, 2023 | Completed final sign-off Jun 2024 | 1300 Stockton St | the project is the business entrance barrier remediation per compliance category two determination (abe 201910247386). request technical infeasibility to correct level change between sidewalk and entrance landing. request equivalent facilitation for non-compliant maneuvering space at entrance.Details
the project is the business entrance barrier remediation per compliance category two determination (abe 201910247386). request technical infeasibility to correct level change between sidewalk and entrance landing. request equivalent facilitation for non-compliant maneuvering space at entrance. | $5,800 |
| Sep 28, 2023 | Never finaled filed Sep 2023, never issued | 1149 Plymouth Av | build a bed room and a full bath room in lower floorDetails
build a bed room and a full bath room in lower floor | $35,000 |
| Jul 28, 2023 | Completed final sign-off Apr 2024 | 220 Lombard St | unit 523. replace kitchen counter tops- (e) cabinets, appliances to remain, replace shower door, replace vanity llights in bathroom, replace carpet.Details
unit 523. replace kitchen counter tops- (e) cabinets, appliances to remain, replace shower door, replace vanity llights in bathroom, replace carpet. | $20,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 20 Lakeview Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2023 | 20 Lakeview Av | remodel 1 kitchen and 1 bath in kind; upgrade elctrical service to 200amp and subpanelDetails
remodel 1 kitchen and 1 bath in kind; upgrade elctrical service to 200amp and subpanel | $13,000 |
| May 10, 2022 | Completed final sign-off Jan 2023 | 1550 42nd Av | interior remodel. remodel existing kitchen and add a new half bath. remodel existing bath at 2nd floor.Details
interior remodel. remodel existing kitchen and add a new half bath. remodel existing bath at 2nd floor. | $20,000 |
| May 20, 2021 | Completed final sign-off Jun 2022 | 6273 03rd St | residential: changing ground fl from vacant to 1 commercial unit & 1 residential unit. commercial part submitted via prop h (pa# 202104239276). this is for interior renovation of residential part. all work within envelope. no alteration to (e) structure/ foundation & exterior mass/ roofline.Details
residential: changing ground fl from vacant to 1 commercial unit & 1 residential unit. commercial part submitted via prop h (pa# 202104239276). this is for interior renovation of residential part. all work within envelope. no alteration to (e) structure/ foundation & exterior mass/ roofline. | $15,000 |
| Apr 23, 2021 | Completed final sign-off Jun 2022 | 6273 03rd St | ground floor change of use from vacant to commercial.Details
ground floor change of use from vacant to commercial. | $20,000 |
| Oct 27, 2020 | Completed final sign-off Jun 2021 | 5930 California St | unit #3: 3rd flr - remodel kitchen and bathroom. add 1 bedroom with eero window.Details
unit #3: 3rd flr - remodel kitchen and bathroom. add 1 bedroom with eero window. | $50,000 |
| Sep 19, 2020 | Completed final sign-off Jul 2024 | 143 Bridgeview Dr | comply w/ complaint #201994367, add unit ord 95-17, legalization of unit, install without permit, legalize kitchen, all work at ground floor.Details
comply w/ complaint #201994367, add unit ord 95-17, legalization of unit, install without permit, legalize kitchen, all work at ground floor. | $15,000 |
| Jun 15, 2020 | Completed final sign-off Aug 2020 | 205 07th Av | kitchen and bathroom remodel in kind. kitchen: new stove, sink , counter and range hood. bathroom: new bathtub, shower, toilet and sink. all work in kind.Details
kitchen and bathroom remodel in kind. kitchen: new stove, sink , counter and range hood. bathroom: new bathtub, shower, toilet and sink. all work in kind. | $29,000 |
| Jun 11, 2020 | Completed final sign-off Oct 2020 | 1275 California St | unit 4 remodel of (e) kitchen & bathroom in-kind. no structural work.Details
unit 4 remodel of (e) kitchen & bathroom in-kind. no structural work. | $37,000 |
| Mar 16, 2020 | Completed final sign-off Dec 2020 | 780 Lawton St | to comply with complaint 202023041: r/r 4in sewer pipe in rear.Details
to comply with complaint 202023041: r/r 4in sewer pipe in rear. | $8,000 |
| Feb 6, 2020 | Completed final sign-off Jun 2024 | 3401 Judah St | to comply with abe ord 51-16 abe 201910257421.business entrance barrier remdieation, replace entry door, install power door push button.Details
to comply with abe ord 51-16 abe 201910257421.business entrance barrier remdieation, replace entry door, install power door push button. | $3,000 |
| Sep 13, 2019 | Completed final sign-off Mar 2020 | 582 35th Av | remove existing siding in rear of building. install 1/2" cdx plywood (6" edge 10" field for nail) w/two coat stucco on top and one coat finish. rear stair repair as necessary (less than 50%).Details
remove existing siding in rear of building. install 1/2" cdx plywood (6" edge 10" field for nail) w/two coat stucco on top and one coat finish. rear stair repair as necessary (less than 50%). | $15,000 |
| Mar 15, 2018 | Completed final sign-off Apr 2018 | 1400 Mission St | replace countertop cabinet and flooringDetails
replace countertop cabinet and flooring | $10,561 |
| Dec 22, 2017 | Completed final sign-off Feb 2018 | 1532 Visitacion Av | stucco replace in front (in kind) approx 25x18Details
stucco replace in front (in kind) approx 25x18 | $6,000 |