Jin's Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Apr 2026
- Last 24 months
- 12 permits filed
32 permits since 2000: 27 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 2 in progress. Typically 72 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2025 | In progress issued Sep 2026 | 2469 18th Av | 3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood.Details
3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood. | $400,000 |
| Aug 28, 2025 | In progress issued Jan 2026 | 150 Westgate Dr | 1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair.Details
1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair. | $98,000 |
| Oct 18, 2024 | Completed final sign-off Nov 2024 | 1886 39th Av | water/leak repair at stair landing.Details
water/leak repair at stair landing. | $2,000 |
| Sep 13, 2019 | Completed final sign-off Mar 2020 | 582 35th Av | remove existing siding in rear of building. install 1/2" cdx plywood (6" edge 10" field for nail) w/two coat stucco on top and one coat finish. rear stair repair as necessary (less than 50%).Details
remove existing siding in rear of building. install 1/2" cdx plywood (6" edge 10" field for nail) w/two coat stucco on top and one coat finish. rear stair repair as necessary (less than 50%). | $15,000 |