Back to bathroom remodel contractors
Jin's Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Apr 2026
- Last 24 months
- 12 permits filed
32 permits since 2000: 27 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 13 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 12 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2026 | Completed final sign-off May 2026 | 1360 48th Av | upgrade kitchen and bath in-kind, change toilet and pantry and change counter top.Details
upgrade kitchen and bath in-kind, change toilet and pantry and change counter top. | $2,800 |
| Nov 7, 2025 | In progress issued Sep 2026 | 2469 18th Av | 3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood.Details
3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood. | $400,000 |
| Aug 28, 2025 | In progress issued Jan 2026 | 150 Westgate Dr | 1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair.Details
1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair. | $98,000 |
| Jul 23, 2025 | In progress issued Jul 2026 | 442 Wilde Av | converting (e) udu at lower lvl of bldg to adu. proposed adu consists of living/dining area, 1-bedroom, 1-bath and a kitchen that has been converted from a laundry. total adu area is 1,068 sqft.Details
converting (e) udu at lower lvl of bldg to adu. proposed adu consists of living/dining area, 1-bedroom, 1-bath and a kitchen that has been converted from a laundry. total adu area is 1,068 sqft. | $8,000 |
| Apr 28, 2025 | Completed final sign-off Jun 2025 | 5930 California St | unit# 3. replace bathroom vanity and toilet only, no other work in bathroom. change elec. subpanel box.Details
unit# 3. replace bathroom vanity and toilet only, no other work in bathroom. change elec. subpanel box. | $3,000 |
| Apr 24, 2025 | Expired or cancelled expired May 2026 | 1358 48th Av | to comply with complaint #: 202536514 - removing and replacing about 10 sq. ft. of drywall, patch and paint, replacing new kitchen cabinets and sink, changing new bathroom vanity and toilet.Details
to comply with complaint #: 202536514 - removing and replacing about 10 sq. ft. of drywall, patch and paint, replacing new kitchen cabinets and sink, changing new bathroom vanity and toilet. | $40,000 |
| Oct 24, 2024 | Completed final sign-off Feb 2026 | 2020 20th Av | 1st fl: add 1 office, bedroom, family & full bath. 2nd fl: remodel kitchen, bathroom, relocate 2 bedrooms, living & add 1 full bath. infill lightwell & bottom rearDetails
1st fl: add 1 office, bedroom, family & full bath. 2nd fl: remodel kitchen, bathroom, relocate 2 bedrooms, living & add 1 full bath. infill lightwell & bottom rear | $120,000 |
| Aug 23, 2024 | Completed final sign-off Dec 2025 | 1824 Ortega St | bathroom remodel in kind. replace kitchen skylight in kind. u-factor <0.30Details
bathroom remodel in kind. replace kitchen skylight in kind. u-factor <0.30 | $15,000 |
| Jul 17, 2024 | Completed final sign-off Nov 2025 | 1690 24th Av | 1/f: infill under sunroom under 10ft., new bedroom, offie, 2 new baths. relocate mech and laundry rooms. 2/f: remodel kitchen, bathroom & add 1 new bathroom. infill lightwell at (e) bathroom.Details
1/f: infill under sunroom under 10ft., new bedroom, offie, 2 new baths. relocate mech and laundry rooms. 2/f: remodel kitchen, bathroom & add 1 new bathroom. infill lightwell at (e) bathroom. | $180,000 |
| Mar 21, 2024 | Completed final sign-off Sep 2024 | 20 Lakeview Av | 1/f: construct new office, bedroom, bathroom with shower, and bar. no other work performed.Details
1/f: construct new office, bedroom, bathroom with shower, and bar. no other work performed. | $101,000 |
| Sep 28, 2023 | Never finaled filed Sep 2023, never issued | 1149 Plymouth Av | build a bed room and a full bath room in lower floorDetails
build a bed room and a full bath room in lower floor | $35,000 |
| Jul 28, 2023 | Completed final sign-off Apr 2024 | 220 Lombard St | unit 523. replace kitchen counter tops- (e) cabinets, appliances to remain, replace shower door, replace vanity llights in bathroom, replace carpet.Details
unit 523. replace kitchen counter tops- (e) cabinets, appliances to remain, replace shower door, replace vanity llights in bathroom, replace carpet. | $20,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 20 Lakeview Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2023 | 20 Lakeview Av | remodel 1 kitchen and 1 bath in kind; upgrade elctrical service to 200amp and subpanelDetails
remodel 1 kitchen and 1 bath in kind; upgrade elctrical service to 200amp and subpanel | $13,000 |
| May 10, 2022 | Completed final sign-off Jan 2023 | 1550 42nd Av | interior remodel. remodel existing kitchen and add a new half bath. remodel existing bath at 2nd floor.Details
interior remodel. remodel existing kitchen and add a new half bath. remodel existing bath at 2nd floor. | $20,000 |
| Oct 27, 2020 | Completed final sign-off Jun 2021 | 5930 California St | unit #3: 3rd flr - remodel kitchen and bathroom. add 1 bedroom with eero window.Details
unit #3: 3rd flr - remodel kitchen and bathroom. add 1 bedroom with eero window. | $50,000 |
| Jun 15, 2020 | Completed final sign-off Aug 2020 | 205 07th Av | kitchen and bathroom remodel in kind. kitchen: new stove, sink , counter and range hood. bathroom: new bathtub, shower, toilet and sink. all work in kind.Details
kitchen and bathroom remodel in kind. kitchen: new stove, sink , counter and range hood. bathroom: new bathtub, shower, toilet and sink. all work in kind. | $29,000 |
| Jun 11, 2020 | Completed final sign-off Oct 2020 | 1275 California St | unit 4 remodel of (e) kitchen & bathroom in-kind. no structural work.Details
unit 4 remodel of (e) kitchen & bathroom in-kind. no structural work. | $37,000 |